B.08 Price List Amendment 0001.xlsx
XLSX spreadsheet 80 KB Posted
- Attached to
- FY23 Essayons Overhaul
- Solicitation number
- W9127N22B0009
View the file
Other files
Show 40 more
Latest 50 of 121 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CAT A
| Category A Work Item Description | PWS Paragraph | Qty | Unit | Unit Price | Amount |
| Transportation | 5.1.1 | 4 | Each | $ - 0 | |
| Crane Services | 5.1.3 | 75 | Hour | $ - 0 | |
| Connection/Disconnection of Services | 5.1.4 | 1 | Job | $ - 0 | |
| Field Office | 5.1.5 | 1 | Job | $ - 0 | |
| Parking | 5.1.6 | 1 | Job | $ - 0 | |
| Drydocking Lift Day | 5.2.1 | 1 | Job | $ - 0 | |
| Drydock Lay Day | 5.2.2 | 60 | Day | $ - 0 | |
| Wet Berth | 5.2.3 | 15 | Day | $ - 0 | |
| Electricity | 5.2.4 | 1 | Job | $ - 0 | |
| Steam | 5.2.5 | 75 | Day | $ - 0 | |
| Marine Chemist Certifications | 5.3.1 | 1 | Job | $ - 0 | |
| Fire Suppression Services | 5.4.1 | 1 | Job | $ - 0 | |
| Bilge Maintenance | 5.5.1 | 1 | Job | $ - 0 | |
| Hull Surface Prep and Coat | 5.6.1 | 1 | Job | $ - 0 | |
| Ventilation Plenum Surface Prep & Coat | 5.6.3 | 1 | Job | $ - 0 | |
| Irathane Coating Repair | 5.6.4 | 1 | Job | $ - 0 | |
| #7 Centerline Double Bottom Void Tank Preservation | 5.6.5 | 1 | Job | $ - 0 | |
| #8 Centerline Double Bottom Void Tank Preservation | 5.6.6 | 1 | Job | $ - 0 | |
| #9 Centerline Double Bottom Void Tank Preservation | 5.6.7 | 1 | Job | $ - 0 | |
| Sluice Valve Replacement | 5.8.1 | 2 | Each | $ - 0 | |
| Dragarm Sheave Inspection | 5.10.3 | 1 | Job | $ - 0 | |
| Port Dragarm Davit Cylinders Removal, Inspection, Overhaul, & Preservation | 5.10.8 | 1 | Job | $ - 0 | |
| Discharge Piping Inspection | 5.11.1 | 1 | Job | $ - 0 | |
| Discharge Pipe Epoxy Repairs | 5.11.2 | 1 | Job | $ - 0 | |
| Dredge Essayons Pipe Replacement | 5.11.3 | 1 | Job | $ - 0 | |
| Hopper Jetting System Clean | 5.13.2 | 1 | Job | $ - 0 | |
| Weir Seal Inspection | 5.13.3 | 1 | Job | $ - 0 | |
| Hopper Inspection Staging | 5.14.1 | 1 | Job | $ - 0 | |
| Tower Staging | 5.14.3 | 50 | Each | $ - 0 | |
| Stern Tube Shaft Seal Replacement | 5.16.5 | 1 | Job | $ - 0 | |
| Bow Thruster - Lower Gearbox (LGB) / Pod Change Out | 5.17.4 | 1 | Job | $ - 0 | |
| Temporary Electric Motor Heaters | 5.19.2 | 1 | Job | $ - 0 | |
| Sewage Pipe Repairs | 5.21.6 | 1 | Job | $ - 0 | |
| Port & Stbd Jetting Pump Power Cable Replacement | 5.21.7 | 1 | Job | $ - 0 | |
| Dragarm Zinc Anodes | 5.22.1 | 1 | Job | $ - 0 | |
| Dragarm Winch Motor Overhaul | 5.22.3 | 2 | Job | $ - 0 | |
| Dragarm Winch Electric Cable Replacement | 5.22.4 | 1 | Job | $ - 0 | |
| ABS Support | 5.24.0 | 1 | Job | $ - 0 | |
| Audio Gauge Reading | 5.24.1 | 1 | Job | $ - 0 | |
| Internal Tank Inspection | 5.24.4 | 1 | Job | $ - 0 | |
| Elevator Inspection and Repair | 5.25.1 | 1 | Job | $ - 0 | |
| Anchor Chain and Chain Locker Inspection for Vessel General Permit | 5.26.3 | 1 | Job | $ - 0 | |
| Life Raft Annual Service | 5.28.1 | 1 | Job | $ - 0 | |
| Sludge Tank Annual Maintenance | 5.29.1 | 1 | Job | $ - 0 | |
| Strut and Stern Tube Bearing Inspection | 5.31.1 | 1 | Job | $ - 0 | |
| Rudder Bushing Clearance Documentations | 5.31.2 | 1 | Job | $ - 0 | |
| Dock and Sea Trials | 5.33.1 | 1 | Job | $ - 0 | |
| #2 Void Steel Repairs | 5.44.2 | 1 | Job | $ - 0 | |
| Pump Room Fan Replacement | 5.44.5 | 1 | Job | $ - 0 | |
| Pedestal Crane Repairs | 5.45.1 | 1 | Job | $ - 0 | |
| Galley Exhaust Duct Cleaning and Fan Motor Overhaul | 5.45.4 | 1 | Job | $ - 0 | |
| Well Deck Door and Hatch Replacement | 5.45.5 | 1 | Job | $ - 0 | |
| Bridge Deck & Boat Deck Doors | 5.45.6 | 1 | Job | $ - 0 | |
| Distiller Removal | 5.47.1 | 1 | Job | $ - 0 | |
| Engine Room Supply Fan Overhaul and VFD Relocation | 5.47.2 | 1 | Job | $ - 0 | |
| Smatco Mooring Winch Brakes | 5.47.3 | 1 | Job | $ - 0 | |
| Main Seawater Heat Exchanger Drains and Vents Pipe Replacement | 5.47.4 | 1 | Job | $ - 0 | |
| Fuel Oil Overflow Jumper Pipe Inspection and Gasket Replacement | 5.47.5 | 1 | Job | $ - 0 | |
| Upper Pump Room Hydraulic Union Replacements | 5.47.6 | 1 | Job | $ - 0 | |
| Deck Drain Installation, Repair, and Clearing | 5.47.8 | 1 | Job | $ - 0 | |
| Center 3512 SSDG Top End Overhaul | 5.48.3 | 1 | Job | $ - 0 | |
| VULKAN Coupling Inspection and Replacement | 5.48.4 | 1 | Job | $ - 0 | |
| Fwd and Aft Fuel Oil Purifier Service | 5.48.5 | 1 | Job | $ - 0 | |
| Vulkan Engine Mount Inspection and Adjustment | 5.48.9 | 1 | Job | $ - 0 | |
| Rescue Boat, Launch, & Lifeboat Davit Inspections | 5.53.1 | 1 | Job | $ - 0 | |
| Essayons Launch Service | 5.53.2 | 1 | Job | $ - 0 | |
| Navigation Equipment Annual Service | 5.54.1 | 1 | Job | $ - 0 | |
| Total Category A Work Items | $ - 0 |
CAT B
| Category B Work Item Description | PWS Paragraph | Qty | Unit | Unit Price | Amount |
| Tug Service | 5.1.2 | 1 | Job | $ - 0 | |
| Deep Cleaning of Vessel Hotel Spaces | 5.1.7 | 1 | Job | $ - 0 | |
| Hopper Jetting Valve (10") Replacement | 5.8.3 | 1 | Each | $ - 0 | |
| Hopper Jetting Valve (12") Replacement | 5.8.4 | 1 | Each | $ - 0 | |
| Drag Arm Sheave Overhaul, Sheave Guide | 5.10.4 | 1 | Each | $ - 0 | |
| Drag Arm Sheave Overhaul, Single Sheave Water Block | 5.10.5 | 1 | Each | $ - 0 | |
| Drag Arm Sheave Overhaul, Single Sheave | 5.10.6 | 1 | Each | $ - 0 | |
| Drag Arm Sheave Overhaul, Swell Comp Single Sheave | 5.10.7 | 1 | Each | $ - 0 | |
| Weir Seal Replacement | 5.13.4 | 1 | Job | $ - 0 | |
| Port & Stbd Rudder Stock Upper Bearing & Packing Gland Inspection | 5.15.1 | 1 | Job | $ - 0 | |
| Port & Stbd Rudder Stock Replacement | 5.15.2 | 1 | Job | $ - 0 | |
| Propeller Blade Inspection | 5.16.1 | 1 | Job | $ - 0 | |
| Propeller Blade Replacement | 5.16.2 | 1 | Job | $ - 0 | |
| Propeller Hub Replacement | 5.16.3 | 1 | Job | $ - 0 | |
| Tailshaft Replacement | 5.16.4 | 1 | Job | $ - 0 | |
| Jetting Pump Repairs | 5.21.5 | 1 | Each | $ - 0 | |
| Inlet Hull Doubler Replacement | 5.44.7 | 1 | Job | $ - 0 | |
| Total Category B Work Items | $ - 0 |
Over & Above Work
| Over & Above Work | |||||
| SCHEDULE OF PRICES/RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED) | |||||
| Over & Above Work | |||||
| Item Description | PWS | ||||
| Paragraph | Required Level | ||||
| Of Effort Hours | Materials | Fully Burdened | |||
| Labor Rate | Material Burden Rate | Total Cost | |||
| Ship Repair Labor Rate | 6.1 | 13,000 | $0.00 | ||
| Materials & Subcontractor | 6.1 | $ 800,000.00 | $ 800,000.00 |
| SCHEDULE OF PRICES/RATES FOR THE PURPOSES OF A GOVERNMENT REQUIRED EXTENSION: DAILY RATES FOR PIER SIDE AND DRY-DOCKING (FULLY BURDENED) | ||||||
| Over & Above Work | ||||||
| Item Description | PWS | |||||
| Paragraph | Qty | Unit | Unit Price | Total Cost | ||
| Dry-Docking Extension Cost | 6.1 | 10 | Days | $ - 0 | ||
| Pier Side Extension Costs | 6.1 | 14 | Days | $ - 0 | ||
| Total Over & Above Work Items | $800,000.00 |