Columbia River Navigation Improvements Disposal Site W-44.0-U

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 10 10.00 25

CONTRACTOR'S OPERATIONS AND REQUIREMENTS

PART 1 GENERAL

1.1 DESCRIPTION OF WORK

1.2 REFERENCES

1.3 SUBMITTALS

1.4 SCHEDULE FOR CONSTRUCTION

1.5 WORK RESTRICTIONS

1.6 INCLEMENT WEATHER CONSTRUCTION

1.7 WORK BY THE GOVERNMENT CONCURRENT WITH CONTRACTOR WORK

1.8 WEEKLY COORDINATION MEETINGS

1.9 CONTRACTOR EMPLOYEES

1.10 ACCESS AGREEMENTS AND WORK AREAS

1.10.1 Access Agreements

1.10.2 Work Areas

1.10.3 Employee Access and Parking

1.11 GOVERNMENT PROJECT ENGINEER'S OFFICE

1.12 SECURITY PROCEDURES

1.12.1 Contractor's General Personnel

1.12.2 Verification of Employment Eligibility

1.12.3 Identification of Employees

1.12.4 Non-US Citizens

1.12.5 Safeguarding of Information

1.13 PROJECT SECURITY

1.14 CONSTRUCTION PROJECT IDENTIFICATION SIGN

1.15 UTILITIES

1.15.1 Sanitary Facilities

1.15.2 Water

1.16 CONTRACTOR'S EQUIPMENT

1.16.1 Contractor's Planned Equipment Methods

1.16.2 Plant and Equipment List

1.17 WORKING HOURS

1.18 CONTRACTOR USE OF GOVERNMENT CRANES

1.19 DAMAGED EQUIPMENT OR ABNORMAL CONDITIONS

1.20 USE OF EXPLOSIVES

1.21 DAILY CLEANUP AND DISPOSAL

1.22 DISPOSAL OF EQUIPMENT AND MISCELLANEOUS MATERIALS

1.23 PROTECTION OF MATERIAL AND WORK

1.24 PROTECTION OF EXISTING UTILITIES

1.25 RESTORATION OF PROJECT ROADS

1.26 CONTRACTOR SURVEY DATA

1.26.1 SURVEYS

1.26.1.1 Pre-Construction Survey

1.26.1.2 Post-Construction Survey

1.26.2 Survey Field Notebooks

1.26.3 Data Storage

PART 2 PRODUCTS - NOT USED

SECTION 01 10 10.00 25 Page 1 Amendment 0001

PART 3 EXECUTION - NOT USED

-- End of Section Table of Contents --

SECTION 01 10 10.00 25 Page 2 Amendment 0001

SECTION 01 10 10.00 25

CONTRACTOR'S OPERATIONS AND REQUIREMENTS

PART 1 GENERAL

1.1 DESCRIPTION OF WORK

This Section covers general requirements applicable to specific Contractor's operations and equipment.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety -- Safety and Health Requirements Manual

EP 310-1-6A (2006; 2019 Change 2) Project Operation -- Sign Standards Manual, VOL 1

EM 1110-1-1005 (2007) Control and Topographic Surveying

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01 33 00, SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Schedule for Construction; G

Contractor's Planned Equipment Methods; G

Plant and Equipment List; G

Access Agreements And Work Areas

Security Procedures

SD-06 Test Reports

Survey Field Notebooks

Data Storage

1.4 SCHEDULE FOR CONSTRUCTION

a. In accordance with Section 00 72 00 Contract Clause 52.236-15, SCHEDULES FOR CONSTRUCTION CONTRACTS, submit a detailed schedule for accomplishing the work in this Contract. The schedule will not be

SECTION 01 10 10.00 25 Page 3 Amendment 0001 used by the Government to select a Contractor; rather it will be used to ensure that the Contractor is capable of accomplishing the necessary work in the allotted time periods. The schedule must be consistent with the completion dates as specified in Section 00 73 00 Contract Clause 52.211-10, COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK. Other Contractor's work must also be coordinated in accordance with Contract Clause 52.236-8, OTHER CONTRACTS.

b. Submit an updated schedule for Government approval on a monthly basis. The updated schedule will be used as a basis to evaluate the Contractor's progress for purposes of payment. Lack of an updated schedule will result in an inability of the Contracting Officer to perform a full evaluation of the Contractor's progress and will result in the Contracting Officer withholding payment until an updated schedule has been submitted and approved.

1.5 WORK RESTRICTIONS

The Government has established interim construction completion dates, described as "Levee Work Periods." The Levee Work Period is the only period that excavations may occur and that the flood protection capability of the levee may be degraded. The levee must be fully rebuilt prior to the end of the Levee Work Period. The Levee Work Period established for this Contract is: May 1st through September 30th.

1.6 INCLEMENT WEATHER CONSTRUCTION

The Contractor's schedule must reflect adverse weather days in all weather dependent activities as defined in Contract Clause 52.236-4, PHYSICAL DATA. Protect work areas from inclement weather, wind damage, and precipitation so that no delay in the prosecution of critical work items, or damage to USACE property occurs. No time extensions will be authorized for materials, work in place, or equipment damaged due to negligence during periods of inclement weather.

1.7 WORK BY THE GOVERNMENT CONCURRENT WITH CONTRACTOR WORK

The Government will limit interference with the Contractor's work to the maximum reasonable extent and the Government and Contractor shall coordinate as necessary.

1.8 WEEKLY COORDINATION MEETINGS

Weekly coordination meetings must be held between the Contractor and the Government. This meeting will be used to discuss Contractor's safety, Quality Control Program, joint risk management, submittals, deficiencies, Contract administration, schedule, actual progress in the last week, and work planned in the upcoming two weeks. Any work requiring Project support or potential impacts to Project operations or maintenance must be noted. During the Preconstruction Meeting, the Government will determine responsibility of running this meeting. If the Government elects to run the coordination meeting, the Contractor must provide a two week look ahead, with the previous week as-builts, 48 hours before each weekly meeting to the Government representative. The responsible party must prepare and distribute, by e-mail, the coordination meeting agenda with a two week look ahead no later than 24 hours before each meeting. A meeting time and place will be mutually agreed upon for the same time each week.

Distribute weekly coordination meeting minutes no later than the close of business the next business day.

SECTION 01 10 10.00 25 Page 4 Amendment 0001

1.9 CONTRACTOR EMPLOYEES

Ensure that all employees are capable of demonstrating adequate knowledge of tools, supplies, equipment, and techniques necessary to competently perform the work. All personnel employed by the Contractor must be fully qualified in their respective fields to render the services necessary.

The Government may require the Contractor to discontinue using any employee in the performance of the work specified in this Contract determined by the Government to be unsatisfactory. Contractor employees will not be permitted to bring guests, family members, or non-employees to the job site at any time.

1.10 ACCESS AGREEMENTS AND WORK AREAS

1.10.1 Access Agreements

a. Submit access procedures to and from the work site after the Contractor, the Contracting Officer, and the Project's Representative have coordinated and determined the most advantageous access to, and staging of, the Contractor's assets deployed to the work site.

b. The right-of-way for the work (or delivery site) and access thereto will be furnished as stated in this paragraph subject to mutual agreement between the Contractor and the Government concerning the specific route the Contractor is to use. Such mutual agreement must be reached prior to initiation, construction, or delivery.

c. The existing access roadway and any associated access roads on the Project, must not be closed as a result of construction or delivery activities associated with this Contract unless previously coordinated and approved by the Government. Traffic delays will only be permitted in accordance with the provisions of this Section.

d. When necessary to operate on or to cross existing highways or roads, all necessary permits must be obtained from the appropriate private or public authority.

e. In accordance with Section 00 72 00 Contract Clause 52.236-13 Alt I, ACCIDENT PREVENTION - ALTERNATE I, and EM 385-1-1 , flaggers, signs, lights, and/or other safeguards must be provided to safely control and direct the flow of traffic when necessary for equipment to operate on or to cross access roads, arterial roads, or highways.

f. Spillage on Project roads and state or county roads will not be permitted, and the spillage must be immediately cleaned up at the expense of the Contractor.

g. No cleated or crawler-type equipment shall be operated on paved surfaces.

h. Damage to all roads caused by the Contractor's operations must be repaired to pre-existing conditions at the expense of the Contractor.

i. Photograph the existing condition of all staging areas prior to mobilization and submit all photographs in the Access Agreements submittal. Failure to properly document existing conditions will result in a Government determination of necessary repairs.

SECTION 01 10 10.00 25 Page 5 Amendment 0001

1.10.2 Work Areas

a. Drawings showing the layout of the area proposed for use must be submitted for review and approval and comply with Contract Clause 52.236-10 OPERATIONS AND STORAGE AREAS. The drawing(s) must show the location of the principal components: offices, access roads, parking, storage facilities and disposal areas, which the Contractor proposes to construct within the designated limits.

b. Only Contractor and subcontractor parts trailers and lunch trailers may be allowed in the Contractor work areas and these must be subject to CO and Project approval. All Contractor and subcontractor trailers are required to be adequately and physically anchored to prevent overturning due to high winds.

1.10.3 Employee Access and Parking

Contractor's employee private vehicle parking areas must be restricted to the area as agreed upon before construction or delivery. All Contractor vehicles used for prosecuting the work must have a Contractor sign or other permanent identification and must carry the required insurance.

Private vehicles not owned by the Prime Contractor or subcontractors must not be used for prosecuting the work. Private vehicles of the Contractor and its employees must enter and leave the project as directed. Keep the parking areas free of litter and debris. An adequate number and size of trash receptacles must be placed in the parking areas and emptied, as necessary to avoid overflowing. Trash receptacles must be adequately secured to provide protection from the wind and animals.

1.11 GOVERNMENT PROJECT ENGINEER'S OFFICE

Provide the Government Project Engineer with a temporary office, approximately 200 square feet in floor area; locate where directed and provide space heat, cooling, electric light, and power. Provide a mail slot in the door or a lockable mail box mounted on the surface of the door. Include a 4- by 8-foot plan table, a standard size office desk, and a 5-wheeled, padded, ergonomic desk chair with lumbar support and armrests. All furniture must be in good, working condition. If the Contractor has Internet access installed in the trailer a minimum of one access point must be provided to the Government's office with an Ethernet cable. The office must have a minimum of one window with operable window blinds. The Contractor's drinking water must be available for consumption by onsite Government employees. Provide janitorial services at a minimum of once per week, including emptying of trash cans and sweeping and mopping of floors. Dedicate a minimum of two parking spots as "Government Parking Only" in the office parking area. At completion of the work, the office will remain the property of the Contractor and must be removed from the site. Utilities must be connected and disconnected in accordance with local codes and to the satisfaction of the Contracting Officer and all utility costs must be borne by the Contractor.

1.12 SECURITY PROCEDURES

1.12.1 Contractor's General Personnel

Prepare an organizational chart and revise whatever organizational changes occur. Maintain a complete organizational chart of all positions that will be working on the project.

SECTION 01 10 10.00 25 Page 6 Amendment 0001

1.12.2 Verification of Employment Eligibility

The Contractor is responsible to pre-screen Contractor and subcontractor personnel using the E-Verify Program at http://www.uscis.gov/E-verify to meet the established employment eligibility requirements. Two valid forms of Government issued identification will be required per individual to ensure the correct information is entered into the E-verify system.

Submit a roster of Contractor and subcontractor personnel with verified or eligible employment eligibility to the CO within three days of Notice to Proceed.

1.12.3 Identification of Employees

a. Submit a complete, dated and signed, list of all Contractor and subcontractor personnel and their titles who will be working on the project at the Weekly Coordination Meeting. This listing must be revised and resubmitted when personnel changes occur.

b. Personnel Identity Verification (PIV) - All personnel, including visitors, shall provide positive verification of individual identity, in the form of a valid Government-issued photo ID prior to being granted access to non-public areas. Driver licenses that do not comply with the REAL ID Act of 2005 cannot be used as the sole source for identity proofing, and a second form of photo ID will be required. For details and current information, see the Department of Homeland Security website https://www.dhs.gov/secure-drivers-licenses .

c. Personally Identifiable Information (PII) - All transmissions containing PII shall be encrypted or the document(s) containing PII shall be encrypted or password protected. All documents containing PII shall be sent directly to the Project RCC and/or Security Specialist.

1.12.4 Non-US Citizens

Submit a scanned legible color copy of the Permanent Resident Card and passport to the CO of all personnel who are non-US citizens working on this Contract. The CO shall provide the Portland District Security Office the submitted copies at least one month (30 calendar days) in advance of the start of work by the employees. Contractor personnel who are non-US citizens shall not be permitted access to the Project until the Foreign Visitor Authorization is received from HQUSACE. Contractor personnel who are non-US citizens shall not be permitted to work on the Contract at all until Foreign Visitor Authorization is received.

1.12.5 Safeguarding of Information

a. The personnel employed on this Contract may, in the performance of their assigned duties, have access to data and information pertaining to location of goods, supplies, parts, equipment, and vehicles.

Knowledge of this nature is considered restricted security information. This information shall be protected and safeguarded against disclosure to any unauthorized person or party and shall be furnished or used on an official "need to know" basis only.

Safeguarding of information is extended to dependents and guests of employees who may, in any manner, obtain any of the above-specified knowledge.

b. The Contractor shall coordinate with the CO for release of

SECTION 01 10 10.00 25 Page 7 Amendment 0001 information to the public concerning this Contract or any program related to this Contract. This clause covers Media Relations and Printed Materials.

1.13 PROJECT SECURITY

a. Submit the intended working hours of staff on site and identify any employees working in any capacity in accordance with the Subparagraph Identification of Employees .

b. Security of the Contractor's property and items furnished under this Contract, until the Government accepts items, are the Contractor's responsibility.

c. Salespersons, personnel seeking employment, and personal visitors are not authorized to enter non-public areas of the Project.

d. Signs may be erected outside the project containing instructions for personnel seeking the Contractor. The content and location of the signs will be approved by the CO prior to erection. Posts or other means of support, if required, must be provided by the Contractor and removed when the Contract is completed. Any open post holes must be suitably backfilled, prior to the end of the shift in which posts are removed, and any other damage must be repaired to preconstruction conditions.

1.14 CONSTRUCTION PROJECT IDENTIFICATION SIGN

Fabricate and install one construction project identification sign in accordance with EP 310-1-6A , Attachment A3, within three days of beginning site work.

1.15 UTILITIES

Provide utilities required for the performance of work under this Contract and water as described below.

1.15.1 Sanitary Facilities

Provide portable, temporary sanitary facilities in accordance with

EM 385-1-1 .

1.15.2 Water

Provide drinking water/handwashing water for all Contractor personnel working on the project.

1.16 CONTRACTOR'S EQUIPMENT

1.16.1 Contractor's Planned Equipment Methods

Submit proposed methods of transportation and operation of cranes and other heavy equipment for approval prior to commencement of those operations. Submittals must include the type, size, loadings of equipment, placement of outriggers, and the proposed transportation routes and work areas to be used on the project. Operation of heavy equipment adjacent to existing structures must be avoided when possible. Testing requirements and operation of cranes and other heavy equipment must be in accordance with EM 385-1-1 . All cranes, rigging, lifts, operators, SECTION 01 10 10.00 25 Page 8 Amendment 0001 vehicles, and other necessary means to move equipment or items must be Contractor-furnished as required to pursue and complete the work and must comply with EM 385-1-1 .

1.16.2 Plant and Equipment List

Within seven days prior to commencing site operations, provide a complete list of all plant and equipment to be used on the job site, exclusive of shop equipment. Throughout the life of the Contract, submit an up-to-date plant and equipment list with each progress payment request. Include rented equipment as well as lease purchase or sale leaseback equipment on the lists. Initial list and the revised monthly lists must indicate dates equipment is assigned to or removed from the project; deadline dates for repairs and returned for use; dates of the most recent and planned inspections; and adequate identification or description of each item of equipment including manufacturer's name (abbreviated), model number, manufacturer's serial number, year of manufacture, and Contractor's assigned serial or record number.

1.17 WORKING HOURS

The site is located adjacent to residences. Construction at the site may take place from 7 AM to 7 PM, Monday through Saturday. Construction must not take place at night (7 PM to 7 AM), on Sundays, or on Holidays.

Idling equipment, material deliveries, and mobilizing or demobilizing equipment are considered construction activities and must fall within the working hours.

1.18 CONTRACTOR USE OF GOVERNMENT CRANES

The Contractor will not be allowed to use Government cranes for any work or access. Use Contractor-furnished equipment to facilitate installation or handling of items and equipment for this Contract.

1.19 DAMAGED EQUIPMENT OR ABNORMAL CONDITIONS

Inform the CO immediately upon finding any damaged equipment or other abnormal conditions involving additional work in which the Contractor believes it has no responsibility. The failure or abnormality must not be disturbed until witnessed by the CO. Prior to proceeding further with work, the Contractor and the Government shall agree in writing as to the responsibility for the damage or abnormality. Any damage or abnormal conditions not reported as specified above must also be corrected.

1.20 USE OF EXPLOSIVES

Use of explosives will not be permitted.

1.21 DAILY CLEANUP AND DISPOSAL

Keep all work areas reasonably neat on a daily basis. Collect, remove, and dispose of all debris resulting from the work, such as waste metalwork, packing cases, scrap lumber, and other debris off-site at least once per week. Do not use the Government's trash cans, dump boxes, and other containers. Do not dispose of liquid waste in Project drains. All costs of removing debris must be incidental to the work, and therefore, no separate payment will be made.

SECTION 01 10 10.00 25 Page 9 Amendment 0001

1.22 DISPOSAL OF EQUIPMENT AND MISCELLANEOUS MATERIALS

Title to all materials and equipment to be disposed of, excepting materials salvaged for the Government, will be vested in the Contractor when beginning disassembly work or when such materials and equipment are designated as scrap. The Government will not be responsible for the condition, loss, or damage to such property after title transfer. The Contractor may retain these items in usable form and take possession of them providing that there is no subsequent cost or inconvenience to the Government. The Government does not guarantee that these items are complete or in working order and the Contractor must assume responsibility for any damages caused by their use immediately upon taking possession of them.

1.23 PROTECTION OF MATERIAL AND WORK

All materials, supplies, tools, equipment and Government property (including all tools, equipment, and special devices supplied by the Contractor and to be turned over to the Government at the end of the Contract) must at all times be protected and preserved in an approved manner. If material, equipment, supplies, and work performed are not adequately protected, such property may be protected by the Government and the cost thereof will be charged to the Contractor or deducted from any payment due.

1.24 PROTECTION OF EXISTING UTILITIES

Protect existing utilities in accordance with Contract Clause 52.236-9, PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS. Repairs must be made immediately and at Contractor's expense.

1.25 RESTORATION OF PROJECT ROADS

Project roads used for construction access will be evaluated and must be restored to their original condition by the Contractor as required.

Repair and restoration must be made at the expense of the Contractor.

1.26 CONTRACTOR SURVEY DATA

1.26.1 SURVEYS

Major survey control points will not be removed by the Contractor.

Preserve all existing and estblished benchmarks and panels onsite. The Contractor assumes full responsibility for detailed dimensions and elevations measured from control. All surveys must also meet the following requirements:

a. Surveys must be performed by a licensed surveyor or civil engineer registered in the state of Washington.

b. Survey must meet the standard for General Construction Site Plan Feature and Topo Detail as outlined in EM 1110-1-1005 .

c. Provide digital CADD files with raw data, processed elevation surface TIN, and contours readable in AutoCAD format.

d. Drawings and digital files must meet all other CADD specifications requirements according to Section 01 78 39.10 25, AS-BUILT DRAWINGS.

SECTION 01 10 10.00 25 Page 10 Amendment 0001

e. The project horizontal and vertical datums are WA83-SF and NAVD88, respectively.

f. Provide all geospatial data in the following coordinate systems:

HORIZONTAL COORDINATE SYSTEM:

North American Datum of 1983, 2011 Adjustment (NAD83 2011), Washington State Plane South Zone 4602 Units: U.S. Survey Feet

VERTICAL DATUM:

North American Vertical Datum of 1988 (NAVD88), Geoid 12B Units: Feet

g. Positional accuracy standards, measurements, testing, and reporting must follow ASPRS 2014 Positional Accuracy Standards for Digital Geospatial Data meeting the following standards:

HORIZONTAL ACCURACY CLASS:

0.16 ft RMSEx, 0.16 ft RMSEy, 0.23 ft RMSEr, and +/- 0.39 ft at 95% confidence

VERTICAL ACCURACY CLASS:

0.16 ft RMSEz and +/- 0.33 ft at 95% confidence

1.26.1.1 Pre-Construction Survey

Conduct and submit the Pre-Construction Survey to the Government for approval prior to commencement of construction activities. Collect topographic survey data at a density appropriate for the terrain gradient and topographic detail in accordance with EM 1110-1-1005. Extend the survey area to 100 feet beyond the limits of planned construction as shown on the contract drawings. Survey the horizontal location of all visible surface features located in or near the construction limits.

1.26.1.2 Post-Construction Survey

Conduct and submit the Post-Construction Survey upon completion of the project. Collect topographic survey data at a density appropriate for the terrain gradient and topographic detail in accordance with EM 1110-1-1005. Extend the survey area to 100 feet beyond the limits of disturbed area. Include the final pipe location and invert elevations.

The Post-Construction survey will be used to verify the final grades, elevations, and inverts of new and repaired project features are within the specified tolerances of the elevations, grades, and inverts shown on the plans. The Contractor is responsible for reworking or repairing any feature or location that devieates from the plans by more than the specified tolerances.

1.26.2 Survey Field Notebooks

Submit waterproof Survey Field Notebooks written in a legible, sequential manner. No erasures are to be made. Field notes must be reduced and checked with each page initialed by the reviewer. Initial reductions must be made in black pencil; corrections by reviewing personnel must be in red pencil. An electronic data collection device may be used, provided that the resulting field data is submitted on 8 1/2- by 11-inch paper. Written data collector information must contain the offset distance from the

SECTION 01 10 10.00 25 Page 11 Amendment 0001 location line/preliminary line/base line, the elevation reading, the station, and a brief feature description. Label information submitted to indicate each facet of work and include all computations and coordinates.

Each notebook submitted must bear the signature and seal of a registered land surveyor following the statement: "I certify that the data in this field notebook has been reviewed and checked and is true and correct."

1.26.3 Data Storage

In addition to field notes submit a CD-R using the current version of Microsoft Windows© Operating System. The file must contain coordinates, elevations, and station values relating to control points on the location line/preliminary line/base line and cross sections along the line. The information must be IBM PC compatible, and presented in the American Standard for Information (ASCII) format. Data on the disk must conform to the following format:

a. An 80-column format with 15 columns devoted to Northing coordinates, Easting coordinates, elevations, and location line/preliminary line/base line station values. Reserve the remainder of the 80 columns for additional designations.

b. The Northing (Y) and Easting (X) coordinates and elevation values must be shown to three places to the right of the decimal and be right justified.

c. A point identification abbreviation must be entered in the field immediately right of the station value. Typical points and identifications are: angle point (AP); back tangent (BK TAN); forward tangent (FWD TAN); angle split (A SPLT); point of curve (PC); point of tangent (PT); and other significant features such as top of rock, centerline of road, railroad bridge, edge of pavement, corner of building, etc.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

-- End of Section --

SECTION 01 10 10.00 25 Page 12 Amendment 0001

SECTION TABLE OF CONTENTS

DIVISION 32 - EXTERIOR IMPROVEMENTS

SECTION 32 31 26.00 25

WIRE FENCES AND GATES

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 QUALITY ASSURANCE

1.4 DELIVERY, STORAGE, AND HANDLING

PART 2 PRODUCTS

2.1 FENCE FABRIC

2.1.1 Woven Wire

2.2 GATES

2.3 POSTS

2.3.1 Wood Posts

2.4 CONCRETE

PART 3 EXECUTION

3.1 INSTALLATION

3.2 EXCAVATION

3.3 FENCE POST INSTALLATION

3.4 ELECTRIC WIRE

3.5 GATE ASSEMBLY

3.6 GROUNDING

-- End of Section Table of Contents --

SECTION 32 31 26.00 25 Page 1 Amendment 0001

SECTION 32 31 26.00 25

WIRE FENCES AND GATES

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN WOOD PROTECTION ASSOCIATION (AWPA)

AWPA U1 (2022) Use Category System: User Specification for Treated Wood

ASTM INTERNATIONAL (ASTM)

ASTM A116 (2022) Standard Specification for Metallic-Coated, Steel Woven Wire Fence Fabric

ASTM A153/A153M (2016a) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware

ASTM A780/A780M (2020) Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings

ASTM C94/C94M (2021b) Standard Specification for Ready-Mixed Concrete

ASTM F1083 (2018) Standard Specification for Pipe, Steel, Hot-Dipped Zinc Coated (Galvanized) Welded, for Fence Structures

ASTM F626 (2014; R 2019) Standard Specification for Fence Fittings

U.S. DEPARTMENT OF DEFENSE (DOD)

UFC 4-022-03 (2013) Security Fences and Gates

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00

SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Installation Drawings

SECTION 32 31 26.00 25 Page 2 Amendment 0001

Fence Installation (G)

Location of Gate, Corner, End, and Pull Posts

Gate Assembly

Gate Hardware and Accessories

SD-03 Product Data

Manufacturer's Instructions

Gate Assembly

Gate Hardware and Accessories

1.3 QUALITY ASSURANCE

Provide manufacturer's instructions that detail proper assembly and materials in the design for fence, gate assembly, gate hardware and accessories. Submit Installation drawings clearly indicating Fence Installation Location of gate, corner, end, and pull posts; Gate Assembly, Gate Hardware, catalog data and Accessories.

1.4 DELIVERY, STORAGE, AND HANDLING

Deliver materials to site in an undamaged condition. Store materials off the ground to provide protection against oxidation caused by ground contact.

PART 2 PRODUCTS

2.1 FENCE FABRIC

Provide fence fabric conforming to the following:

2.1.1 Woven Wire

Provide woven wire conforming to UFC 4-022-03 , Sheet UFC-730 and ASTM A116 No. 9 farm fence; grade, site as indicated. Applicable fittings shall conform to ASTM F626.

2.2 GATES

Provide and install gate type and swing shown conforming to UFC 4-022-03 , Sheet UFC-731 "Typical Panel Gate Elevation", ASTM F1083, and ASTM A153/A153M . Gate shall conform to strength and coating requirements of ASTM F1083 for Group IA, steel pipe, with external coating Type A, nominal pipe size (NPS) 1-1/2. Gate leaves more than 8 feet wide shall have either intermediate members and diagonal truss rods or tubular members as necessary to provide rigid construction, free from sag or twist. Welding is not permitted. Furnish and install hinges, stops, keepers, rollers, and other hardware items as required for the operation of the gate. Provide stops for holding the gates in the open position.

Provide two 12' wide gate sections capable of allowing 24-ft clear opening. Provide gates with minimum height of 4 ft and maximum height of 6 ft.

SECTION 32 31 26.00 25 Page 3 Amendment 0001

2.3 POSTS

2.3.1 Wood Posts

Provide wood posts cut from sound and solid trees free from short or reverse bends in more than one plane. Make tops convex rounded or inclined. Provide posts free of ring shake, season cracks more than 1/4 inch wide, splits in the end, and unsound knots. Provide posts with a length of 6.5 feet and shape indicated. Treat posts in accordance with AWPA U1 as applicable.

2.4 CONCRETE

ASTM C94/C94M, using 3/4 inch maximum size aggregate, and having minimum compressive strength of 3000 psi at 28 days. Provide grout consisting of one part portland cement to three parts clean, well-graded sand and the minimum amount of water to produce a workable mix.

PART 3 EXECUTION

3.1 INSTALLATION

Install fence to the lines and grades indicated. Clear the area on either side of the fence line to the extent required for installation. Space line posts equidistant at intervals not exceeding 10 feet. Set terminal (corner, gate, and pull) posts at abrupt changes in vertical and horizontal alignment. Provide continuous fabric between terminal posts;

however, runs between terminal posts shall not exceed 500 feet. Any damage to galvanized surfaces, including welding, shall be repaired with paint containing zinc dust in accordance with ASTM A780/A780M .

3.2 EXCAVATION

Clear loose material from all post holes. Spread waste material where directed. Eliminate ground surface irregularities along the fence line to the extent necessary to maintain a 2 inch clearance between the bottom of the fabric and finish grade.

3.3 FENCE POST INSTALLATION

For wood posts (Farm Style Fence), excavate to depth indicated and brace post until backfill is completed. Place soil backfill (approved satisfactory materials) in layers of 9 inches or less, moistened to optimum condition, and compacted with hand tampers or other approved method. Set posts plumb and in proper alignment. A minimum embedment depth of 2.5 feet must be achieved for each post.

3.4 ELECTRIC WIRE

Install two 12-gauge electric wires on the north side of the fence. The wire spacing from the ground surface shall be 16 inches for the bottom wire and between 34 to 40 inches for the top wire.Pull wires taut to provide a smooth uniform appearance, free from sag. Fasten wire to posts using insulated fasteners that allow the wire to flow or slide past line posts as necessary, unless indicated otherwise.

3.5 GATE ASSEMBLY

For farm style fencing, provide standard metal gate assemblies with frame

SECTION 32 31 26.00 25 Page 4 Amendment 0001 and fittings necessary for complete installation.

3.6 GROUNDING

Ground fences on each side of all gates, at each corner, at the closest approach to each building located within 50 feet of the fence, and where the fence alignment changes more than 15 degrees. Grounding locations shall not exceed 650 feet. Each gate panel shall be bonded with a flexible bond strap to its gate post. Ground fences crossed by powerlines of 600 volts or more at or near the point of crossing and at distances not exceeding 150 feet on each side of crossing. Ground conductor shall consist of No. 8 AWG solid copper wire. Grounding electrodes shall be 3/4 inch by 10 foot long copper-clad steel rod. Drive electrodes into the earth so that the top of the electrode is at least 6 inches below the grade. Where driving is impracticable, bury electrodes a minimum of 12 inches deep and radially from the fence. The top of the electrode shall not be less than 2 feet or more than 8 feet from the fence. Clamp ground conductor to the fence and electrodes with bronze grounding clamps to create electrical continuity between fence posts, fence fabric, and ground rods. After installation, the total resistance of fence to ground shall not be greater than 25 ohms.

-- End of Section --

SECTION 32 31 26.00 25 Page 5 Amendment 0001

PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 10 10.00 25 - CONTRACTOR'S OPERATIONS AND REQUIREMENTS
01 10 10.00 25 - CONTRACTOR'S OPERATIONS AND REQUIREMENTS
PART 1 GENERAL
1.1 DESCRIPTION OF WORK
1.2 REFERENCES
1.3 SUBMITTALS
1.4 SCHEDULE FOR CONSTRUCTION
1.5 WORK RESTRICTIONS
1.6 INCLEMENT WEATHER CONSTRUCTION
1.7 WORK BY THE GOVERNMENT CONCURRENT WITH CONTRACTOR WORK
1.8 WEEKLY COORDINATION MEETINGS
1.9 CONTRACTOR EMPLOYEES
1.10 ACCESS AGREEMENTS AND WORK AREAS
1.10.1 Access Agreements
1.10.2 Work Areas
1.10.3 Employee Access and Parking
1.11 GOVERNMENT PROJECT ENGINEER'S OFFICE
1.12 SECURITY PROCEDURES
1.12.1 Contractor's General Personnel
1.12.2 Verification of Employment Eligibility
1.12.3 Identification of Employees
1.12.4 Non-US Citizens
1.12.5 Safeguarding of Information
1.13 PROJECT SECURITY
1.14 CONSTRUCTION PROJECT IDENTIFICATION SIGN
1.15 UTILITIES
1.15.1 Sanitary Facilities
1.15.2 Water
1.16 CONTRACTOR'S EQUIPMENT
1.16.1 Contractor's Planned Equipment Methods
1.16.2 Plant and Equipment List
1.17 WORKING HOURS
1.18 CONTRACTOR USE OF GOVERNMENT CRANES
1.19 DAMAGED EQUIPMENT OR ABNORMAL CONDITIONS
1.20 USE OF EXPLOSIVES
1.21 DAILY CLEANUP AND DISPOSAL
1.22 DISPOSAL OF EQUIPMENT AND MISCELLANEOUS MATERIALS
1.23 PROTECTION OF MATERIAL AND WORK
1.24 PROTECTION OF EXISTING UTILITIES
1.25 RESTORATION OF PROJECT ROADS
1.26 CONTRACTOR SURVEY DATA
1.26.1 SURVEYS
1.26.1.1 Pre-Construction Survey
1.26.1.2 Post-Construction Survey
1.26.2 Survey Field Notebooks
1.26.3 Data Storage
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 31 26.00 25 - WIRE FENCES AND GATES
32 31 26.00 25 - WIRE FENCES AND GATES
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 QUALITY ASSURANCE
1.4 DELIVERY, STORAGE, AND HANDLING
PART 2 PRODUCTS
2.1 FENCE FABRIC
2.1.1 Woven Wire
2.2 GATES
2.3 POSTS
2.3.1 Wood Posts

2.4 CONCRETE

PART 3 EXECUTION
3.1 INSTALLATION
3.2 EXCAVATION
3.3 FENCE POST INSTALLATION
3.4 ELECTRIC WIRE
3.5 GATE ASSEMBLY
3.6 GROUNDING