This document is an Amendment to Solicitation W9127N24B0001 for the Baker Bay Pile Dike Repair project. The key changes are:
-
The solicitation closing date has been extended from August 22, 2024 to September 5, 2024.
-
The description for CLIN 0004 - Permanent Revegetation has been updated to allow a price of $0.00 if the contractor's methods do not require restoration under the specification.
-
Revisions have been made to specification section 35 31 19.00 25, including changes to petrographic examination testing requirements and the removal of certain supplemental tests. The government notification periods for sampling have also been increased.
-
The government will provide .tif, .dwg, and .grs files as government furnished information upon request to assist contractors in developing CAD models and estimating quantities.
All other terms and conditions of the solicitation remain unchanged.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See block 14 for the purpose of this amendment.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Aug-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9127N24B0001
X 9B. DATED (SEE ITEM 11)
23-Jul-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Aug-2024
CODE
USACE PORTLAND
333 SW 1ST AVE
PORTLAND OR 97204
W9127N 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9127N24B0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 1
The purpose of this amendment is as follows:
1. The solicitation closing due date and time is extended from 08/22/2024 at 2pm PDT to 09/05/2024 at 2pm PDT.
2. The following statement has been added to the extended description of CLIN 0004: If the contractor’s method does not result in disturbance requiring restoration under specification section 32 90 00.00 25 then a value of $0.00 is considered a valid price for this CLIN.
3. Specification section 35 31 19.00 25 has been revised as follows: the petrographic examination test has been changed from a supplemental test to a required test. Perform petrographic testing only when COR is present. Provide minimum 14 calendar day notice to COR prior to testing. The wetting/drying, freezing/thawing, and X-ray analysis supplemental tests have been removed from the contract. The following paragraphs of specification section 35 31 19.00 25 have been revised as follows:
2.1.1.1.b, government notice for sampling has been revised from 48 hours to no less than 14 calendar days.
2.1.1.3.a, government notice for sampling has been revised from three days to no less than 14 calendar days.
Removed sections 2.1.1.2.d.1, 2.1.1.2.d.2, & 2.1.1.2.d.4.
Moved section 2.1.1.2.d.3 – “Petrographic Examination” to section 2.1.1.2.c.5.
See attached revised specification section.
4. The .tif , .dwg, and .grs files can be provided by the government as government furnished information upon request and can be used by the contractor to develop a model in CAD to better estimate quantities using the same data the government used during design. For example, rock quantities could be calculated by doing a surface-to-surface comparison using the USACE-provided survey data and model provided herein. Please contact the POCs noted in the solicitation and SAM posting to request these files.
All other terms and conditions remain unchanged.
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 22-Aug-2024 02:00 PM to 05-Sep-2024 02:00 PM.
W9127N24B0001
CLIN 0004
The CLIN extended description has changed from:
Measurement will be made as a job for providing all labor, equipment, materials, parts and incidentals for permanent revegetation of the upland areas on West Sand Island disturbed during construction via preparation, revegetation seeding and planting, and landscape construction maintenance during irrigation and vegetation establishment periods.
To:
Measurement will be made as a job for providing all labor, equipment, materials, parts and incidentals for permanent revegetation of the upland areas on West Sand Island disturbed during construction via preparation, revegetation seeding and planting, and landscape construction maintenance during irrigation and vegetation establishment periods. If the contractors methods do not result in disturbance requiring restoration under specification section 32 90 00.00 25 then a value of $0.00 is considered a valid price for this CLIN.
(End of Summary of Changes)