SPECIFICATIONS
US Army Corps of Engineers® Little Rock District SOLICITATION NO. W9127S-15-R-0010
REFUELING VEHICLE REPAIR SHOP
BUILDING 301
LRAFB JACKSONVILLE, ARKANSAS
VOLUME I – ISSUED FOR CONSTRUCTION
15 JUNE 2015
SPECIFICATIONS
US Army Corps of Engineers®
Little Rock District SOLICITATION NO. W9127S-15-R-0010
REFUELING VEHICLE REPAIR SHOP
BUILDING 301
LRAFB JACKSONVILLE, ARKANSAS
VOLUME I – ISSUED FOR CONSTRUCTION
15 JUNE 2015
SOLICITATION NO. W9127S16R6001
06 NOVEMBER 2015
This page was intentionally left blank.
Refueling Vehicle Repair Shop Building 301 Sol. No. W9127S-16-R-6001 Little Rock, AFB Volume I - Issued for Construction - 2015-11-06
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 50 FORMS AND ATTACHMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 17 00 CONTRACTOR SECURITY REQUIREMENTS
01 22 00.00 10 MEASUREMENT AND PAYMENT
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 29.00 20 SUSTAINABILITY REQUIREMENTS
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS)
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 20.00 10 ENVIRONMENTAL PROTECTION
01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL
01 62 35 RECYCLED/SALVAGED/RECOVERED/BIOBASED MATERIALS
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES
02 82 16.00 20 ENGINEERING CONTROL OF ASBESTOS CONTAINING MATERIALS
DIVISION 03 - CONCRETE
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00.00 10 CONCRETE ACCESSORIES
03 20 00.00 10 CONCRETE REINFORCING
03 30 00.00 10 CAST-IN-PLACE CONCRETE
03 35 00.00 10 CONCRETE FINISHING
03 39 00.00 10 CONCRETE CURING
DIVISION 04 - MASONRY
04 20 00 MASONRY
DIVISION 05 - METALS
05 05 23 WELDING, STRUCTURAL
05 12 00 STRUCTURAL STEEL
05 21 19 OPEN WEB STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 17 STAINED WOOD CABINETRY
06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS
06 64 00 PLASTIC PANELING (GLASS FIBER REINFORCED PLASTIC PANELING)
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
PROJECT TABLE OF CONTENTS Page 1
07 13 53 ELASTOMERIC SHEET WATERPROOFING
07 17 00 BENTONITE WATERPROOFING
07 19 00 WATER REPELLENTS
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 41 00 METAL SOFFIT PANELS
07 41 63 FABRICATED ROOF PANEL ASSEMBLIES
07 42 13 METAL WALL PANELS
07 42 63 FABRICATED WALL PANEL ASSEMBLIES
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 33 23 OVERHEAD COILING DOORS
08 36 13 SECTIONAL OVERHEAD DOORS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 13 CERAMIC TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 67 23.14 CHEMICAL RESISTIVE RESINOUS FLOORING
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 26 13 WALL AND CORNER GUARDS
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
DIVISION 12 - FURNISHINGS
12 21 00 WINDOW BLINDS
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 19 METAL BUILDING SYSTEMS
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
SECTION 01 00 50
FORMS AND ATTACHMENTS
03/12
PART 1 GENERAL
Listed below, and attached at the end of this section, are forms and attachments referred to in to other parts of the technical specifications.
1.1 SUBMITTAL REGISTER
See Section 01 33 00 SUBMITTAL PROCEDURES
1.2 TRANSMITTAL FORM (ENG FORM 4025-R)
See Section 01 33 00 SUBMITTAL PROCEDURES
1.3 ACTIVITY HAZARD ANALYSIS (AHA)
See Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
1.4 ACCIDENT INVESTIGATION REPORT (ENG FORM 3394)
See Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
1.5 SWL FORM 463
1.6 OSHA FORM 300 & 301
See Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
1.7 RMS-QCS MONTHLY INJURIES-ILLNESSES & EXPOSURE
See Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
1.8 SAFETY PERFORMANCE SIGN
See Section 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
1.9 PROJECT IDENTIFICATION SIGN
See Section 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
Not Used
-- End of Section --
SECTION 01 00 50 Page 1
SECTION 01 11 00
SUMMARY OF WORK
08/11
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Product Description
The new Refueling Vehicle Repair Shop will provide improved repair operations to refueling vehicles. Current refueling vehicle repair operations are conducted in B552. The primary space will be three open vehicle maintenance bays with associated repair support spaces (supervisor's office, entry/waiting, tool storage, flammable material storage, restrooms, etc.). The facility will accommodate four repair shop personnel and three driver personnel during typical operation. The new facility will be located in close proximity to the existing refueling operations at the southwest edge of the flight line (immediately east of the refueling wash rack). The vehicle repair bays are sized to allow substantial repair of three R-11 or R-12 refueling vehicles simultaneously, with extra room for temporary parts layout, tool accessibility, and circulation of personnel. Retractable overhead compressed air and electrical attachment points will be provided. An electrically operated, 3-ton bridge crane will be roof structure mounted and will operate over all three bays. A roof structure supported fall restraint system is included in each maintenance bay. Access to the repair bays on both sides will be via lockable overhead doors. The floor of the repair bays will be sloped inwardly to sufficiently provide secondary fuel containment. The building will be fully sprinklered and will be provided with fire alarm and mass notification systems. The base bid is an exterior metal wall panel.
(AM0001)Option 1 in this contract is the addition of an exterior masonry wainscot.
Option 2 in this contract is the addition of an in-ground oil change pit covered with an OSHA compliant sliding safety grate in one of the maintenance bays.
Demolition of the existing vehicle repair facility B552 is included as Option 3 in this contract.
1.1.2 Location
The work shall be located at the Little Rock Air Force Base, AR, approximately as indicated. The exact location will be shown by the Contracting Officer.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
Energy Star (1992; R 2006) Energy Star Energy Efficiency Labeling System
SECTION 01 11 00 Page 1
1.3 WORK RESCHEDULING
Normal duty hours for work shall be from 8:00 a.m. to 5:00 p.m., Monday through Friday. Requests for additional work shall require written approval from the Contracting Officer 7 days in advance of the proposed work period
1.4 PROJECT ENVIRONMENTAL GOALS
Contractor shall distribute copies of the Environmental Goals to each subcontractor and the Contracting Officer. The overall goal for design, construction, and operation is to produce a building that meets the functional program needs and incorporates the principles of sustainability. Specifically:
a. Preserve and restore the site ecosystem and biodiversity; avoid site degradation and erosion. Minimize offsite environmental impact.
b. Use the minimum amount of energy, water, and materials feasible to meet the design intent. Select energy and water efficient equipment and strategies.
c. Use environmentally preferable products and decrease toxicity level of materials used.
d. Use renewable energy and material resources.
e. Optimize operational performance (through commissioning efforts) in order to ensure energy efficient equipment operates as intended.
Consider the durability, maintainability, and flexibility of building systems.
f. Manage construction site and storage of materials to ensure no negative impact on the indoor environmental quality of the building.
g. Reduce construction waste through reuse, recycling, and supplier take-back.
1.4.1 Independent Verification
1.4.1.1 EPA Energy Performance Rating
Provide work consistent with drawings in order to meet Energy Star in accordance with design.
1.5 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.
SECTION 01 11 00 Page 2
1.6 ON-SITE PERMITS
1.6.1 Utility Outage Requests and Utility Connection Requests
Notify the Contracting Officer at least 72 hours prior to starting excavation work. Contractor is responsible for marking and verifying all utilities not marked.
The Contractor shall verify the elevations of existing piping, utilities, and any type of underground obstruction not indicated or specified to be removed, but indicated in locations to be transversed by piping, ducts, and other work to be installed. Work shall be scheduled to hold outages to a minimum.
1.7 LOCATION OF UNDERGROUND UTILITIES
1.7.1 Notification Prior to Excavation
Notify the Contracting Officer at least 15 days prior to starting excavation work.
1.8 SALVAGE MATERIAL AND EQUIPMENT
Items designated by the Contracting Officer to be salvaged shall remain the property of the Government.
The salvaged property shall be segregated, itemized, delivered, and off-loaded at the Government designated storage area.
Contractor shall maintain property control records for material or equipment designated as salvage. Contractor's system of property control may be used if approved by the Contracting Officer. Contractor shall be responsible for storage and protection of salvaged materials and equipment until disposition by the Contracting Officer.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
SECTION 01 11 00 Page 3
SECTION 01 14 00
WORK RESTRICTIONS
11/11
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 241 (2013) Standard for Safeguarding Construction,Alteration, and Demolition Operations
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
40 CFR 761 Polychlorinated Biphenyls (PCBs) Manufacturing, Processing, Distribution in Commerce, and Use Prohibitions
49 CFR 172 Hazardous Materials Table, Special Provisions, Hazardous Materials Communications, Emergency Response Information, and Training Requirements
1.2 WORK SCHEDULE
Little Rock Air Force Base normal duty hours are 0700 to 1600 all days of the week except Saturday, Sunday and Federal Holidays. The Contractor is solely responsible for determining the necessary work hours to complete this project within the contract construction time. The Contractor shall work extended shifts and weekends if required to complete this project on time. Digging permits and base utility outages will only be processed during normal hours (0730-1630 Monday-Friday, excluding Federal Holidays). Inspections, coordination meetings, training, performance testing, 3-phase inspection meetings, Tool Box safety meetings, concrete pre-placement inspections, etc. will be conducted between the hours of 0730 to 1600 hours Monday-Friday, excluding Federal Holidays. No work will be performed at any time other than normal work week without obtaining written approval of the Contracting Officer. (If weekend or evening work is required at least seven (7) calendar days due to utility outages or other requirements, such work shall be with prior approval of the Contracting Officer, and accomplished at no additional cost to the Government.) The requirement for advance notice and concurrence from the Contracting Officer is to permit our evaluating if we need to provide inspection for extended shifts. Our intent is to not limit the Contractors schedule, unless required by security, but instead to coordinate activities with the Corps and Air Force agencies. However, the contractor is advised that escorts and shop personnel may or may not be available on holidays, weekends, and Air Force down days, and certain activities such as utility outages, concrete placements, and coordination meetings may not be possible. This will not be cause for delay under the Contract. Other unaffected construction activities may proceed. A
SECTION 01 14 00 Page 1 tentative schedule of the Contractor's work and inspection activities for each week shall be prepared and faxed to the resident office no later than Monday morning of that week. It will identify any anticipated holiday or weekend work and request approval of any anticipated deviations in allowable working hours. The cost for extended shifts, weekend and holiday work is part of the base bid for this project and shall not result in additional costs to the Government. The Government is responsible for the costs for additional Government inspectors.
1.3 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER
a. This provision specifies the procedure for determination of time extensions for unusually severe weather in accordance with the contract clause entitled "Default (Fixed Price Construction)". In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:
(1) The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.
(2) The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor
b. The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities.
MONTHLY ANTICIPATED ADVERSE WEATHER DELAY
WORK DAYS BASED ON (5) DAY WORK WEEK
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
4 4 4 3 2 2 2 1 2 3 4 4
c. Throughout the contract the Contractor will record on the daily CQC report, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the Contractor's scheduled work day. The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day of each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated in paragraph b., above, the Contracting Officer will convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather work days, and issue a modification in accordance with the contract clause entitled "Default (Fixed Price Construction)".
SECTION 01 14 00 Page 2
1.4 UTILITIES
Existing electrical service to the facilities will be maintained until new electrical service is in place and ready for operation. Utility interruptions will be approved by the Contracting Officer. The Contractor shall submit a schedule outage/installation plan for all utility outages 30 days after notice to proceed. This plan will be reviewed by the Contracting Officer. The plan must be approved prior to implementing any work. The Contractor shall submit to the Contracting Officer a written request for such work at least three (3) weeks prior to the desired date.
Telecommunication lines will be impacted by the construction and related work must be phased to ensure continuous service. See below. Electrical, water, sewer, and gas systems shall not be interrupted without prior approval of the Contracting Officer. Any utility road crossings will be accomplished by boring under the road.
1.4.1 Outages
The Contractor shall obtain written permission or approval from the Contracting Officer for any utility outage. The outage request shall be submitted by the Contractor in accordance with the following and shall indicate the proposed work and length of outage.
1.4.2 Water, Sewer, and Gas
Water outages will be performed by Base Civil Engineering. At least three
(3) weeks written advance notice is required prior to shutting off water, sewer, or gas utilities. A service outage shall not exceed 4 hours unless otherwise approved by the Contracting Officer. Tapping of utilities without outages shall be accomplished where possible, and shall be in accordance with good commercial practice.
1.4.3 Electrical
At least three (3) weeks written advance notice is required prior to shutting off electrical utilities. Electrical primary power outages will be performed by 314th Civil Engineers Squadron. The outage shall not exceed 4 hours. "Hot" line work will not be allowed.
1.4.4 Postponement of Outages
The Government reserves the right to postpone for 7 days, any scheduled outages. There shall be no outages when the outside temperature is expected to be below 35 degrees F.
1.4.5 Turning Utilities On and Off
Government personnel shall perform all shutting off and turning on of valves and switches necessary to accomplish scheduled outage.
1.4.6 Telecommunications
The Contractor shall not disturb communication wiring to facilities. Where such facilities require removal of communication equipment and wiring to accomplish the work involved, the Contractor shall notify the Contracting Officer at least five (5) work days in advance of the requirement, for scheduling such removals by the Government. The Contractor shall allow for the accomplishment of such removals by the telephone company or communications personnel for the systems they service. If construction
SECTION 01 14 00 Page 3 activities damage any communication equipment or wiring, the Contractor shall restore services as soon as possible, but no later than 24-hours, and at no cost to the Government.
1.5 PROTECTION OF EXISTING FACILITIES
The Contractor shall conduct and schedule his work in a manner to cause as little disruption as possible to the existing facilities and operation.
1.6 STREET CLOSURES AND TRAFFIC SAFETY
Street closures for utility line crossings will not be permitted. Any street crossing shall use trenchless technologies.
1.7 MOWING
Grass and weedy vegetation within the areas utilized by the Contractor, including work areas, administrative areas, and storage areas, shall be kept mowed to control vegetative growth. Vegetation shall be mowed to a height of three inches when it reaches a height of six inches. Mowing shall be done with a rotary mower. Mowing shall be done during periods and in such a manner that the soil and grass will not be damaged. Areas adjacent to trees, shrubs, fences, buildings, etc. shall be hand trimmed.
The Government may, after notice to the Contractor and at the discretion of the Contracting Officer, mow the Contractor's areas at any time the vegetation height exceeds 6 inches and all costs incurred by the Government for performing such work will be deducted from the contract.
1.8 GOVERNMENT FURNISHED UTILITIES
Utilities will be furnished by the Government to the Contractor free of charge as provided in the CLAUSE: AVAILABILITY AND USE OF UTILITY SERVICES and as specified below. The Contractor shall carefully conserve any utilities furnished by the Government.
Government furnished electricity will be available from existing electrical utility service lines. The Contractor shall furnish and install all panels, circuit breakers, wiring, transformers and all other incidentals necessary to meet the needs of the equipment used in the work.
1.9 PORTABLE SANITARY FACILITIES
The Contractor shall provide portable sanitary facilities.
1.10 WORK AREA AND STORAGE AREA
The Contracting Officer will assign the Contractor's work and storage area.
1.11 TRASH DISPOSAL/CONSTRUCTION DEBRIS - LITTLE ROCK AIR FORCE BASE
Debris shall be removed from the Base promptly, and as feasible, all equipment and materials shall be removed or secured at the end of each day. The Contractor is responsible for the daily cleanup of all construction areas and construction debris that has escaped from the construction site.
The Contractor shall exercise caution in not disturbing adjacent facilities, finishes, materials, grounds and other items not a part of this project. The Contractor shall clean daily all areas outside the
SECTION 01 14 00 Page 4 project area of dirt, dust, and debris generated by this Contract.
The Contractor shall use designated haul routes for both delivery and removals. Haul routes are noted on the drawings.
All debris generated by the Contract shall be properly disposed of by the Contractor off the base. Removal of debris and other material shall be handled, transported, stored, and disposed of by the Contractor and his Subcontractors in accordance with all applicable federal, state or local laws, ordinances, regulations, court orders or other types of rules or rulings having the effect of laws. All hazardous waste shall be disposed of through DRMO. These restrictions shall apply both on and off base.
Contractor shall submit for approval the name and location of the proposed landfill site and types of material for which the site is certified. Contractor shall also submit with the regular progress reports, tickets showing yardage, tonnage dumped, and estimates by yds or lbs of each type of material dumped, i.e. 2.3 cubic yards of sheetrock, 1171 square yards of carpet, etc. This submittal is required before progress payments can be made and also applies to any disposal by subcontractors.
The Contractor is required to take all precautions to prevent spillage of materials from Contractor vehicles on base pavements. The Contractor shall provide adequate labor and equipment to keep paved areas free of debris, and to contain loose materials at all times. The Contractor shall direct all concrete washings, or slurries resulting from saw cutting activities that contain Portland cement to areas on the construction site where the sediments will be filtered out into the soil. Do not allow washings to enter the storm drain system or any water course. The Contractor shall coordinate with the Contracting Officer prior to any concrete truck arriving on Base to determine an appropriate wash out area. If concrete wash water cannot be directed to a suitable area on the construction site, it must be properly contained, collected and disposed of as construction debris. Excess concrete not used in construction activities shall not be dumped and must be removed and disposed of off Base. Spills of concrete, concrete wash water or chemicals used with exposed aggregate must be contained and cleaned up immediately to prevent the spill form entering any part of the storm sewer system.
1.12 SITE VISITATION
The Contractor is responsible to visit the project site prior to, and during, the course of design to verify existing conditions, actual sizes, and other requirements outlined in the other sections of the specifications. Notify the Contracting Officer of any conditions that are different than those shown in the contract documents.
1.13 BASE REGULATIONS
The Contractor shall conform to all base regulations and directives pertaining to security, safety, debris removal, fire, traffic and personnel clearances, insofar as they pertain to the Contractor's activities on Little Rock Air Force Base. Contractor shall ensure conformance by all of his employees. Security requirements are subject to change. The Contractor can expect to be questioned and to present identification proof each time accessing the base. Entry to the Base under elevated security levels is limited to the main entrance for contractors. Entry may take as much as 30 minutes or more. The
SECTION 01 14 00 Page 5
Contractor shall have a representative available on Base to receive all materials and equipment arriving on Base. The Contractor shall coordinate with Little Rock Air Force Base for security requirements. The Contractor shall directly escort deliveries. Delivery of concrete shall be closely coordinated to assure adequate inspectors and escorts are available.
1.14 BASE PASS
All Contractor personnel are required to present photo identification to receive a Base pass. A Base pass is required for vehicles parked on Base property (Security Regulation 840, MAOI 125-2, and AFR 125-17). Base passes are obtained as directed by the Corps of Engineer Little Rock Construction Resident Office and/or Base Security Police. Prior to the start of construction, a letter that identifies all Contractor personnel and indicates hours of operation shall be sent to the Base Security Police Office. All vehicles will be required to have current registration, insurance and state inspection.
1.15 MATERIAL SHIPMENTS
The Government will not receive material shipments for construction projects and the Contractor shall not ship materials to himself addressed in care of U.S. Army Corps of Engineers, Base Civil Engineer Squadron or the Base Contracting Office. Receiving and storage of all construction shipments is entirely the responsibility of the Contractor.
Shipments shall be addressed to the Contractor who shall be responsible for their receipt, unloading, handling, and storage at the site.
Government will not accept deliveries on behalf of the Contractor or his subcontractors or assume responsibility for security of materials, equipment, or supplies delivered to the site. Contractor shall protect and preserve materials, supplies, and equipment of every description (including property which may be Government furnished or owned) and work performed.
1.16 FIRE PROTECTION
The Contractor shall be responsible for conformance with base fire regulations and NFPA 241 , including Appendix A. These regulations are available for review during duty hours at the Base Fire Station located in Building 239. Fire extinguishers required during the construction period shall be furnished and maintained by the Contractor and removed by the Contractor upon acceptance of the facility by the Contracting Officer. No welding/cutting and open flame operation shall be allowed in facilities when automatic fire detection and suppression systems are out of service unless the Contractor posts a fire guard for 24 hours after welding/cutting and open flame operation or certifies the facility fire safe.
1.17 WELDING PERMIT
Prior to performing any welding, cutting or brazing, the Contractor must obtain a properly completed AF Form 592 (Burning Permit) from the Civil Engineering project inspector. A permit is needed per job, per day.
Contractor shall return all welding, cutting, or brazing permits to the Fire Department at the end of each week, as a minimum. The Contractor shall maintain a fully charged fire extinguisher on site at all times regardless as to whether or not welding, cutting, or brazing is being performed.
SECTION 01 14 00 Page 6
1.18 CONSTRUCTION PERMIT
A properly completed AF Form 103, Base Civil Engineering Work Clearance Request, will be obtained by the Contractor prior to his performing any excavation. A separate AF Form 103 is required for each excavation to be accomplished. Submit a request for AF Form 103 a minimum of 14 calendar days and a maximum of 28 days prior to desired start of excavation. The Contractor shall allow 14 calendar days for processing. Each request shall be in writing and designate the location of the proposed excavation and the scheduled date. The completed AF Form 103 will contain information for locating existing utilities and telephone lines. The Contractor will keep the AF Form 103 at the excavation site and will comply with instructions for hand excavation and with other methods of safeguarding the buried utilities. In addition to the requirement to obtain a construction permit and prior to any excavation, the Contractor shall perform a pipe/cable location survey using a variety of modern locating equipment suitable for locating various types of pipe and cable.
The Contractor shall use a signal generating locator such as a Goldak Gold Digger 4400 for metallic pipe and cable. For non-metallic pipe use a vibration generator such as a Fuji Tecom PL-130 or an RD-500. For non-metallic sewer pipe use a snake with attached generator. The Contractor shall mark all locations on the ground. The Contractor shall submit a sketch showing the found locations of utilities to the Contracting Officer for approval prior to beginning excavation. The Contracting Officer will provide available information as to the existence and location of known utilities with the approved construction permit.
The Contractor shall be responsible for repairing damage to utilities, whether known or unknown, due to any failure on his part to form a rigorous survey, and at no additional cost to the Government.
1.19 UNDERGROUND COMMUNICATIONS AND ELECTRICAL POWER CABLES
Digging within three feet of underground communication or electrical power cables shall be performed by hand until the cable is exposed. The Contracting Officer shall be notified 14 days prior to hand excavation. A base utilities representative will mark underground cable locations prior to excavation. Once the cable is exposed, mechanical excavation may be used if there is no chance of damaging the cable. Marking of utilities by the Base or its representatives does not relieve the Contractor of the responsibility to 1) perform its own rigorous survey and 2) repair damage caused to existing utilities at no additional cost to the government.
1.20 BURIED CABLES AND LINES
The Contractor shall notify the Contracting Officer or his representative one working day prior to digging or performing other earthwork, as required by the approved excavation permit. If the Contractor fails to provide notification, the Contractor shall be liable for any damages to any buried telephone cables or lines regardless of care exercised or drawings followed. The Government shall not grant time extensions nor pay additional costs incurred because of delays, unless the Contractor has properly notified the Government one working day in advance of the desired digging date.
1.21 CULTURAL RESOURCE MANAGEMENT
For the protection of cultural, historic and prehistoric resources, the Contractor must submit a signed certification that the selected land
SECTION 01 14 00 Page 7 borrow area is free of all materials of this type. This includes anything of an archeological nature as well as any Native American sites to include tribal burial ground. Section 106 of the National Historic Preservation Act requires all cultural resources to be taken into account for all federal actions or permits. The source for all fill material/top soil must be checked for cultural resources by an accepted professional archeologist, as determined necessary by the U.S. Army Corps of Engineers, prior to use in any project. U.S. Army Corps of Engineers, Little Rock District phone number is (501) 324-5752.
1.22 CRANE HEIGHT REQUIREMENTS
A permit will be required for crane heights exceeding 100 feet. The Contractor shall complete Form FAA 7460-1, Notice of Proposed Construction or Alteration and submit the Federal Aviation Administration (FAA), Corps of Engineers, and Little Rock Air Force Base for approval. Contractor shall submit Form FAA 7460-1 to the FAA 120 days prior to use. Failure to do so may result in delay due to FAA approval.
1.23 ELECTRICAL EQUIPMENT DISPOSAL
Oil filled transformers and medium voltage equipment that is removed shall be tested by the Contractor for polychlorinated biphenyls (PCB's) and disposed of through DRMO. The turn in procedure is as follows:
a. Oil filled transformers and other equipment containing insulating liquid must be tested for the presence of PCB's by the Contractor at the Contractor's expense.
b. Equipment cannot be leaking. All caps/covers etc. must be tight.
c. Contractor shall present the Hazardous Materials Office (HAZMO)/Centralized Accumulation Point (CAP) (Bldg. 1575, 501-987-5247) with analytical results and ORG shop code, KVA rating, serial number, manufacturer, date equipment was taken out of service and an estimate of the original cost of the equipment. HAZMO will send proper forms to DRMO and inform contractor to set up a turn-in appointment with DRMO.
d. The Contractor shall call DRMO in advance of delivering the equipment to DRMO for a turn-in appointment.
e. The contractor shall provide DRMO a copy of the complete analysis at the time of turn-in. Affix a single page of the analysis that reflects the PCB results for that particular piece of equipment to the side of the equipment.
f. The Contractor must package all equipment for long distance shipping securely to a pallet prior to transport to DRMO. Any equipment containing PCB's must be packaged separately.
g. Contractor shall deliver and unload equipment to DRMO site on base per scheduled appointment. There is no forklift support at DRMO.
h. Other reusable equipment can be turned in to DRMO at the same time as long as it is packaged separately.
SECTION 01 14 00 Page 8
1.24 CHLOROFLUOROCARBON (CFC) REFRIGERANTS
1.24.1 Restrictions, Precautions and Controls
The Contractor shall not vent or cause to be vented chlorofluorocarbon (CFC) and hydochlorofluorocarbon (HCFC) refrigerants (R-11, R-12, R-22, R-113, R-114, R-115, R-501, R-502, or any other mixtures containing CFCs) to the atmosphere during repair or maintenance work on the equipment covered by this Contract. The Contractor shall have available refrigerant recovery or reclaim equipment to perform the work. Contractor personnel who operate refrigerant reclaim or recycling equipment shall possess the necessary state and local certificates for operating that equipment.
Contractor shall be responsible for meeting all requirements, permitting the licensing and certification required by state or local ordinance to work on refrigeration systems. Replacement compressors and other replacement equipment used in repairing CFC-containing systems shall be compatible with CFC replacement refrigerants. If such would result in an increase in cost, the Contractor shall notify the Contracting Officer prior to replacement.
1.24.2 Demolition of Existing Systems
Refrigerant from existing systems to be demolished shall be removed, captured, and turned over to LRAFB.
1.25 FLUORESCENT BALLAST & LAMP DISPOSAL
a. All ballasts from demolished light fixtures shall be examined for markings, labels, etc. that identify the presence (or absence) of PCB's. If no identifying Non-PCB characteristics can be determined, the ballast shall be considered as being PCB ballast. It shall be containerized, processed through the Centralized Accumulation Point (CAP), and then turned in to the Little Rock Air Force DRMO office for PCB disposal. The ballasts that are clearly identifiable as Non-PCB may be recycled or disposed as solid wastes. The hours of the CAP office are 0700 to 1600, M-F, 987-8073. The contractor shall call DRMO in advance for a turn-in appointment @ 987-3715. The contractor shall not attempt to (1) turn-in PCB ballast without processing said items through the CAP and (2) deliver same to DRMO without an appointment.
b. Container: Contractor shall store all PCB ballasts in either new UN approved steel or plastic open head drums as specified in 49 CFR
178.504 and 509. All used and/or reconditioned containers are unacceptable. The steel or plastic drums may not exceed 55 gallons in size. The total weight of container and PCB ballasts must not exceed the inscribed manufacturer container weight specifications. Contractor may store PCB containers on-site up to one week (five days), at which time the container shall be turned in to DRMO. The Contractor may turn in PCB containers at a more frequent rate, e.g., daily, etc., if so desired. PCB containers shall be stored within the confines of the immediate project site. The PCB containers shall not be exposed to the elements, placed in the open, nor allowed to collect rainwater. When not in use, each PCB container shall be covered with its appropriate lid. Contractor shall label each container as specified in 40 CFR 761 and 49 CFR 172 .101. The number of PCB ballasts in each container shall be provided to the contract inspector prior to turn in to DRMO.
c. Detached light fixtures that are clearly identified as having non-PCB ballasts shall be placed in government supplied dumpster's which will
SECTION 01 14 00 Page 9 be picked up, on site, by the Base Recycling Center.
d. The contractors shall be responsible for all QA/QC functions required in segregating PCB ballasts from non-PCB ballasts. The CAP will not perform any inspection, segregation, or identification of said ballast for the contractor. The contractor is fiscally responsible for any improper disposal of PCB ballasts. The Arkansas Department of Environmental Quality shall be notified should any contractor be found violating any State or Federal regulations on PCB ballast disposal.
e. Fluorescent lamps shall be packaged, processed through the CAP, and then delivered to DRMO. Contractor shall store fluorescent tubes in their original container (if available) or an appropriately sized cardboard box. In the event a cardboard box is used, each tube shall be protected from breakage by using appropriate egg crate or bubble-wrap packing.
1.26 ELECTRICAL EQUIPMENT DISPOSAL
Oil filled transformers and medium voltage equipment that is removed shall be tested by the Contractor for PCB's and disposed of through DRMO. The turn in procedure is as follows:
a. Oil filled transformers must be tested for the presence of PCB's by the Contractor.
b. Contractor shall present HAZMO/CAP (Bldg. 350, Rm. 18, 501-987-5247) with analytical results and ORG shop code, KVA rating, serial number, manufacturer, date transformer was taken out of service and an estimate of the original cost of the transformer. HAZMO will send proper forms to DRMO and inform contractor to set up a turn-in appointment with DRMO.
c. The Contractor shall call DRMO in advance of delivering the transformers to DRMO for a turn-in appointment @ 501-987-3715.
d. The Contractor must package all transformers for long distance shipping. Any transformers containing PCB's must be packaged separately.
e. Contractor shall deliver transformer(s) to DRMO site on base per scheduled appointment.
f. Other reusable equipment can be turned in to DRMO at the same time as long as it is not packaged together with the transformers.
1.27 SAFETY REGULATIONS
The Contractor shall comply with all Base, OSHA, and EPA safety regulations.
1.28 OPERATION AND MAINTENANCE INSTRUCTIONS, SPARE PARTS LISTS, SPARE
PARTS, SPECIAL TOOLS, INVENTORIES OF INSTALLED PROPERTIES AND TRAINING OF
OPERATING AND SERVICE PERSONNEL
The Contractor shall be responsible for the preparation, coordination, execution and submittal of six copies of all operation and maintenance instructions, training of operating and service personnel, spare parts lists, special tools, and inventories of installed properties furnished
SECTION 01 14 00 Page 10 under this contract. The equipment manuals, maintenance instructions, and training shall be for all system installations provided in this contract, including those technical provision sections that do not have specific O&M or training requirements, and shall be in sufficient detail to facilitate normal maintenance and troubleshooting by persons with minimum experience with the installed equipment.
1.28.1 Submittal Requirements
All systems of these specifications shall be submitted to the Contracting Officer for approval with the equipment or systems shop drawings. Failure to submit this information will result in disapproval and return of the shop drawings. After approval, all equipment or systems instructions, parts lists, test reports and other similar data shall be assembled in binders in the number of copies specified and in the order specified or directed by the Contracting Officer. Approved operation and maintenance instructions shall be provided 30 days prior to scheduling training of operating and service personnel. The Contractor shall coordinate the content of each instruction period required in the Technical Provisions of these specifications (if an instruction period is not included in the specification, a minimum of two hours shall be required) with the Contracting Officer's representative prior to the actual start of the training period. The Contractor shall record (in DVD format) all instructional training utilizing color video equipment. DVD's shall be submitted in two copies to the Contracting Officer prior to acceptance of the facility.
1.28.2 Operation and Maintenance Manuals and As-Built Drawings
Reference Contract Clause DFARS 52.227-7030, TECHNICAL DATA--WITHHOLDING
OF PAYMENT.
Operation and Maintenance Manuals will be prepared and delivered for review and acceptance by the Contracting Officer prior to the final prove out, testing and training for each system, to be described within the Operation and Maintenance Manuals.
As allowed by the referenced clause, the Contracting Officer may, until such data is accepted by the Government, withhold payment to the Contractor of 1% of the total contract price for the Operation and Maintenance Manuals and 0.5% of the total contract for the As-Built Drawings.
The percentage of the contract for the Operation and Maintenance Manuals and the As-Built Drawings will be shown on the Contractor's Progress Schedule or Network Analysis Schedule as applicable.
1.28.3 Non-Acceptance Actions
The Government may take possession of any completed or partially completed work, as provided for under the CLAUSE: USE AND POSSESSION PRIOR TO COMPLETION. If the installed equipment and/or systems thereto, have not been accepted by the Government due to the Contractor's failure to submit the above specified items, the Contractor shall operate and maintain such plant or system at no additional cost to the Government until such time that the specified items have been received, approved and any subsequent testing, check out and/or training has been completed.
SECTION 01 14 00 Page 11
1.28.4 Work Completion and Close Out Plan (Military Construction)
a. No less than sixty days in advance of the request for a pre-final inspection, the contractor shall prepare and submit a Work Completion and Close Out Plan comprehensive plan and schedule for the completion of all contract close out activities and requirements necessary to assure work completion and acceptance. Preparation of the plan shall be coordinated with the Red Zone Meeting described in Section 01451 - Contractor Quality Control. The plan shall be organized to address the following minimum requirements:
(1) Final Testing Plan. The contractor shall conduct a thorough review of the Technical Provision Sections and Drawings to identify all required testing to be performed either by specific reference in the Contract, or if not defined, an operations test to demonstrate proper operation and function. Each test shall identify Specification Section and paragraph number, drawing number or other identifier, and the person or unit responsible for conducting the test. Pre-requisites for the each test shall be identified. For example: 1) the test & balance for the HVAC system has to be completed prior to the final functional test; 2) preliminary fire alarm system test has to be completed by the contractor prior to scheduling the final performance test for witness by the Fire Department. A minimum of ten days written notice shall be provided, individually, for each preliminary and final performance testing activity. All testing shall be completed prior to training and work completion.
(2) Training Plan. Training shall be provided for each and every operating system installed in the project. Specific training requirements are identified in the various Technical Provision Sections. Training or demonstration, as applicable, shall also be provided for systems where specific training requirements were not stated. The contractor shall prepare a list of training sessions required to meet these requirements. Each session may cover more than one system in the case where multiple systems operate together, overlap, or are otherwise related to one another. In identifying the sessions, consideration shall be given to the user shops organization and every effort shall be made to correlate sessions to the shops that will need the training. For example:
training combined into a single session should be targeted to a specific shop or group of shops. Typical military installation shop organizations include: alarm shop, fire department, plumbing shop, HVAC shop, controls/EMCS shops, exterior electrical shop, and electrical shop. Pre-requisites for training are completion of functional testing, approval and availability of O&Ms, and submission of a training outline. The one-year warranty of construction shall not start on any system that training has not been completed. All training sessions shall be recorded by the contractor in DVD format with two copies of the training DVD's turned over to the Contracting Officer. A minimum of ten days written notice shall be provided for each training session. A training outline shall accompany the written notice of each training session. The Government reserves the right to one week notice of any revisions in the training schedule by the contractor. Unless otherwise approved by the Contracting Officer, all training shall be scheduled on Tuesdays through Thursdays (Government holidays excluded). All training shall be accomplished prior to work completion and start of the one-year
SECTION 01 14 00 Page 12 construction warranty. In the event that the Government agrees to carry a training session past beneficial occupancy, or the contractor is unable to complete the training, the one-year warranty of construction on the associated system or work will not begin until training for the item has been completed.
(3) Operations & Maintenance Manuals. O&M Manual requirements are outlined in each respective specification section. In addition, the contractor shall review the drawings and note any requirements, stated thereon, and prepare a list of all O&M Manuals. The O&M Manuals for the various technical provision sections shall be consolidated by systems into bound manuals.
Typical systems are HVAC system, plumbing systems, electrical systems, architectural items (i.e. motorized video screens, overhead door, door hardware, etc.), fire suppression system and fire alarm system. O&M Manuals shall be submitted and approved prior to scheduling training for any specific system. The contractor is encouraged to initially submit, as early as possible, a single copy of O&M Manuals for review and comment.
After obtaining approval of the initial copy, prepare the required number of copies for turnover to the Contracting Officer. Each bounded O&M systems manual shall: 1) be organized by section and equipment, 2) be indexed, 3) include a table of contents in the front, 4) be edited and highlighted for specific equipment installed, and 5) contain a spare parts list.
(4) Warranties. In addition to the standard one-year construction warranty, the contractor shall obtain all required special warranties and standard manufacture warranties greater than one year, and turn them over to the Government. A list of all special warranties shall be prepared.
(5) Keys, Spare Parts and Materials. A review of each Technical Provisions Section shall be made and all spare parts and spare materials identified for turnover listed. Examples are electrical box keys, fire alarm panel/pull station keys, padlock keys, spare floor tile, carpet, ceiling tile, wall covering, sprinkler heads, fuses, generator and compressor filters, and HVAC filters.
(6) Submittals. The CQCM shall conduct a review of all outstanding submittal items and identify submittals that are proposed for deletion as non-applicable, and all submittals that are overdue or remaining. The organization responsible for assembling the outstanding submittals shall be identified as part of the list. A due date for submission shall be assigned. As part of the review the CQCM will highlight any specific submittals that are a pre-requisite to testing or training and cross-index them.
(7) As-Built Drawings. The preliminary as-built drawings are due at the time of the Pre-final Inspection and shall be included in the Close Out Plan. All amendments, RFIs and modifications shall have been incorporated.
b. The plan shall be in a form that enables identifying the party directly responsible (prime contractor, subcontractor, supplier, Government, etc.) for each action, submittal or activity identified.
The plan shall be listed as a submittal in the submittal register and the close out processes or testing, training, notifications, and inspections shall be reflected in the contractor's schedule.
SECTION 01 14 00 Page 13
c. The plan shall include a simplified flow chart schedule or arrow diagram reflecting all training, testing, notices, inspections, and submittals, showing the interdependency of the activities and…