This solicitation is for West Coast hopper dredging services for 2023. The U.S. Army Corps of Engineers, Portland District is seeking a contractor to perform dredging at multiple locations along the West Coast, including Humboldt Bay, CA, the Mouth of the Columbia River in OR/WA, the Lower Columbia River in OR/WA, San Clemente Beach in CA, and Encinitas and Solana Beaches in CA. The scope of work involves furnishing supervision, labor, materials and equipment to complete dredging in accordance with contract requirements. The estimated value of the contract is between $25-100 million. The solicitation was released on February 28, 2023, with bids due by March 30 at 1:00 PM Pacific Time. The point of contact for questions is the USACE-NWP Contracting Office.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NO. 2. DATE ISSUED 3. DATE OPENED PAGE 1 OF 1
2/28/2023 4/3/2023
4. ISSUING OFFICE
DISTRICT ENGINEER CONTRACT SPECIALIST SIGNATURE CONTRACTING OFFICER SIGNATURE
PORTLAND DISTRICT, CORPS OF ENGINEERS
P.O. BOX 2946
PORTLAND, OR 97208-2946
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
(CHECK A, B, OR C AND COMPLETE NO.1 NO.2 NO.3
D, E, AND F.) A. OFFEROR A. OFFEROR A. OFFEROR
X A. HIRED LABOR
B. REASONABLE CONTRACT B. BID SECURITY
(WITHOUT PROFIT) 20% of bid price
C. REASONABLE CONTRACT C. ADDENDA ACKNOWLEDGED C. ADDENDA ACKNOWLEDGED ADDENDA ACKNOWLEDGED
(INCLUDING PROFIT) YES YES
6. NUMBER OF ADDENDA ISSUED
7A.
ITEM D. E. UNIT F. ESTIMATED D. UNIT F. ESTIMATED D. UNIT F. ESTIMATED D. UNIT F. ESTIMATED
NO. QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
MANDATORY CLINS
0001 Mobilization and Demobilization 1 JOB 8,450,000.00$ 8,450,000.00$ 7,750,000.00$ 7,750,000.00$ -$ -$ 0002 HUM, Bin Measure to Required Depth, HOODS Ocean Placement 300,000 CY 4.30$ 1,290,000.00$ 4.70$ 1,410,000.00$ -$ -$ 0003 LCR Maintenance, RM 3+00 to RM 25+00, Bin Measure, Flow Lane (FL) Placement 200,000 CY 3.80$ 760,000.00$ 3.50$ 700,000.00$ -$ -$ 0004 LCR Maintenance, RM 3+00 to RM 105+00, Pre/Post Dredge Survey, (FL) Placement 650,000 CY 4.20$ 2,730,000.00$ 4.70$ 3,055,000.00$ -$ -$ 0007 LCR Maintenance, RM 3+00 to RM 105+00, Bin Measure to Required Depth 250,000 CY 3.90$ 975,000.00$ 4.00$ 1,000,000.00$ -$ -$ 0008 LCR Increment Transit Miles for Material Placement Site (other than five miles one-way) Cubic Yard x Miles 3,300,000 CY 0.31$ 1,023,000.00$ 0.30$ 990,000.00$ -$ -$
0009 LCR Intra-Project Transit Miles 250 MI 462.00$ 115,500.00$ 450.00$ 112,500.00$ -$ -$ 0010 MCR, Bin Measure, Shallow Water Site (SWS) or North Jetty Site (NJS) Placement 1,300,000 CY 3.10$ 4,030,000.00$ 4.00$ 5,200,000.00$ -$ -$ 0013 MCR, Bin Measure, Increment for Operations and Maintenance Deep Water Site (DWS) Placement 300,000 CY 1.20$ 360,000.00$ 2.50$ 750,000.00$ -$ -$
SUBTOTAL FOR MANDATORY LINE ITEMS 19,733,500.00$ 20,967,500.00$ -$ -$
OPTIONAL CLINS
0005 LCR Maintenance, RM 3+00 to RM 105+00, Pre/Post Dredge Survey, (FL) Placement (OPTIONAL) 350,000 CY 4.00$ 1,400,000.00$ 4.55$ 1,592,500.00$ -$ -$
0006 LCR Maintenance, RM 3+00 to RM 105+00, Pre/Post Dredge Survey, (FL) Placement (OPTIONAL) 350,000 CY 4.00$ 1,400,000.00$ 4.20$ 1,470,000.00$ -$ -$
0011 MCR, Bin Measure, Shallow Water Site (SWS) or North Jetty Site (NJS) Placement (OPTIONAL) 300,000 CY 3.10$ 930,000.00$ 3.00$ 900,000.00$ -$ -$
0012 MCR, Bin Measure, Shallow Water Site (SWS) or North Jetty Site (NJS) Placement (OPTIONAL) 250,000 CY 3.10$ 775,000.00$ 2.50$ 625,000.00$ -$ -$ 0014 MCR, Bin Measure, Increment for Operations and Maintenance Deep Water Site (DWS) Placement (OPTIONAL) 300,000 CY 1.20$ 360,000.00$ 2.00$ 600,000.00$ -$ -$
0015 MCR, Bin Measure, Increment for Operations and Maintenance Deep Water Site (DWS) Placement (OPTIONAL) 250,000 CY 1.20$ 300,000.00$ 2.00$ 500,000.00$ -$ -$
0016 SDB, SDB, Incremental Mobilization/Demobilization (OPTIONAL) 1 JOB 6,610,000.00$ 6,610,000.00$ 6,850,000.00$ 6,850,000.00$ -$ -$
0017 SDB, Solana Beach, Pre/Post Beach Survey, Beach Placement (OPTIONAL) 700,000 CY 21.10$ 14,770,000.00$ 21.60$ 15,120,000.00$ -$ -$
0018 SDB, Encinitas Beach, Pre/Post Beach Survey, Beach Placement (OPTIONAL) 340,000 CY 32.60$ 11,084,000.00$ 32.60$ 11,084,000.00$ -$ -$
0019 SCS, Incremental Mobilization/Demobilization (OPTIONAL) 1 JOB 1,920,000.00$ 1,920,000.00$ 700,000.00$ 700,000.00$ -$ -$
0020 SCS, San Clemente Beach, Pre/Post Beach Survey, Beach Placement (OPTIONAL) 200,000 CY 28.10$ 5,620,000.00$ 42.60$ 8,520,000.00$
SUBTOTAL FOR OPTIONAL LINE ITEMS 45,169,000.00$ 47,961,500.00$ -$ -$
64,902,500.00$ 68,929,000.00$ -$ -$
NSN 7540-01-150-0981
ABSTRACT OF OFFERS
W9127N23B0003
I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT
ALL OFFERS RECEIVED IN RESPONSE TO THIS SOLICITATION.
West Coast Hopper Maintenance Dredging 2023
7B. DESCRIPTION OF OFFERED ITEM
TOTAL
ACCEPTANCE LIMITATION - DAYS
INFORMALITIES
Manson Construction Co.
5209 E Marginal Way S Seattle, WA 98134
B. BID SECURITY B. BID SECURITY
STANDARD FORM 1419 (10-3)
| 2023-04-03T13:03:34-0700 | |
| FLORES.KRISTEL.MADARIAGA.1280597402 |
| 2023-04-03T13:40:45-0700 | |
| JOHNSON.MITCHELL.JEFFREY.1366665095 |
File details come from the government source that posted it. Updated .