Questions from Contractors:

1. What voltage is this system running at? 480V 208V 3P, 240V 1P?? The system is running at 480V 3-Phase.

1. There is no spec for cable or connection to the generator. I would assume that cable is needed. Correct, cable is needed from the generator to USACE termination point. I would assume a 4/0 cable for the 480v 3-Phase system.

1. What distance are we required to make connections? The distance is the connection point is approximately 100 feet.

1. Is a site walk available? Yes, a formal site visit will be scheduled.

1. Although the generator is designed to be 110% spill containment, typically anytime I am in a situation like this I put the generator into an additional spill berm. The 110% containment is for the generator and 1,000-gallon fuel tank.

1. Besides getting the unit set up and ready for operation unless the unit is running (which this sounds to be a standby project) what if any additional services is being required so I can accurately put forth the costs for them? Training for operational personnel to stop, start, and the controls and alarm features/functions.