Attachment 1 - DET Battery Purchase Description-R1.pdf
PDF 438 KB Posted
- Attached to
- Detroit Powerhouse Battery Bank Replacement
- Solicitation number
- W9127N24Q0091
About this file
This document is a Purchase Description (PD) for a stationary GroE vented pure lead acid (VLA) battery, with certified seismic racks and spill control system, required as part of the Detroit Dam's 125VDC system. The battery must have a nominal capacity of at least 691AhC10 and a design life of at least 25 years, conforming to various industry standards. The battery bank, to be housed in two identical rows of racks within the existing battery room, shall be supplied with all necessary connectors, lugs, bolts, and plates. Delivery is required Monday through Thursday, 7:00 am to 4:00 pm, to the US Army Corps of Engineers' Detroit Dam location. The solicitation number is W9127N24Q0091, and the agency is the Department of the Army Corps of Engineers Engineering District Portland.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PURCHASE DESCRIPTION (PD): Stationary GroE (Pure Lead/Plante Positive) Vented Lead Acid (VLA) Battery
FOR: US Army Corps of Engineers, Portland District, Willamette Valley Project (CENWP-ODV)
DESCRIPTION: The stationary GroE vented pure lead acid (VLA) Battery, with certified seismic racks and spill control system, is required as part of Detroit Dam’s 125VDC system. The battery, with seismic rack and spill containment system, shall consist of 58 2V cells and conform to the standards of Unified Facilities Criteria (UFC) 3-520-05 (Dated 2020), American National Standards Institute (ANSI) 9540:2023, Institute of Electrical and Electronics Engineers (IEEE) 450-2020, IEEE 484-2019, IEEE 1375, International Electrotechnical Commission (IEC) 60896-11, National Fire Protection Association (NFPA) 1, NFPA 853, German institute for Standardization (DIN) 40738 and their respective references. The battery must have a nominal capacity of at least 691AhC10. Battery design life must be at least 25 years. The battery bank design and protection shall meet or exceed the requirements within the above references, with UFC 3-520-05 superseding all in any case of conflict. The battery bank shall be supplied with all necessary inter-cell connectors and terminal lugs, bolts, and plates necessary for the complete assembly. Markings shall be provided according to ANSI 9540:2023. The battery cell container shall be transparent, styrene acrylonitrile (SAN) plastic, with flame retardant jar covers. The battery rack shall fit within the battery room with at least 3 feet of clearance from the sink and walls. be of single tier, two row stepped construction. The 58 cell battery shall be housed in two identical rows of racks in order to fit within the existing battery room at Detroit Dam.
The below supplies shall come with all standard commercial warranties, instructions, manuals, guides, literature, product sheets, procedure guides, etc.
SUPPLIES:
Line Item Quantity 0001 Stationary 58-cell 2V GroE VLA
Battery with a nominal capacity of at least 691AhC10
0002 Certified Seismic Battery Rack 2 0003 Spill Containment System 2
DELIVERY INFORMATION:
Mon-Thurs (7:00am-4:00pm) Ship to:
US Army Corps of Engineers (USACE) Attn: Ceyel Clark Detroit Dam 40990 Hwy 22, Mill City, OR 97360
Point of Contact: Ceyel Clark, Ceyel.P.Clark@usace.army.mil, 541-294-3549 Please also cc: Steve Gardner, Steven.R.Gardner@usace.army.mil, (503) 897-4453
Please reference the following attachments:
• Attachment 1: Detroit Existing Battery Room Layout
• Attachment 2: Detroit Battery Room Photo
• Attachment 3: Location of Detroit Battery Room within Detroit Powerhouse
INVOICE SUBMITTAL:
Upon satisfactory completion of delivery, please submit an electronic PDF invoice to USACE Millington (the USACE Finance Center) via email address:
cefc-g2invoices@usace.army.mil, and please cc: Quenton Chocktoot, Quenton.P.Chocktoot@usace.army.mil.
CONTRACT ADMINISTRATION:
Contract will be administered by:
US Army Corps of Engineers (USACE), Portland District Attn: Contracting Division PO Box 2946 Portland, Oregon 97208-2946 mailto:cefc-g2invoices@usace.army.mil mailto:Quenton.P.Chocktoot@usace.army.mil
Attachment 1: Detroit Existing Battery Room Layout
Attachment 2: Detroit Battery Room Photo
Attachment 3: Location of Detroit Battery Room within Detroit Powerhouse
| Attachment 1: Detroit Existing Battery Room Layout |
| Attachment 2: Detroit Battery Room Photo |
| Attachment 3: Location of Detroit Battery Room within Detroit Powerhouse |
File details come from the government source that posted it. Updated .