Bid Abstract_25BA011 BIFLED.pdf

PDF 196 KB Posted

Attached to
Bradford Island Fish Ladder Exit Dredging 2025 Federal contract opportunity
Solicitation number
W9127N25BA011
Issued by
Department of the Army Corps of Engineers Engineering District Portland

About this file

This document is an Abstract of Offers for the Bradford Island Fish Ladder Exit Dredging 2025 project, solicitation number W9127N25BA011, issued by the Portland District, Corps of Engineers. The solicitation covers two mandatory Contract Line Items (CLINs) and two optional CLINs, including mobilization/demobilization, dredging and disposal of materials at Bradford Island Fish Ladder Exit and Bonneville Spillway, and Eurasian Watermilfoil removal and disposal. The initial government estimate for the project totals $998,880.00, with HME Construction submitting an initial bid of $691,250.00. The solicitation was issued on 7/30/2025, with offers due by 8/29/2025, and includes provisions for bid security at 20% of the bid price. The project involves environmental and infrastructure work related to dredging and invasive species removal at specific locations near Bradford Island and Bonneville Spillway.

View the file

Other files for this federal contract opportunity

Other files attached to Bradford Island Fish Ladder Exit Dredging 2025, newest first.
File Type Posted
Bid Opening Attendance Sheet_25BA011.pdf PDF
Site visit map_Bonneville_Parking at Security Office.pdf PDF
W9127N25BA011_Plans_ADVERTISE.pdf PDF
W9127N25BA011 BNBIFLED25_SPECS_ADVERTISE.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NO. 2. DATE ISSUE3. DATE OPENEPAGE 1 OF 1

7/30/2025 8/29/2025

4. ISSUING OFFICE

DISTRICT ENGINEER CONTRACT SPECIALIST SIGNATURE CONTRACTING OFFICER SIGNATURE

PORTLAND DISTRICT, CORPS OF ENGINEERS

P.O. BOX 2946

PORTLAND, OR 97208-2946

5. PROJECT TITLE 8a. INITIAL GOVERNMENT ESTIMATE

(CHECK A, B, OR C AND COMPLETE NO.1 NO.2 NO.2

D, E, AND F.) A. OFFEROR A. OFFEROR A. OFFEROR

X A. HIRED LABOR

B. REASONABLE CONTRACT B. BID SECURITY B. BID SECURITY

(WITHOUT PROFIT) 20% of bid price 20% of bid price 20% of bid price C. REASONABLE CONTRACT C. ADDENDA ACKNOWLEDGED C. ADDENDA ACKNOWLEDGEDC. ADDENDA ACKNOWLEDGED

(INCLUDING PROFIT) YES YES YES

6. NUMBER OF ADDENDA ISSUED

7A.

ITEM D. E. UNIT F. ESTIMATED D. UNIT F. AMOUNT D. UNIT F. AMOUNT D. UNIT F. AMOUNT

NO. QUANTITY UNIT PRICE AMOUNT PRICE PRICE PRICE

MANDATORY CLINS

0001 Mobilization and Demobilization 1 JOB 572,000.00$ 572,000.00$ 350,000.00$ 350,000.00$ 0002 Dredging and Disposal of Materials; Bradford Island Fish Ladder Exit, Truck Measure 850 NET TON (2,000 LB 195.20$ 165,920.00$ 215.00$ 182,750.00$

SUBTOTAL FOR MANDATORY LINE ITEMS 737,920.00$ 532,750.00$

OPTIONAL CLINS

0003 Eurasian Watermilfoil Removal and Disposal; Bradford Island Fish Ladder Exit 1 JOB 138,000.00$ 138,000.00$ 62,500.00$ 62,500.00$ 0004 Dredging and Disposal of Materials; Bonneville Spillway, Truck Measure 400 NET TON (2,000 LB 307.40$ 122,960.00$ 240.00$ 96,000.00$

SUBTOTAL FOR OPTIONAL LINE ITEMS 260,960.00$ 158,500.00$

998,880.00$ 691,250.00$

NSN 7540-01-150-0981

INITIAL AND FINAL BID INITIAL BID FINAL BID

ABSTRACT OF OFFERS

W9127N25BA011

I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT

ALL OFFERS RECEIVED IN RESPONSE TO THIS SOLICITATION.

Bradford Island Fish Ladder Exit Dredging 2025

7B. DESCRIPTION OF OFFERED ITEM

TOTAL

ACCEPTANCE LIMITATION - DAYS

INFORMALITIES

HME Construction

STANDARD FORM 1419 (10-3)

N/A

B. BID SECURITY

Offers 1-3

2025-08-29T13:38:56-0700
CARLTON.JULIA.BETH.1275687223
2025-09-02T07:00:30-0700
LASICH.BRANDON.MATTHEW.1255369012

File details come from the government source that posted it. Updated .