B.08 Inquiries and responses.pdf
PDF 118 KB Posted
- Attached to
- The Dalles Construction Trailer
- Solicitation number
- W9127N22Q0126
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Inquiries and responses to W9127N22Q0126
• No need for a general building permit or a mechanical permit. Correct – this takes place on Federal property.
• Contractor includes and provides an electrical permit as required for the disconnects and reconnects. No electrical permit required with the local utility as power is provided directly via dam facilities. There will be need to coordinate for any electrical disconnects and reconnects, however, this can be done via your local POC / COR.
• Assume no asbestos in trailer materials to be demolished and disposed. Correct
• Assume no actionable quantity of lead-containing coatings on trailer materials to be demolished and disposed. Correct
• No requirement that Contractor provide performance or payment bonds. Correct – dollar value is under the requirement threshold in FAR 28.103.
File details come from the government source that posted it. Updated .