W9127N21R0005 - Cougar Butterfly Valve Replacement.pdf
PDF 7 MB Posted
- Attached to
- Cougar Butterfly Valve Replacement
- Solicitation number
- W9127N21R0005
About this file
This solicitation is for a construction project to replace two 90-inch butterfly valves and control unit systems at the Cougar Powerhouse. The project aims to improve reliability and safety, as the existing valves and systems are becoming increasingly problematic after over 60 years of service. Offerors must provide pricing for design, manufacturing, installation, testing, and other work. Proposals are due by September 27, 2021. The award will be a firm-fixed-price contract to the responsible offeror whose proposal represents the best value based on evaluation of past performance, technical approach, and price. The solicitation provides templates for offerors to fill out detailing their experience, work plan, small business participation, and pricing for the project.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposal W9127N21R0005
Cougar Dam Lane County, Oregon
COUGAR BUTTERFLY VALVES REPLACEMENT
Project Manual
TOC-1
COUGAR BUTTERFLY VALVES REPLACEMENT
LANE COUNTY, OREGON
TABLE OF CONTENTS
00 10 00 SOLICITATION, OFFER, AND AWARD FORM (SF 1442)
00 10 00 SOLICITATION
00 21 00 INSTRUCTIONS
00 45 00 REPRESENTATIONS AND CERTIFICATIONS
00 70 00 CONDITIONS OF THE CONTRACT
00 73 00 SUPPLEMENTARY CONDITIONS
GENERAL AND TECHNICAL SPECIFICATION REQUIREMENTS
ATTACHMENTS
A1: Submittal Register (ENG Form 4288-R)
A2: Transmittal Form (ENG Form 4025-R)
A3: Construction Project Identification Sign
A4: Spill Emergency - Initial Report Form
A5: Hazardous Energy Control Program
A6: Oregon Wage Rates
00 72 00 GENERAL CONDITIONS
00 21 16 INSTRUCTIONS TO PROPOSERS
PROJECT TITLE: Cougar Butterf ly Valve Replacement
LOCATION OF PERFORMANCE: Cougar Dam, Lane County, OR
MAGNITUDE OF CONSTRUCTION: Betw een $5,000,000.00 and $10,000,000.00
SOCIOECONOMIC: Unrestricted, Full and Open
CORY R PFENNING 503-808-4398
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
27-Aug-2021
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________27 Sep 2021 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
USACE, PORTLAND DISTRICT
333 SW 1ST AVE
PORTLAND OR 97204
W9127N
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W9127N21R0005 53
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued)
(Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
00 10 00-3
Section 00 10 00 - Solicitation
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
Design New 90-inch Penstock Butterfly Va
FFP
Design New 90-inch Penstock Butterfly Valve IAW Clauses and Specification
FOB: Destination
PSC CD: Z1KA
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 2 Each
Manufacture of Butterfly Valve and Shop
FFP
Manufacture of Butterfly Valve and Shop Testing IAW Clauses and Specification
FOB: Destination
PSC CD: Z1KA
NET AMT
00 10 00-4
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003 1 Job
Other Equipment Manufacturing and Shop T
FFP
Other Equipment Manufacturing and Shop Testing IAW Clauses and Specification
FOB: Destination
PSC CD: Z1KA
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0004 1 Job
Mobilization and Demobilization
FFP
Mobilization and Demobilization IAW Clauses and Specification
FOB: Destination
PSC CD: Z1KA
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0005 1 Job
On-Site Demolition
FFP
On-Site Demolition IAW Clauses and Specification
FOB: Destination
PSC CD: Z1KA
NET AMT
00 10 00-5
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0006 1 Job
On-Site Installation
FFP
On-Site Installation IAW Clauses and Specification
FOB: Destination
PSC CD: Z1KA
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0007 1 Job
On-Site Testing
FFP
On-Site Testing IAW Clauses and Specification
FOB: Destination
PSC CD: Z1KA
NET AMT
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 05-MAY-2023 1 USACE, PORTLAND DISTRICT
CENWP-CT
333 SW 1ST AVE
PORTLAND OR 97204
FOB: Destination
W9127N
00 10 00-6
0002 20-MAY-2023 2 (SAME AS PREVIOUS LOCATION)
FOB: Destination
W9127N
0003 05-MAY-2023 1 (SAME AS PREVIOUS LOCATION)
FOB: Destination
W9127N
0004 05-MAY-2023 1 (SAME AS PREVIOUS LOCATION)
FOB: Destination
W9127N
0005 05-MAY-2023 1 (SAME AS PREVIOUS LOCATION)
FOB: Destination
W9127N
0006 05-MAY-2023 1 (SAME AS PREVIOUS LOCATION)
FOB: Destination
W9127N
0007 05-MAY-2023 1 (SAME AS PREVIOUS LOCATION)
FOB: Destination
W9127N
00 21 00-1
Section 00 21 00 - Instructions
CLAUSES INCORPORATED BY REFERENCE
52.204-16 Commercial and Government Entity Code Reporting AUG 2020
52.204-22 Alternative Line Item Proposal JAN 2017
52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017
252.215-7008 Only One Offer JUL 2019
CLAUSES INCORPORATED BY FULL TEXT
52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2018)
(a) Definitions. As used in this provision--
Electronic Funds Transfer (EFT) indicator means a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the commercial, nonprofit, or Government entity to establish additional System for
Award Management records for identifying alternative EFT accounts (see subpart 32.11) for the same entity.
Registered in the System for Award Management (SAM) means that--
(1) The Offeror has entered all mandatory information, including the unique entity identifier and the EFT indicator, if applicable, the Commercial and Government Entity (CAGE) code, as well as data required by the Federal Funding
Accountability and Transparency Act of 2006 (see subpart 4.14) into SAM;
(2) The offeror has completed the Core, Assertions, and Representations and Certifications, and Points of Contact sections of the registration in SAM;
(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification
Number (TIN) with the Internal Revenue Service (IRS). The offeror will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and
(4) The Government has marked the record ``Active''.
Unique entity identifier means a number or other identifier used to identify a specific commercial, nonprofit, or
Government entity. See www.sam.gov for the designated entity for establishing unique entity identifiers.
(b)(1) An Offeror is required to be registered in SAM when submitting an offer or quotation, and shall continue to be registered until time of award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.
(2) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation
``Unique Entity Identifier'' followed by the unique entity identifier that identifies the Offeror's name and address exactly as stated in the offer. The Offeror also shall enter its EFT indicator, if applicable. The unique entity identifier will be used by the Contracting Officer to verify that the Offeror is registered in SAM.
(c) If the Offeror does not have a unique entity identifier, it should contact the entity designated at www.sam.gov for establishment of the unique entity identifier directly to obtain one. The Offeror should be prepared to provide the following information:
http://www.sam.gov/
00 21 00-2
(1) Company legal business name.
(2) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(3) Company physical street address, city, state, and Zip Code.
(4) Company mailing address, city, state and Zip Code (if separate from physical).
(5) Company telephone number.
(6) Date the company was started.
(7) Number of employees at your location.
(8) Chief executive officer/key manager.
(9) Line of business (industry).
(10) Company headquarters name and address (reporting relationship within your entity).
(d) Processing time should be taken into consideration when registering. Offerors who are not registered in SAM should consider applying for registration immediately upon receipt of this solicitation. See https://www.sam.gov for information on registration.
(End of Provision)
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm Fixed Priced contract resulting from this solicitation.
(End of provision)
52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY
2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting
Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
(End of provision) https://www.sam.gov/
00 21 00-3
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00, whichever is less.-
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of provision)
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
USACE-Portland District
Attn: CECT-NWP-C (Kristina K. Morrow)
P.O. Box 2946
Portland, OR 97208-2946
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of provision)
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for--
9 September 2021 at 10:00 AM PDT
00 21 00-4
(c) Participants will meet at--
Cougar Dam, Lane County, OR
(d) Additional Site visit requirements
(1) All prospective offerors intending to attend the site visit must send an RSVP to Cory Pfenning, Contract
Specialist at cory.r.pfenning@usace.army.mil before September 2, 2021 at 3:00 PM PDT with the following information
(i) Company name
(ii) Number of attendees
(iii) Name of each attendee
(iv) Citizenship of each attendee (Only U.S. citizens will be permitted to attend.)
(2) The use of cloth face covings to cover your nose and mouth will be required the entire time during the site visit.
(3) All site visit attendees will be required to maintain social distancing of six (6) feet to the maximum extent possible.
(4) The following safety gear is required at the site: Steel toed boots, Hardhats, Safety Vests, Safety Glasses.
(5) Each individual must have picture identification on his/her person while at the project site. There can be no substitutions of one individual for another. If an individual arrives at the site visit without having called ahead of time and/or without picture identification, that individual may not be allowed on the project.
(End of provision)
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
https://www.acquisition.gov/
(End of provision)
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.
(b) The use in this solicitation of any Defense Federal Acquisition Regulation (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
https://www.acquisition.gov/
00 21 16-1
Section 00 21 16 - Instructions to Proposers
INSTRUCTIONS TO PROPOSERS
A. BASIS FOR AWARD
(1) This solicitation will be advertised using Full and Open Competition . The Government intends to award a single, firm-fixed price construction contract to the responsible offeror whose proposal represents the best value after evaluation in accordance with the evaluation factors in the solicitation. Offerors shall submit a technical proposal and a price proposal. The evaluation results of the non-price and price proposals will determine an awardee. All non-price factors are approximately equal in importance. All non-price evaluation factors other than price, when combined, are significantly more important than price.
(2) The Government intends to make an award without discussions but reserves the right to conduct discussions should discussions prove to be necessary or advantageous to the Government. Because the Government does not intend to hold discussions, offerors are encouraged to include their best pricing in their initial proposal.
(3) All proposals received will stand alone and be considered complete and final. Accordingly, proposals submitted in response to this solicitation should provide clear, complete, concise, and straightforward responses to the evaluation factors. The evaluation board will not consider any information or data incorporated by reference or otherwise referred to. The successful offeror will be selected solely on the basis of the evaluation factors set forth below. Elaborate proposals, color brochures, and other excesses are discouraged. The offeror’s technical proposal will be incorporated into the awarded contract.
(4) Joint Ventures (JV). A joint venture is defined as follows: a legal business entity formed between two or more companies (parties) to undertake the performance activities of a contract together. This does not include other arrangements such as “teaming agreements” or “strategic alliance” which are not recognized as bona fide joint ventures for the purposes of this solicitation. A company that is part of a joint venture shall submit a legally binding joint venture agreement. Joint ventures shall include a copy of the legal joint venture agreement signed by an authorized officer from each of the firms comprising the joint venture with the chief executive of each entity identified. If submitting a proposal as a joint venture, the past performance of each of the joint venture partners can be submitted for the joint venture entity. The past performance for each joint venture partner will be considered the past performance of the joint venture entity. Page and project form limits apply to the joint venture as a whole.
Prospective offerors that submit proposals may not change their firm (including Letters of Commitment (LOC) and proposed subcontractors) or their Joint Venture firms, if selected to submit Final Proposal Revisions (FPR).
B. Definitions.
The Government will use the following definitions when evaluating proposals:
Deficiency- A material failure of a proposal to meet a Government requirement or a combination of weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. See FAR 15.001.
Strength- An aspect of an Offeror’s proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.
Significant Strength- An aspect of an Offeror's proposal that has appreciable merit or appreciably exceeds specified performance or capability requirements in a way that will be appreciably advantageous to the Government during contract performance.
Weakness- A flaw in the proposal that increases the risk of unsuccessful contract performance. See FAR 15.001.
Significant Weakness- in the proposal is a flaw that appreciably increases the risk of unsuccessful contract performance. See FAR 15.001.
00 21 16-1
5. SUBMISSION OF PROPOSALS AND EVALUATION
A. Administrative Details and General Instructions: Proposals are due no later than the time and date specified in Block 13 of Standard Form 1442.
(1) General Proposal Format. The proposal shall be in electronic Portable Document Format, filename extension “.pdf” and suitable for viewing in Adobe Reader. Offerors shall bookmark and label each electronic PDF to afford easy identification from the proposal table of contents.
Title Page. Each copy must include the offeror’s name and address, phone number and email address, title of the solicitation, solicitation number and date of submittal clearly identified on the front cover.
Table of Contents. Each volume of the proposal shall contain a detailed and complete table of contents.
Submissions. PDF pages containing text are expected to be 8 ½ x 11 inches with at least one-inch margins at the top, bottom, and both sides. Paragraphs should be separated by at least one blank line. A standard 11-point font in either Arial or Times New Roman is required. The use of hyperlinks in proposals is prohibited.
Organization charts or schedules. An 11” x 17” PDF format may be used. Larger format drawings or tables may also be used.
All information must be confined to the appropriate volume. Each volume of the proposal is expected to contain a table of contents, summary section with a brief abstract of the volume, and the narrative discussion.
(2) Proposal Content Limitations.
The offeror must confine the proposal to relevant information and documentation sufficient to provide an adequate basis for evaluation. Offerors are responsible for including sufficient details, in a concise manner, to permit a complete and accurate evaluation of the proposal. The page count is at the discretion of the offeror; however, the proposal may not be more than 25 typewritten
(single page only) pages total. The 25-page limit does NOT include past performance information submitted under Factor 2. Evaluation of the non-price factors will end on the 25th page submitted.
Extraneous information provided in the proposals will not be considered in the evaluations;
therefore, the offeror should only provide information that satisfies the solicitation requirements.
Merely restating the specifications without sufficient elaboration demonstrates a lack of understanding of the requirement.
DO NOT cross reference past performance information. It is acceptable to repeat data, project information or experience in more than one non-price area as long as it satisfies the requirements of the factor.
Proprietary information must be clearly marked.
B. Content of Proposals: All proposals must be prepared in two volumes: A technical proposal (Volume I), a price proposal (Volume II). Each of the volumes shall be separate and complete in itself so that evaluation of one may be accomplished independently from evaluation of the other. The technical proposal (Volume I) must not contain reference to price. The narrative and content structure of the proposal shall follow the format shown under Volume
I below. Offerors that fail to submit a complete proposal may be excluded and thus receive no further consideration for award.
00 21 16-2
(1) Technical Proposal, Volume I: Provide one (1) electronic proposal in Portable Document
Format, filename extension “.pdf” and suitable for viewing in Adobe Reader. Volume I shall consist of information for the three (3) factors, listed in tabular form, as noted below. Repeating or restating the specifications without sufficient elaboration will be determined to show a lack of understanding of the requirement.
Volume I – Technical (Non-Price) Factors:
Tab 1 – Factor 1 – Past Performance
Tab 2 – Factor 2 – Work Plan
Tab 3 – Factor 3 – Small Business Participation Plan
(2) Price Proposal, Volume II: Provide one (1) electronic proposal in Portable Document Format, filename extension “.pdf” and suitable for viewing in Adobe Reader of a complete and detailed Price
Proposal on the forms provided in the solicitation. Provide pricing and complete all line items on Standard
Form 1442 (SF 1442). The price proposal must be prepared in accordance with the following and must include:
Tab 1 – SF1442, Solicitation, Offer, and Award.
The SF1442 shall be filled out completely by the offeror and signed by an official that is authorized to bind the company. The offeror shall also acknowledge all amendments to the solicitation in accordance with the instructions on the Standard Form 30 or Block 19 of SF1442.
Tab 2 – Section 00 10 00, Proposal Price / Bid Schedule.
The offeror shall fully complete this section.
Tab 3 – Representations, Certifications and other Statements of Offerors.
The offeror shall complete all representations and certifications in Section 00 45 00 and also ensure current registration and completed/updated Annual Representations and Certifications on the System for Award Management (SAM) website, www.sam.gov.
Tab 4 – Banking and Bonding Points of Contact.
The Government is required to determine Contractor’s responsibility; the offeror shall provide contact information (company name, point of contact, address, email and phone number) for the offeror’s bank and bonding institutions.
Tab 5 – Bid/Offer Guarantee. The Bid Bond shall be at least 20% of the bid price but shall not exceed $3 million. See FAR 52.228-1 – Bid Guarantee.
Submission of Proposals: Proposals are due no later than the time and date established in Block 13, SF 1442.
There will not be a public proposal opening.
Proposals are due no later than the time and date specified in Block 13 of Standard Form 1442, or SF 30 if applicable. Proposals received after the date and time in block 13A of the solicitation will be considered late and will not be considered for award.
Offeror shall submit its proposal via email to Cory Pfenning, Cory.R.Pfenning@usace.army.mil, and Kristina
Morrow, Kristina.K.Morrow@usace.army.mil. Offerors should enter a description for every file submitted. For files over 20 megabytes (MB) the offeror shall break the file into smaller files sent via separate emails, each marked to identify which number the email is relative to the total number of emails submitted (i.e. “one of four”). Once all the emails submitted have been received, the Government will confirm receipt via return email.
If an offeror submits multiple proposals, the Government will only consider the last proposal submitted prior to the due date and time.
00 21 16-3
The electronic proposal shall be in Portable Document Format, filename extension: “.pdf” and suitable for viewing in Adobe Reader. Offerors shall bookmark and label each electronic PDF to afford easy identification from the table of contents.
Do not assume submission will be instantaneous. File size and number of files submitted shall be considered.
Offeror/Teammate/Subcontractors should allow adequate time for submission completion because the entire proposal (i.e. offerors submission and all teammate/subcontractor(s) independent submissions) must be received by the time and date specified in Block 13 of Standard Form 1442, or SF 30 if applicable.
To avoid rejection of an offer, the offeror must make every effort to ensure its electronic submission is virus-free. Proposals, or portions thereof, submitted with the presence of a virus or which are otherwise unreadable will be treated as unreadable pursuant to FAR 15.207(c).
The requirement that an original and copy(ies) be submitted as found in block 13A of the SF1442 is satisfied through the electronic submission. Additionally, electronic submission of the bid guarantee, when a bid guarantee is required, is due with the bid submission (mailing a bid guarantee is not allowed).
6. EVALUATION FACTORS
Volume I – Technical (Non-Price) Submission Requirements and Evaluation Method:
FACTOR 1 (TAB 1) – Past Performance
Submission Requirements:
The offeror shall submit information* for at least two and no more than four substantially complete projects that demonstrate the offeror’s experience performing projects similar in size, scope, and complexity to the work required by this solicitation. Each project must be completed or be substantially completed within the last ten (10) years.
“Substantially complete” is defined as having completed more than 75% of the project work at the time of proposal submission. If an offeror submits a project that it represents is “substantially complete,” the offeror must reasonably explain why the project is considered at least 75% complete. If an offeror submits an ongoing project without providing an accompanying reasonable explanation that explains how the project is at least 75% complete, the Government reserves the right to reject the project.
A maximum of four (4) projects will be evaluated. If an offeror disregards these instructions and submits more than four projects, only the first four projects will be evaluated. Offerors should describe each project with enough detail to ensure that the Government can meaningfully assess how well the projects submitted meet the evaluation criteria outlined below.
Instructions on the use of subcontractor past performance: Offerors may use the past performance of subcontractors. If the offeror submits past performance of a subcontractor, the offeror must submit a letter of commitment from the subcontractor on the letterhead of the firm to be subcontracted. The letter of commitment must be signed by an authorized individual from the subcontractor that is proposed to perform the work. If a letter of commitment is not submitted, the past performance will not be considered.
*For each project, submit the following information:
• Information outlined in Attachment A, Offeror Experience Form. The offeror must address all items included in Attachment A.
• A completed Contractor Performance Assessment Reporting System (CPARS) evaluation, if a completed CPARS evaluation is available.
00 21 16-4
• If there is not a completed CPARS evaluation, the offeror shall submit a Past Performance
Questionnaire (PPQ) for the project. See Attachment B. Do not submit a PPQ when a completed CPARS is available.
o If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror shall complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s).
o Offerors should follow up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the
Government's point of contact, Cory Pfenning, via email at
Cory.R.Pfenning@usace.army.mil prior to proposal closing date. The offerors shall instruct the clients to refer to the solicitation number in the subject line.
o PPQs are source selection materials. All successfully submitted PPQs will receive an email confirmation upon receipt. If the offeror does not receive the confirmation, it is the offeror’s responsibility to follow up to ensure the government has received the information.
Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other procurements. However, this does not preclude the Government from utilizing previously submitted past performance information in the past performance evaluation.
Offerors may provide explanation on problems encountered on past projects and the corrective actions taken by the offeror.
In addition to the above, the Government may review other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the PPIRS (Past Performance Information Retrieval System) including CPARS, using all
CAGE/DUNS (Commercial and Government Entity Code/Data Universal Numbering System) numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), FAPIIS (Federal Awardee
Performance and Integrity Information System), Electronic Subcontract Reporting System (eSRS), or other databases, telephone interviews with organizations familiar with the offeror’s performance, Government personnel with personal knowledge of the offeror’s performance capability, and any other known sources not provided by the offeror.
While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate, and complete past performance information rests with the offeror.
Evaluation Method:
The past performance evaluation results in an assessment of the offeror’s probability of meeting the solicitation requirements. The recency and relevancy of the information, source of the information, context of the data, and general trends in the contractor’s performance shall be considered. These are combined to establish one performance confidence assessment rating for each offeror.
There are three aspects to the past performance evaluation: recency, relevancy (including text of data), and quality (including general trends in contractor performance and source of information).
The first aspect is to evaluate the recency of the offeror’s past performance. For this solicitation, recent projects are those completed or substantially completed (as defined above) within ten (10) years of the date that proposals are due.
mailto:Cory.R.Pfenning@usace.army.mil
00 21 16-5
The second aspect is to determine how relevant a recent effort accomplished by the offeror is to the work required by the solicitation. There are four levels of relevancy as shown in the table below.
PAST PERFORMANCE RELEVANCY
RATING DESCRIPTION
Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
In assessing the relevancy of the offeror’s past performance, the Government will consider the following:
• The extent to which the offeror’s submitted projects demonstrate Large Valve Manufacturing
(Large diameter butterfly valves are defined at those 78” in diameter or larger and in compliance with AWWA C516, or meeting the intent of AWWA C516.).
• The extent to which the offeror’s submitted projects demonstrate HPU Manufacturing.
• The extent to which the offeror’s submitted projects demonstrate work experience in confined space areas.
• The extent to which the offeror’s submitted projects demonstrate Control Panel Fabrication
• The extent to which the offeror’s submitted projects demonstrate the following type of installation:
▪ industrial piping component installation (4 feet in diameter or larger),
▪ HPU installation and component connection that also include the use of a bank of accumulators, and
▪ electrical wiring installation.
More relevant past performance will typically be a stronger predictor of future success and have more influence on the past performance confidence assessment than past performance of lesser relevance.
The third aspect of the past performance is to determine how well the offeror performed on its past performance projects. If any performance issues are identified, the Government will consider the number, type and severity of the problems and effectiveness of corrective actions taken.
Based on a consideration of those three aspects for each project, the Government will assign a final
Performance Confidence Assessment Rating for this factor. The Government will review the past performance information and determine the quality and usefulness as it applies to performance confidence assessment. In conducting a performance confidence assessment, each offeror shall be assigned one of the ratings using the table below.
PERFORMANCE CONFIDENCE ASSESSMENT
RATING DESCRIPTION
Substantial Confidence
Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence
Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Neutral Confidence
No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance.
00 21 16-6
Limited Confidence
Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence
Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.
In the case of an offeror without a record of relevant past performance or for which information on past performance is not available, the offeror will not be evaluated favorably or unfavorably on past performance, and therefore may receive a “Neutral Confidence” rating.
FACTOR 2 (TAB 2) – Work Plan
Submission Requirements:
The offeror shall submit a Work Plan that demonstrates the offeror’s approach to performing the required work as outlined in the specifications.
The Work Plan must include, at a minimum:
• Gantt Chart: Submit a project schedule in Gantt chart format using the critical path method (MS
Project or Primavera software). Provide enough detail and tasks to adequately cover the scope of the project and the activities required to successfully complete the project as required by the solicitation.
Include the following:
1. All applicable phases of work, to include design, fabrication, shop testing, delivery, disassembly, installation, reassembly, and on-site testing/commissioning.
2. All major milestones, to include major component delivery completion, disassembly start date, acquisition of long lead items, installation complete, reassembly complete, and on-site testing completion (The maximum allowable schedule must meet the stated schedule requirements specified in the Contract Clause 52.211-10, Commencement, Prosecution, and
Completion of Work).
3. Sufficient time for all Government reviews.
• Work Plan Narrative: Provide a detailed narrative for how the offer plans to execute the work, with at a minimum, the following addressed:
1. How the offeror plans to successfully complete the following project phases: Inspection, disassembly, procurement, fabrication, factory testing, installation, and on-site testing of all major features of work.
2. Likely challenges and constraints to be encountered (e.g., site restrictions, access limitations and availability, restricted resources) and the offeror’s plan to deal with those challenges and constraints.
3. Description of any major equipment required and how the offeror will procure and use that equipment onsite.
00 21 16-7
Evaluation Method:
The Government will rate this factor using the combined technical/risk rating as follows:
COLOR RATING DESCRIPTION
Blue Outstanding
Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Purple Good
Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Green Acceptable
Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Yellow Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Red Unacceptable
Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.
TECHNICAL RISK RATING METHOD
ADJECTIVAL RATING DESCRIPTION
Low
Proposal may contain weakness(es) which have little potential to cause disruption of schedule, increased cost or degradation of performance.
Normal contractor effort and normal Government monitoring will likely be able to overcome any difficulties.
Moderate
Proposal contains a significant weakness or combination of weaknesses which may potentially cause disruption of schedule, increased cost or degradation of performance. Special contractor emphasis and close
Government monitoring will likely be able to overcome difficulties.
High
Proposal contains a significant weakness or combination of weaknesses which is likely to cause significant disruption of schedule, increased cost or degradation of performance. Is unlikely to overcome any difficulties, even with special contractor emphasis and close Government monitoring.
Unacceptable
Proposal contains a material failure or a combination of significant weaknesses that increases the risk of unsuccessful performance to an unacceptable level.
In determining strengths and weaknesses, the Government will consider the following when evaluating the offeror’s Work Plan:
• How realistic the offeror’s schedule durations are considering the scope of work and the offeror’s stated plan for each work phase;
• The extent to which the offeror understands the scope of work and how to accomplish each project phase;
• The extent to which the offeror understands the challenges to be encountered during construction, such as schedule constraints, site constraints, and logistics related to long lead items/equipment;
and
• The extent to which the offeror has a logical and well-thought out plan for dealing with challenges to be encountered during construction, to include maximizing flexibility to deal with unexpected problems.
00 21 16-8
A detailed and descriptive, project-specific Work Plan that describes the offeror’s approach with a supporting Gantt chart reinforcing a realistic schedule will receive greater weight than a vague and general plan.
FACTOR 3 – Small Business Participation Plan
a. The purpose of this criterion is to evaluate the amount of work proposed to be performed by small businesses in relation to the total value of the project, as well as the types of work small businesses will be performing and the extent of commitment in using the identified small business firms (particularly major project phases – design, manufacturing, installation/testing, and demolition/removal).
b. Other than small business Offerors will be evaluated on the level of proposed participation by U.S. small businesses in the performance of this project relative to the objectives and goals established herein, as well as Offerors’ past performance complying with the requirements of FAR 52.219-9, Small Business
Subcontracting Plan.
c. Other than small business Offerors will be rated using the small business rating method table below.
NOTE: In accordance with 13 C.F.R. § 125.3(g)(3), small business Offerors shall receive the maximum rating under this evaluation factor without having to submit any information in connection with this factor.
Submission Requirements:
Other than small business Offerors shall submit the following:
1) Small Business Participation Plan – Complete and submit Attachment C, Small Business
Participation Plan (SBPP), to identify the extent to which small businesses will participate in the performance of the proposed acquisition.
2) A mandatory minimum Total Small Business Participation goal of 10% of the total contract value (through small business participation from small-, small disadvantaged-, HUB Zone-, Service Disabled Vet-, Vet-, or Woman-owned small businesses) is required based on the nature of the work for this project.
3) Small Business Past Performance – Submit past performance information reflecting the
Offeror’s small business participation for each project listed by the Offeror under Factor 1, Past Performance. For each project submitted under Factor 1, Past Performance, submit the following:
(a) Name of the project;
(b) Total dollar amount and percentage of the contract value self-performed;
(c) Total dollar amount and percentage of the contract value subcontracted;
(d) Total dollar amount and percentage of the contract value subcontracted to small businesses;
(e) Total dollar amount and percentage of the contract value subcontracted to other than small businesses, and
(f) If the project was performed for a Federal agency, all Individual Subcontract Reports
(ISRs) and Summary Subcontract Reports (SSRs) from the Electronic
Subcontracting Reporting System (eSRS) for the project.
4) In addition to the above project submission information, the Government reserves the right to review Offerors ISRs and SSRs from the eSRS.
Evaluation Method:
00 21 16-9
The Government will rate this factor using the technical rating as follows:
COLOR RATING DESCRIPTION
Blue Outstanding Proposal indicates an exceptional approach and understanding of the small business objectives.
Purple Good Proposal indicates a thorough approach and understanding of the small business objectives.
Green Acceptable Proposal indicates an adequate approach and understanding of small business objectives.
Yellow Marginal Proposal has not demonstrated an adequate approach and understanding of the small business
Red Unacceptable Proposal does not meet small business objectives.
d. In determining strengths and weaknesses, the Government will consider the following:
i. The extent of the Offeror’s proposed participation of small businesses in terms of the percentage of the value of the total acquisition expressed in both percentage and dollar value.
ii. The extent to which the Offeror meets or exceeds the mandatory minimum small business goal and the suggested socioeconomic category goals. These goals are a percentage of the total value of the acquisition.
A mandatory minimum total small business participation goal of 10% of the total contract value is assigned to this acquisition.
In addition to the mandatory small business goal, the following goals are suggested for the individual socioeconomic categories and determined to be reasonable based on market research for this requirement. Goals are based on % of TOTAL contract value:
{1%} Small Disadvantaged Business
{1%} Woman-Owned Small Business (WOSB)
{0.5%} Historically Underutilized Zone (HUB Zone) Small Business
{1%} Veteran Owned Small Business (VOSB)
{0.5%} Service Disabled Veteran Owned Small Business (SDVOSB)
iii. The extent to which proposed small business firms, are specifically identified by name
(DFARS 215.304(c)(1)(C)).
iv. The extent of commitment to use the identified small business firms (enforceable and/or long-term commitments will be considered more favorably than non-enforceable commitments).
v. The complexity and variety of the work small businesses are proposed to perform (for example: work requiring specific certifications, i.e. welding, mechanical, electrical, manufacturing, supply, etc. to expand competitive pool - particularly major project phases – design, manufacturing, installation/testing, and demolition/removal).
vi. The extent of the Offeror’s past compliance with the requirements of FAR 52.219-9, Small Business Subcontracting Plan (eSRS and CPARS evaluations).
00 21 16-10
Volume II - Price.
Price Evaluation
The Price Proposal will be evaluated to determine fairness and reasonableness. For evaluation purposes, the total evaluated price will be calculated by adding the total price for all optional items to the total price for the basic requirement. Evaluation of options will not obligate the
Government to exercise the options.
The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .