C.04_Abstract - W9127N22B0005 IFB SIGNED.pdf
PDF 231 KB Posted
- Attached to
- West Coast Hopper Dredge FY22
- Solicitation number
- W9127N22B0005
About this file
This solicitation is for hopper dredging services along the West Coast of the United States, including locations in Humboldt Bay, CA, the Mouth of the Columbia River in OR/WA, and the Lower Columbia River in OR/WA. The estimated value of the contract is between $25-100 million. Interested offerors were required to submit bids by March 9, 2022.
The scope of work involves the contractor providing all supervision, labor, equipment, and materials to perform dredging at the specified locations using hopper dredges. Services include mobilization/demobilization, dredging to required depths, pre- and post-dredge surveys, and transport of dredged materials to placement sites. The solicitation identifies line items for mandatory and optional work both with unit rates and estimated quantities. The point of contact listed is Brian Roberts of the USACE-NWP Contracting Office.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NO. 2. DATE ISSUED 3. DATE OPENED PAGE 1 OF 1 PAGES
2/7/2022 3/10/2022
4. ISSUING OFFICE
DISTRICT ENGINEER CONTRACT SPECIALIST SIGNATURE CONTRACTING OFFICER SIGNATURE
PORTLAND DISTRICT, CORPS OF ENGINEERS
P.O. BOX 2946
PORTLAND, OR 97208-2946
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
(CHECK A, B, OR C AND COMPLETE NO.1 NO.2 NO.3
D, E, AND F.) A. OFFEROR A. OFFEROR A. OFFEROR
X A. HIRED LABOR
B. REASONABLE CONTRACT B. BID SECURITY
(WITHOUT PROFIT) 20% of bid price 20% of bid price C. REASONABLE CONTRACT C. ADDENDA ACKNOWLEDGED C. ADDENDA ACKNOWLEDGED ADDENDA ACKNOWLEDGED
(INCLUDING PROFIT) YES YES
6. NUMBER OF ADDENDA ISSUED
7A.
ITEM E. UNIT F. ESTIMATED D. UNIT F. ESTIMATED D. UNIT F. ESTIMATED D. UNIT F. ESTIMATED NO. QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT No. 1 vs IGE No. 2 vs IGE No. 3 vs IGE
0001 Mobilization and Demobilization 1 JOB 9,170,000.00$ 9,170,000.00$ 6,850,000.00$ 6,850,000.00$ -$ -$ -25.3% -100.0% -100.0% 0002 HUM, Bin Measure to Required Depth, HOODS OceanPlacement 600,000 CY 4.10$ 2,460,000.00$ 4.70$ 2,820,000.00$ -$ -$ 14.6% -100.0% -100.0% 0004 LCR Maintenance, RM 3+00 to RM 25+00, Bin Measure, Flow Lane (FL) Placement 200,000 CY 3.70$ 740,000.00$ 3.20$ 640,000.00$ -$ -$ -13.5% -100.0% -100.0% 0005 LCR Maintenance, RM 3+00 to RM 105+00, Pre/Post Dredge Survey, (FL) Placement 650,000 CY 4.60$ 2,990,000.00$ 4.70$ 3,055,000.00$ -$ -$ 2.2% -100.0% -100.0% 0008 LCR Maintenance, RM 3+00 to RM 105+00, Bin Measure to Required Depth 250,000 CY 4.20$ 1,050,000.00$ 3.75$ 937,500.00$ -$ -$ -10.7% -100.0% -100.0% 0009 LCR Increment Transit Miles for Material Placement Site (other than five miles one-way) 1,100,000 CY MI 0.37$ 407,000.00$ 0.16$ 176,000.00$ -$ -$ -56.8% -100.0% -100.0% 0010 LCR Intra-Project Transit Miles 250 MI 560.00$ 140,000.00$ 400.00$ 100,000.00$ -$ -$ -28.6% -100.0% -100.0% 0011 MCR, Bin Measure, Shallow Water Site (SWS) or North Jetty Site (NJS) Placement 1,300,000 CY 3.30$ 4,290,000.00$ 3.40$ 4,420,000.00$ -$ -$ 3.0% -100.0% -100.0% 0015 MCR, Bin Measure , Increment for Operations and Maintenance Deep Water Site (DWS) Placement 300,000 CY 1.50$ 450,000.00$ 2.10$ 630,000.00$ -$ -$ 40.0% -100.0% -100.0%
SUBTOTAL FOR MANDATORY LINE ITEMS 21,697,000.00$ 19,628,500.00$ -$ -$ -9.5% -100.0% -100.0%
OPTIONAL CLINS
0003 HUM, Bin Measure to Required Depth, HOODS OceanPlacement (Optional) 400,000 CY 4.10$ 1,640,000.00$ 4.50$ 1,800,000.00$ -$ -$ 9.8% -100.0% -100.0% 0006 LCR Maintenance, RM 3+00 to RM 105+00, Pre/Post Dredge Survey, (FL) Placement (OPTIONAL) 350,000 CY 4.60$ 1,610,000.00$ 4.55$ 1,592,500.00$ -$ -$ -1.1% -100.0% -100.0% 0007 LCR Maintenance, RM 3+00 to RM 105+00, Pre/Post Dredge Survey, (FL) Placement (OPTIONAL) 350,000 CY 4.60$ 1,610,000.00$ 4.20$ 1,470,000.00$ -$ -$ -8.7% -100.0% -100.0% 0012 MCR, Bin Measure, Shallow Water Site (SWS) or North Jetty Site (NJS) Placement (OPTIONAL) 300,000 CY 3.30$ 990,000.00$ 2.80$ 840,000.00$ -$ -$ -15.2% -100.0% -100.0% 0013 MCR, Bin Measure, Shallow Water Site (SWS) or North Jetty Site (NJS) Placement (OPTIONAL) 250,000 CY 3.30$ 825,000.00$ 2.50$ 625,000.00$ -$ -$ -24.2% -100.0% -100.0%
0014 DELETED -$ -$ -$ -$ #DIV/0! #DIV/0! #DIV/0!
0016 MCR, Bin Measure , Increment for Operations and Maintenance Deep Water Site (DWS) Placement (OPTIONAL) 300,000 CY 1.50$ 450,000.00$ 2.00$ 600,000.00$ -$ -$ 33.3% -100.0% -100.0% 0017 MCR, Bin Measure , Increment for Operations and Maintenance Deep Water Site (DWS) Placement (OPTIONAL) 250,000 CY 1.50$ 375,000.00$ 1.75$ 437,500.00$ -$ -$ 16.7% -100.0% -100.0%
SUBTOTAL FOR OPTIONAL LINE ITEMS 7,500,000.00$ 7,365,000.00$ -$ -$ -1.8% -100.0% -100.0%
29,197,000.00$ 26,993,500.00$ -$ -$ -7.5% -100.0% -100.0%
NSN 7540-01-150-0981 1419-101
ABSTRACT OF OFFERS
W9127N22B0005
I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT
ALL OFFERS RECEIVED IN RESPONSE TO THIS SOLICITATION.
West Coast Hopper Maintenance Dredging 2022
7B. DESCRIPTION OF OFFERED ITEM D.
TOTAL
ACCEPTANCE LIMITATION - DAYS
INFORMALITIES
Manson Construction Co.
5209 E Marginal Way S Seattle, WA 98134-2409 0FCP9
B. BID SECURITY
STANDARD FORM 1419 (10-3)
Offers 1-3
| 2022-03-10T16:34:38-0800 | |
| MORROW.KRISTINA.KAYE.1290513320 |
| 2022-03-10T16:51:02-0800 | |
| ROBERTS.BRIAN.STARBUCK.1166760921 |
File details come from the government source that posted it. Updated .