Bid Abstract_25BA011 BIFLED.pdf
PDF 196 KB Posted
- Attached to
- Bradford Island Fish Ladder Exit Dredging 2025 Federal contract opportunity
- Solicitation number
- W9127N25BA011
About this file
This document is an Abstract of Offers for the Bradford Island Fish Ladder Exit Dredging 2025 project, solicitation number W9127N25BA011, issued by the Portland District, Corps of Engineers. The solicitation covers two mandatory Contract Line Items (CLINs) and two optional CLINs, including mobilization/demobilization, dredging and disposal of materials at Bradford Island Fish Ladder Exit and Bonneville Spillway, and Eurasian Watermilfoil removal and disposal. The initial government estimate for the project totals $998,880.00, with HME Construction submitting an initial bid of $691,250.00. The solicitation was issued on 7/30/2025, with offers due by 8/29/2025, and includes provisions for bid security at 20% of the bid price. The project involves environmental and infrastructure work related to dredging and invasive species removal at specific locations near Bradford Island and Bonneville Spillway.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Opening Attendance Sheet_25BA011.pdf | ||
| Site visit map_Bonneville_Parking at Security Office.pdf | ||
| W9127N25BA011_Plans_ADVERTISE.pdf | ||
| W9127N25BA011 BNBIFLED25_SPECS_ADVERTISE.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NO. 2. DATE ISSUE3. DATE OPENEPAGE 1 OF 1
7/30/2025 8/29/2025
4. ISSUING OFFICE
DISTRICT ENGINEER CONTRACT SPECIALIST SIGNATURE CONTRACTING OFFICER SIGNATURE
PORTLAND DISTRICT, CORPS OF ENGINEERS
P.O. BOX 2946
PORTLAND, OR 97208-2946
5. PROJECT TITLE 8a. INITIAL GOVERNMENT ESTIMATE
(CHECK A, B, OR C AND COMPLETE NO.1 NO.2 NO.2
D, E, AND F.) A. OFFEROR A. OFFEROR A. OFFEROR
X A. HIRED LABOR
B. REASONABLE CONTRACT B. BID SECURITY B. BID SECURITY
(WITHOUT PROFIT) 20% of bid price 20% of bid price 20% of bid price C. REASONABLE CONTRACT C. ADDENDA ACKNOWLEDGED C. ADDENDA ACKNOWLEDGEDC. ADDENDA ACKNOWLEDGED
(INCLUDING PROFIT) YES YES YES
6. NUMBER OF ADDENDA ISSUED
7A.
ITEM D. E. UNIT F. ESTIMATED D. UNIT F. AMOUNT D. UNIT F. AMOUNT D. UNIT F. AMOUNT
NO. QUANTITY UNIT PRICE AMOUNT PRICE PRICE PRICE
MANDATORY CLINS
0001 Mobilization and Demobilization 1 JOB 572,000.00$ 572,000.00$ 350,000.00$ 350,000.00$ 0002 Dredging and Disposal of Materials; Bradford Island Fish Ladder Exit, Truck Measure 850 NET TON (2,000 LB 195.20$ 165,920.00$ 215.00$ 182,750.00$
SUBTOTAL FOR MANDATORY LINE ITEMS 737,920.00$ 532,750.00$
OPTIONAL CLINS
0003 Eurasian Watermilfoil Removal and Disposal; Bradford Island Fish Ladder Exit 1 JOB 138,000.00$ 138,000.00$ 62,500.00$ 62,500.00$ 0004 Dredging and Disposal of Materials; Bonneville Spillway, Truck Measure 400 NET TON (2,000 LB 307.40$ 122,960.00$ 240.00$ 96,000.00$
SUBTOTAL FOR OPTIONAL LINE ITEMS 260,960.00$ 158,500.00$
998,880.00$ 691,250.00$
NSN 7540-01-150-0981
INITIAL AND FINAL BID INITIAL BID FINAL BID
ABSTRACT OF OFFERS
W9127N25BA011
I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT
ALL OFFERS RECEIVED IN RESPONSE TO THIS SOLICITATION.
Bradford Island Fish Ladder Exit Dredging 2025
7B. DESCRIPTION OF OFFERED ITEM
TOTAL
ACCEPTANCE LIMITATION - DAYS
INFORMALITIES
HME Construction
STANDARD FORM 1419 (10-3)
N/A
B. BID SECURITY
Offers 1-3
| 2025-08-29T13:38:56-0700 | |
| CARLTON.JULIA.BETH.1275687223 |
| 2025-09-02T07:00:30-0700 | |
| LASICH.BRANDON.MATTHEW.1255369012 |