CAT A
| Category A Work Item Description | PWS Paragraph | Qty | Unit | Unit Price | Amount |
| 5.1 VESSEL SUPPORT | |||||
| Dock and Undock Vessel; accomplish | 5.1.1 | 1 | Job | $ - 0 | |
| Drydock Lay Day Services; provide | 5.1.2 | 30 | Day | $ - 0 | |
| Wet Berth for Vessel; provide | 5.1.3 | 42 | Day | $ - 0 | |
| Electrical Power; provide | 5.1.5 | 1 | Job | $ - 0 | |
| Steam Service; provide | 5.1.6 | 1 | Job | $ - 0 | |
| Compressed Air Service; provide | 5.1.7 | 1 | Job | $ - 0 | |
| Potable Water Service; provide | 5.1.8 | 1 | Job | $ - 0 | |
| Sanitation Service; provide | 5.1.9 | 1 | Job | $ - 0 | |
| Internet Service; provide | 5.1.10 | 1 | Job | $ - 0 | |
| Vessel Services; connect and disconnect | 5.1.11 | 1 | Job | $ - 0 | |
| Transportation; provide | 5.1.12 | 1 | Job | $ - 0 | |
| Crane Service; provide | 5.1.13 | 1 | Job | $ - 0 | |
| Office Space; provide | 5.1.14 | 72 | Day | $ - 0 | |
| Parking Spaces; provide | 5.1.15 | 20 | Each | $ - 0 | |
| Temporary Heaters; provide | 5.1.16 | 1 | Job | $ - 0 | |
| 5.2 TEST & INSPECTION SUPPORT | |||||
| Underwater Hull; pressure wash | 5.2.1 | 1 | Job | $ - 0 | |
| Chain lockers; open, clean, and inspect | 5.2.2 | 1 | Job | $ - 0 | |
| Bilges; clean and maintain | 5.2.5 | 1 | Job | $ - 0 | |
| ABS Survey Support; provide | 5.2.9 | 1 | Job | $ - 0 | |
| Dock and Sea Trials; accomplish | 5.2.10 | 1 | Job | $ - 0 | |
| 5.3 STRUCTURAL | |||||
| Steering Gear Room; preserve | 5.3.1 | 1 | Job | $ - 0 | |
| Engine Room Cofferdams and Trunk; preserve | 5.3.2 | 1 | Job | $ - 0 | |
| Main Reduction Gear Foundations; modify | 5.3.4 | 1 | Job | $ - 0 | |
| Sewage Overboard Fitting; replace | 5.3.5 | 1 | Job | $ - 0 | |
| Sewage Tank Top; preserve | 5.3.6 | 1 | Job | $ - 0 | |
| Crane Base; preserve | 5.3.15 | 1 | Job | $ - 0 | |
| 5.4 OUTFITTING | |||||
| Bridge Windows; replace | 5.4.1 | 1 | Job | $ - 0 | |
| Stateroom Carpet; replace | 5.4.2 | 1 | Job | $ - 0 | |
| Escape Scuttles; replace | 5.4.3 | 1 | Job | $ - 0 | |
| Ventilation Deck Terminals; refurbish | 5.4.5 | 1 | Job | $ - 0 | |
| Fuel Oil Vent Piping Terminals; replace | 5.4.6 | 1 | Job | $ - 0 | |
| Fire Suppression Equipment; inspect and repair | 5.4.7 | 1 | Job | $ - 0 | |
| Life Raft Annual Certification; accomplish | 5.4.8 | 1 | Job | $ - 0 | |
| 5.5 DREDGE GEAR | |||||
| Draghead Winch Assemblies; recondition | 5.5.1 | 1 | Job | $ - 0 | |
| Sluice Valves; replace | 5.5.7 | 1 | Job | $ - 0 | |
| 5.6 MACHINERY | |||||
| Main Propulsion Engines; inspect and repair | 5.6.1 | 1 | Job | $ - 0 | |
| Main Propulsion Shafting & Rudder Clearances; measure | 5.6.2 | 1 | Job | $ - 0 | |
| Main Propulsion Shafting Rope Guards; replace | 5.6.7 | 1 | Job | $ - 0 | |
| Main Propulsion Shafting Stern Tube Shaft Seal; modify | 5.6.8 | 1 | Job | $ - 0 | |
| Steam Piping; replace | 5.6.9 | 1 | Job | $ - 0 | |
| Pump Room Ventilation Ducting; replace | 5.6.10 | 1 | Job | $ - 0 | |
| Emergency Generator Maintenance; accomplish | 5.6.13 | 1 | Job | $ - 0 | |
| 5.7 ELECTRICAL/ELECTRONICS | |||||
| Security Cameras; install | 5.7.1 | 1 | Job | $ - 0 | |
| Navigation Equipment; inspect and repair | 5.7.2 | 1 | Job | $ - 0 | |
| Launch Davit Variable Frequency Drive (VFD); install | 5.7.4 | 1 | Job | $ - 0 | |
| Tank Level Indicating System; modify | 5.7.5 | 1 | Job | $ - 0 | |
| Total Category A Work Items | $ - 0 |
CAT B
| Category B Work Item Description | PWS Paragraph | Qty | Unit | Unit Price | Amount |
| 5.1 VESSEL SUPPORT | |||||
| Tug Services; provide | 5.1.4 | 1 | Job | $ - 0 | |
| Deep Cleaning of Vessel Hotel Spaces | 5.1.17 | 1 | Job | $ - 0 | |
| 5.2 TEST & INSPECTION SUPPORT | |||||
| Tanks; open, clean and gas free | 5.2.3 | 1 | Job | $ - 0 | |
| Slops and Dirty Oil Tanks; clean and gas free | 5.2.4 | 1 | Job | $ - 0 | |
| Hopper Staging; provide | 5.2.6 | 1 | Job | $ - 0 | |
| Tower staging; provide | 5.2.7 | 20 | Each | $ - 0 | |
| Hull and Structures Thickness; measure | 5.2.8 | 1 | Job | $ - 0 | |
| 5.3 STRUCTURAL | |||||
| Engine Room Cofferdam and Trunk Steel Plating; replace | 5.3.3 | 1 | Job | $ - 0 | |
| Tanks, Voids, & Double Bottoms; preserve - Ballast Tank, FR 0-9 | 5.3.7.1 | 1 | Tank | $ - 0 | |
| Tanks, Voids, & Double Bottoms; preserve - Ballast Tank, FR 83-88 STBD | 5.3.7.2 | 1 | Tank | $ - 0 | |
| Tanks, Voids, & Double Bottoms; preserve - Ballast Tank, FR 83-88 PORT | 5.3.7.3 | 1 | Tank | $ - 0 | |
| Tanks, Voids, & Double Bottoms; preserve - Double Bottom, FR 9-18 STBD | 5.3.7.4 | 1 | Tank | $ - 0 | |
| Tanks, Voids, & Double Bottoms; preserve - Double Bottom, FR 9-18 PORT | 5.3.7.5 | 1 | Tank | $ - 0 | |
| Tanks, Voids, & Double Bottoms; preserve - Double Bottom, FR 18-32 STBD | 5.3.7.6 | 1 | Tank | $ - 0 | |
| Tanks, Voids, & Double Bottoms; preserve - Double Bottom, FR 18-32 PORT | 5.3.7.7 | 1 | Tank | $ - 0 | |
| Tanks, Voids, & Double Bottoms; preserve - Double Bottom, FR 32-53 STBD | 5.3.7.8 | 1 | Tank | $ - 0 | |
| Tanks, Voids, & Double Bottoms; preserve - Double Bottom, FR 32-53 PORT | 5.3.7.9 | 1 | Tank | $ - 0 | |
| Tanks, Voids, & Double Bottoms; preserve - Double Bottom FR 53-68 STBD | 5.3.7.10 | 1 | Tank | $ - 0 | |
| Tanks, Voids, & Double Bottoms; preserve - Double Bottom, FR 53-68 PORT | 5.3.7.11 | 1 | Tank | $ - 0 | |
| Tanks, Voids, & Double Bottoms; preserve - Void below AMR, FR 68-78 | 5.3.7.12 | 1 | Tank | $ - 0 | |
| Tanks, Voids, & Double Bottoms; preserve - Void below Sewage Flat, FR 78-83 | 5.3.7.13 | 1 | Tank | $ - 0 | |
| Steel Plating; replace - Pump Room, port pump well | 5.3.8.1 | 1 | Each | $ - 0 | |
| Steel Plating; replace - Pump Room, starboard pump well | 5.3.8.2 | 1 | Each | $ - 0 | |
| Steel Plating; replace - Port Trunnion Room, bilge turn at sea chest | 5.3.8.3 | 1 | Each | $ - 0 | |
| Steel Plating; replace - Port Trunnion Room, tank top at side shell | 5.3.8.4 | 1 | Each | $ - 0 | |
| Steel Plating; replace - Starboard Trunnion Room, tank top at side shell | 5.3.8.5 | 1 | Each | $ - 0 | |
| Steel Plating; replace - Hopper Void Double Bottom, hull plating, port | 5.3.8.6 | 1 | Each | $ - 0 | |
| Steel Plating; replace - Hopper Void Double Bottom, hull plating, starboard | 5.3.8.7 | 1 | Each | $ - 0 | |
| Hull Anodes; replace | 5.3.9 | 1 | Job | $ - 0 | |
| Hull Below Waterline; apply coatings | 5.3.10 | 11,000 | SqFt | $ - 0 | |
| Hull Above Waterline; apply coatings | 5.3.11 | 6,500 | SqFt | $ - 0 | |
| Weather Decks; apply coatings | 5.3.12 | 500 | SqFt | $ - 0 | |
| Aluminum House; apply coatings | 5.3.13 | 500 | SqFt | $ - 0 | |
| Hopper Irathane Coating; apply | 5.3.14 | 1 | Job | $ - 0 | |
| 5.4 OUTFITTING | |||||
| Watertight Doors; replace | 5.4.4 | 1 | Job | $ - 0 | |
| Launch Davit; inspect and repair | 5.4.9 | 1 | Job | $ - 0 | |
| Rescue Boat Davit; inspect and repair | 5.4.10 | 1 | Job | $ - 0 | |
| Ship's Crane; inspect and repair | 5.4.11 | 1 | Job | $ - 0 | |
| 5.5 DREDGE GEAR | |||||
| Hydraulic Operating Cylinders; overhaul - Swell Compensator Cylinder | 5.5.2.1 | 1 | Each | $ - 0 | |
| Hydraulic Operating Cylinders; overhaul - Hopper Overflow Cylinder | 5.5.2.2 | 1 | Each | $ - 0 | |
| Hydraulic Operating Cylinders; overhaul - Hopper Door Cylinder | 5.5.2.3 | 1 | Each | $ - 0 | |
| Hydraulic Operating Cylinders; overhaul - Draghead Gantry Cylinder | 5.5.2.4 | 1 | Each | $ - 0 | |
| Hydraulic Operating Cylinders; overhaul - Gimbal Gantry Cylinder | 5.5.2.5 | 1 | Each | $ - 0 | |
| Hopper Door Operating Rod; replace | 5.5.3 | 1 | Job | $ - 0 | |
| Hopper Door Bearing Support Beam; renew | 5.5.4 | 1 | Job | $ - 0 | |
| Hopper Door Frame Hinges; renew | 5.5.5 | 1 | Job | $ - 0 | |
| Hopper Door Hinge Bushings; renew | 5.5.6 | 1 | Job | $ - 0 | |
| Pipe Spool Pieces; replace | 5.5.8 | 1 | Job | $ - 0 | |
| Suction Inlet Hull Rings and Pipe Liners; replace | 5.5.9 | 1 | Job | $ - 0 | |
| Sliding Piece; fit up | 5.5.10 | 1 | Job | $ - 0 | |
| Jetting System Piping; replace | 5.5.11 | 1 | Job | $ - 0 | |
| 5.6 MACHINERY | |||||
| Main Propulsion Shaft Bearings; replace | 5.6.3 | 1 | Job | $ - 0 | |
| Main Propulsion Shaft & Hub Assembly; replace | 5.6.4 | 1 | Job | $ - 0 | |
| Main Propulsion CPP Blades; replace | 5.6.5 | 1 | Job | $ - 0 | |
| Rudder Assembly; repair/replace | 5.6.6 | 1 | Job | $ - 0 | |
| Ventilation System Fan; overhaul - Pump Room Supply OR Exhaust Fan | 5.6.11.1 | 1 | Each | $ - 0 | |
| Ventilation System Fan; overhaul - Engine Room Supply Fan | 5.6.11.2 | 1 | Each | $ - 0 | |
| Ventilation System Fan; overhaul - Engine Room Exhaust Fan | 5.6.11.3 | 1 | Each | $ - 0 | |
| Ventilation System Fan; overhaul - Aux. Machinery Room Supply OR Exhaust Fan | 5.6.11.4 | 1 | Each | $ - 0 | |
| Galley Exhaust Ducting; clean and inspect | 5.6.12 | 1 | Job | $ - 0 | |
| 5.7 ELECTRICAL/ELECTRONICS | |||||
| CPP Control System Service; provide | 5.7.3 | 1 | Job | $ - 0 | |
| Bridge Monitors; install | 5.7.6 | 1 | Job | $ - 0 | |
| ILS Control System; inspect and repair | 5.7.7 | 1 | Job | $ - 0 | |
| Total Category B Work Items | $ - 0 |
OVER & ABOVE WORK
| SCHEDULE OF PRICES/RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED) | |||||
| Over & Above Work Description | |||||
| Item Description | PWS | ||||
| Paragraph | Required Level | ||||
| Of Effort Hours | Materials | Fully Burdened | |||
| Labor Rate | Material Burden Rate | Total Cost | |||
| Ship Repair Labor Rate | |||||
| 6.2 | 6,500.00 | $ 200,000.00 | $ - 0 | 0% | $200,000.00 |
| SCHEDULE OF PRICES/RATES FOR THE PURPOSES OF A GOVERNMENT REQUIRED EXTENSION: DAILY RATES FOR PIER SIDE AND DRY-DOCKING (FULLY BURDENED) | |||||||
| Over & Above Work Description | |||||||
| Item Description | PWS | ||||||
| Paragraph | Qty | Unit | Unit Price | Total Cost | |||
| Dry-Docking Extension Cost | 6.3 | 10 | Days | $ - 0 | $ - 0 | ||
| Pier Side Extension Costs | 6.3 | 14 | Days | $ - 0 | $ - 0 | ||
| Total Over & Above Work | $200,000.00 |