This document is a Past Performance Questionnaire (PPQ) form used by the U.S. Army Corps of Engineers (USACE) to evaluate contractor performance across multiple assessment categories. The form requires detailed information from both the contractor and the client, including contract specifics, project complexity, and performance ratings across seven key areas: Quality, Schedule/Timeliness, Customer Satisfaction, Management/Personnel/Labor, Cost/Financial Management, Safety/Security, and General Performance. Contractors are required to have clients complete the questionnaire, rating performance using adjective scales from Exceptional (E) to Unsatisfactory (U), with the option to submit directly to USACE contacts Mr. Andrew Sprys or Ms. Alicia Evans.

The questionnaire is specifically related to Solicitation Number W9127N26RA008 for the John Day Transportation and Site Access project, a small business set-aside procurement for design-build transportation and site access improvements at the John Day Dam. The project involves constructing a new public access road, modifying existing roads, adding staging space, building a new guard station, canopy, and auxiliary monitoring building, and providing electrical and sewer connections. The acquisition strategy involves a Request for Proposals (RFP) with evaluation factors including Past Performance, Technical Approach, Management Approach, Preliminary Design, and Price, resulting in a single fixed-price contract under NAICS code 237310 with a $45M size standard.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment B Past Performance Questionnaire

1. The USACE Form PPQ shall be utilized for all evaluations that require a Past Performance Questionnaire and only if a CPARS Evaluation is not available.

As provided in the solicitation:

4.3.1 Contractor Performance Assessment Reports System (CPARS). For projects constructed for other Government or commercial entities, submit the performance appraisal sheets used by the respective Government or commercial entity. For each project that may be private industry work or other Government entity not covered in the CPARS database, submit a Past Performance Questionnaire (PPQ), Attachment B, completed by an owner or owner’s representative not affiliated with the Offeror’s firm. Offerors are advised to ensure correct phone numbers and email addresses are provided for the Client point of contact. (Do not submit a PPQ when a completed CPARS evaluation is available). Offeror should explain any past performance resulting in significant cost and/or time growth.

If the client requests, questionnaires may be submitted directly to the Government points of contact:

Mr. Andrew Sprys at andrew.j.sprys@usace.army.mil Ms. Alicia Evans at alicia.g.evans@usace.army.mil

4.3.2 Offerors shall instruct the clients to refer to the solicitation number in the subject line. PPQs are source selection materials. All successfully submitted PPQs will receive an email confirmation upon receipt. If the offeror does not receive the confirmation, it is the offeror’s responsibility to follow up to ensure the government has received the information. Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other procurements. However, this does not preclude the Government from utilizing previously submitted past performance information in the past performance evaluation.

USACE Form PPQ will be made accessible on SAM.gov as a separate attachment.

NAVFAC/USACE Past Performance Questionnaire (Form PPQ-0)

Contract Information (Contractor to complete Blocks 1-4)

1. Contractor Information

Firm Name: CAGE Code:

Address: DUNs Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Subcontractor Joint Venture (Explain) Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

Other

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify): Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable): Explain Differences:

4. Project Description:
Complexity of Work:HighMedRoutine

How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information

Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

Note: USACE requests that the client completes this questionnaire and submits directly back to the offeror. The offeror will submit the completed questionnaire to USACE with their proposal and may duplicate this questionnaire for future submission on USACE solicitations. Clients are highly encouraged to submit questionnaires directly to the offeror. However, questionnaires may be submitted directly to USACE. Please contact the offeror for USACE POC information. The government reserves the right to verify any and all information on this form.

SOURCE SELECTION INFORMATION (SEE FAR 2.101 and 3.104)

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

RATINGDEFINITIONNOTE
(E) Exceptional
Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/ Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
(VG) Very Good
Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory
Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
(U) Unsatisfactory
Performance does not meet most contractual requirements, and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/ Owner. A singular problem: however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable
No information or did not apply to your contract
Rating will be neither positive nor negative.

SOURCE SELECTION INFORMATION (SEE FAR 2.101 and 3.104)

Contractor Information (Firm Name):

Client Information (Name):

To Be Completed by Client Please Circle the Adjective Rating which best reflects your evaluation of the Contractor’s performance.

1. QUALITY:

a. Quality of technical data/report preparation efforts
E
VG
S
M
U
N

b. Ability to meet quality standards specified for technical performance

E

VG

S

M

U

N

c. Timeliness/effectiveness of contract problem resolution without extensive customer guidance

E

VG

S

M

U

N

d. Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

E

VG

S

M

U

N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a. Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

E

VG

S

M

U

N

b. Rate the contractor’s use of available resources to accomplish tasks identified in the contract

E

VG

S

M

U

3. CUSTOMER SATISFACTION:

a. To what extent were the end users satisfied with the project?
E
VG
S
M
U
N

b. Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)

E

VG

S

M

U

N

c. To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?

E

VG

S

M

U

N

d. Overall customer satisfaction
E
VG
S
M
U
N

4. MANAGEMENT/ PERSONNEL/LABOR

a. Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?

VG

S

M

U

N

b. Ability to hire, apply, and retain a qualified workforce to this effort
E
VG
S
M
U
N
c. Government Property Control
E
VG
S
M
U
N
d. Knowledge/expertise demonstrated by contractor personnel
E
VG
S
M
U
N
e. Utilization of Small Business concerns
E
VG
S
M
U
N
f. Ability to simultaneously manage multiple projects with multiple disciplines
E
VG
S
M
U
N

g. Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes

VG

S

M

U

N

h. Effectiveness of overall management (including ability to effectively lead, manage and control the program)

E

VG

S

M

U

N

Contractor Information (Firm Name):

Client Information (Name):

To Be Completed by Client Please Circle the Adjective Rating which best reflects your evaluation of the Contractor’s performance.

5. COST/FINANCIAL MANAGEMENT

a. Ability to meet the terms and conditions within the contractually agreed price(s)?

VG

S

M

U

N

b. Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client

E VG

S

M

U

c. If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back- up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

E VG

S

M

U

d. Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.

Yes

No

e. If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

f. Have there been any indications that the contractor has had any financial problems? If yes, please explain below.

6. SAFETY/SECURITY

a. To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the user’s rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

E VG

S

M

b. Contractor complied with all security requirements for the project and personnel security requirements.

E VG

S

M

U

7. GENERAL

a. Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

E VG

S

M

U

N

b. Compliance with contractual terms/provisions (explain if specific issues)
EVG
S
M
U
N
c. Would you hire or work with this firm again? (If no, please explain below)
Yes
No

d. In summary, provide an overall rating for the work performed by this contractor.

E VG

S

M

Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary).