This is a Question and Answers document for the Building 1450 A/V Project solicitation, providing clarifications on project scope, equipment specifications, and installation requirements for the 154th RTI – 5th MBTS facility located at Camp Shelby, Mississippi.

The project encompasses four CLINs: CLIN 0001 covers classroom installation (Rooms 120, 113, 124) with 10 displays (98-inch), interactive touchscreens on mobile carts, lecterns, control processors, audio DSPs, document cameras, amplifiers, and AV switchers for Rooms 120 and 113 only, as Room 124 serves as a student breakroom requiring only TV mounting; CLIN 0002 addresses digital signage displays for 11 offices compatible with LG SuperSign content management system; CLIN 0003 covers Conference Room 117 with two displays, conferencing bar with USB extension to conference table, distribution amplifier, and network switch; CLIN 0004 covers six breakout rooms with 24 RGB DMX-controlled fixtures mounted from truss, fog machines mounted on catwalks, separate DMX lighting consoles, AV-over-IP streaming encoders for recording, control systems, and audio DSPs. The document clarifies that BAA (Buy American Act) applies rather than TAA compliance, floor plans and blueprints are available, all government-furnished equipment will be on-site at installation, and the 30-day completion timeline is flexible to accommodate standard procurement and delivery lead times. Installation will occur at Building 1450, 14th Street, Camp Shelby, MS 39407, with power and data already in place at display and rack locations, free-air cable routing permitted above ceilings, and separate AV networks required from building LAN. Key specifications include wireless touch panels with camera and NFC capabilities requiring ITAS waivers, Crestron or AMX control systems acceptable, JITC certification required, and contractor flexibility on DSP and control processor brands provided specifications meet SOW intent. The document confirms no progress payments are allowed and no UPS backup power is required.

View the file

Other files

File Type Posted
BLDG 1450 AV Remodel.pptx PPTX presentation
Statement of Work 1450 - Revised 27 MAR.pdf PDF
W9127Q-26-Q-A003 CLAUSES and PROVISIONS.pdf PDF
Statement of Work 1450 - Revised 18 MAR.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question and Answers

(BLDG 1450 A/V Project)

Would the Government be able to provide any available floor plans, room layouts, or as-built drawings for Building 1450 (classrooms, conference room, offices, and breakout rooms)? Yes, see amended SOW

Access to this information would assist in developing a more accurate estimate for installation labor, cabling routes, mounting requirements, and overall system integration.

Are floor plans or layout drawings (PDF/DWG) available for Building 1450? A blueprints has been attached to the solicitation

Will floor coring or dedicated cable pathways be required, and is there a designated AV rack location? No

Is there any existing AV equipment that will need to be decommissioned or removed? No, New construction.

Are TAA-compliant products required for this procurement? NO, BAA applies

Can you confirm that video conferencing requirements are limited to the conference room (USB camera) and document cameras in classrooms, with no additional camera requirements in other spaces? Video conferencing in conference room only

IT/Network Access: Will the IT point of contact be on-site to assist with the managed switch, VLAN configuration, and installation? IT support will be available upon request

Breakout Room DMX: Will the breakout room automation controllers drive DMX directly for each room, or do we need to provide a separate DMX lighting console or node? Need separate DMX lighting console or node

AV-over-IP Destination: Will there be a central recording server, monitoring station, and instructor control room? Or will each room require its own dedicated rack space setup?

Each room will need dedicated setup

GFE Readiness: Will all government-furnished equipment be on-site and available on the day of installation? Or will that be provided at some point during the 30 day installation?

Yes, will be on site the day of installation

Fog Machine Drain/Ventilation: Have the HVAC and fire suppression systems been evaluated for compatibility with water-based haze and fog machines operating in enclosed training spaces? Yes

TAA compliance - does this apply to all products? If so, it may render the GFE OPS3 computer for 5863RK unusable if the 5863RK cannot be included in this project.NO, BAA applies

Please define the total number of displays in CLIN 0001, what input source(s) needed in room 3, 10 displays (4 mounted to RM 120 walls, 4 mounted to RM 113 walls, 2 mounted to RM 124) Input source will be laptop via HDMI

Ability to move lectern in room 1 &2? Speaker cables, control cables, signal in and out cables will all need to be connected to the lectern, making it difficult to provide more than one location for this. No, each room needs stand only equipment

CLIN 0001 - Define number and size of requested displays and source needed SOW CLIN 0001 Item 1

CLIN 0003 - Will there be a need for overhead speakers or can we use the display speakers? SOW CLIN 0003 Item 5

0003 - Please define quantity of displays and size requested. SOW CLIN 0003 Item 1

0003 - Will an auto framing camera be sufficient? Yes

0003 - Will there need to be a control system or can we turn on displays with remotes?

Control system is needed

0004 - Can we provide one system controller for all 6 rooms, or stay with 6 separate control systems? 6 separate control systems

0004 - How many audio sources will you need for these rooms? 6

On the RFP, you state delivery of all hardware AND Installation of all hardware including programming within 30 days from bid award. Is this correct? 30 days to provide, install, and program the systems? No

In each of the conference and training rooms, is there already power and Data in-place for/at the new display and rack locations? Yes

Can you please provide part numbers for the item listed in your SOW? In the Statement of Work 1450, it states that “The Contractor/Offeror shall ensure all commercial grade A/V equipment is on ground with appropriate installation labor to install said equipment with a target completion date of no later than 30 days after award of contract.” Based on our experience, procurement timelines for this type of equipment can often exceed 30 days.

Could you please clarify whether this timeline is flexible to accommodate standard procurement and delivery lead times? This timeline can be flexible only to accommodate standard procurement and delivery lead time

What is ceiling height and material (hard lid, drop tile)? Height varies with drop tiles in classrooms, conference room, and break room

Regarding the 24 RGB DMX controlled fixtures, is Unistrut an acceptable mounting option or would you like more of a studio type solution with pipe? Or triangle truss, boxes truss, etc? The ppt doc may have some info related to this but the text is unreadable. The RGB DMX fixtures will be mounted from truss above each breakout room, dropped down to the top of the walls

Can all 4 fixtures be mounted to 1 strut/pipe/truss? Or how many separate mounting points are needed? 6 for each breakout room

Does fog machine need to be strut/pipe/truss mounted or can it be on the floor? Mounted on the catwalk above the breakout room

I do not see a DMX controller listed, is the intent to control lights and fogger with the touch panel/control system? If so, how many scenes or presets will be needed? SOW CLIN 0004 Item 1

Do RDB lights and fogger need to be TAA compliant? No, BAA applies

What are the desired sources for:

Classrooms 1-3 Laptop provided by the RTI

Offices 1-11 Laptop provided by the RTI

Conference Room Laptop provided by the RTI

In the Breakout rooms, what are the IP encoders encoding? Local Laptop? Where does that signal need to be decoded? Or is it just recorded? SOW CLIN 0004 Item 9 & 14

Is JITC a requirement? Yes

How many sources per classroom? Is the document camera being used as a source or as an extension of a local PC (USB)? One Instructor laptop per classroom (local PC).

Document camera needs to be used as a source as well

The requested touch panels have built in cameras, speakers, mics, and NFC readers. This is normally a No-Go in government facilities. Is this required? If so, what will be the function of the built-in hardware? Some items required ITAS waivers, those items with be covered under waivers.

Nothing stated about TAA equipment. Is this a requirement? Yes

The specification calls for a touch panel that has integrated camera and NFC capabilities, are these required for the control panel? See revised SOW 27MAR26

Is a touch panel without camera and NFC capabilities acceptable? No

Is a wired or wireless touch panel required? Wireless

Is a Crestron Control processor acceptable for control integration? Yes

CLIN 0001 item 14 calls for 2 4K switchers, how many inputs and outputs are required?

One to each display (4) in each classroom

How many HDMI and USB C inputs are required respectively? Approximately 30

CLIN 0002 item 1 calls for a display compatible with the organization’s content management, what content management is utilized by the organization? LG SuperSign display for course information

Section 2, Project Goals: This section calls out Digital Signage in Classrooms, but the rest of the document doesn't reference Digital Signage for these spaces. Confirm this is the only location digital signage is planned per CLINS 0001 #1. See revised SOW for layout of location for digital signage

Objective 1.1 calls out "wireless video/audio extenders", but nothing like this is called out in the Materials section. OBJ 1.1 is the installation of 10 98” Displays and required equipment for each call room (4 for RM 120, 4 for RM 113, 2 for RM 124)

Goal 2: This section calls out the "RTI Conference Room", but that name doesn't appear elsewhere. Is this what's referenced under "CLIN 003 - Building 1450, Conference Room 117"? Yes

CLIN 0001 - Building 1450, Medical Battalion Training Site (Rooms 120, 113, 124)

Item #2 - 86" interactive touchscreen - Will these be integrated into the installed systems in these rooms, or will these be fully standalone? If integrated, what is the intent in terms of AV connectivity? 2 (mounted on mobile carts to be placed in classroom 120 and 113)

Item #5 - Lectern - Are there any requirements or preferences beyond those listed here? Material, color, top, power / AV connectivity, etc.? No

Item #5 - Lectern - A quantity of (2) is shown, but this section covers (3) rooms. Is this quantity accurate? If so, which rooms require Lecterns? RM 120 and RM 113

Items #6 and #7 - Control Processor and Touchpanel - Is there a preferred platform? The specification could describe AMX or Crestron. No preferred platform.

Items #6 and #7 - A quantity of (2) is shown, but this section covers (3) rooms. Is this quantity accurate? If so, which rooms require control systems? RM 120 and RM 113

Item #8 - HDBaseT Receiver - A quantity of (8) is shown, but there are (10) wall-mounted displays in these spaces (plus 2 cart-mounted touch displays). Is this quantity correct? If so, what is the intent for AV connectivity for the remaining displays? Items for RM 120 and

RM 113

Item #9 - Audio DSP - This spec seems to specifically call out a BSS BSSBLU100M. Is this a requirement or strong preference, or is another similar DSP (for example, Biamp or Q-SYS) acceptable? As long as the spec meets the intent for the SOW

Item #9 - Audio DSP - A quantity of (2) is shown, but this section covers (3) rooms. Is this quantity accurate? If so, which rooms require Audio DSPs? RM 120 and RM 113

Item #10 - Document Camera - What is the intended location of this item relative to the head-end in the lectern? See SOW revised 27MAR26 for location of equipment

Item #10 - Document Camera - what rooms require Document Cameras? RM 120 and RM

Item #12 - Amplifiers - A quantity of (2) is shown, but this section covers (3) rooms. Is this quantity accurate? If so, which rooms require Amplifiers? RM 120 and RM 113

Item #13 - AV Switcher - This document does not call out any sources beyond the Document Camera. What is the total quantity and format of sources? 2

Item #13 - AV Switcher - HDBaseT output is noted. Is an HDBaseT output per display required? How many (if any) outputs are required for the displays on carts? 2 AV Switcher (one for each classroom) 8 Displays (4 per classroom)

Item #13 - AV Switcher - Are any other outputs required beyond those feeding the displays (and audio out to the DSP)? No

There is no Ethernet switch listed; will this equipment sit on the building LAN, or is a separate AV switch / network required? Separate form building LAN

CLIN 0002 - Building 1450, Offices

Item #1 - Display - This line calls out compatibility with the existing content ecosystem;

what are the details of that ecosystem? LG SuperSign

Item #4 - Ethernet Patch Cable - This calls out patch cables for the display side; is a patch cable required at the closet side as well, or will this be furnished by others? Yes

CLIN 0003 - Building 1450, Conference Room 117

Item #3 - Conferencing Bar - Will users connect directly to this bar, or should the USB connection be extended to the Conference Table? USB extended for conference table

Item #3 - Conferencing Bar - Is this desired to be secured to the wall, or mounted above/below one of the Displays with a VESA mount? Mounted above or below center of the two displays

CLIN 0004 - Building 1450, Breakout Rooms

Item #7 - Audio DSP - This spec seems to specifically call out a BSS BSSBLU100M. Is this a requirement or strong preference, or is another similar DSP (for example, Biamp or Q-SYS) acceptable? As long as the spec meets the intent for the SOW

Items #8 and #9 - Control Processor and Touchpanel - This spec seems to specifically call out an AMX MU-3300 as the processor (due to the "multi-language scripting support" verbiage). Is AMX a requirement, or is Crestron acceptable? As long as the spec meets the intent for the SOW

Item #10 - Streaming Encoder / Recorder - There are no video sources called out in this material list. What source is intended to be streamed / recorded? This will be for recording within each breakout room

There is no Ethernet switch listed; will this equipment sit on the building LAN, or is a separate AV switch / network required? Separate form building LAN

CLIN 0006 - Installation of Government Furnished Equipment

Item #2 - PCs - This calls out that we are responsible for configuring these PCs. What are these PCs intended to do, and what configuration is required? Are these intended to be inserted into the 86" interactive displays in the Classrooms? The RTI will furnish PCs, intent is for linking each breakout room together

Item #3 - Ethernet Switches- Where and how are these intended to be used? The RTI will furnish PCs, intent is for linking each breakout room together

CLIN 0001

1) Item 2: For the interactive touchscreens, will the government be providing the required computer for content and USB interaction? Yes

2) Item 5: There are three (3) rooms in the CLIN description, but only two (2) equipment racks Equipment for RM 120 and RM 113

3) Item 6: There are three (3) rooms in the CLIN description, but only two (2) control processors Equipment for RM 120 and RM 113

4) Item 7: There are three (3) rooms in the CLIN description, but only two (2) control points Equipment for RM 120 and RM 113

5) Item 8: There are 8 receivers listed, but 10 displays in the requirement. Equipment for RM 120 and RM 113

6) Item 9: There are three (3) rooms in the CLIN description, but only two (2) audio processors Equipment for RM 120 and RM 113

7) Item 10: There are three (3) rooms in the CLIN description, but only two (2) document cameras Equipment for RM 120 and RM 113

8) Item 12: There are three (3) rooms in the CLIN description, but only two (2) audio amplifiers Equipment for RM 120 and RM 113

9) Item 14: There are three (3) rooms in the CLIN description, but only two (2) Presentation switchers Equipment for RM 120 and RM 113

10) Item 14: There is a specification for a presentation switcher, but no definition of input requirements?

a. How many inputs are required Instructor Laptops will be used (2)

b. Where in the room are they to be located? Equipment for RM 120 and RM 113

c. Are all displays to receive the same source, or is there a requirement that different displays can show different sources? Yes, same source displayed on each display

CLIN 0002

1) Item 1: Requirement states that the display must work with the existing content management system. What is the existing system? LG SuperSign

2) Item 3: Where is the IDF located on the floorplan See SOW revised 27MAR26 for location of equipment

3) Is the existing network switch going to be utilized or is a new switch required? New network switch

CLIN 0003

1) Item 2: Would you consider two floor stands for the displays and locate them between the conference table and the kitchenette? No, see SOW revised 27MAR26 for location of equipment

2) Item 4: What is the source for the distribution amplifier? Laptop

3) Item 6: What are the audio sources for the room? Laptop

4) Item 8: A network switch is specified. What is its function? There are no networked devices on the list

CLIN 0004

1) Item 1: The light fixtures are specified to support DMX control, but there are no DMX controllers listed in the requirements See SOW revised 27MAR26 CLIN 0004 Item 1

2) Item 2: The Fog Machine is listed to have DMX control, but there are no DMX controllers listed in the requirements. See SOW revised 27MAR26 CLIN 0004 Item 1

3) Would you be open to the implementation of a show control system that can control lighting, fox, sound, and other special effects based on a specific timeline and or triggers by operators and participants? As long as the spec meets the intent for the SOW

4) Items 6,7,8: Where are these devices to be housed? See SOW revised 27MAR26 for location of equipment

5) Item 9: Where is the controller going to be located? See SOW revised 27MAR26 for location of equipment

6) Item 10: What is the function of the video encoder? To record footage within breakout rooms

7) Item 12: What is the rigging requirement? For mounting the equipment on catwalk above the breakout rooms

a. What is the height of the ceiling/structure in the space? 20 to 30 feet

b. What is the ceiling constructed of or is it open to structure above? Open

c. There are only four (4) light fixtures designated per room, where are they to be located? Above and center of each breakout room

8) Item 14: Is the wireless touch panel in addition to the control point listed in item 9?

a. What wireless network is this connecting to? Tablet

CLIN 0006

1) Item 1: Where are these devices to be installed? See SOW revised 27MAR26 for location of equipment

2) Item 2: Where are these devices to be installed? See SOW revised 27MAR26 for location of equipment

3) Item 3: Where are these devices to be installed? See SOW revised 27MAR26 for location of equipment

Can you provide staging location(ship to address) for the audio visual equipment to delivered to? Building 1450 14th Street, Camp Shelby, MS 39407

Room quantities of each type

• List of sources/displays for each room See SOW revised 27MAR26 for location of equipment

• Many of these rooms are assumed to be identical. Are there any variations within a room category?

• It looks as if Room 130 is a divisible room.

• If that is the case, does it need to be setup as combinable and separatable into 2-rooms? Yes

Mobile Carts

• Are these to be self-contained or are they integrating into the room system?

These will be in each classroom (RM 120 and RM 113) to be able to move freely within each classroom

• If integrating, are they doing so via wall plates? No

Mobile lecterns

• The lecterns you have specified allow for customization. Do they have any preference on color, or desire for a logo? No

• What A/V gear is intended to be housed in these? What is require to meet the intent of the SOW for each classroom

• Are these to be self-contained or are they integrating into the system? Self-contained

• If integrating, are they doing so via wall plates or floor boxes? No

Client requests a "Digital Signage Display that offers native, built-in compatibility with the organization's existing content management system, without the need for external media players."

• What is this existing content management system? LG SuperSign

Client requests fog machines and wash LEDs with DMX control, but do not spec a DMX controller. Is there one existing? No

How old is the facility? full remodel was completed in 2026

How much square footage is in the facility? Unknown

How stable is the power? Stable

Is there a dropped ceiling in all areas of installation? Yes, with in the classrooms, offices, break room, and conference room

What type of walls are in the perimeter areas? Cinderblocks

Do we need to drill between the walls, to run our cable infrastructure? The longest cables will be to the breakout rooms which will have a cable trough running above it

Do we need to use conduit? If yes, what do you estimate the total conduit footage will be?

No

Are the door frames metal and concrete filled? No

Please provide a comprehensive list of quantities of all IDS items needed (e.g. total number of motion sensors, glass breaks, etc.) per location. IDS and security is not the scope of the current contract

Do you currently have existing IDS Sensors in your doors? Please specify which doors. IDS and security is not the scope of the current contract

What is the manufacturer of the existing IDS system? IDS and security is not the scope of the current contract

Will we be able to reuse the existing cable? If so, what type of cable is there currently? You may reuse whichever cable is not dedicated to maintaining infrastructure needs if it exists

Are Ceilings Suspended? Or Hard Lid? Breakout rooms are open-ceiling to larger building space, classrooms have generic drop ceiling tiles

Are there existing Cable Trays for wiring above ceilings? Breakout rooms have cable tray/trough running above them

Can Existing Wiring be utilized? Yes

Is a “UPS” required? If so, What Time/Power Duration is required? No re “Or Equal” Equipment substitutions allowed? Yes

Is “Plenum Wire” acceptable? Yes

Is “After Hours Access” for said work, available to contractor at no add’l cost to the

Gov’t? Yes

What is the height of Exterior Cameras? (If any) N/A

Please provide/post other “Q & A” requests. N/A

Please provide a list of equipment and parts # that are to be installed. Equipment/parts are stated in the SOW

Are there pipe chases between floors? The building is one story with the exception of the elevated catwalk above the breakout rooms

What is the range of the budget for this project, and is it already appropriated? We’re evaluating solutions in a competitive range and will align budget with the strongest proposal.

Because of the high cost of the parts can we bill when parts arrive on site, or in the alternative are progress payments allowed? Progress payments are not allowed

How many feet of new wire will have to be run? Excessive new wire will not have to be run as every room should have accessible power outlets near their proposed locations

CLIN 001:

1) Classrooms usually have at least one or more Microphones for an instructor. Are there GFE microphones that need to be supported? No

CLIN 002:

2) The Government states: “digital signage display that must offer native, built in compatibility with the organization’s existing Content management and distribution system” …. What is that system? LG SuperSign

CLIN 003:

3) Is the intent for this room to use the specified HDMI DA (Item No. 4) to take a single computer signal and send it to the three specified displays? Yes, but the updated CLIN (27 MAR revision) currently only needs to support two

4) If so, where will the DA be located? Contractor’s choice as long as it maintains a clean and professional appearance in the room

5) How far away will the DA be located from each display? Contractor’s choice as long as it maintains a clean and professional appearance in the room

6) Where will the amplifier (Item No. 6) be located? Contractor’s choice as long as it maintains a clean and professional appearance in the room

7) Is a cable cubby existing in the table in this room, or needed? Cable cubby does not exist in the room

CLIN 004:

8) What are the dimensions of these rooms (LxWxH)? The solution should be designed to operate independently of room dimensions and will perform consistently across varying room dimensions

9) What are the ceilings composed of in these rooms? The ceiling of the rooms is an open design to a larger catwalk above

10) What are the walls composed of in these rooms? The solution should be designed to operate independently of wall materials and will perform consistently across varying rooms

11) What is the floor composed of in these rooms? The solution should be designed to operate independently of wall materials and will perform consistently across varying rooms

12) Are there GFE Racks being used in these rooms? There is a cable tray/trough running above the entire length of the breakout rooms

13) Since the Government desires “rigging”, are there architectural reflected ceiling plans for these rooms? The rigging is intended for the metal catwalk and cable trough

14) What source/s are the specified encoders (Item No. 10) supposed to support? GFE Student/Instructor PCs

15) Will the encoders connect to a GFE network? Commercial/civilian network

CLIN 006:

16) Is the GFE equipment in this section for some sort of monitoring room? No, equipment has already been purchased prior to the solicitation

• Name of end customer and address of installation 154th RTI – 5th MBTS 1450 14th St.

Camp Shelby, MS 39407-5500

• Building diagrams, ceiling, and wall construction type The solutions should be designed to operate independently of room dimensions and will perform consistently across varying room dimensions. See the attached diagram in the solicitation

• Installation heights The solution should be designed to operate independently of room dimensions and will perform consistently across varying room dimensions

• Is a lift required? No

• Details of devices which are being removed No devices are being removed as the building has just finished a major renovation

• Are there any security clearances required? There is an ID registration to get onto Camp Shelby

• When is the expected installation dates? While the desired completion is 30 days from award, offerors may propose alternative schedules with justification for consideration

1. For Training Rooms 120, 113, and 124:

The displays are distributed across all three rooms, but several of the associated components appear to be listed at a quantity of 2 rather than 3. Could you please confirm whether the quantities are correct as listed, or whether these items should be provided at one per room for all three rooms? This question applies to the lecterns, control processors, DSPs, touch screens, document cameras, amplifiers, and video switchers.

Only two of the rooms (120 and 113) will be used as a classroom. Room 124 will be used as a student breakroom and will only need tv mounting

2. For the six office locations:

Can you please confirm whether there is an approved CAT6 patch panel in the IDF room where the new cable runs should be terminated, or whether this portion will be handled by the government/IT infrastructure team? The network closet has patch panels

Also, is there existing conduit available for the cable path, or will the contractor be permitted to free-air run the cable above the ceiling where applicable? Free-air run above the ceiling is fine

3. For Conference Room 117:

Can you please confirm whether the Netgear AV switch model is approved for use on campus, or whether there is a preferred or required switch brand for this installation? As long as the device meets compliance and comes from a reliable brand.