Category A Work Item DescriptionPWS ParagraphQtyUnitUnit PriceAmount
5.1 VESSEL SUPPORT
Dock and Undock Vessel; accomplish5.1.11Job$ - 0
Drydock Lay Day Services; provide5.1.21Job$ - 0
Wet Berth for Vessel; provide5.1.31Job$ - 0
Electrical Power; provide5.1.51Job$ - 0
Steam Service; provide5.1.61Job$ - 0
Compressed Air Service; provide5.1.71Job$ - 0
Potable Water Service; provide5.1.81Job$ - 0
Sanitation Service; provide5.1.91Job$ - 0
Internet Service; provide5.1.101Job$ - 0
Vessel Services; connect and disconnect5.1.111Job$ - 0
Transportation; provide5.1.121Job$ - 0
Crane Service; provide5.1.131Job$ - 0
Office Space; provide5.1.1472Day$ - 0
Parking Spaces; provide5.1.1520Each$ - 0
Temporary Heaters; provide5.1.161Job$ - 0
5.2 TEST & INSPECTION SUPPORT
Underwater Hull; pressure wash5.2.11Job$ - 0
Chain lockers; open, clean, and inspect5.2.21Job$ - 0
Bilges; clean and maintain5.2.51Job$ - 0
ABS Survey Support; provide5.2.91Job$ - 0
Dock and Sea Trials; accomplish5.2.101Job$ - 0
5.3 STRUCTURAL
Steering Gear Room; preserve5.3.11Job$ - 0
Engine Room Cofferdams and Trunk; preserve5.3.21Job$ - 0
Main Reduction Gear Foundations; modify5.3.41Job$ - 0
Sewage Overboard Fitting; replace5.3.51Job$ - 0
Sewage Tank Top; preserve5.3.61Job$ - 0
Crane Base; preserve5.3.151Job$ - 0
5.4 OUTFITTING
Bridge Windows; replace5.4.11Job$ - 0
Stateroom Carpet; replace5.4.21Job$ - 0
Escape Scuttles; replace5.4.31Job$ - 0
Ventilation Deck Terminals; refurbish5.4.51Job$ - 0
Fuel Oil Vent Piping Terminals; replace5.4.61Job$ - 0
Fire Suppression Equipment; inspect and repair5.4.71Job$ - 0
Life Raft Annual Certification; accomplish5.4.81Job$ - 0
5.5 DREDGE GEAR
Draghead Winch Assemblies; recondition5.5.11Job$ - 0
Sluice Valves; replace5.5.71Job$ - 0
5.6 MACHINERY
Main Propulsion Engines; inspect and repair5.6.11Job$ - 0
Main Propulsion Shafting & Rudder Clearances; measure5.6.21Job$ - 0
Main Propulsion Shafting Rope Guards; replace5.6.71Job$ - 0
Main Propulsion Shafting Stern Tube Shaft Seal; modify5.6.81Job$ - 0
Steam Piping; replace5.6.91Job$ - 0
Pump Room Ventilation Ducting; replace5.6.101Job$ - 0
Emergency Generator Maintenance; accomplish5.6.131Job$ - 0
5.7 ELECTRICAL/ELECTRONICS
Security Cameras; install5.7.11Job$ - 0
Navigation Equipment; inspect and repair5.7.21Job$ - 0
Launch Davit Variable Frequency Drive (VFD); install5.7.41Job$ - 0
Tank Level Indicating System; modify5.7.51Job$ - 0
Total Category A Work Items$ - 0

CAT B

Category B Work Item DescriptionPWS ParagraphQtyUnitUnit PriceAmount
5.1 VESSEL SUPPORT
Tug Services; provide5.1.41Job$ - 0
Deep Cleaning of Vessel Hotel Spaces5.1.171Job$ - 0
5.2 TEST & INSPECTION SUPPORT
Tanks; open, clean and gas free5.2.31Job$ - 0
Slops and Dirty Oil Tanks; clean and gas free5.2.41Job$ - 0
Hopper Staging; provide5.2.61Job$ - 0
Tower staging; provide5.2.720Each$ - 0
Hull and Structures Thickness; measure5.2.81Job$ - 0
5.3 STRUCTURAL
Engine Room Cofferdam and Trunk Steel Plating; replace5.3.31Job$ - 0
Tanks, Voids, & Double Bottoms; preserve - Ballast Tank, FR 0-95.3.7.11Tank$ - 0
Tanks, Voids, & Double Bottoms; preserve - Ballast Tank, FR 83-88 STBD5.3.7.21Tank$ - 0
Tanks, Voids, & Double Bottoms; preserve - Ballast Tank, FR 83-88 PORT5.3.7.31Tank$ - 0
Tanks, Voids, & Double Bottoms; preserve - Double Bottom, FR 9-18 STBD5.3.7.41Tank$ - 0
Tanks, Voids, & Double Bottoms; preserve - Double Bottom, FR 9-18 PORT5.3.7.51Tank$ - 0
Tanks, Voids, & Double Bottoms; preserve - Double Bottom, FR 18-32 STBD5.3.7.61Tank$ - 0
Tanks, Voids, & Double Bottoms; preserve - Double Bottom, FR 18-32 PORT5.3.7.71Tank$ - 0
Tanks, Voids, & Double Bottoms; preserve - Double Bottom, FR 32-53 STBD5.3.7.81Tank$ - 0
Tanks, Voids, & Double Bottoms; preserve - Double Bottom, FR 32-53 PORT5.3.7.91Tank$ - 0
Tanks, Voids, & Double Bottoms; preserve - Double Bottom FR 53-68 STBD5.3.7.101Tank$ - 0
Tanks, Voids, & Double Bottoms; preserve - Double Bottom, FR 53-68 PORT5.3.7.111Tank$ - 0
Tanks, Voids, & Double Bottoms; preserve - Void below AMR, FR 68-785.3.7.121Tank$ - 0
Tanks, Voids, & Double Bottoms; preserve - Void below Sewage Flat, FR 78-835.3.7.131Tank$ - 0
Steel Plating; replace - Pump Room, port pump well5.3.8.11Each$ - 0
Steel Plating; replace - Pump Room, starboard pump well5.3.8.21Each$ - 0
Steel Plating; replace - Port Trunnion Room, bilge turn at sea chest5.3.8.31Each$ - 0
Steel Plating; replace - Port Trunnion Room, tank top at side shell5.3.8.41Each$ - 0
Steel Plating; replace - Starboard Trunnion Room, tank top at side shell5.3.8.51Each$ - 0
Steel Plating; replace - Hopper Void Double Bottom, hull plating, port5.3.8.61Each$ - 0
Steel Plating; replace - Hopper Void Double Bottom, hull plating, starboard5.3.8.71Each$ - 0
Hull Anodes; replace5.3.91Job$ - 0
Hull Below Waterline; apply coatings5.3.1011,000SqFt$ - 0
Hull Above Waterline; apply coatings5.3.116,500SqFt$ - 0
Weather Decks; apply coatings5.3.12500SqFt$ - 0
Aluminum House; apply coatings5.3.13500SqFt$ - 0
Hopper Irathane Coating; apply5.3.141Job$ - 0
5.4 OUTFITTING
Watertight Doors; replace5.4.41Job$ - 0
Launch Davit; inspect and repair5.4.91Job$ - 0
Rescue Boat Davit; inspect and repair5.4.101Job$ - 0
Ship's Crane; inspect and repair5.4.111Job$ - 0
5.5 DREDGE GEAR
Hydraulic Operating Cylinders; overhaul - Swell Compensator Cylinder5.5.2.11Each$ - 0
Hydraulic Operating Cylinders; overhaul - Hopper Overflow Cylinder5.5.2.21Each$ - 0
Hydraulic Operating Cylinders; overhaul - Hopper Door Cylinder5.5.2.31Each$ - 0
Hydraulic Operating Cylinders; overhaul - Draghead Gantry Cylinder5.5.2.41Each$ - 0
Hydraulic Operating Cylinders; overhaul - Gimbal Gantry Cylinder5.5.2.51Each$ - 0
Hopper Door Operating Rod; replace5.5.31Job$ - 0
Hopper Door Bearing Support Beam; renew5.5.41Job$ - 0
Hopper Door Frame Hinges; renew5.5.51Job$ - 0
Hopper Door Hinge Bushings; renew5.5.61Job$ - 0
Pipe Spool Pieces; replace5.5.81Job$ - 0
Suction Inlet Hull Rings and Pipe Liners; replace5.5.91Job$ - 0
Sliding Piece; fit up5.5.101Job$ - 0
Jetting System Piping; replace5.5.111Job$ - 0
5.6 MACHINERY
Main Propulsion Shaft Bearings; replace5.6.31Job$ - 0
Main Propulsion Shaft & Hub Assembly; replace5.6.41Job$ - 0
Main Propulsion CPP Blades; replace5.6.51Job$ - 0
Rudder Assembly; repair/replace5.6.61Job$ - 0
Ventilation System Fan; overhaul - Pump Room Supply OR Exhaust Fan5.6.11.11Each$ - 0
Ventilation System Fan; overhaul - Engine Room Supply Fan5.6.11.21Each$ - 0
Ventilation System Fan; overhaul - Engine Room Exhaust Fan5.6.11.31Each$ - 0
Ventilation System Fan; overhaul - Aux. Machinery Room Supply OR Exhaust Fan5.6.11.41Each$ - 0
Galley Exhaust Ducting; clean and inspect5.6.121Job$ - 0
5.7 ELECTRICAL/ELECTRONICS
CPP Control System Service; provide5.7.31Job$ - 0
Bridge Monitors; install5.7.61Job$ - 0
ILS Control System; inspect and repair5.7.71Job$ - 0
Total Category B Work Items$ - 0

OVER & ABOVE WORK

SCHEDULE OF PRICES/RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED)
Over & Above Work Description
Item DescriptionPWS
ParagraphRequired Level
Of Effort HoursMaterialsFully Burdened
Labor RateMaterial Burden RateTotal Cost
Ship Repair Labor Rate
6.26,500.00$ 200,000.00$ - 00%$200,000.00
SCHEDULE OF PRICES/RATES FOR THE PURPOSES OF A GOVERNMENT REQUIRED EXTENSION: DAILY RATES FOR PIER SIDE AND DRY-DOCKING (FULLY BURDENED)
Over & Above Work Description
Item DescriptionPWS
ParagraphQtyUnitUnit PriceTotal Cost
Dry-Docking Extension Cost6.310Days$ - 0$ - 0
Pier Side Extension Costs6.314Days$ - 0$ - 0
Total Over & Above Work$200,000.00