ESS-23-002 HTEX DRAIN_VENT REPLACEMENT.pdf
PDF 1 MB Posted
- Attached to
- FY23 Essayons Overhaul
- Solicitation number
- W9127N22B0009
View the file
Other files
Show 40 more
Latest 50 of 121 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TASK REQUEST - ESSAYONS SHIPS TR # ESS -11-
CONTACT(S) OFFICE TR #
INITIATOR TR DATE
PRIORITY DATE REQUESTED
ROUTING INITIALS SUPERVISORS MASTERS
SYSTEM INFORMATION
SYSTEM
COMPARTMENT LEVEL
SIDE FRAME NOTE
DESCRIPTION OF TASK
DESCRIPTION OF PROBLEM
SAFETY ISSUES
ATTACHMENTS YES NO PAGES TECH. MANUAL #
ENGINEERING
COORDINATOR DATE
PRIORITY 1 PRIORITY 2 PRIORITY 3
PROJECT ENGINEER DATE JOB ORDER
SHIP’S FORCE VENDOR CONTRACTOR SHIPYARD MOORINGS
ESTIMATED COST COMPLETION DATE
υ ENGINEERING COMMENTS υ
PROPOSAL / ACTION / DIRECTION ACCEPT MORE INFO NEEDED DEFER CANCEL
TR RECEIVED FROM VESSEL TR RETURNED TO VESSEL
| SHIPS TR # |
| CONTACT(S) |
| TASK REQUEST - ESSAYONS |
| OFFICE TR # |
| INITIATOR |
| TR DATE |
| PRIORITY |
| DATE REQUESTED |
| MASTERS |
| SUPERVISORS |
| ROUTING INITIALS |
| SYSTEM INFORMATION |
| NOTE |
| DESCRIPTION OF TASK |
| DESCRIPTION OF PROBLEM |
| SAFETY ISSUES |
| ATTACHMENTS |
| YES NO |
| PAGES |
| TECH. MANUAL # |
| ENGINEERING |
| COORDINATOR |
| DATE |
| PRIORITY 1 |
| PRIORITY 2 |
| PRIORITY 3 |
| PROJECT ENGINEER |
| DATE |
| JOB ORDER |
| ESTIMATED COST |
| COMPLETION DATE |
| ( ENGINEERING COMMENTS ( |
| PROPOSAL / ACTION / DIRECTION |
| TR RECEIVED FROM VESSEL |
| TR RETURNED TO VESSEL |
| ESS-15-083 - ICMS-Wonderware CorrectionsJOH.pdf |
| ESS-15-083 - ICMS-Wonderware Corrections |
| SHIPS TR # |
| CONTACT(S) |
| TASK REQUEST - ESSAYONS |
| OFFICE TR # |
| INITIATOR |
| TR DATE |
| PRIORITY |
| DATE REQUESTED |
| MASTERS |
| SUPERVISORS |
| ROUTING INITIALS |
| SYSTEM INFORMATION |
| NOTE |
| DESCRIPTION OF TASK |
| DESCRIPTION OF PROBLEM |
| SAFETY ISSUES |
| ATTACHMENTS |
| YES NO |
| PAGES |
| TECH. MANUAL # |
| ENGINEERING |
| COORDINATOR |
| DATE |
| PRIORITY 1 |
| PRIORITY 2 |
| PRIORITY 3 |
| PROJECT ENGINEER |
| DATE |
| JOB ORDER |
| ESTIMATED COST |
| COMPLETION DATE |
| ( ENGINEERING COMMENTS ( |
| PROPOSAL / ACTION / DIRECTION |
| TR RECEIVED FROM VESSEL |
| TR RETURNED TO VESSEL |
Wonderware Task Request support doc 2014
| Paquet/Rolle Chief Engineers: WAISANEN |
| Joe Bateman: |
| SY 15/16: 05/19/22 |
| Point of Contact: PAQUET/WAISANEN |
| tr#: ESS-23-002 |
| MM/DD/YY: 5/19/2022 |
| 1,2,3: 2 |
| SYSTEM: CENTRAL SW COOLING |
| COMPARTMENT: HEAT EXCHANGER |
| LEVEL: LOWER LEVEL |
| SIDE: P/C/S |
| FRAME: 15 |
| NOTE: |
| Task Description: REMOVE PORT/CENTER/STBD HEAT EXCHANGER 1 1/4" DRAIN PIPES/VALVES, AND 1/2" VENT PIPES/VALVES WHILE ON DRY DOCK. EVALUATE WELD-O-LET THREADS AND CROP/REPLACE IF NEEDED. REPLACE 1 1/4" DRAIN AND 1/2" VENT NIPPLE AND BALL VALVES WITH SCH 80/CLASS 800 304 SS MATERIALS, ALONG WITH NEW SS PLUGS. WORK WILL BE ACCEPTED FOLLOWING INSPECTION BY C/E. |
| Description of Problem: HEAT EXCHANGER DRAIN/VENT VALVES/NIPPLES ARE CURRENTLY LEAKING AND HEAVILY CORRODED- NECESSITATING REPLACEMENT AT THE NEXT OPPORTUNITY. UNITS ARE INSTALLED WITH INCONSISTENT MATERIALS/GRADES CAUSING ELECTROLYSIS. |
| Safety Issues: CENTRAL SW COOLING IS A CRITICAL SYSTEM FOR VESSEL POWER/PROPULSION. |
| Y: Yes |
| No: Off |
| PAGES: 5 |
| TECH MANUAL: |
| Comments: |
| COORDINATOR: |
| DATE: |
| PRIORITY 1: Off |
| PRIORITY 2: Off |
| PRIORITY 3: Off |
| PROJECT ENGINEER: |
| DATE_2: |
| JOB ORDER: |
| ship's force: Off |
| vendor: Off |
| contractor: Off |
| shipyard: Off |
| moorings: Off |
| ESTIMATED COST: |
| COMPLETION DATE: |
| engineering comments: |
| accept: Off |
| more info: Off |
| defer: Off |
| cancel: Off |
| TR RECEIVED FROM VESSEL: |
| TR RETURNED TO VESSEL: |
File details come from the government source that posted it. Updated .