Site visit map_Bonneville_Parking at Security Office.pdf

PDF 558 KB Posted

Attached to
Bradford Island Fish Ladder Exit Dredging 2025 Federal contract opportunity
Solicitation number
W9127N25BA011
Issued by
Department of the Army Corps of Engineers Engineering District Portland

About this file

The file is a site visit map for the Bradford Island Fish Ladder Exit Dredging 2025 federal contract opportunity. The aerial map details the security entrance and parking locations for a mandatory site visit at the Bonneville Lock and Dam in Cascade Locks, Oregon. Key site visit details include the date of 18 AUG 2025 at 10:00 am (Pacific), with contractors required to submit security clearance information by 13 AUG 2025. The map shows multiple parking areas, including a primary Security Office Parking Lot and an Overflow Parking area if required, along with the Security Office Entrance and proximity to Exit 40 of I-84. The site is located near the Bonneville Lock and Tanner Creek Fishway, with multiple access routes and nearby road infrastructure clearly marked.

View the file

Other files for this federal contract opportunity

Other files attached to Bradford Island Fish Ladder Exit Dredging 2025, newest first.
File Type Posted
Bid Opening Attendance Sheet_25BA011.pdf PDF
Bid Abstract_25BA011 BIFLED.pdf PDF
W9127N25BA011_Plans_ADVERTISE.pdf PDF
W9127N25BA011 BNBIFLED25_SPECS_ADVERTISE.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exit 40, I-84

Security Office Parking Lot

Security Office Entrance

Overflow Parking if Required

File details come from the government source that posted it. Updated .