This document provides details for a federal solicitation seeking proposals for drainage gallery repairs at the John Day Lock and Dam. The U.S. Army Corps of Engineers Portland District intends to award a firm-fixed price contract for corrective measures, design, installation, and implementation of repairs to address water flow issues into the powerhouse galleries and generator floor at the John Day Dam in Sherman County, Oregon and Klickitat County, Washington. The project scope involves reviewing the entire powerhouse drainage system and methods to mitigate water flow, collect water, and dispose of drainage. Options for water stop technological advances will also be reviewed. This is a total small business set-aside acquisition classified under NAICS code 238110 with a small business size standard of $16.5 million. The estimated value is between $1,000,000 and $5,000,000. Offerors must register in the System for Award Management and direct all responses to the identified contracting office contact by the specified due date.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposal W9127N20R0007
John Day Lock and Dam Klickitat County, WA Sherman County, OR
Powerhouse Monolith Drainage Repairs
Project Manual
TOC-1
MONOLITH DRAINAGE REPAIRS
JOHN DAY LOCK AND DAM
SHERMAN COUNTY, OR
KLICKITAT COUNTY, WA
TABLE OF CONTENTS
00 10 00 SOLICITATION, OFFER, AND AWARD (SF 1442)
SF 30 INFORMATION ON AMENDMENT: NOT USED
00 10 00 SOLICITATION
00 21 00 INSTRUCTIONS
00 45 00 REPRESENTATION AND CERTIFICATIONS
00 72 00 GENERAL CONDITIONS
00 73 00 SUPPLEMENTARY CONDITIONS
GENERAL AND TECHNICAL SPECIFICATION REQUIREMENTS
ATTACHMENTS
A1: Submittal Register (ENG FORM 4288-R)
A2: Transmittal Form (ENG FORM 4025-R)
A3: Construction Project Identification Sign
A4: Spill Emergency - Initial Report Form
A5: Hazardous Energy Control Program
A6: Oregon Wage Rates
A7: Washington Wage Rates
A8: BRZ Policy
NAME OF PROJECT: John Day Monolith Drainage Repair Project
LOCATION OF PERFORMANCE: John Day Lock and Dam, Klickitat County, Washington, Sherman County, Oregon
MAGNITUDE OF CONSTRUCTION: Betw een $1,000,000 and $5,000,000.00
SOCIOECONOMIC: Total Small Business Set Aside
HARRON E ELLOSO
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
05-Aug-2020
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10 AltI
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________04 Sep 2020 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
USACE PORTLAND DISTRICT
333 SW 1ST AVE
PORTLAND OR 97204-3440
W9127N
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
12:00 AM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W9127N20R0007 47
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00 10 00 - Solicitation
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
Mobilization and Demobilization
FFP
Mobilization and demobilization in accordance with contract specifications.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 1 Job
Monolith Joint Repair
FFP
Monolith joint repair in accordance with contract specifications.
FOB: Destination
NET AMT
00 10 00-3
0003 200 Gallon
Grouting Phase 1
FFP
Grouting Phase 1 in accordance with contract specifications. These are estimated quantities.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0004 200 Gallon
Grouting Phase 2
FFP
Grouting Phase 2 in accordance with contract specifications. These are estimated quantities.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0005 1 Job
Water & Compressed Air Piping Improve
FFP
Water and Compressed Air Piping Improvements in accordance with contract specifications.
FOB: Destination
00 10 00-4
0006 1 Job
Lighting
FFP
Lighting in accordance with contract specifications.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0007 1 Job OPTION SS/1 Monolith Joint Repair
FFP
SS/1 Monolith Joint Repair in accordance with contract specifications.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0008 1 Job OPTION 10/11 Monolith Joint Repair
FFP
10/11 Monolith Joint Repair in accordance with contract specifications.
FOB: Destination
00 10 00-5
0009 1 Job OPTION 17/18 Monolith Joint Repair
FFP
17/18 Monolith Joint Repair in accordance with contract specifications.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0010 1 Job OPTION 18/19 Monolith Joint Repair
FFP
18/19 Monolith Joint Repair in accordance with contract specifications.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0011 1 Job OPTION 19/20 Monolith Joint Repair
FFP
19/20 Monolith Joint Repair in accordance with contract specifications.
FOB: Destination
00 10 00-6
TOTALS
SUBTOTAL FOR MANDATORY LINE ITEMS $__________________
SUBTOTAL FOR OPTIONAL LINE ITEMS $ __________________
TOTAL PROPOSED PRICE FOR ALL LINE ITEMS $___________________
00 10 00-7
Section 00 21 00 - Instructions
BIDDER INQUIRIES
(All inquiries regarding this solicitation are to be submitted via ProjNet-Bid. Telephone and email inquiries will not be accepted. ProjNet-Bid is a web-based program that allows offerors to post questions regarding the solicitation, and to view all questions by other offerors, and answers by the U.S. Army Corps of Engineers.
ProjNet-Bid can be accessed through the ProjNet website: https://www.projnet.org/projnet/.
To access the ProjNet-Bid website the first time:
1) Register.
2) Click Quick Add Key. (The Agency is USACE.)
3) Enter the following information for access:
The Bidder Inquiry Key: 2QMJN8-K5YC34
Valid business contact information (e.g. Company name, contact person, business address, phone number and email address). (required on first project only)
Establish secret question and answer which will be used as a password (required on first project only)
4) For subsequent access use your email address, the Bid Inquiry Key and response to the secret question to access the ProjNet-Bid Module 00100.
5) Submit questions or review questions and answers. (A bidder who submits a question will receive an automated email notification that their question has been received. When an answer is posted to a question, the question and answer is then available for all other bidders to review.
6) For a specific step-by-step for POSTING YOUR INQUIRIES, is available in the Reference link on the Contract Viewer.
7) For questions about the ProjNet-Bid, please contact the Call Center help desk. The contact information is listed on the ProjNet website.
No response will be posted to inquiries after the Close of Business on the 7th business day preceding the solicitation due date. All bidders will be held to have reviewed the questions and responses in ProjNet-Bid prior to bid submission.
BASIS OF AWARD
1. BASIS FOR AWARD.
A. General.
(1) This solicitation is Total Small Business Set-Aside. The Government intends to award a single, firm-fixed price construction contract to the responsible Offeror whose proposal represents the best value after evaluation in accordance with the evaluation factors in the solicitation. Offerors shall submit a technical proposal, and a price proposal. The evaluation results of the non-price and price proposals will determine an awardee. All evaluation
00 21 00-1 factors other than price are of approximately equal importance. All evaluation factors other than price, when combined, are approximately equal to price.
(2) The Government intends to make an award without discussions, but reserves the right to conduct discussions should discussions prove to be necessary or advantageous to the Government. Because the Government does not intend to hold discussions Offerors are encouraged to include their best pricing in their initial proposal.
(3) In the context of this proposal, the “offeror” refers to the proposed prime contractor. A major subcontractor is defined as a subcontractor that the offeror proposes to perform the chemical grouting portion of the work required under the solicitation.
(4) Information submitted about any company other than the Offeror, whether an affiliated company, major subcontractor, or other associated business, may not be given much weight unless the proposal contains evidence that the Offeror has obtained a written commitment from this other business entity to perform a portion of the work.
(5) All proposals received will stand alone and be considered complete and final. The evaluation board will not consider any information or data incorporated by reference or otherwise referred to. The successful Offeror will be selected solely on the basis of the evaluation factors set forth below. Elaborate proposals, color brochures, and other excesses are discouraged.
(6) Joint Ventures (JV) A joint venture is defined as follows: a legal business entity formed between two or more companies (parties) to undertake the performance activities of a contract together. This does not include other arrangements such as “teaming agreements” or “strategic alliance” which are not recognized as bona fide joint ventures for the purposes of this solicitation. A company that is part of a joint venture shall submit a legally binding joint venture agreement. Joint ventures shall include a copy of the legal joint venture agreement signed by an authorized officer from each of the firms comprising the joint venture with the chief executive of each entity identified. If submitting a proposal as a joint venture, the experience and past performance of each of the joint venture partners can be submitted for the joint venture entity. The experience for each joint venture partner will be considered the experience of the joint venture entity. Page and project form limits apply to the joint venture as a whole. Prospective Offerors that submit proposals may not change their firm (including Letters of Commitment (LOC) and proposed subcontractors) or their Joint Venture firms, if selected to submit Final Proposal Revisions
(FPR).
(7) The Government recognizes that completion of a project is often a team effort. Thus, offerors are required to submit experience and past performance information for any major subcontractor proposed to be used to help demonstrate that the team they select to perform this project has a complete record of experience and past performance. Per FAR 15.305(a)(2)(iii). In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available, the offeror may not be evaluated favorably or unfavorably on past performance.
(8) The successful offeror will be selected solely on the basis of the evaluation factors set forth below. Accordingly, proposals submitted in response to this solicitation should provide clear, complete, concise, and straightforward responses to the evaluation factors. The offeror’s technical proposal will be incorporated into the awarded contract.
B. Evaluation Ratings.
All non-price factors other than past performance shall be rated using the combined technical/risk rating as follows:
COLOR RATING DESCRIPTION
Blue Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Purple Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
00 21 00-2
Green Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Yellow Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Red Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable.
Proposal is unawardable.
TECHNICAL RISK RATING METHOD
ADJECTIVAL RATING DESCRIPTION
Low Proposal may contain weakness(es) which have little potential to cause disruption of schedule, increased cost or degradation of performance. Normal contractor effort and normal Government monitoring will likely be able to overcome any difficulties.
Moderate Proposal contains a significant weakness or combination of weaknesses which may potentially cause disruption of schedule, increased cost or degradation of performance. Special contractor emphasis and close Government monitoring will likely be able to overcome difficulties.
High Proposal contains a significant weakness or combination of weaknesses which is likely to cause significant disruption of schedule, increased cost or degradation of performance. Is unlikely to overcome any difficulties, even with special contractor emphasis and close Government monitoring.
Unacceptable Proposal contains a material failure or a combination of significant weaknesses that increases the risk of unsuccessful performance to an unacceptable level.
C. Definitions.
Deficiency- A material failure of a proposal to meet a Government requirement or a combination of weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. See FAR 15.001.
Strength- An aspect of an Offeror’s proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.
Significant Strength- An aspect of an Offeror's proposal that has appreciable merit or appreciably exceeds specified performance or capability requirements in a way that will be appreciably advantageous to the Government during contract performance.
Weakness- A flaw in the proposal that increases the risk of unsuccessful contract performance. See FAR 15.001.
Significant Weakness- in the proposal is a flaw that appreciably increases the risk of unsuccessful contract performance. See FAR 15.001.
2. SUBMISSION OF PROPOSALS AND EVALUATION
A. Administrative Details and General Instructions: Proposals are due no later than the time and date specified in Block 13 of Standard Form 1442.
(1) General Proposal Format. The proposal shall be in electronic Portable Document Format, filename extension “.pdf” and suitable for viewing in Adobe Reader except for Excel spreadsheets which shall also be submitted in Microsoft Excel 2013 format. Offerors shall bookmark and label each electronic PDF to afford easy identification from the proposal table of contents.
Title Page. Each copy must include the Offeror’s name and address, phone number and email address, title of the solicitation, solicitation number and date of submittal.
00 21 00-3
Table of Contents. Each proposal shall contain a detailed and complete table of contents.
Organization charts or schedules. An 11” × 17” PDF format may be used. Larger format drawings or tables may also be used.
All information must be confined to the appropriate volume. Each volume of the proposal is expected to contain a table of contents, summary section with a brief abstract of the volume, and the narrative discussion.
(2) Proposal Content Limitations.
The Offeror must confine the proposal to relevant information and documentation sufficient to provide an adequate basis for evaluation. Offerors are responsible for including sufficient details, in a concise manner, to permit a complete and accurate evaluation of the proposal.
Extraneous information provided in the proposals will not be considered in the evaluations;
therefore, the Offeror should only provide information that satisfies the solicitation requirements.
Merely restating the specifications without sufficient elaboration demonstrates a lack of understanding of the requirement.
DO NOT cross reference past performance information. It is acceptable to repeat data, project information or experience in more than one non-price area as long as it satisfies the requirements of the factor.
Proprietary information must be clearly marked.
(3) English Language Requirement
In order for a proposal to be considered, it MUST be prepared in ENGLISH.
B. Content of Proposals: All proposals must be prepared in two volumes: A technical proposal (Volume I), a price proposal (Volume II). Each of the volumes shall be separate and complete in itself so that evaluation of one may be accomplished independently from evaluation of the other. The technical proposal (Volume I) must not contain reference to price. The narrative and content structure of the proposal shall follow the format shown under Volume I below. Offerors who fail to submit a complete proposal may be excluded and thus receive no further consideration for award.
(1) Technical Proposal, Volume I: Volume I shall consist of information for the three (3) factors, listed in tabular form, as noted below. Repeating or restating the specifications without sufficient elaboration will be determined to show a lack of understanding of the requirement.
Volume I – Technical (Non-Price) Factors and Sub-factors:
Tab 1 - Factor 1 - Experience
Tab 2 - Factor 2 – Past Performance
Tab 3 - Factor 3 – Work Plan
Volume II – Price Proposal:
Price Proposal, Volume II: The Price Proposal shall be complete, detailed and submitted on forms provided in the Request for Proposal (RFP). Offeror shall provide pricing and complete all line items on Standard Form 1442 (SF 1442).
00 21 00-4
Volume II - Price. Offeror’s price proposal must be prepared in accordance with below paragraphs and must include:
Tab 1 – SF1442, Solicitation, Offer, and Award.
The SF1442 shall be filled out completely by the Offeror and signed by an official that is authorized to bind the company. The Offeror shall also acknowledge all amendments to the solicitation in accordance with the instructions on the Standard Form 30 or Block 19 of SF1442.
Tab 2 – Section 00 10 00, Proposal Price / Bid Schedule.
The Offeror shall fully complete this section.
Tab 3 – Representations, Certifications and other Statements of Offerors.
The Offeror shall complete all representations and certifications in Section 00 45 00 and also ensure current registration and completed/updated Annual Representations and Certifications on the System for Award Management (SAM) website, www.sam.gov.
Tab 4 – Banking and Bonding point of contacts.
The Government is required to determine Contractor’s responsibility; the Offeror shall provide contact information (Company name, point of contact, address, email, and phone number) for the offeror’s bank and bonding institutions.
Tab 5 – Bid/Offer Guarantee. The Bid Bond shall be at least 20% of the bid price, but shall not exceed $3 million. See FAR 52.228-1 – Bid Guarantee.
Submission of Proposals: Proposals are due no later than the time and date established in Block 13, SF 1442.
There will not be a public proposal opening.
Offeror shall submit its Bid via email to Harron Elloso, Harron.E.Elloso@usace.army.mil and Kristina Morrow, Kristina.K.Morrow@usace.army.mil. Offerors should enter a description for every file submitted. For files over 20 megabytes (MB) the offeror shall break the file into smaller files sent via separate emails, each marked to identify which number the email is relative to the total number of emails submitted (i.e. “one of four”). Once all of the emails submitted have been received, the Government will confirm receipt via return email. If an offeror submits multiple bids, the Government will only consider the last bid submitted prior to the bid due date and time.
The electronic Bid shall be in Portable Document Format, filename extension: “.pdf” and suitable for viewing in Adobe Reader. Offerors shall bookmark and label each electronic PDF to afford easy identification from the Bid table of contents.
Do not assume submission will be instantaneous. File size and number of files submitted shall be considered.
Offeror/Teammate/Subcontractors should allow adequate time for submission completion because the entire Bid (i.e. offerors submission and all teammate/subcontractor(s) independent submissions) must be received by the time and date specified in Block 13 of Standard Form 1442, or SF 30 if applicable.
To avoid rejection of an offer, the offeror must make every effort to ensure its electronic submission is virus-free.
Bids, or portions thereof, submitted with the presence of a virus or which are otherwise unreadable will be treated as unreadable pursuant to FAR 15.207(c).
The requirement that an original and copy(ies) be submitted as found in block 13A of the SF1442 is satisfied through the electronic submission. Additionally, electronic submission of the bid guarantee, when a bid guarantee is required, is due with the bid submission (mailing a bid guarantee is not allowed).
3. EVALUATION FACTORS
Volume I – Technical (Non-Price) Submission Requirements and Evaluation Method:
00 21 00-5
FACTOR 1 (TAB 1) – Experience
Submission Requirements:
The Offeror shall submit information for a minimum of one (1) and a maximum of three (3) projects valued $300,000 or greater and substantially completed within the past 5 years that best demonstrates the Offeror’s experience performing work similar in size, scope, and complexity to the Powerhouse Drainage Gallery Repair project required by this solicitation. Provide pressures, crack/joint openings, and flows if available to allow the Government to evaluate the similarity to the current RFP.
Instructions on the use of major subcontractors to fulfill the chemical grouting portion of the work:
If the Offeror will not be self-performing the chemical grouting portion of the work, the Offeror must submit at least one past experience of the subcontractor it proposes to perform the chemical grouting portion of the work as part of its Factor 1 proposal. This requirement does not change the maximum number of projects in total that the Offeror may submit under this factor (maximum of three projects in total).
“Substantially complete” is defined as having completed more than 75% of the project work at the time of proposal submission. If an offeror submits a project that it represents is “substantially complete,” the offeror must reasonably explain why the project is considered at least 75% complete. If an offeror submits an ongoing project without providing an accompanying reasonable explanation that explains how the project is at least 75% complete, the Government reserves the right to reject the project.
Information submitted for each project must include the information outlined in Attachment A, Offeror’s Experience Form.
A maximum of three (3) projects will be evaluated. If an offeror disregards these instructions and submits more than three projects, only the first three projects will be evaluated. Offerors should describe each project with enough detail to ensure that the Government can meaningfully assess how well the projects submitted meet the evaluation criteria outlined below.
Evaluation method:
In determining strengths and weaknesses, the Government will consider the following:
How comparable each project is to the specific project elements required by this solicitation, to include chemical grouting in a concrete structure;
Whether projects demonstrate grout injection experience. Projects that demonstrate experience under comparable crack/joint openings and pressures (i.e. joints or openings greater than ¼” and a minimum of 90 feet of head or 40 pounds per square inch [psi]) will be given a more favorable rating. It is up to the offeror to provide enough detail for the Government to evaluate the pressures and flows of the submitted project.;
FACTOR 2 (TAB 2) – Past Performance
Submission Requirements:
The Offeror shall provide past performance information for each project listed by the Offeror under Factor 1: Experience, including any projects performed by a major subcontractor. Relevant projects are projects valued over $300,000.00 that are comparable in size, scope, and complexity with this project, as identified in Factor 1. A recent project is defined as a project completed or substantially completed within the past 5 years.
“Substantially complete” is defined as having completed more than 75% of the project work at the time of proposal submission.
00 21 00-6
If a completed Contractor Performance Assessment Reporting System (CPARS) evaluation is available, the offeror shall submit the CPARS evaluation with the proposal. Do not submit a PPQ when a completed CPARS is available. Completed PPQs should be submitted with your proposal if a CPARS is not available. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror shall complete and submit with the proposal the first page of the PPQ (Attachment B), which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact, Harron Elloso, via email at harron.e.elloso@usace.army.mil prior to proposal closing date. The offerors shall instruct the clients to refer to the solicitation number in the subject line. The PPQs are Source Selection materials. All successfully submitted PPQs will receive an e-mail confirmation upon receipt. If the offeror does not receive the confirmation, it is their responsibility to follow up to ensure the government has received the information.
Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted past performance information in the past performance evaluation.
Offerors may provide explanation on problems encountered on past projects and the corrective actions taken by the offeror.
In addition to the above, the Government may review other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the PPIRS (Past Performance Information Retrieval System) including CPARS (Contractor Performance Assessment Reporting System), using all CAGE/DUNS (Commercial and Government Entity Code/ Data Universal Numbering System) numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), FAPIIS (Federal Awardee Performance and Integrity Information System), Electronic Subcontract Reporting System (eSRS), or other databases; telephone interviews with organizations familiar with the offeror’s performance, Government personnel with personal knowledge of the offeror’s performance capability, and any other known sources not provided by the offeror.
While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.
Evaluation Method:
The Government seeks a contractor who maintains a strong commitment to customer satisfaction and superior performance. It is the offeror’s responsibility to affirmatively document these qualities in his technical proposal. In doing so, be mindful that “past performance” and “experience” are not identical.
Experience measures what the offeror has done and how many times, or for how long, the offeror have done it. Past performance, however, measures how well the offeror has performed.
The past performance evaluation results in an assessment of the offeror’s probability of meeting the solicitation requirements. The recency and relevance of the information, source of the information, context of the data, and general trends in the contractor’s performance shall be considered. These are combined to establish one performance confidence assessment rating for each offeror.
There are three aspects to the past performance evaluation: recency, relevancy (including text of data), and quality (including general trends in contractor performance and source of information). The first aspect is to evaluate the recency of the offeror’s past performance. The second aspect is to determine how relevant a recent effort accomplished by the offeror is to the work required by the RFP. The third aspect of the past performance is to determine how well the offeror performed on the recent and relevant projects.
00 21 00-7
A final Performance Confidence Assessment Rating will be given for this factor based on the assessment of recent and relevant past performance information and the assessment of the quality of past performance on prior contract efforts.
With respect to relevancy, more relevant past performance will typically be a stronger predictor of future success and have more influence on the past performance confidence assessment than past performance of lesser relevance.
Relevancy will be determined based on how closely the Past Performance effort involved similarity of scope and magnitude of effort, dollar value, and complexities this solicitation requires.
There are four levels of relevancy as shown in the Table below.
PAST PERFORMANCE RELEVANCY
RATING DESCRIPTION
Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant
Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
The SSEB will review the past performance information and determine the quality and usefulness as it applies to performance confidence assessment. In conducting a performance confidence assessment, each offeror shall be assigned one of the ratings using the Table below, focusing on performance that is relevant to the contract requirements.
PERFORMANCE CONFIDENCE ASSESSMENTS
RATING DESCRIPTION
Substantial Confidence
Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence
Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Neutral Confidence
No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance.
Limited Confidence
Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence No recent/relevant performance record is available or the offeror’s Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.
If any performance issues are identified, the Government will consider the number, type and severity of the problems and effectiveness of corrective actions taken.
00 21 00-8
In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available, the offeror will not be evaluated favorably or unfavorably on past performance, and therefore may receive a “Neutral Confidence” rating.
FACTOR 3 (TAB 3) – Work Plan
Submission Requirements:
The Offeror shall submit a Work Plan that demonstrates the Offeror’s approach to performing the required work as outlined in the specifications. The Work Plan must include a Grout Injection Plan.
The Work Plan must provide, at a minimum:
A discussion of the means, methods, equipment, and sequence of work for all joint repairs in the gallery.
A narrative detailing the challenges and site constraints that may be encountered and proposed mitigation measures to successfully complete the work.
The Grout Injection Plan must provide, at a minimum:
Whether the Offeror plans to self-perform the chemical grouting portion of the work or if the Offeror plans to have a subcontractor perform the chemical grouting work. If a subcontractor is to be used, include the name of the proposed subcontractor.
Provide a narrative providing details of the grout injection sequence.
The Offeror may submit drawings, photos, or figures to further illustrate any portion of the Grout Injection Plan.
Evaluation method:
In determining strengths and weaknesses, the Government will consider the following when evaluating the Offeror’s Work Plan:
How well the Offeror understands the scope of work, the challenges to be encountered during construction, and how the Offeror plans to mitigate those challenges;
A detailed and descriptive, project specific, Work Plan that describes how the Offeror’s approach and methodology will function to stop joint leakage will receive greater weight than a vague and general plan.
Volume II - Price.
Price Evaluation
For this solicitation, the non-price factors, when combined, are approximately equal to price. The Price Proposal will be evaluated to determine fairness and reasonableness. For evaluation purposes, the total evaluated price will be calculated by adding the total price for all optional items to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the options.
The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.
CLAUSES INCORPORATED BY REFERENCE
00 21 00-9
52.204-7 System for Award Management OCT 2018 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-22 Alternative Line Item Proposal JAN 2017 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 52.217-5 Evaluation Of Options JUL 1990 252.215-7008 Only One Offer JUL 2019
CLAUSES INCORPORATED BY FULL TEXT
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.
(End of provision)
52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY
2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
(End of provision)
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
00 21 00-10
3.8% - Sherman County, OR 3.8% - Klickitat County, WA
6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Sherman County, OR and Klickitat County, WA.
(End of provision)
52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT--CONSTRUCTION MATERIALS (MAY 2014)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American --Construction Materials” (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a
00 21 00-11 determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested--
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of provision)
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c) The amount of the bid guarantee shall be 20% percent of the bid price or $3,000,000.00, whichever is less.-
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
00 21 00-12
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of provision)
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
USACE – Portland District
ATTN: CECT-NWP-C
PO BOX 2946
PORTLAND, OR 97208-2946
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of provision)
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditiosn Affecting the Work, wil be included in any contract awarded as a result of this solicitiation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been tentatively scheduled for Thursday, 20 August 2020 at 10:00 AM to 2:00 PM.
(c) Participants will meet at:
John Day Lock and Dam, Entry Gate I-84 Exit 109 Rufus, OR 97050
(d) Due to security requirements at the powerhouse, you must RSVP by close of business 05 August 2020 in order to attend the site visit. The following information should be submitted to Dan Richer, John Day Dam Point-of- Contact at daniel.j.richer@usace.army.mil and Harron Elloso, Contract Specialist at harron.e.elloso@usace.army.mil.
In accordance with state and local guidelines, the dam has limited indoor gatherings to a maximum of ten (10) people. Contractors are encouraged to limit attendance by only essential personnel.
Name of person attending site visit;
Company Name;
Phone Number;
E-mail address:
U.S. Citizen? (Y/N)
Please note that due to the time required to process background checks for non-US citizens, only US citizens will be allowed to attend the site visit. Personally Identifiable Information will be very closely held in accordance with
00 21 00-13
Army policy.
(e) Personal protective equipment, hard hats, and steel-toed boots will be required. Attendees should come with their own wet weather gear (rain jacket and pants) as well as a waterproof flashlight. The work site often has 18 inches of standing water as well as areas where water intrusion/spray is present. Attendees shall prepare accordingly.
(End of provision)
52.236-28 PREPARATION OF PROPOSALS--CONSTRUCTION (OCT 1997)
(a) Proposals must be (1) submitted on the forms furnished by the Government or on copies of those forms, and (2) manually signed. The person signing a proposal must initial each erasure or change appearing on any proposal form.
(b) The proposal form may require offerors to submit proposed prices for one or more items on various bases, including--
(1) Lump sum price;
(2) Alternate prices;
(3) Units of construction; or
(4) Any combination of paragraphs (b)(1) through (b)(3) of this provision.
(c) If the solicitation requires submission of a proposal on all items, failure to do so may result in the proposal being rejected without further consideration. If a proposal on all items is not required, offerors should insert the words “no proposal” in the space provided for any item on which no price is submitted.
(d) Alternate proposals will not be considered unless this solicitation authorizes their submission.
(End of provision)
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .