Lost Steel Summary.xls

XLS spreadsheet 23 KB Posted

Attached to
Clearwater Dam Major Rehab Phase II Cutoff Wall, Piedmont, Missouri
Solicitation number
W9127S-08-R-0002
Issued by

About this file

Lost Steel Summary

View the file

Other files

File Type Posted
08-R-0002 0008.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Holes Where Steel Was Left In Place or Encountered
Holes with steel that require overburden redrilling:
AS70Left two 3-meter sections of steel casing and three 3-meter augers in hole from 82.8' to 112.8'
Holes with steel that DO NOT require redrilling:
AP177Steel casing from above ground surface to 142.9'
AP182Left nine 3-meter sections (i.e., about 89') of steel casing in hole, somewhere between 0'-150.9'
AP184Steel casing from above top of slab to 147.8'
AP197Left eleven 3-meter sections (i.e., about 108') of steel casing in hole, somewhere between 0'-147.8'
AS201Steel casing from above top of slab to 137.9'
BS161Left thirteen 3-meter sections (i.e., about 128') of steel casing in hole, somewhere between 0'-144.2'
Holes with steel that have been redrilled:
AS62Steel casing from above top of slab to 103.3', three augers, and fishing tool left in hole
AP77Steel casing from below top of slab to about 26.2'
AP87Steel casing from 0' to 78.8', PVC installed, lost one auger in hole when attempting to redrill through PVC
AS180Steel casing from 65' to 134' (seven 3-meter sections), offset 1.5' ahead station (A.S.), and re-drilled
AP193aSteel casing from 11' to 100', tremie backfilled to surface, offset 1.5' A.S., and re-drilled
AP193Steel casing from above top of slab to 147.4' (re-drill location)
BS118Steel auger stuck in hole from 60' to 110', offset 1.5' back station, and re-drilled
Miscellaneous:
AS4Packer lost in hole at about 79', offset 1.5' A.S., and re-drilled (AS4A)
BP11Steel drill rods and HQ3 core barrel from Boyles rig grouted in place from above top of slab to 185', inside PVC
BS199Steel casing (up to 3" long) from previous drilling operation by others encountered at about 138'
Notes:
Steel casing installed by ACT is 4.5" diameter.
List is up-to-date as on 07/15/08.

Sheet2 Drilling Issues

Sheet3