W9127N19R0065_Solicitation.pdf

PDF 1004 KB Posted

Attached to
Lower Columbia River Security Guard Services
Solicitation number
W9127N19R0065
Issued by

About this file

This document provides details for an upcoming solicitation for armed security guard services at three Lower Columbia River dam projects. The U.S. Army Corps of Engineers Portland District intends to issue a request for proposal for armed security guards at Bonneville Dam, The Dalles Dam, and John Day Dam. Services will include alarm monitoring, gate guarding, roving patrols, and administrative functions. The requirement is anticipated to be a 100% total small business set-aside. The period of performance will commence in January 2020 with four one-year option periods. The contract type will be firm-fixed price. Responses are due in mid-September 2019. Interested parties must register in the System for Award Management to be eligible for award. The primary point of contact is provided for any questions.

W9127N19R0065 Solicitation

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W9127N19R0065 23-Sep-2019

b. TELEPHONE NUMBER 8. OFFER DUE DATE/LOCAL TIME

04:00 PM 23 Oct 2019

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W9127N9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

MEGAN L ACORD

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

USACE PORTLAND DISTRICT

333 SW 1ST AVE

PORTLAND OR 97204-3440

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 16. ADMINISTERED BY

SEE SCHEDULE

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$20,500,000

NAICS:

561612

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W9127N19R0065

Section SF 1449 - CONTINUATION SHEET

INSTRUCTION FOR OFFERORS

1. SUBMISSION OF PROPOSALS

A. Submission Instructions:

1) Proposals are due no later than the time and date specified in Block 8 of Standard Form 1449, or SF 30 if applicable.

2) Offeror shall submit its proposal through the FedBizOpps (FBO.gov) system. The requirements and procedures for offer submission are found in the FBO Vendor User Guide located on the FBO webpage at:

https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf.

3) The electronic proposal shall be in Portable Document Format, filename extension: “.pdf” and suitable for viewing in Adobe Reader. Offerors shall bookmark and label each electronic PDF to afford easy identification from the proposal table of contents.

4) Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal. Propriety information shall be clearly marked. DO NOT cross reference past performance information. It is acceptable to repeat data, project information, or experience in more than one non-price area as long as it satisfies the requirements of the factor. Extraneous information provided in the proposals will not be considered in the evaluations; therefore, the offeror should only provide information that satisfies the solicitation requirements.

Merely restating the performance work statement or evaluation criteria without sufficient elaboration demonstrates a lack of understanding of the requirement.

5) The offeror must confine the proposal to relevant information and documentation sufficient to provide an adequate basis for evaluation. The page count is at the discretion of the offeror; however the proposal may not be more than fifty (50) pages total. The fifty (50) page limit does NOT include past performance information submitted under Factor 3. Evaluation of the non-price factors will end on the 50th page submitted.

6) The offeror’s proposal shall consist of two (2) volumes; Volume I – Technical Proposal and Volume II – Price Proposal. The use of hyperlinks in proposals is prohibited.

a) Technical Proposal, Volume I: Volume I shall consist of information for the three (3) factors, as stated in FAR clauses 52.212-2:

i. Experience (Factor 1)

ii. Past Performance (Factor 2)

iii. Work Plan (Factor 3)

b) Price Proposal, Volume II: Volume II shall be prepared in accordance with the following and must include:

i. SF 1449 – Solicitation:

The offeror shall complete the SF 1449 Blocks 17a, 30a, 30b, and 30c and have it signed in Block 30b by an official that is authorized to bind the company. The offeror shall also provide and acknowledge all amendments in accordance with the instructions on the SF 30, if applicable.

i. Price Schedule:

The offeror shall complete the Price Schedule found in the solicitation, under section B – Supplies or Services and Prices.

ii. Representations, Certifications, and other Statements of Offerors.

The offeror shall complete all representations and certifications within 52.212-3 Alt 1, and also ensure current registration and completed/updated Annual Representations and Certifications on the System for Award Management (SAM) website, www.sam.gov.

7) Offerors should enter a description for every file uploaded. For files over 10 megabytes (MB) the "Large Upload (JAVA)" button must be used. The combined file size limit for upload using "Large Upload (JAVA)" is 100MB. If needed, the offeror can break single files over 100MB into smaller files or use the upload utility multiple times if files exceed the 100MB size limit.

8) Once the offeror's proposal is submitted, it can be systematically revised prior to the solicitation response deadline. Refer to Paragraph 4.3.2 of the FBO Vendor Guide titled "Reviewing / Editing an Electric Response" for detailed guidance on completing a revision to an electronic proposal submission. Note: the FBO bid response system will send an email to the email address on file for the user confirming the electronic submission. Note: the offeror must be logged into the system to be able to submit / revise electronic responses.

9) For assistance and troubleshooting for the FBO electronic bid response system, contact the Federal Service Desk (FSD.gov). Phone: 866-606-8820 or Web Form (https://gsafsd.service-now.com/fsd-gov/login.do).

10) Do not assume submission will be instantaneous. File size and number of files to be uploaded will be factors to consider. Offeror/Teammate/Subcontractors should allow adequate time for submission completion because the entire proposal (i.e. offerors submission and all teammate/subcontractor(s) independent submissions) must be received by the time and date specified in Block 8 of Standard Form 1449, or SF 30 if applicable.

11) To avoid rejection of an offer, the offeror must make every effort to ensure its electronic submission is virus-free Proposals, or portions thereof, submitted with the presence of a virus or which are otherwise unreadable will be treated as unreadable pursuant to FAR 15.207(c).

B. Bidders Inquiries:

All inquiries regarding this solicitation must be submitted via the ProjNet Bidder Inquiry System. Telephone and email inquiries will not be accepted. Bidder Inquiry is a web-site that allows offerors to post questions regarding the solicitation and view all questions by other offeror and the responses by USACE. ProjNet can be accessed at:

https://www.projnet.org

To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment /question will receive an acknowledgement of their comment/question via email. Another email to the same address will notify the prospective vendor once the reply is available for viewing.

The Bidder Inquiry Key is: Z8252D-URG4IX

Specific Instructions for ProjNet Bid Inquiry Access:

1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

2. Identify the Agency. This should be marked as USACE.

3. Key. Enter the Bidder Inquiry Key listed above.

4. Email. Enter the email address you would like to use for communication.

5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.

6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and

Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

http://www.sam.gov/ https://gsafsd.service-now.com/fsd-gov/login.do https://www.projnet.org/

Instructions for Entering Questions:

1. After you are logged in click on the "post new inquiry", it is on the left side of the window under the Word "Submit"

a) This is the window where you will enter your questions.

b) Comment Classification: Click on the down arrow to the right of the words “Please select from below”, select “Public”.

c) Discipline: This is where you select who this question should be directed to. There may be dropdowns based upon the discipline selected to narrow down the topic of your question.

d) Question. Enter your question here.

Specific Instructions for Future ProjNet Bid Inquiry Access:

1. For future access to ProjNet, you will not be provided any type of password. You will utilize your Secret

Question and Secret Answer to log in.

2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

3. Identify the Agency. This should be marked as USACE.

4. Key. Enter the Bidder Inquiry Key listed above.

5. Email. Enter the email address you used to register previously in ProjNet.

6. Click Continue. A page will then open asking you to enter the answer to your Secret Question.

7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.

A prospective offeror who submits a question will receive an automated email notification that their question has been received. When an answer is posted to a question, the question and answer is then available for all other prospective offerors to review.

For questions about the ProjNet Bidder Inquiry, please contact the Call Center help desk toll free at 1-800-428- HELP, which operates from 8AM to 5PM (Central US time zone). ProjNet-Bid questions can also be emailed to the helpdesk at staff@rcesupport.com.

No response will be posted to inquiries after the Close of Business on the seventh (7th) business day preceding the solicitation due date. All prospective offerors will be held to have reviewed the questions and responses in ProjNet prior to proposal submission. Nothing in the solicitation is changed unless a solicitation amendment is sent out.

mailto:staff@rcesupport.com

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 12 Months Armed Guard Services Bonneville Dam

FFP

For armed guard services performed in accordance with the Performance Work Statement (PWS).

FOB: Destination

NET AMT

0002 12 Months Armed Guard Services The Dalles Dam

FFP

0003 12 Months Armed Guard Services John Day Dam

0004 7 Days OPTION Armed Guard Services

FFP

FPCON level status change from Bravo to Charlie

1001 12 Months OPTION Armed Guard Services Bonneville Dam

FFP

For armed guard services performed in accordance with the Performance Work

1002 12 Months OPTION Armed Guard Services The Dalles Dam

1003 12 Months OPTION Armed Guard Services John Day Dam

1004 7 Days OPTION Armed Guard Services

FFP

2001 12 Months OPTION Armed Guard Services Bonneville Dam

FFP

For armed guard services performed in accordance with the Performance Work

2002 12 Months OPTION Armed Guard Services The Dalles Dam

2003 12 Months OPTION Armed Guard Services John Day Dam

2004 7 Days OPTION Armed Guard Services

FFP

3001 12 Months OPTION Armed Guard Services Bonneville Dam

FFP

For armed guard services performed in accordance with the Performance Work

3002 12 Months OPTION Armed Guard Services The Dalles Dam

3003 12 Months OPTION Armed Guard Services John Day Dam

3004 7 Days OPTION Armed Guard Services

FFP

4001 12 Months OPTION Armed Guard Services Bonneville Dam

FFP

For armed guard services performed in accordance with the Performance Work

4002 12 Months OPTION Armed Guard Services The Dalles Dam

4003 12 Months OPTION Armed Guard Services John Day Dam

4004 7 Days OPTION Armed Guard Services

FFP

5001 6 Months OPTION Armed Guard Services Bonneville Dam

FFP

For evaluation of armed guard security service that may be required under clause FAR 52.217-8, Option to Extend Services

5002 6 Months OPTION Armed Guard Services The Dalles Dam

FFP

For evaluation of armed guard security service that may be required under clause

5003 6 Months OPTION Armed Guard Services John Day Dam

FFP

For evaluation of armed guard security service that may be required under clause

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government N/A Government 0002 Destination Government N/A Government 0003 Destination Government N/A Government 0004 Destination Government N/A Government 1001 Destination Government N/A Government 1002 Destination Government N/A Government 1003 Destination Government N/A Government 1004 Destination Government N/A Government 2001 Destination Government N/A Government 2002 Destination Government N/A Government 2003 Destination Government N/A Government 2004 Destination Government N/A Government 3001 Destination Government N/A Government 3002 Destination Government N/A Government 3003 Destination Government N/A Government 3004 Destination Government N/A Government 4001 Destination Government N/A Government 4002 Destination Government N/A Government 4003 Destination Government N/A Government 4004 Destination Government N/A Government 5001 Destination Government N/A Government 5002 Destination Government N/A Government 5003 Destination Government N/A Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 04-JAN-2020 TO

03-JAN-2021

N/A BONNEVILLE LOCK & DAM PROJECT

JENNIFER BAKER

USACE PORTLAND DISTRICT

BONNEVILLE DAM, I-84 EXIT 40

CASCADE LOCKS OR 97014-0150

541-374-4578

960412

0002 POP 04-JAN-2020 TO

03-JAN-2021

N/A (SAME AS PREVIOUS LOCATION)

0003 POP 04-JAN-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

0004 POP 04-JAN-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

1001 POP 04-JAN-2021 TO

03-JAN-2022

N/A (SAME AS PREVIOUS LOCATION)

1002 POP 04-JAN-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

1003 POP 04-JAN-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

1004 POP 04-JAN-2021 TO

N/A (SAME AS PREVIOUS LOCATION)

2001 POP 04-JAN-2022 TO

03-JAN-2023

N/A (SAME AS PREVIOUS LOCATION)

2002 POP 04-JAN-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

2003 POP 04-JAN-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

2004 POP 04-JAN-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

3001 POP 04-JAN-2023 TO

03-JAN-2024

N/A (SAME AS PREVIOUS LOCATION)

3002 POP 04-JAN-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

3003 POP 04-JAN-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

3004 POP 04-JAN-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

4001 POP 04-JAN-2024 TO

03-JAN-2025

N/A (SAME AS PREVIOUS LOCATION)

4002 POP 04-JAN-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

4003 POP 04-JAN-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

4004 POP 04-JAN-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

5001 POP 04-JAN-2025 TO

03-JUL-2025

N/A (SAME AS PREVIOUS LOCATION)

5002 POP 04-JAN-2025 TO

N/A BONNEVILLE LOCK & DAM PROJECT

JENNIFER BAKER

USACE PORTLAND DISTRICT

BONNEVILLE LOCK AND D

CASCADE LOCKS OR 97014-0150

(541) 374-4578

5003 POP 04-JAN-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

CLAUSES INCORPORATED BY REFERENCE

52.202-1 Definitions NOV 2013 52.203-3 Gratuities APR 1984 52.203-12 Limitation On Payments To Influence Certain Federal

Transactions

OCT 2010

52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights

APR 2014

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper

MAY 2011

52.204-7 System for Award Management OCT 2018 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards

OCT 2018

52.204-13 System for Award Management Maintenance OCT 2018 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

52.204-22 Alternative Line Item Proposal JAN 2017 52.210-1 Market Research APR 2011 52.212-1 (Dev) Instructions to Offerors - Commercial Items. (DEVIATION

2018-O0018)

OCT 2018

52.219-6 (Dev) Notice of Total Small Business Set-Aside (DEVIATION 2019-O0003)

DEC 2018

52.219-14 (Dev) Limitations on Subcontracting (DEVIATION 2019-O0003). JAN 2019 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.229-3 Federal, State And Local Taxes FEB 2013 52.232-18 Availability Of Funds APR 1984 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.237-1 Site Visit APR 1984 52.237-2 Protection Of Government Buildings, Equipment, And

Vegetation

APR 1984

52.237-3 Continuity Of Services JAN 1991 52.242-13 Bankruptcy JUL 1995 52.242-15 Stop-Work Order AUG 1989 52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7005 Representation Relating to Compensation of Former DoD

Officials

NOV 2011

252.204-7000 Disclosure Of Information OCT 2016 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7008 Compliance With Safeguarding Covered Defense Information

Controls

OCT 2016

252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting

OCT 2016

252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support

MAY 2016

252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By

The Government of a Country that is a State Sponsor of Terrorism

MAY 2019

252.215-7008 Only One Offer JUL 2019 252.223-7004 Drug Free Work Force SEP 1988 252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or

Hazardous Materials

SEP 2014

252.225-7012 Preference For Certain Domestic Commodities DEC 2017 252.225-7016 Restriction On Acquisition Of Ball and Roller Bearings JUN 2011 252.225-7048 Export-Controlled Items JUN 2013 252.226-7001 Utilization of Indian Organizations and Indian-Owned

Economic Enterprises, and Native Hawaiian Small Business Concerns

APR 2019

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports

DEC 2018

252.232-7010 Levies on Contract Payments DEC 2006 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.244-7000 Subcontracts for Commercial Items JUN 2013

CLAUSES INCORPORATED BY FULL TEXT

52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)

(a) Definitions. As used in this provision--

Administrative proceeding means a non-judicial process that is adjudicatory in nature in order to make a determination of fault or liability (e.g., Securities and Exchange Commission Administrative Proceedings, Civilian Board of Contract Appeals Proceedings, and Armed Services Board of Contract Appeals Proceedings). This includes administrative proceedings at the Federal and State level but only in connection with performance of a Federal contract or grant. It does not include agency actions such as contract audits, site visits, corrective plans, or inspection of deliverables.

Federal contracts and grants with total value greater than $10,000,000 means--

(1) The total value of all current, active contracts and grants, including all priced options; and

(2) The total value of all current, active orders including all priced options under indefinite-delivery, indefinite-quantity, 8(a), or requirements contracts (including task and delivery and multiple-award Schedules).

Principal means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity (e.g., general manager; plant manager; head of a division or business segment; and similar positions).

(b) The offeror ( ) has ( ) does not have current active Federal contracts and grants with total value greater than $10,000,000.

(c) If the offeror checked “has” in paragraph (b) of this provision, the offeror represents, by submission of this offer, that the information it has entered in the Federal Awardee Performance and Integrity Information System (FAPIIS) is current, accurate, and complete as of the date of submission of this offer with regard to the following information:

(1) Whether the offeror, and/or any of its principals, has or has not, within the last five years, in connection with the award to or performance by the offeror of a Federal contract or grant, been the subject of a proceeding, at the Federal or State level that resulted in any of the following dispositions:

(i) In a criminal proceeding, a conviction.

(ii) In a civil proceeding, a finding of fault and liability that results in the payment of a monetary fine, penalty, reimbursement, restitution, or damages of $5,000 or more.

(iii) In an administrative proceeding, a finding of fault and liability that results in--

(A) The payment of a monetary fine or penalty of $5,000 or more; or

(B) The payment of a reimbursement, restitution, or damages in excess of $100,000.

(iv) In a criminal, civil, or administrative proceeding, a disposition of the matter by consent or compromise with an acknowledgment of fault by the Contractor if the proceeding could have led to any of the outcomes specified in paragraphs (c)(1)(i), (c)(1)(ii), or (c)(1)(iii) of this provision.

(2) If the offeror has been involved in the last five years in any of the occurrences listed in (c)(1) of this provision, whether the offeror has provided the requested information with regard to each occurrence.

(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).

https://www.sam.gov/

(End of provision)

52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)

(A) General.

(1) The acquisition is being conducted as a Small Business set-aside using the Best Value Tradeoff (BVTO) source selection process for award. Award will be made to the offeror whose proposal is determined to present the best value to the Government with consideration of cost and non-cost factors.

(2) The Government intends to make an award without discussions, but reserves the right to conduct discussions should discussions prove to be necessary or advantageous to the Government. Because the Government does not intend to hold discussions, offerors are encouraged to include their best pricing in their initial proposal.

(3) All proposals received will stand alone and be considered complete and final. The Government will not consider any information or data incorporated by reference or otherwise referred to. The successful offeror(s) will be selected solely on the basis of the evaluation factors set forth below. Accordingly, proposals submitted in response to this solicitation should provide clear, complete, concise, and straightforward responses to the evaluation factors.

Elaborate proposals, color brochures, and other excesses are discouraged.

(4) Joint Ventures (JV). A joint venture is defined as a legal business entity formed between two or more companies (parties) to undertake the performance activities of a contract together. This does not include other arrangements such as “teaming agreements” or “strategic alliances,” which are not recognized as bona fide joint ventures for the purposes of this solicitation. An offeror that is a joint venture shall submit a copy of its legally binding joint venture agreement signed by an authorized officer from each of the firms comprising the joint venture with the chief executive of each entity identified. If submitting a proposal as a joint venture, the experience and past performance of each of the joint venture partners can be submitted for the joint venture entity. The experience for each joint venture partner will be considered the experience of the joint venture entity.

(B) Evaluation Factors.

The Government will evaluate proposals using the following factors:

Experience (Factor 1) Past Performance (Factor 2) Work Plan (Factor 3)

Factors 1 through 3 are all approximately equal in importance to one another. All evaluation factors other than price, when combined, are significantly more important than price.

The Government will use the following definitions when evaluating proposals:

Deficiency – A material failure of a proposal to meet a Government requirement or a combination of weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. See FAR 15.001.

Significant Weakness – A flaw in a proposal that appreciably increases the risk of unsuccessful contract performance. See FAR 15.001.

Weakness – A flaw in a proposal that increases the risk of unsuccessful contract performance. See FAR 15.001.

Strength – An aspect of a proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.

Significant Strength – An aspect of an offeror's proposal that has appreciable merit or appreciably exceeds specified performance or capability requirements in a way that will be appreciably advantageous to the Government during contract performance.

C. Volume I – TECHNICAL (Non-Price) SUBMISSION REQUIREMENTS AND EVALUATION.

A. Experience (Factor 1).

Submission Requirements:

The offeror shall submit up to three (3) projects demonstrating the offeror’s recent and relevant experience performing Armed Guard services of similar size, scope, and complexity to the work required by this solicitation.

To be considered, each project must have either been completed or be substantially complete within ten (10) years of the date that proposals are due. Substantially complete is defined as an on-going project in which at least one (1) calendar year of armed guard services have been performed.

For each project submitted under this factor, the offeror shall submit a separate, completed Solicitation Attachment A, “Offeror Experience Form”.

A maximum of three projects will be evaluated. If an offeror disregards these instructions and submits more than three projects, only the first three projects will be evaluated. Offerors should describe each project with enough detail to ensure that the Government can meaningfully assess the projects against the evaluation criteria described in the RFP.

Use of Subcontractor Experience. Offerors may submit experience of subcontractors that it proposes to use under the contract. However, to be considered, project submissions for subcontractors must include a letter of commitment, signed by the prime offeror and subcontractor. In addition, at least 50% of the projects submitted by the offeror must demonstrate experience of the prime offeror (e.g., if submitting 3 projects, at least 2 must demonstrate prime offeror experience; If submitting 2 projects, at least 1 must demonstrate prime offeror experience). If a letter of commitment is not submitted, the experience will not be considered.

Evaluation Method:

The Government will evaluate each proposal to determine the breadth and depth of the offeror’s experience in armed security guard services that are similar in size, scope, and complexity to the work described in the Performance Work Statement (PWS).

In determining strengths and weaknesses, the Government will consider the following:

• The extent of the offeror’s experience in the types of armed guard services outlined in the PWS, to include alarm monitoring services, gate guard services, roving guard services, and administrative services;

• The extent of the offeror’s experience managing security services at multiple (2 or more) sites simultaneously;

• The extent of the offeror’s experience providing guard services with a similar number of positions working 24 hours a day, seven days a week, 365 days a year;

• The extent of the offeror’s experience providing guard services that require interface with the public;

• The extent of the offeror’s experience providing armed guard services in Oregon or Washington.

• The extent of the offeror’s experience providing armed guard services for Department of Defense agencies.

The Government will evaluate this factor using the combined technical/risk rating as follows:

Color Rating Description

Blue Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.

Purple Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.

Green Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.

Yellow Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.

Red Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.

Adjectival

Rating Definition

Low Proposal may contain weakness(es) which have little potential to cause disruption of schedule, increased cost or degradation of performance. Normal contractor effort and normal Government monitoring will likely be able to overcome any difficulties.

Moderate

Proposal contains a significant weakness or combination of weaknesses which may potentially cause disruption of schedule, increased cost or degradation of performance.

Special contractor emphasis and close Government monitoring will likely be able to overcome difficulties.

High

Proposal contains a significant weakness or combination of weaknesses which is likely to cause significant disruption of schedule, increased cost or degradation of performance.

Is unlikely to overcome any difficulties, even with special contractor emphasis and close Government monitoring.

Unacceptable Proposal contains a material failure or a combination of significant weaknesses that increases the risk of unsuccessful performance to an unacceptable level.

B. Past Performance (Factor 2).

Submission Requirements:

The offeror shall submit past performance information for each project listed by the offeror under Factor 1 – Experience.

• If a completed Contractor Performance Assessment Reporting System (CPARS) evaluation is available, submit it with the proposal.

• If there is not a completed CPARS evaluation, submit a completed Past Performance Questionnaire (PPQ) for the project. The standard PPQ for USACE is Form PPQ-0 (9/30/11) and it is provided as an attachment to this solicitation. Offerors are advised to ensure correct phone numbers and email addresses are provided for the client point of contact. Do not submit a PPQ when a completed CPARS evaluation is available.

o If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s).

o Offerors should follow up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact, Megan Accord, via email at megan.l.acord@usace.army.mil, prior to proposal closing date.

Offerors shall instruct the clients to refer to the solicitation number in the subject line.

mailto:megan.l.acord@usace.army.mil o PPQs are source selection materials. All successfully submitted PPQs will receive an email confirmation upon receipt. If the offeror does not receive the confirmation, it is the offeror’s responsibility to follow up to ensure the Government has received the information.

Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other procurements. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

Offerors may provide explanation on problems encountered on past projects and the corrective actions taken by the offeror.

In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including CPARS, using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), telephone interviews with organizations familiar with the offeror’s performance, Government personnel with personal knowledge of the offeror’s performance capability, and any other known sources not provided by the offeror.

While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate, and complete past performance information rests with the offeror.

Evaluation Method:

The past performance evaluation results in an assessment of the offeror’s probability of meeting the solicitation requirements. The past performance valuation considers each offeror’s demonstrated recent and relevant record of performance in supplying products and services that meet the contract’s requirements. In accordance with FAR 15.305(a)(2), the currency and relevance of the information, source of the information, context of the data, and general trends in contractor’s performance shall be considered. These are combined to establish one performance confidence assessment rating for each offeror.

There are three aspects to the past performance evaluation: recency, relevancy (including context of data), and quality (including general trends in contractor performance and source of information).

The first aspect is to evaluate the recency of the offeror’s past performance. For this solicitation, recent projects are those that have been completed or substantially complete within ten (10) years of the date proposals are due.

Substantially complete is an on-going project in which at least one (1) calendar year of work has been performed.

The second aspect is to determine how relevant a recent effort accomplished by the offeror is to the work required by this RFP. In establishing what is relevant for the acquisition, consideration should be given to those aspects of an offeror’s history of contract (or subcontract) performance that would provide the most context and give the greatest ability to measure whether the offeror will successfully satisfy the current requirement. There are four levels of relevancy as shown in the table below.

Past Performance Relevancy Ratings Rating Description

Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.

Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Somewhat Present/past performance effort involved some of the scope and magnitude Relevant of effort and complexities this solicitation requires.

Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

More relevant past performance will typically be a stronger predictor of future success and have more influence on the past performance confidence assessment than past performance of lesser relevance.

The third aspect of the past performance evaluation, quality, is to determine how well the offeror performed on its past performance projects. The past performance evaluation does not establish, create, or change the existing record and history of the offeror’s past performance on past contracts; rather, the past performance evaluation process gathers information from customers on how well the offeror performed those past contracts. If any performance issues are identified, the Government will consider the number, type, and severity of the problems, and effectiveness of corrective actions taken. If an issue did arise in the performance of work, the Government will consider the ability of the offeror to successfully adapt to the changes, problems, and setbacks.

Based on a consideration of those three aspects, the Government will assign a final Performance Confidence Assessment rating for this factor. The Government will review the past performance information and determine the quality and usefulness as it applies to the performance confidence assessment. In conducting a performance confidence assessment, each offeror shall be assigned one of the ratings using the table below.

Performance Confidence Assessments

RATING DESCRIPTION

Substantial Confidence

Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.

Satisfactory Confidence

Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.

Neutral Confidence

No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance.

Limited Confidence Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will be able to successfully perform the required effort.

No Confidence Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.

In the case of an offeror without a record of relevant past performance or for which information on past performance is not available, the offeror may not be evaluated favorably or unfavorably on the factor of past contract performance. In this case, the offeror’s past performance is unknown and assigned a Neutral Confidence rating.

C. Work Plan (Factor 3).

Submission Requirements:

The purpose of this factor is to determine the offeror’s overall understanding of the Performance Work Statement (PWS) and its plan to initiate and maintain continuity of armed guard services at the three LCR sites identified in the

PWS.

The offeror shall submit the following under this factor:

• The offeror’s management plan, to include the offeror’s management structure, coordination and communication strategy between sites, and the role of the Contractor Supervisory Manager (CSM) and site leads.

• The offeror’s staffing plan for each location. Include the anticipated shift lengths for each position.

Discuss how the offeror intends to recruit and maintain sufficient staff to ensure 100% coverage at each location. Also discuss how replacement personnel will be made available for those employees that miss their shifts.

• The offeror’s plan for ensuring all employees are properly licensed, trained, and certified, both prior to commencement of services and throughout contract performance.

• The offeror’s plan to support those instances where additional guards are needed for short periods of time, and a discussion of the offeror’s plan to provide additional staffing if it were to become necessary for security reasons.

• The offeror’s transition plan to assume responsibility for the requirements of the contract in a period of 30 days at all three locations on the LCR.

Evaluation Method:

The offeror’s work plan will be evaluated for reasonableness in meeting the requirements specified in the Performance Work Summary (PWS).

In determining strengths and weaknesses, the Government will consider the following:

• The adequacy and feasibility of:

o The offeror’s plan to manage the facilities day-to-day to ensure 24/7 coverage within the requirements of the PWS;

o The offeror’s plan to manage all services and coordination of personnel at three remote locations, to include the offeror’s communication strategy;

o The offeror’s plan to staff appropriate personnel throughout the life of the contract, to include ensuring staff is certified, trained, and retained;

o The offeror’s plan to account for unexpected instances that require additional guards; and o The offeror’s plan to timely transition between the current in and the offeror and assume responsibility for the requirements of the services contemplated by this solicitation.

The Government will evaluate this factor using the combined technical/risk rating as follows:

Color Rating Description

Blue Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.

Purple Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.

Green Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.

Yellow Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.

Red Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.

Adjectival Rating Definition

Low Proposal may contain weakness(es) which have little potential to cause disruption of schedule, increased cost or degradation of performance. Normal contractor effort and normal Government monitoring will likely be able to overcome any difficulties.

Moderate

Proposal contains a significant weakness or combination of weaknesses which may potentially cause disruption of schedule, increased cost or degradation of performance.

Special contractor emphasis and close Government monitoring will likely be able to overcome difficulties.

High

Proposal contains a significant weakness or combination of weaknesses which is likely to cause significant disruption of schedule, increased cost or degradation of performance.

Is unlikely to overcome any difficulties, even with special contractor emphasis and close Government monitoring.

Unacceptable Proposal contains a material failure or a combination of significant weaknesses that increases the risk of unsuccessful performance to an unacceptable level.

D. Volume II, Price Proposal – Proposal Price Schedule.

The Proposal Price Schedule submitted in Volume II, Price Proposal will be evaluated to determine fairness and reasonableness. This award will be for a firm-fixed-price commercial service contract. For evaluation purposes, the total evaluated price will be calculated by adding the total price for all optional items, including services under FAR 52.217-8, to the total price for the base CLINs. The evaluated price of services under FAR 52.217-8 will be calculated as one-half of the total price for CLINs 4001-4003. Evaluation of options will not obligate the Government to exercise the options.

The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government

(End of provision)

52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS--COMMERCIAL ITEMS (OCT 2018)

The Offeror shall complete only paragraph (b) of this provision if the Offeror has completed the annual representations and certification electronically in the System for Award Management (SAM) accessed through https://www.sam.gov. If the Offeror has not completed the annual representations and certifications electronically, the Offeror shall complete only paragraphs (c) through (u)) of this provision.

(a) Definitions. As used in this provision --

“Economically disadvantaged women-owned small business (EDWOSB) Concern” means a small business concern that is at least 51 percent directly and unconditionally owned by, and the management and daily business operations of which are controlled by, one or more women who are citizens of the United States and who are economically disadvantaged in accordance with 13 CFR part 127. It automatically qualifies as a women-owned small business eligible under the WOSB Program.

"Forced or indentured child labor" means all work or service-

(1) Exacted from any person under the age of 18 under the menace of any penalty for its nonperformance and for which the worker does not offer himself voluntarily; or https://www.sam.gov/

(2) Performed by any person under the age of 18 pursuant to a contract the enforcement of which can be accomplished by process or penalties.

“Highest-level owner” means the entity that owns or controls an immediate owner of the offeror, or that owns or controls one or more entities that control an immediate owner of the offeror. No entity owns or exercises control of the highest level owner.

“Immediate owner” means an entity, other than the offeror, that has direct control of the offeror. Indicators of control include, but are not limited to, one or more of the following: Ownership or interlocking management, identity of interests among family members, shared facilities and equipment, and the common use of employees.

“Inverted domestic corporation” means a foreign incorporated entity that meets the definition of an inverted domestic corporation under 6 U.S.C. 395(b), applied in accordance with the rules and definitions of 6 U.S.C. 395(c).

“Manufactured end product” means any end product in product and service codes (PSCs) 1000-9999, except--

(1) PSC 5510, Lumber and Related Basic Wood Materials;

(2) Product or Service Group (PSG) 87, Agricultural Supplies;

(3) PSG 88, Live Animals;

(4) PSG 89, Subsistence;

(5) PSC 9410, Crude Grades of Plant Materials;

(6) PSC 9430, Miscellaneous Crude Animal Products, Inedible;

(7) PSC 9440, Miscellaneous Crude Agricultural and Forestry Products;

(8) PSC 9610, Ores;

(9) PSC 9620, Minerals, Natural and Synthetic; and

(10) PSC 9630, Additive Metal Materials.

“Place of manufacture” means the place where an end product is assembled out of components, or otherwise made or processed from raw materials into the finished product that is to be provided to the Government. If a product is disassembled and reassembled, the place of reassembly is not the place of manufacture.

“Predecessor” means an entity that is replaced by a successor and includes any predecessors of the predecessor.

“Restricted business operations” means business operations in Sudan that include power production activities, mineral extraction activities, oil-related activities, or the production of military equipment, as those terms are defined in the Sudan Accountability and Divestment Act of 2007 (Pub. L. 110-174).

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .