This is a Performance Work Statement (PWS) for the inspection and repair of a 32-inch LeBlond sliding gap bed lathe located at US Moorings, 8010 NW St. Helens Road, Portland, Oregon 97210. The contract requires all labor, material, and equipment necessary to troubleshoot and repair the equipment, with a period of performance of 90 days from award date. The contractor must follow all applicable state, local, and federal safety requirements including EM-385-1-1.
The work is organized into three contract line items (CLINs): CLIN 0001 requires disassembly and comprehensive inspection of the apron, rack pinion, and internal components, with submission of a Condition Found Report (CFR) identifying damaged parts requiring manufacturing or replacement; CLIN 0002 involves repair and assembly of components strictly per Contracting Officer-approved CFR and operational testing; and CLIN 0003 requires functional testing with Machine Shop Supervisor verification that repairs resolve the binding issue and equipment meets operational parameters. Performance standards mandate 100% accurate identification of required repairs in the CFR (0% deviation), zero instances of unauthorized work during repair and assembly, and 100% functionality with zero binding, jamming, or mechanical failures during final operational testing. The Machine Shop Supervisor or Government Representative shall be present during service delivery and final testing for acceptance. The contractor must develop and submit a Quality Control Plan within 14 calendar days of award. Security requirements include DoD/Army security training within 30 days of award, E-Verify compliance within three business days, and vetting for unescorted access to the DoD installation. Invoices must be submitted electronically to USACE Finance Center (Millington) upon satisfactory completion, with copies to the technical lead Brandon Scherschel and other designated government representatives. Contract administration is through the Department of the Army, Portland District, Corps of Engineers.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement
Inspection and Repair of the LeBlond Sliding Gap Bed Lathe
Portland, OR
1. General: Provide all labor, material, and equipment necessary to troubleshoot and repair 32” Leblond sliding gap bed lathe, hereinafter referred to as “the equipment”.
1.1. Government Furnished Materials (GFM):
None.
1.2. Safety Precautions:
Follow all applicable state, local, and federal requirements including those specified in EM-385-1-1 latest revision.
1.3. Submittals:
None.
1.4. Period of Performance:
Period of Performance (PoP) is 90 days starting from an award date.
1.5. Work Location:
The equipment is currently located at the Machine Shop Building.
Address: US Moorings, 8010 NW St. Helens Rd., Portland, OR 97210
2. Definitions:
• Acceptable Quality Level (AQL): The performance standard that defines the maximum allowable margin of error or defect rate before performance is considered unsatisfactory. The Contractor must re-perform all unsatisfactory work unless excused by the Government Representative.
• Contracting Officer (KO): The Government employee who is authorized to enter into, administer, and/or terminate contracts and make related determinations and findings.
• Contract Discrepancy Report (CDR): A written record of unsatisfactory performance by the Contractor as observed by the Government Representative.
• Performance Requirements Summary (PRS): Identifies critical success factors for the contract, including performance objectives and the threshold required for each objective.
• Quality Assurance (QA): A method used by the Government to provide control over the quality of services received.
• Quality Assurance Surveillance Plan (QASP): A systematic method used by the Government to evaluate the services the Contractor is required to furnish.
• Quality Control (QC): A method implemented by the Contractor to control the quality of goods and services provided.
• Condition Found Report (CFR): A document prepared by the Contractor used to transmit specific information concerning inspections, deficiencies, or to propose additional work requiring a Government response.
3. Specification and Tasks:
Background Issue: During a threading operation, the apron became bound and cease movement. A preliminary visual inspection revealed that the pinion gear jammed into the lead screw due to the excessive play in the pinion bearing.
3.1. CLIN 0001: Disassembly & Inspection
Disassemble and comprehensively inspect the apron, rack pinion, and internal components. Determine which components are damaged and require manufacturing or replacement. Submit a Condition Found
Report (CFR) outlining these required parts to ensure the equipment will be restored to its full operation.
3.2. CLIN 0002: Repair & Assembly
Pending written approval and authorization from the Contracting Officer (KO) based on the CFR, proceed with the repairs. Reassemble the apron and conduct operational testing on the lathe to ensure the equipment is fully restored to operational parameters.
3.3. CLIN 0003: Operational Testing & Restoration
Functional test the equipment. Machine Shop Supervisor verifies repairs resolve the binding issue and performance meets PWS scope prior to final acceptance.
4. Inspection & Acceptance:
Machine Shop Supervisor shall be present during the service to ensure the service is conformed to the scope in this Performance Work Statement (PWS). Machine Shop Supervisor or a Government
Representative shall be present during final testing to ensure service conforms to the scope defined in this
PWS and that all repairs successfully resolve the identified issues prior to final acceptance.
5. Performance Requirement Summary (PRS)
5.1. General: The PRS determines if the Contractor meets the performance standards of the contract and provides guidelines for surveillance. Government contract quality assurance will be performed per the
PRS surveillance schedule.
5.2. Performance Requirements Summary Table: Work shall be considered incomplete or unacceptable when any of the following conditions exist in accordance with the QASP.
5.3. Surveillance: Periodic inspection by the Machine Shop Supervisor or Government Representative will serve as the primary surveillance method. If the Machine Shop Supervisor or Government
Representative discovers deficiencies, the Contractor will be alerted for immediate correction.
5.4. Quality Control: The Contractor is responsible for quality control. The Contractor shall develop and submit a Quality Control Plan (QCP) for Government approval within 14 calendar days after contract award. Non-conforming services shall be rejected.
5.5. Unacceptable Performance: When performance is determined unacceptable, the Machine Shop
Supervisor or Government Representative will provide written documentation via Form DD 2772, Contract
Discrepancy Report. If services do not conform to contract requirements, the Government may require the
Contractor to re-perform the services at no increase in contract amount. If defects cannot be corrected by re-performance, the Government may:
5.5.1.1. Reduce the contract price to reflect the reduced value of the services.
5.5.1.2. Have the services performed by another party and charge the Contractor for incurred costs.
5.5.1.3. Issue a Cure Notice or Terminate the contract for Cause/Convenience.
5.6. Correction of Non-Performance: The Contractor shall employ adequate personnel to ensure any non-compliant area is made acceptable during the first business day after the noncompliance has been reported to and verified by the Government Representative.
Performance Objective Performance Standard Acceptable Quality Level (AQL) Surveillance Method
Disassembly, Inspection, &
CFR (PWS 3.1)
Thoroughly inspect apron, rack pinion, and internal components. Accurately identify damaged parts and submit a complete Condition
Found Report (CFR).
0% Deviation. 100% accurate identification of required repairs in the CFR prior to any repair work starting.
100% Review of CFR by
Government (Government
Representative/Machine Shop
Supervisor).
Repair & Assembly (PWS
3.2)
Manufacture or replace components strictly per the
KO-approved CFR and reassemble the apron.
0 Instances of unauthorized work.
100% compliance with repairing only what is authorized in the CFR.
Periodic Visual Inspection by
Machine Shop Supervisor during the repair phase.
Operational Testing &
Restoration (PWS 3.3)
Lathe operates smoothly during threading operations;
pinion gear and lead screw engage properly. Equipment restored to full operational parameters.
100% Functionality. Zero (0) binding, jamming, or mechanical failures during final operational testing.
100% Visual and Operational
Functional Test observed by the
Machine Shop Supervisor prior to final acceptance.
6. Security Requirement:
6.1. General Security: The security requirements apply to all prime and subcontractor personnel. Contract personnel are critical to the overall security and safety of USACE installations. All personnel shall complete DoD/Army security initial training within 30 days of contract award. Within five (5) business days of completion, the Contractor shall provide written documentation to the Government representative.
Personnel and vehicles are subject to search when entering federal installations. Personnel shall comply with Force Protection Condition (FPCON) and Health Protection Condition (HPCON) measures.
6.2. Physical Security & Access Control: Contract personnel requiring unescorted access to a DoD installation shall be vetted by the Provost Marshal/Security Office using the NCIC-III and TSDB.
Personnel who do not meet requirements for unescorted access shall coordinate escorted access with the
Machine Shop Supervisor or Government Representative.
6.3. Escorting in Sensitive Areas: Personnel without appropriate security clearances will be escorted in areas where they may be exposed to sensitive information or restricted activities.
6.4. E-Verify Program: Contractors shall comply with FAR clause 52.222-54 Employment Eligibility
Verification, using the E-Verify Program (https://www.e-verify.gov/) to meet employment eligibility requirements. An initial list of verified candidates shall be provided to the Government Representative no later than three (3) business days after contract award.
7. Subcontracting Requirements:
The Contractor shall notify the Machine Shop Supervisor or the KO in writing of any work to be subcontracted.
Compliance with the provisions of this contract by subcontractors remains the strict responsibility of the Prime
Contractor.
8. Point of Contact:
Technical Lead: Brandon Scherschel
Email: Brandon.Scherschel@usace.army.mil https://www.google.com/url?q=https%3A%2F%2Fwww.e-verify.gov%2F
Tel: (503) 808-5422
9. Invoice Submittal:
Upon satisfactory completion and acceptance of delivery, please submit an electronic PDF invoice to:
USACE Finance Center (Millington): cefc-g2invoices@usace.army.mil
Invoice submittal emails shall CC:
Brandon.Scherschel@usace.army.mil
Trista.M.Stark@usace.army.mil; and
Ian.K.Lutjens@usace.army.mil
For invoice receipt verification or for a vendor's Payment problem, the vendor may contact the USACE Finance
Center at Phone Number (901) 873-9077.
10. Contract Administration:
Contract will be administered by: