Memphis District Industry Day Presentation Summary

This document is an industry briefing presentation for the Memphis District of the U.S. Army Corps of Engineers, presented by Colonel John L. Morrow on April 21-22, 2026. The presentation outlines the district's FY2025 accomplishments and FY2026 planned construction awards and project opportunities across multiple program areas. In FY2025, the Memphis District achieved 28 construction completions with 19 new construction contracts, obligated $198 million, and executed 393 contracting actions valued at $136 million. The district realized 92% of HQUSACE milestones and 94% of actualized milestones overall.

The FY2026 program anticipates 20 contract awards with 31 project completions across over 140 separate projects totaling $1.031 billion in funding. Project funding sources include $117 million for regular programs with community directed funding, $127 million for disaster relief supplemental acts, and $766 million from the Bipartisan Infrastructure Law. Major project categories include levee and channel work (3 contract awards, 8 completions; $1-$25 million ranges), floodwall and culvert replacement (1 award, estimated $5-$10 million), harbor and river work (10 awards, 12 completions; $5-$10 million ranges), and miscellaneous projects including vessel construction and Coast Guard homeport facilities (estimated $5-$50 million ranges). Anticipated advertisements span from the third quarter of FY2026 through FY2027. Points of contact for operations, engineering and construction, contracting, small business programs, and regulatory matters are provided.

View the file

Other files

File Type Posted
CORRECT_2026ArkansasRegionalIndustryDayForum.xlsx XLSX spreadsheet
5_DOD Subcontracting Plan Checklist 7.16.pdf PDF
Master Slide Deck.pptx PPTX presentation
Arkansas Regional Industry Forum 2026 - Tentative Agenda 21-22 Apr.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1Col. John Morrow Commander Memphis District April 21 & 22 2026

MEMPHIS DISTRICT

INDUSTRY DAY

2CUI

CUI

28 Construction Completions 19 New Construction Contracts

$198M FY2025 Obligations HQUSACE Milestones 95/103 – 92%

Actualized 292/312 Milestones - 94 % Scheduled Obligations – 152%

Contracting Actions – 393 / $136M Project Agreements – 3

Hatchie-Loosahatchie – PDT of Year Contract Manhours: 204,565

SFB-M: Belle Fountain

CAP 107: Osceola Harbor

SFB-M: DD17 Pump Station

April 2025 Flood Dredge Hurley MRL-M: Levee Slides RCI: Greenbelt PPA

PIANC 2025

SFB-C: 15 Mile Bayou

Grand Prairie: Electrical Substation

MRL-C: Caruthersville Floodwall

O&M: Harbor Dredging

Low Water Press Conference

MRC Hearings

3FY 26 SCHEDULED CONSTRUCTION AWARDS

20 AWARDS - 31 COMPLETIONS

2026 Program

Regular Program (with Community Directed Funding)

FY26 Workplan

Disaster Relief Supplemental Act Multiple Year Funding – 11 Projects

Bipartisan Infrastructure Law Multiple Year Funding – 20 Projects

Disaster Relief Supplemental Act Multiple Year Funding – New Orleans to Venice

$127 Million

$21 Million

$117 Million Over 140 Separate Projects

$TBD

$766 Million Regular Supplemental

42026 WHAT TO EXPECT BY PROGRAM

20 AWARDS - 31 COMPLETIONS

HARBOR DREDGINGST FRANCIS BASIN

CHANNEL IMPROVEMENT / WORK FOR OTHERS GROUNDWATER SUSTAINABILITY

MISSISSIPPI RIVER LEVEES

5LEVEE & CHANNEL WORK

Project Location Anticipated Advertisement Estimated Range

Belle Fountain Ditch Phase 2 St Francis Basin 4th Quarter $1M to $5M Bayou Meto Phase 4 Check Structure De Valls Bluff, AR FY27 $10M to $25M

Ditch 15 and Bypass St Francis Basin FY27 $5M to $10M Ditch 15 Diversion St Francis Basin FY27 $1M to $5M

Ditch 19 Channel Cleanout

Belle Fountain Ditch Cleanout

Big Slough

FLOODWALL & CULVERT REPLACEMENT

Caruthersville Floodwall

Project Location Anticipated Advertisement Estimated Range St Francis Town Levee & Culvert St Francis, AR FY27 $5M to $10M

HARBOR & RIVER WORK

Sycamore Chute Dikes

Stone Repairs

Wolf River Harbor Dredging

Project Location Anticipated Advertisement Estimated Range FY26 Harbor Dredging (Existing SATOC) Varies 3rd Quarter $5M to $10M

FY26 Fritz Revetment Stone (Existing SATOC) Varies 3rd Quarter $5M to $10M FY27 Harbor Dredging (Future SATOC) Varies FY27 $5M to $10M

MISCELLANEOUS

Huxtable Engine Rebuild

NSWC

Ram Lab

Project Location Anticipated Advertisement Estimated Range EEY Stringout Memphis, TN 3rd Quarter $25M to $50M

Armor 1 Mooring Barge Vicksburg, MS 3rd Quarter $25M to $50M Stormrider Vertical Construction Memphis, TN FY27 $5M to $10M

USCG Memphis WCC Homeport Upland Memphis, TN FY27 $5M to $10M USCG Memphis WCC Homeport Shoreside Memphis, TN FY27 $15M to $25M

POINTS OF CONTACT

Operations Division Andrea Williams

(901) 299-1414

Regulatory Branch Roger Allan

(901) 544-3682

Small Business Programs Kelsey Daniels

(314) 331-8181

Contracting Division Priscilla G. Sweeney

(901) 834-9204

Memphis District Commander Colonel John L. Morrow

Deputy District Engineer for Programs and Project Management

Derrick Smith

(901) 413-1867

Engineering & Construction Division

Shane Callahan

(901) 834-8361

Construction Branch Samantha Harper

(901) 828-0562

On the Web www.mvm.usace.army.mil On Social Media http://www.mvm.usace.army.mil/

MEMPHIS DISTRICT
Slide Number 2
FY 26 Scheduled Construction Awards�20 Awards - 31 Completions
2026 what to expect by Program�20 Awards - 31 Completions
Slide Number 5
Slide Number 6
Slide Number 7
Slide Number 8
Slide Number 9

File details come from the government source that posted it. Updated .