B08 7N24B0001 Baker Bay Amendment 2 Conformed Bid Schedule.pdf

PDF 50 KB Posted

Attached to
Baker Bay Pile Dike Repair
Solicitation number
W9127N24B0001
Issued by

About this file

This document is a Conformed Bid Schedule for the Baker Bay Pile Dike Repair solicitation (W9127N24B0001). The solicitation is for the provision of labor, equipment, materials, and incidentals required for the removal and disposal of approximately 860 existing timber piles, the installation of steel pipe marker piles with pile caps, signage, and ladders, the placement of new rock along the dike structures, and the permanent revegetation of the upland areas disturbed during construction.

The bid schedule includes six contract line items covering mobilization/demobilization, pile removal and installation, rock placement in two separate sections, and site restoration and maintenance. Pricing is required for the base contract line items, with two optional rock placement line items. The solicitation was issued on 23 July 2024 by the Department of the Army Corps of Engineers, Engineering District Portland.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W9127N24B0001

Section 00 10 00 - Solicitation

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0001 Mobilization and Demobilization

1 Job

Measurement will be made as a job for mobilizing and demobilizing all plant, equipment, fuel, supplies, materials, and personnel to and from the job site.

Funded:

0002 Pile Removal and Installation

Measurement will be made as a job for providing all labor, equipment, materials, parts, and incidentals for removal and disposal of approximately 860 existing timber piles from dike structure BB0.28 and installation of steel pipe marker piles with pile caps, signage, and ladders on dike structures BB0.28, BB0.56, BB0.70, and BB0.86.

0003 Rock Placement

0+00 to 13+50

Measurement will be made as a job providing all labor, plant, equipment, materials, and incidentals required for placement of new rock on BB0.28 from station 0+00 to 13+50, and the placement of cobble revetment as a transition zone between the shore connection rock and the existing sandy dune.

0004 Site Restoration and Maintenance

Measurement will be made as a job for providing all labor, equipment, materials, parts and incidentals for permanent revegetation of the upland areas on West Sand Island disturbed during construction via preparation, revegetation seeding and planting, and landscape construction maintenance during irrigation and vegetation establishment periods. If the contractors methods do not result in disturbance requiring restoration under specification section 32 90

00.00 25 then a value of $0.00 is considered a valid price for this CLIN.

0005 Rock Placement

13+50 to 26+00

OPTION Measurement will be made as a job providing all labor, plant, equipment, materials, and incidentals required for placement of new rock on BB0.28 from station 13+50 to station 26+00.

0006 Rock Placement

26+00 to 34+00

OPTION Measurement will be made as a job providing all labor, plant, equipment, materials, and incidentals required for placement of new rock on BB0.28 from station 26+00 to station 34+00.

BID SCHEDULE TOTAL

Total Price for all Base Contract Line Items

Total Price for all Option(s) Line Items

Total Price for All Contract (Base and Option(s)) Line Items