Site visit map_Bonneville_Parking at Security Office.pdf
PDF 558 KB Posted
- Attached to
- Bradford Island Fish Ladder Exit Dredging 2025 Federal contract opportunity
- Solicitation number
- W9127N25BA011
About this file
The file is a site visit map for the Bradford Island Fish Ladder Exit Dredging 2025 federal contract opportunity. The aerial map details the security entrance and parking locations for a mandatory site visit at the Bonneville Lock and Dam in Cascade Locks, Oregon. Key site visit details include the date of 18 AUG 2025 at 10:00 am (Pacific), with contractors required to submit security clearance information by 13 AUG 2025. The map shows multiple parking areas, including a primary Security Office Parking Lot and an Overflow Parking area if required, along with the Security Office Entrance and proximity to Exit 40 of I-84. The site is located near the Bonneville Lock and Tanner Creek Fishway, with multiple access routes and nearby road infrastructure clearly marked.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Opening Attendance Sheet_25BA011.pdf | ||
| Bid Abstract_25BA011 BIFLED.pdf | ||
| W9127N25BA011_Plans_ADVERTISE.pdf | ||
| W9127N25BA011 BNBIFLED25_SPECS_ADVERTISE.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exit 40, I-84
Security Office Parking Lot
Security Office Entrance
Overflow Parking if Required
File details come from the government source that posted it. Updated .