This is a Standard Pre-Lift Plan (LHE)/Checklist form (Form 16-2) that must be completed before using cranes, derricks, hoists, and power-operated equipment for lifting operations. The form is an attachment to a solicitation for crane rental and operator services at Dexter Dam.
The checklist contains four main sections with yes/no checkboxes: Crane Considerations (covering rated capacities, obstructions, environmental factors, and safety measures), Rigging (addressing inspection requirements, sling angles, and equipment specifications), Personnel (covering roles, qualifications, and training requirements), and Area Preparation (dealing with landing locations, ground support, and safety notifications). The form requires signatures from the crane operator, rigger(s), signal person, and other relevant personnel, with dates for each. This is a template document that must be completed for each lift operation to ensure proper safety protocols are followed.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FORM 16-2
Standard Pre-Lift Plan (LHE)/Checklist
Date: Job #: Location: _______________________
Time: Completed By (Competent Person): _____________________________
Note: Applies to Cranes, Derricks, Hoists and Power-Operated equipment that can be used to hoist, lower and/or horizontally move a suspended load (includes excavators, forklifts, Rough Terrain equipment, etc., when used with rigging).
Crane Considerations Yes No
1 Are the lifts within the crane’s rated capacities? (based on boom height, radius)
2 Boom deflections considered?
3 Have all potential crane boom obstructions been identified?
4 Have environmental considerations been addressed? (wind, weather, lightning)
5 Have electrical hazards been addressed (overhead /underground)
- Clearance distances established?
- Is a spotter required?
- Public Utility contact required?
6 Crane swing radius properly barricaded and personnel advised of hazards?
Comments:
Crane Considerations Yes No
1 Weights and Centers of Gravity (COG) have been determined?
2 Anything inside/outside the loads that could shift during the lift?
3 Does rigging need protection from the loads?
4 All anchor bolts, hold-downs, or fasteners have been removed?
5 Potential for binding: are load cells required to verify the loads are free?
6 Attachment points rated to take load weight?
7 Are the loads structurally capable of being lifted? (bending/twisting issues)
8 Is a Critical Lift Plan required per EM 385-1-1, Section 16.H?
Rigging Yes No
1 All rigging has been inspected by a Qualified Rigger?
2 Have sling angles been calculated?
3 Are shackles correctly sized for the sling eyes?
4 Are softeners needed?
Comments:
Personnel Yes No
1 The roles, responsibilities and qualifications for personnel have been defined?
(Operator, Lift Supervisor, Rigger, Signal Person)
2 A Pre-Lift meeting has been conducted?
3 Personnel trained per the EM?
Comments:
Area Preparation Yes No
1 The locations for the load landings has been selected and prepared?
2 Blocking and/or cribbing available to set the loads on?
3 Travel paths have been determined and cordoned off?
4 Other personnel in the area have been notified of the lifts?
5 Have ground bearing support questions been addressed?
Crane Operator: ___________________________________ Date: __________
Rigger(s): _________________________________________ Date: __________
Signal Person: ___________________________________ Date: __________
Other: _________________________________________ Date: ________
| Date: |
| Job: |
| Location: |
| Time: |
| Completed By Competent Person: |
| Comments: |
| Comments_2: |
| Comments_3: |
| Comments_4: |
| Comments_5: |
| Crane Operator: |
| Riggers: |
| Signal Person: |
| Other: |
| Date_2: |
| Date_3: |
| Date_4: |
| Date_5: |
| Check Box3: |
| 0: |
| 1: Off |
| 0: |
| 0: |
| 0: Off |
| 1: |
| 0: |
| 1: Off |
| 0: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: |
| 0: Off |
| 1: Off |
| 3: |
| 0: Off |
| 1: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: |
| 0: Off |
| 1: Off |
| 3: |
| 0: Off |
| 1: Off |
| 1: |
| 0: Off |
| Check Box4: Off |
| Check Box5: |
| 0: |
| 0: Off |
| 1: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: |
| 0: Off |
| 1: Off |
| 3: |
| 0: Off |
| 1: Off |
| 4: |
| 0: Off |
| 1: Off |
| 5: |
| 0: Off |
| 1: Off |
| 6: |
| 0: Off |
| 1: Off |
| 7: |
| 0: Off |
| 1: Off |
| Check Box6: |
| 0: |
| 0: Off |
| 1: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: |
| 0: Off |
| 1: Off |
| 3: |
| 0: Off |
| 1: Off |
| Check Box7: |
| 0: Off |
| 1: Off |
| Check Box8: |
| 0: |
| 0: Off |
| 1: Off |
| 1: |
| 0: Off |
| 1: Off |
| Check Box9: Off |
| Check Box10: |
| 0: |
| 0: Off |
| 1: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: |
| 0: Off |
| 1: Off |
| 3: |
| 0: Off |
| 1: Off |
Check Box11: Off
File details come from the government source that posted it. Updated .