W66QKZ11887152
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
a. The purpose of this amendment is to further revise the PWS on account of requirements that have been determined not applicable to this project. Addtionally, attachments AEC Graphics Standard R2.1, and AEC CAD Standard R6.1 are removed. See Summary of Changes for further details.
b. The Solcitation's Offer Due Date is extended to 3 November 2021 at 2PM Pacif ic.
c. No other changes are made or implied.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 8
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Oct-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N22Q0002
X 9B. DATED (SEE ITEM 11)
22-Oct-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Oct-2021
CODE
USACE, PORTLAND DISTRICT
333 SW 1ST AVE
PORTLAND OR 97204
W9127N 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9127N22Q0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 29-Oct-2021 02:00 PM to 03-Nov-2021 02:00 PM.
The following have been modified:
PERFORMANCE WORK STATEMENT PWS
PERFORMANCE WORK STATEMENT (PWS) FOR
PORTLAND DISTRICT COMPUTER AIDED DRAFTING (CAD) SERVICES
1.0 GENERAL STATEMENT.
The Contractor shall provide all personnel, equipment, tools, materials, software, supervision, and other items and services necessary to perform CAD services as defined in this Performance Work Statement (PWS) for the Portland District (NWP) US Army Corps of Engineers (USACE). Drawing types include civil, structural, mechanical, and electrical disciplines. The focus of the requirement is accurate, high production CAD work services and should not be confused with design services. Services are not required to be performed at a physical USACE project site and rather will be performed at the Contractor’s place of business. The Contractor shall perform to the standards in the contract and comply with all local, state, and federal regulations during the services performed.
The period of performance for this firm fixed price contract will be 75 calendar days from award date (see below).
The contractor shall complete and provide the Government, for its review and acceptance, a weekly delivery of a minimum 15 Vectorized drawings with all 256 Drawings completed on or before the end of the 75 calendar days performance period.
2.0 DEFINITIONS. Throughout this PWS terms are defined as follows:
Contracting Officer (KO): The Government employee who is authorized to enter into, administer, and/or terminate contracts and make related determinations and findings.
Contracting Officer’s Representative (COR): The Government employee who has been authorized in writing as the Contracting Officer’s Representative, acting within the limits of their authority.
Contract Discrepancy Report (CDR): A written record of unsatisfactory performance by the Contractor as observed by the Contracting Officer’s Representative (COR).
3.0 GOVERNMENT WILL FURNISH
3.1 Electronic files in Tagged Image File Format (TIFF) or Portable Document Format (PDF) format of the drawings will be delivered to the contractor for vectorizing.
3.2 Electronic border and seed files for AutoCAD drawings with tag sets.
3.3 File naming conventions.
3.4 RESERVED.
3.5 File Transfer Protocol (FTP) services for safe file transfer between Government and contractor via
DoDSafe: https://safe.apps.mil/
3.6 Points of contact for contract; identified after award.
https://safe.apps.mil/
4.0 CONTRACTOR SHALL FURNISH
4.1 The Contractor shall furnish all labor, equipment, and software necessary to perform the work required under this performance work statement. Contractor’s software shall remain current with the Government’s version of the following CAD software throughout the duration of the contract: AutoCAD 2019.
Contractor shall provide a software list (brand, software and version) for approval prior to beginning this CONTRACT. Any changes to the software list throughout the period of this contract shall be submitted to the COR.
4.2 The CAD services listed in section 5.1
4.3 Quality control of CAD services (see paragraph 6.1.2).
4.4 Means of communication with the Government including email, phone call, web conference, and FTP file transfer systems. The Government may require periodic coordination meetings by teleconference or web conference.
5.0 PERFORMANCE STANDARDS AND GUIDELINE REQUIREMENTS
The Contractor (shall vectorize and/or update Government furnished drawings or models in AutoCAD format as requested and shall make them available for the Government to download. Electronic files in TIFF or PDF format of the drawings or sketches will be delivered to the contractor for vectorizing. Start all new files from provided Seed or Template files.
AutoCAD drawing requirements for converting scanned drawings shall follow the general guidelines below:
• All lines and text to be drawn in color 252 and by-layer
• No Stacked fractions
• All dimensions aligned and above the dimension line
• Dimensions to be put on a dim style. No broken dimensions or leaders
• All arrow terminators for dimensions and leaders for callouts to be filled, be 1/16” wide and 3/16” long (a ratio of 1.5 length and .5 width)
• Centerlines are line style 4
• Hidden lines are line style 2
• All text to be in Arial (Regular) font
• Text height and width for notes, dimension text, call-outs to be 3/32”
• Text height and width for view titles and headings to be 3/16”
• Electrical components/devices to be on layer named E-DIAG-GRPH
• Electrical text only to be on layer named E-ANNO-TEXT
• Mechanical components and text to be on an “M” layer
• Structural components and text to be on an “S” layer (all architectural elements like concrete outlines or walls to be placed on the “S” layer and not “A” layer)
• All text for general notes or border text to be on a “G” layer
• All text with leaders is to be dynamically justified
• No periods after any abbreviation
• All objects should be dimensioned with one dimension style with 1/8" text with annotative scale on.
• All models to be drawn in model space at one-to-one scale
Turn-around time for drawings shall be minimum of 15 drawings per week, delivered weekly on Fridays.
Contractor produced or modified drawings or models shall match the original files including dimensional accuracy and the original title blocks unless otherwise noted. TrueType fonts shall be used unless otherwise specified. File naming conventions shall match the original file names furnished by the Government unless otherwise noted. All drawings shall be vector drawings, hybrid or raster images are not acceptable.
All electronic copies of drawings shall become the property of the Government. The information developed, gathered, assembled, and reproduced by the CONTRACTOR or their associates, in fulfillment of the contract requirements as defined in or related to this performance work statement, shall become the complete property of the Government. Therefore, the CONTRACTOR shall not use/release the information for any purposes at any time without the written consent of the KO. All drawing and information contained therein shall be treated as “For Official Use Only” (FOUO) as defined by the Government.
The following guidelines describe what is considered adequate for CAD services under this contract. The Contractor, through innovation, technology, or other means, shall perform the necessary CAD services in order to meet the quality and performance standards required by the contract.
The following guidelines are for reference only and final results shall be the determining factor for the success or failure of this contract. Performance shall be based on the Contracting Officer’s, or their designated representative’s, evaluation of performance and quality results, not the method of performance.
5.1 CAD SERVICES
This section contains general services and work requirements that are applicable to the CAD work covered by this contract. The items in this section are listed as separate items according to location in the Bid Schedule.
General CAD services required include:
a. Vectorize an existing drawing or sketch (2D). The base files will be in PDF or TIFF format and be based either on existing Government drawings or hand sketches. Sizes will vary from ANSI A (8.5 in x 11 in) to Engineering F (28 in x 40 in) and standard sizes in between.
b. Provide transfer of electronic CAD files via email or FTP site, as requested (applicable to 1-6 above).
c. Provide final drawings in PDF or TIFF in addition to electronic CAD files, as requested (applicable to 1-6 above).
6.0 PERFORMANCE REQUIREMENTS SUMMARY
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
It is intended to ensure that the Government receives the services for which it contracted. The Government will only pay for services received. The Performance Requirements Summary (PRS) determines if the contractor meets the performance standards of the contract, as well as provides guidelines for how and when surveillance will be performed. It ensures timeliness, effectiveness, and that the contract is delivering the results specified in the contract. Government contract quality assurance will be performed at such times and/or places as may be necessary to determine the services conform to contract requirements.
If the Contractor fails to perform at any time and the work is deemed critical by the COR, Government forces may be assigned to perform the work. If this occurs, the Contractor shall be required to reimburse the Government for the full costs of the work performed including labor, materials, transportation, and supervision.
These are the criteria against which the performance will be evaluated.
PERFORMANCE REQUIREMENTS SUMMARY
Performance Objective
Performance Standard
Allowed Number of
Discrepancies Surveillance Validated
Complaints
Portland District CAD Services CONTRACT
Vectorize an existing drawing or sketch (2D), 5.1.1
Drawing is fully vectorized, functional, and editable. All attributes are present.
Drawing conforms to CAD standards. Adequate communication performed in timely manner. Meets PWS requirements.
1 every 10 drawings, not to exceed 5% of substantive content of drawing.
100% Surveillance (Each drawing).
1 per group.
Security requirements, 7.2 and identification of employees, 7.3
Provide COR with a list of all employees who work under this contract and identify workers with a criminal record in accordance with PWS.
None Periodic (Weekly, Biweekly, Monthly)
6.1.1 Surveillance: 100% surveillance with periodic inspections by the COR, in addition to complaints from
Government personnel under this contract, will serve as the surveillance method. If the COR discovers deficiencies and/or receives complaints, the COR will pass them on to the Contractor's Quality Control Inspector (QCI) for correction.
6.1.2 Quality Control: The Contractor, not the Government, is responsible for quality control actions necessary to meet the quality standards set forth by the contract. The Government reserves the right under the Contract Terms and Conditions—Commercial Items (FAR 52.212-4) to inspect and test the services called for by the contract, to the extent practicable at all times and places during the term of the contract. Non-conforming services shall be rejected.
6.1.3 Unacceptable Performance: When performance is determined unacceptable, as defined in the
Performance Requirements Summary, the COR will inform the Contractor’s on-site representative that performance is unacceptable and provide written documentation by use of the form DD 2772, Contract Discrepancy Report. By initialing and dating the form, the Contractor is only acknowledging notification of unacceptable performance. Disputes in surveillance should be referred to the Contracting Officer.
6.1.4 The Government COR will notify the Contracting Officer of less than acceptable performance. If any of the services do not conform to contract requirements, the Government may require the Contractor to perform the services again in conformity with the contact requirements, at no increase in contract amount. When the defect(s) in services cannot be corrected by re-performance, the Government may:
a. Require the Contractor to take necessary action to ensure future performance conforms to contract requirements.
b. Reduce the contract price to reflect the reduced value of the services performed.
c. If the Contractor fails to promptly re-perform the services, or to take the necessary action to ensure future performance in conformity with contract requirements, the government may:
(1) By contract or otherwise, perform the services and charge to the Contractor any cost incurred by the government that is directly related to the performance of such service or
(2) Issue Cure Notice
(3) Terminate the contract for Government convenience
(4) Terminate the contract for Cause.
6.2 Correction of Non-Performance of Work
The Contractor shall employ an adequate quantity of personnel to ensure that any service found to be not in compliance and therefore not acceptable, shall be made acceptable by the performance or re-performance of the work, where such re-performance is possible, during the first business day after non-compliance has been observed by or reported to and verified by the COR.
6.2.1 Recurring defects are not permitted for any of the above service items. For example, if the COR discovers a deficiency in the drawings under the contract, the Contractor is required to correct the defect through re-performance. No defect is recorded against the Contractor's performance. However, if this same situation occurs again during the contract period, a defect will be recorded and reported to the Contracting Officer for appropriate action in accordance with FAR 52.212.4, Contract Terms and Conditions-Commercial Items (July 2013).
The Contractor shall employ a Project Manager who shall be available between 7:30 AM to 5:30 PM PST Monday through Friday oversee the work at the time it is being performed, and who shall have authority to represent the Contractor in dealing with the Government.
6.3 Work Scheduling
6.3.1 CAD Services work performed under this contract shall be tracked on an up-to-date schedule indicating the number of drawings being worked on and their due dates including past work already completed under the contract.
Communications with the Government shall take place between normal business hours as listed above and must result in a minimum conflict between the Government and Contractor’s employees. The COR maintains the authority to adjust the working hours to meet Government needs.
6.4 Damages Caused by the Contractor: The Contractor shall be held accountable and liable to the
Government for any damages to Government files or data caused by the Contractors or their employees.
The Contractor is responsible for reporting any such known damages to the COR within one business day from the time that the damages are known by the Contractor.
7.0 SAFETY AND ENVIRONMENTAL REGULATIONS
7.1 General: The Contractor shall comply with applicable Occupational Safety and Health Act (OSHA) standards as well as the Corps of Engineers Safety Requirements Manual, EM 385-1-1, dated November 2014 or most current edition. The OSHA standards are subject to change and such changes may affect the Contractor during performance under the contract. It is the Contractor’s responsibility to be aware of such changes.
7.2 Security Requirements
7.2.1 Pre-screen Candidates using E-Verify Program. The Contractor shall pre-screen all employees using the E-Verify Program (http://www.uscis.gov/E-Verify) website to meet the established employment eligibility requirements. The Prime Contractor shall ensure that each employee has two valid forms of Government issued identification to ensure the correct information is entered into the E-Verify system. An initial list of verified/eligible employees must be provided to the COR no later than three (3) working days after award.
http://www.uscis.gov/E-Verify
8. GENERAL.
8.1 Contract Administration. Contract will be administered by the following:
Department of the Army, Portland District, Corps of Engineers P. O. Box 2946 Attn: CECT-NWP-S Portland, Oregon 97208-2946
Contract Specialist: Robbie Newland, robbie.r.newland@usace.army.mil , 503-808-4634
Contracting Officer Representative: Meghan Garriques, meghan.e.garriques@usace.army.mil 503-808-4410
8.2 Invoice Submittals (in accordance with FAR Clause 52.212-4(g)).
Original to:
U.S. Army, COE, Finance Center Attn: CEFC-AO-P 5722 Integrity Drive Millington, TN 38054-5005
One Electronic Copy to the following:
Finance Center: cefc-g2invoices@usace.army.mil Contracting Officer Representative: Meghan Garriques, meghan.e.garriques@usace.army.mil 503-808-4410
8.3 WALSH-HEALEY PUBLIC CONTRACTS ACT OR THE MCNAMARA-O’HARA SERVICE
CONTRACT ACT (SCA). Every employer performing work covered by the Walsh-Healey Public Contracts Act or the McNamara-O'Hara Service Contract Act (SCA) is required to post a notice of the compensation required (including, for service contracts, any applicable wage determination) in a prominent and accessible location at the worksite where it may be seen by all employees performing on the contract.
A copy of the poster is available in two versions at the following DOL website:
http://www.dol.gov/whd/regs/compliance/posters/sca.htm The rest of the content is subjective to each location needs. There are the additional requirements that are to be observed by the Contractor
(End of Summary of Changes) mailto:robbie.r.newland@usace.army.mil mailto:meghan.e.garriques@usace.army.mil mailto:cefc-g2invoices@usace.army.mil mailto:meghan.e.garriques@usace.army.mil http://www.dol.gov/whd/regs/compliance/posters/sca.htm