The purpose of this amendment is to remove Para 1.6.2.2 in Section 01 35 26.00 25, and change the process to receive Offeror proposals from RepliWeb to FBO and CD-ROM.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B.07_Site_Visit_PowerPoint.pptx | PPTX presentation | |
| B.07_Final_site_visit_list_of_attendees.pdf | ||
| B.08_Solicitation_Amendment_0004_FINAL_SPECS.pdf | ||
| B.08_Solicitation_Amendment_0003.docx.pdf | ||
| B.08_W9127N19R0021P0002.pdf | ||
| Attachment_A.doc | DOC document | |
| B.08_19R21P01.pdf | ||
| B.08_FIO_Drawings.pdf | ||
| B.08_19R21_final_specs.pdf | ||
| B.08_Contract_Drawings_19R21.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W66QKZ80535848-0001
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04 EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment 0005 is to remove Para 1.6.2.2 in Section 01 35 26.00 25, and change the process to receive Offeror proposals from RepliWeb to FBO and CD-ROM.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Dec-2018
16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer) (Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N19R0021
X 9B. DATED (SEE ITEM 11)
08-Nov-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Dec-2018
CODE
USACE PORTLAND DISTRICT
333 SW 1ST AVE
PORTLAND OR 97204-3440
W9127N 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODE CODE
EMAIL: TEL:
W9127N19R0021
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
I. INTRODUCTION
Your firm is invited to submit a proposal in response to Request for Proposal (RFP) Number W9127N-19-R-0021 for the project entitled “John Day Dam New 20-Ton Trash Rake Gantry Crane”. The Government intends to procure this requirement on a competitive basis in accordance with the provisions set forth in FAR Part 15 Contracting by Negotiation, and within this RFP.
The Offeror’s proposal shall be submitted electronically as detailed below. It is the Offeror's responsibility to confirm receipt prior to the proposal submission deadline. If the Offeror does not receive the confirmation, it is the Offeror’s responsibility to follow up to ensure the Government has received the information.
ELECTRONIC PROPOSAL SUBMITTAL REQUIREMENTS
Offeror shall submit its proposal through the FedBizOpps (FBO.gov) system. The requirements and procedures for offer submission are found in the FBO Vendor User Guide located on the FBO webpage at:
https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf.
The proposal submittal method used for this solicitation is the electronic response via document upload method.
The electronic proposal shall be Portable Document Format, filename extension: “.pdf” and suitable for viewing in Adobe Reader. Offerors shall bookmark and label each electronic PDF to afford easy identification from the proposal table of contents.
The Offeror’s proposal shall consist of two (2) volumes; Volume I – Technical Proposal and Volume II – Price Proposal. The use of hyperlinks in proposals is prohibited.
Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal. Propriety information shall be clearly marked.
Offerors should enter a description for every file uploaded. For files over 10 megabytes (MB) the "Large Upload (JAVA)" button must be used. The combined file size limit for upload using "Large Upload (JAVA)" is 100MB.
If needed, the Offeror can break single files over 100MB into smaller files or use the upload utility multiple times if files exceed the 100MB size limit.
Once the Offeror's proposal is submitted, it can be systematically revised prior to the solicitation response deadline. Refer to Paragraph 4.3.2 of the FBO Vendor Guide titled "Reviewing / Editing an Electric Response" for detailed guidance on completing a revision to an electronic proposal submission. Note: the FBO bid response system will send an email to the email address on file for the user confirming the electronic submission.
Note: the Offeror must be logged into the system to be able to submit / revise electronic responses.
For assistance and troubleshooting for the FBO electronic bid response system, contact the Federal Service Desk (FSD.gov). Phone: 866-606-8820 or Web Form (https://gsafsd.service-now.com/fsd-gov/login.do).
https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf
Do not assume submission will be instantaneous. File size and number of files to be uploaded will be factors to consider. Offeror/Teammate/Subcontractors should allow adequate time for submission completion because the entire proposal (i.e. Offerors submission and all Teammate/Subcontractor(s) independent submissions) must be received by the due date and time for the proposal to be considered.
To avoid rejection of an offer, the Offeror must make every effort to ensure its electronic submission is virus-free. Proposals, or portions thereof, submitted with the presence of a virus or which are otherwise unreadable will be treated as unreadable pursuant to FAR 15.207(c).
IN ADDITION TO FBO, Offerors are required to mail a CD-ROM to the below POC in case the system is down for maintenance or unavailable.
BY HAND OR COURIER TO:
U.S. ARMY CORPS OF ENGINEERS, NWP
Attention: Jason Tanamor – CECT-NWP-P Block 300 (10th Floor USACE Security Desk) 333 SW First Avenue Portland, Oregon 97204
OR SURFACE MAIL ADDRESS:
U.S. ARMY CORPS OF ENGINEERS, NWP
Attention: Jason Tanamor – CECT-NWP-P P. O. Box 2946 Portland, Oregon 97208-2946
NOTE: If the electronic CD-ROM proposal differs from the FBO submitted proposal, the CD-ROM will take precedence.
OFFEROR SHALL MARK THE OUTSIDE ENVELOPE AS FOLLOWS:
Envelope shall be plainly marked with the following information:
Solicitation No. W9127N-19-R-0021
II. PRE-PROPOSAL CONFERENCE AND SITE VISIT
A site visit will be scheduled as detailed in provision 52.236-27 alt. 1.
III. SUBMITTING QUESTIONS
Questions and answers will be handled via a U.S. Army Corps of Engineers (USACE) bidder inquiry system, ProjNet/DrChecks, found at https://www.projnet.org/projnet/binKornHome/index.cfm. An account has been created under the solicitation number W9127N19R0021; the Public Access Key is 3PDH7G-UFC8PX. Use this website to submit technical questions about the project. The website will be monitored by USACE personnel who will post answers to submitted questions. All Offerors are able to see the questions and answers from all submissions. This ensures all interested parties have an equal opportunity to gain project insight from the questions submitted by other potential Offerors.
IV. GENERAL PROPOSAL REQUIREMENTS
a. Each volume (Volume I-Technical Proposal, and Volume II-Price Proposal) shall be submitted as a separate file in AMRDEC and shall be in PDF format. The printed number of pages (single sided) should not exceed and size limitations detailed elsewhere in this document. Any pages that are changed (as a result of negotiations or proposal revisions) should be of a different color and have changed information clearly marked by a vertical line in the right margin of the page. Revised pages shall be dated.
https://www.projnet.org/projnet/binKornHome/index.cfm
b. ORGANIZATION – VOLUMES
The following volumes of material shall be submitted:
1. Volume 1: Technical Proposal
2. Volume 2: Price Proposal
c. CONTENT – GENERAL
Proposals must set forth full, accurate, and complete information as required by this RFP. Absence of information will be deemed as if no support for that criterion was provided. Offerors submitting proposals should limit submission to data essential for evaluation of proposals so that a minimum of time and money is expended in preparing information required by the RFP. Penalty for making false statements in proposals is prescribed in 18 U.S.C. 1001.
1. Format
Proposals may be in PDF or DOC format but should format to 8 ½ x 11-inch paper, when printed. Any drawings shall be 11x17-inch paper,when printed, can be folded to the same dimensions as the 8 ½ x 11-inch paper. Elaborate artwork, expensive paper and bindings, and expensive/ extensive visual and other presentation aids are not necessary. Each proposal should address the requests for information in the order identified in Section L.
2. Page Numbering
All pages of each volume shall be appropriately numbered and identified by the complete company name, date and RFP number in the header and/or footer.
3. Page Limits
Volume I Technical Proposal shall not exceed 75 single sided pages, when printed.
4. Signatures
Original signature from the Offeror’s responsible party is required in box 15 of the SF33 submitted with the Price Proposal.
REQUIRED TABS FOR VOLUME 1: TECHNICAL PROPOSAL
Factor 1 –Past Experience Factor 2 –Past Performance
REQUIRED TABS FOR VOLUME 2: PRICE PROPOSAL
Factor 3 – Price Proposal SF33, Solicitation, Offer, and Award Price Schedule Representations and Certifications
V DETAILED CONTENT REQUIREMENTS FOR VOLUME 1: TECHNICAL PROPOSAL
Offerors shall submit the information noted below.
Factor 1 – Past Experience
This project will consist of designing, fabricating, factory testing, transporting, erecting, and field testing a new 20‐ton gantry crane with one trolley with dual main hoists. The four major project phases are: (1) design of the new crane, (2) manufacture of the new crane, (3) installation and testing of the new crane, and (4) demolition/removal of the existing crane.
The Offeror shall submit information for up to three projects* best demonstrating the Offeror’s experience performing projects that are similar in size, scope, and complexity to this project, as further described in the RFP specifications.
To be evaluated, each project must have been completedor must be substantially complete** by the Prime or the Prime’s major subcontractor*** within 10 years of the date that proposals are due.
Each of the three projects must have involved at least one or more of these four major phases: design, manufacture, installation/testing of a crane with a capacity at least 20 tons, or demo/removal of an existing crane.
NOTE: Although each project submitted need not demonstrate experience in all four major project phases (design, manufacture, installation/testing and removal), the Offeror’s Factor 1 proposal in its totality must demonstrate that the Offeror has experience in all four major project phases: design, manufacture, installation/testing, and demolition/removal.
For each project submitted, the Offeror shall provide an “Offeror Experience Form” using Attachment A (or document that addresses all of the information included in Attachment A). The Offeror must address all items included on Attachment A. Offerors may include photographs or drawings for each project submission to provide a visual basis for the written description.
*A maximum of three projects will be evaluated. If an Offeror disregards these instructions and submits more than three projects, only the first THREE projects submitted will be evaluated. Offerors should describe each project with enough detail to ensure that the Government can meaningfully assess the projects against the evaluation criteria described in Section M of the RFP.
**Substantially complete is defined as being 75% complete by the date that proposals are due. If an Offeror submits a project that it represents is “substantially complete,” the Offeror must reasonably explain why the project is considered at least 75% complete. If an Offeror submits an ongoing project without providing an accompanying reasonable explanation that explains how the project is at least 75% complete, the Government reserves the right to reject the project.
***Instructions on the use of major subcontractor experience: Offerors may use the past experience of major subcontractors to demonstrate experience in any of the four major project phases, however a letter of commitment is required in order for that experience to be considered. The letter of commitment must be signed by the subcontractor who is proposed to perform the work. The commitment letter must be submitted even if the firm is in some way related to a joint venture partner (for example, the subcontractor is a subsidiary of a joint venture partner, or a subsidiary of a firm to which the joint venture partner is also a subsidiary). If a letter of commitment is not submitted, the experience will not be considered.
Factor 2 – Past Performance The Offeror shall provide past performance information for each project listed by the Offeror under Factor 1: Past Experience.
Recent and relevant projects are those projects completed or substantially completed* in the past 10 years that are comparable in size, scope, and complexity with this project.
** Substantially complete is defined as being 75% complete by the date that proposals are due.
If a completed Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it shall be submitted with the proposal. If there is not a completed CPARS evaluation, the standard Past Performance Questionnaire (PPQ) for USACE is Form PPQ-0 (9/30/11) and it is provided as an attachment to this solicitation. PPQ-0 is provided for the Offeror or its team members to submit to the client for each project the Offeror includes in its proposal under Factor 1, Past Experience, and for which a completed CPARS evaluation is not available. (Ensure correct phone numbers and email addresses are provided for the client point of contact.) Do not submit a PPQ when a completed CPARS evaluation is available.
Completed PPQs should be submitted with your proposal if a CPARS evaluation is unavailable. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact, Jason Tanamor, via email at jason.n.tanamor@usace.army.mil, prior to proposal closing date. The Offerors mailto:jason.n.tanamor@usace.army.mil, shall instruct the clients to refer to the solicitation number in the subject line. The PPQs are Source Selection materials. All successfully submitted PPQs will receive an e-mail confirmation upon receipt. If the Offeror does not receive the confirmation, it is their responsibility to follow up to ensure the Government has received the information.
Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.
Offerors may provide explanation on problems encountered on past projects and the corrective actions taken by the Offeror.
In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the PPIRS, including CPARS, using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), telephone interviews with organizations familiar with the Offeror’s performance, Government personnel with personal knowledge of the Offeror’s performance capability, and any other known sources not provided by the Offeror.
While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate, and complete past performance information rests with the Offeror.
Volume II – Price:
The Offeror shall submit their price proposal in a separate file consisting of the SF33, bid schedule, and reps and certs.
The Offeror must provide a complete bid schedule and acknowledge all amendments on the signed SF33.
(End of Summary of Changes)
John Day Dam New 20 Ton Trash Rake Gantry Crane
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 10 00.00 25 CONTRACT ADMINISTRATION DATA
01 10 10.00 25 CONTRACTOR'S OPERATIONS AND REQUIREMENTS
01 11 00.00 25 SUMMARY OF WORK
01 22 00.00 25 MEASUREMENT AND PAYMENT
01 32 01.00 25 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26.00 25 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 25 QUALITY CONTROL
01 45 00.15 25 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 57 19.00 25 TEMPORARY ENVIRONMENTAL CONTROLS
01 78 23.00 25 OPERATION AND MAINTENANCE DATA
01 78 39.00 25 PROJECT RECORD DOCUMENTS
DIVISION 02 - EXISTING CONDITIONS
02 41 16.00 26 REMOVE EXISTING CRANE
02 82 14.00 25 ASBESTOS ABATEMENT WORK
DIVISION 05 - METALS
05 50 03.00 26 METALWORK FABRICATION, MACHINE WORK, AND MISCELLANEOUS
PROVISIONS
05 50 04.00 26 METALS: MISCELLANEOUS, STANDARD ARTICLES, SHOP FABRICATED
ITEMS
DIVISION 09 - FINISHES
09 97 02.10 26 PAINTING: STEEL STRUCTURES
09 97 02.13 26 PAINTING - TRASH RAKE & LIFTING BEAM STRUCTURE
DIVISION 26 - ELECTRICAL
26 05 00.00 26 BASIC ELECTRICAL MATERIALS AND METHODS
26 32 15.00 26 DIESEL-GENERATOR SET
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 01 20.75 26 STRUCTURAL CRANE APPURTENANCES
41 22 13.16 26 NEW TRASH RAKE CRANE DATA, TESTING AND TRAINING
41 22 13.17 26 NEW TRASH RAKE CRANE MECHANICAL AND STRUCTURAL WORK
41 22 13.18 26 NEW TRASH RAKE GANTRY CRANE ELECTRICAL WORK
41 22 13.19 26 NEW TRASH RAKE AND LIFTING BEAM
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 35 26.00 25
GOVERNMENTAL SAFETY REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 DEFINITIONS
1.4 REGULATORY REQUIREMENTS
1.5 DRUG AND ALCOHOL USE PREVENTION PROGRAM
1.6 SITE QUALIFICATIONS, DUTIES, AND MEETINGS
1.6.1 Personnel Qualifications
1.6.1.1 Site Safety and Health Officer (SSHO)
1.6.1.2 Alternate SSHO and Designated Representative (DR)
1.6.1.3 Crane Operators
1.6.2 Personnel Duties
1.6.2.1 Site Safety and Health Officer (SSHO)
1.6.2.2 Deleted
1.6.3 Meetings
1.6.3.1 Preconstruction Conference
1.6.3.2 Safety Meetings
1.6.3.3 Work Phase Meetings
1.7 TRAINING
1.7.1 New Employee Indoctrination
1.7.2 Periodic Training
1.7.3 Training Plan
1.7.4 Hazardous Energy Control Plan and HEC Procedures Training
Certification
1.7.5 Fall Protection Training Program
1.8 ACCIDENT PREVENTION PLAN (APP)
1.8.1 General Information
1.8.2 EM 385-1-1 Contents
1.9 ACTIVITY HAZARD ANALYSIS (AHA)
1.9.1 General
1.9.2 Periodic AHA Review and Updating
1.10 DISPLAY OF SAFETY INFORMATION
1.11 SITE SAFETY REFERENCE MATERIALS
1.12 EMERGENCY MEDICAL TREATMENT
1.13 PROJECT SAFE CLEARANCE PROCEDURE
1.13.1 General
1.13.2 Safe Clearance Procedure System
1.14 THIRD PARTY CERTIFICATION OF BARGE-MOUNTED MOBILE CRANES AND
MOBILE EQUIPMENT
1.15 REPORTS
1.15.1 Accident Notification
1.15.2 Accident or Mishap Reports
1.15.3 Crane Testing Reports
1.15.4 Certificate of Compliance
1.16 HOT WORK
SECTION 01 35 26.00 25 Page 1
1.17 FACILITY OCCUPANCY CLOSURE
1.18 INCLEMENT WEATHER AND HEAT/COLD STRESS MANAGEMENT
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.1 CONSTRUCTION AND OTHER WORK
3.1.1 General
3.1.2 Hazardous Material Exclusions
3.1.3 Unforeseen Hazardous Material
3.2 PRE-OUTAGE COORDINATION MEETING
3.3 FALL HAZARD PROTECTION AND PREVENTION PROGRAM
3.3.1 General
3.3.2 Fall Protection Equipment and Systems
3.3.2.1 General
3.3.2.2 Personal Fall Arrest Equipment
3.3.3 Work Over Water
3.3.4 Existing Anchorage
3.3.5 Horizontal Lifelines
3.3.6 Guardrails and Safety Nets
3.3.7 Rescue and Evacuation Procedures
3.3.8 Aerial Lift Equipment and Movable Work Platforms
3.3.9 Safety Monitoring System
3.3.10 Controlled Access Zones
3.4 SCAFFOLDING
3.5 EQUIPMENT
3.5.1 Load Handling Equipment (LHE)
3.5.2 Cranes, Hoists, and Rigging
3.6 EXCAVATIONS
3.6.1 Soil Classification
3.6.2 Utility Locations
3.6.3 Utility Location Verification
3.6.4 Utilities Within and Under Concrete, Bituminous Asphalt, and
Other Impervious Surfaces
3.7 ELECTRICAL
3.7.1 Conduct of Electrical Work
3.7.2 Portable Extension Cords
3.8 HOUSEKEEPING
3.8.1 Clean-Up
3.8.2 Dust control
-- End of Section Table of Contents --
SECTION 01 35 26.00 25 Page 2
SECTION 01 35 26.00 25
GOVERNMENTAL SAFETY REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)
ASSE/SAFE A10.28 (2011) Safety Requirements for Work Platforms Suspended from Cranes or Derricks - American National Standard for Construction and Demolition Operations
ASSE/SAFE A10.34 (2001; R 2012) Protection of the Public on or Adjacent to Construction Sites
ASSE/SAFE Z359-PKG (2009) Fall Protection Code
ANSI/ASSE Z490.1 (2009) Criteria for Acceptance Practices in Safety, Health, & Environmental Training
ASME INTERNATIONAL (ASME)
ASME B30-PKG Load Handling Equipment
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 10 (2013) Standard for Portable Fire Extinguishers
NFPA 241 (2013) Standard for Safeguarding Construction, Alteration, and Demolition Operations
NFPA 51B (2014) Standard for Fire Prevention During Welding, Cutting, and Other Hot Work
NFPA 70 (2017; ERTA 1-2 2017; TIA 17-1; TIA 17-2;
TIA 17-3) National Electrical Code
NFPA 70E (2012; Errata 2012) Standard for Electrical Safety in the Workplace
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
ER 385-1-31 (2009) Safety and Occupational Health: The Control of Hazardous Energy
SECTION 01 35 26.00 25 Page 3
U.S. ARMY CORPS OF ENGINEERS - PORTLAND DISTRICT (NWP)
CENWP-OD-SAF-385-1 (2014) CENWP-OD Standing Safety Procedure 385-1, SAFETY, Portland District Supplement (Fixed Plant) to USACE, Hazardous Energy Control Program
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910 Occupational Safety and Health Standards
29 CFR 1910.146 Permit-required Confined Spaces
29 CFR 1915 Occupational Safety and Health Standards for Shipyard Employment
29 CFR 1919 Gear Certification Marine Activity
29 CFR 1926 Safety and Health Regulations for Construction
CPL 02-00-147 OSHA Control of Hazardous Energy - Enforcement Policy and Inspection Procedures
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. The following must be submitted in accordance with Section 01 33 00, SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Crane Operators; G, Section 01 of EM 385-1-1.
Training Plan; G, Section 01 of EM 385-1-1.
Hazardous Energy Control Plan and HEC Procedures Training Certification; G, Section 12 of EM 385-1-1 and Local Procedures.
Accident Prevention Plan (APP); G, Section 01 and Appendix A of
EM 385-1-1.
Activity Hazard Analysis (AHA); G, Section 01 of EM 385-1-1.
Inclement Weather and Heat/Cold Stress Management Plans; G, Section 06 and 19 of EM 385-1-1.
Fall Prevention and Protection Plan; G, Section 21 of EM 385-1-1.
Scaffolding; G, Section 22 of EM 385-1-1.
Fatigue Management Plan (FMP); G, Section 01 of EM 385-1-1.
SD-06 Test Reports
Submit reports as their incidence occurs, in accordance with the
SECTION 01 35 26.00 25 Page 4 requirements of the paragraph, REPORTS.
Regulatory Citations, Violations, and Corrective Action
Drug and Alcohol Use Prevention Program
Accident or Mishap Reports, Section 01 of EM 385-1-1.
Crane Testing Reports
SD-07 Certificates
Confined Space Entry Permit, Section 34 of EM 385-1-1.
Hot Work Permit, Section 9 and 10 of EM 385-1-1.
Submit one copy of each permit attached to each Daily Contractor Quality Control Report (Section 01 45 00.00 25, QUALITY
CONTROL).
Third Party Certification of Barge-Mounted Mobile Cranes and Mobile Equipment, to include Naval Architectural Analysis, Section 16 and 19 of EM 385-1-1.
Certificate of Compliance
1.3 DEFINITIONS
a. High Visibility Mishap. Any mishap which may generate publicity and/or high visibility. The following high visibility mishaps must be reported immediately:
(1) Electrical - to include Arc Flash and Uncontrolled release of Hazardous Energy.
(2) Load Handling Equipment of Rigging.
(3) Fall-from-Height; and
(4) Underwater diving
b. Medical Treatment. Treatment administered by a physician or by registered professional personnel under the standing orders of a physician. Medical treatment does not include first aid treatment even though provided by a physician or registered personnel.
c. Recordable Injuries or Illnesses. Any work-related injury or illness that results in:
(1) Death, regardless of the time between the injury and death, or the length of the illness;
(2) Days away from work (any time lost after day of injury/illness onset);
(3) Restricted work or transfer to another job;
(4) Medical treatment beyond first aid;
SECTION 01 35 26.00 25 Page 5
(5) Loss of consciousness; or
(6) A significant injury or illness diagnosed by a physician or other licensed health care professional, even if it did not result in (1) through (5) above.
d. "USACE" property and equipment specified in EM 385-1-1 must be interpreted as Government property and equipment.
1.4 REGULATORY REQUIREMENTS
a. In addition to the detailed requirements included in the provisions of this Contract, comply with the most recent edition of EM 385-1-1, in effect on the date of the Solicitation for this Contract, and applicable Federal, State, and local laws, ordinances, criteria, rules and regulations. Submit regulatory citations, violations, and corrective action and matters of interpretation of standards to the appropriate administrative agency for resolution before starting work.
Where the requirements of this specification, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirements must apply.
b. Contact the Contracting Officer immediately of any OSHA or other regulatory agency inspection or visit, and provide the Contracting Officer with a copy of each citation, report, and Contractor response.
Correct violations and citations promptly and provide written corrective actions to the Contracting Officer.
1.5 DRUG AND ALCOHOL USE PREVENTION PROGRAM
Conduct a proactive drug and alcohol use prevention program for all workers, prime and subcontractor, on the site, to include administrative action for employees failing the program. Ensure that no employee uses illegal drugs, in accordance with Federal law, or consumes alcohol during work hours. Ensure there are no employees under the influence of drugs or alcohol during work hours and are fit for duty. During the Contract period a copy of tests, to include results of random testing, must be submitted to the Contracting Officer. No personal data must be submitted, only numbers of individuals tested and results of tests.
1.6 SITE QUALIFICATIONS, DUTIES, AND MEETINGS
1.6.1 Personnel Qualifications
1.6.1.1 Site Safety and Health Officer (SSHO)
a. Provide a Safety oversight team that includes a minimum of one competent person to function as the SSHO. The SSHO must meet the requirements of EM 385-1-1, section 1, and ensure that the requirements of 29 CFR 1926 are met for the project. The SSHO must be at the work site at all times to implement and administer the Contractor's safety program and Government-accepted Accident Prevention Plan. The SSHO's training, experience, and qualifications must be as required by
EM 385-1-1.
b. Provide a Competent Person for all of the hazards identified in the Contractor's Safety and Health Program in accordance with the accepted Accident Prevention Plan. The Competent Person must be on-site at all times when the work that presents the hazards associated with their
SECTION 01 35 26.00 25 Page 6 professional expertise is being performed. Provide the credentials of the Competent Persons(s) for acceptance by the Contracting Officer in consultation with the Safety Office.
c. The SSHO must have no duties other than SSHO. The SSHO must meet the following requirements:
(1) A minimum of five years of continuous construction industry safety experience in supervising/managing general construction (managing safety programs or processes or conducting hazard analyses and developing controls) on similar projects.
(2) Thirty-hour OSHA Construction safety class or equivalent within the last four years.
(3) SSHOs must maintain competency through having taken eight hours of documented formal, on-line, or self-study safety and health related coursework every year.
(4) Competent person training as needed.
1.6.1.2 Alternate SSHO and Designated Representative (DR)
a. The Alternate SSHO must meet the same requirements and assume the responsibilities of the project SSHO. Assistant SSHO's may be necessary during the main shift along with the lead SSHO, but are primarily intended to be on-site during the times that the lead SSHO is absent from the work site. The assistant SSHO may have other duties on the jobsite.
b. If the SSHO is off-site for a period longer than 24 hours, an alternate SSHO must be provided and fulfill the same roles and responsibilities as the primary SSHO.
c. When the SSHO is temporarily (up to 24 hours) off-site, a Designated Representative (DR), as identified in the AHA may be used in lieu of an Alternate SSHO, and must be on the project site at all times when work is being performed.
Note: DRs are collateral duty safety personnel, with safety duties in addition to their full-time occupation.
d. If an activity, task or DFOW contains multiple sites and has been assessed and given an activity Risk Assessment Code (RAC) of low or medium, a DR must be appointed for each site where remote work locations are more than 45 minutes travel time from the SSHO's duty location.
(1) DRs must perform safety program tasks as designated by the SSHO and report safety findings to the SSHO.
(2) A DR may not be assigned to projects that have a RAC level of high or extremely high.
1.6.1.3 Crane Operators
Meet the crane operator's training and medical requirements in EM 385-1-1, Section 16 and Appendix I; ASME B30-PKG; 29 CFR 1910; and 29 CFR 1926.
Provide proof of current qualification.
SECTION 01 35 26.00 25 Page 7
1.6.2 Personnel Duties
1.6.2.1 Site Safety and Health Officer (SSHO)
Superintendent, QC Manager, and SSHO are subject to dismissal if the above duties are not being effectively carried out. If the Superintendent, QC Manager, or SSHO are dismissed project work will be stopped and will not be allowed to resume until a suitable replacement is approved and the above duties are again being effectively carried out. The SSHO must:
a. Conduct daily safety and health inspections and maintain a written log which includes area/operation inspected, date of inspection, identified hazards, recommended corrective actions, estimated and actual dates of corrections. Attach safety inspection logs to the Daily Contractor Quality Control Report.
b. Conduct mishap investigations and complete required reports.
Maintain the OSHA Form 300 and Daily Contractor Quality Control Report for prime and subcontractors.
c. Maintain applicable safety reference material on the job site.
d. Attend the pre-construction conference, pre-work meetings including the Contractor Quality Control Preparatory Phase inspection meeting, Initial Phase inspection meetings, Follow-up Phase, additional Preparatory and Initial Phase meetings, and periodic in-progress meetings.
e. Implement and enforce accepted APPs and AHAs.
f. Maintain a safety and health deficiency tracking system that monitors outstanding deficiencies until resolution. Post a list of unresolved safety and health deficiencies on the safety bulletin board.
g. Ensure subcontractor compliance with safety and health requirements.
h. Maintain a list of hazardous chemicals on site and their safety data sheets (SDS).
1.6.2.2 Deleted
1.6.3 Meetings
1.6.3.1 Preconstruction Conference
a. The purpose of the Preconstruction conference is for the Contractor and the Contracting Officer to become acquainted and explain the functions and operating procedures of their respective organizations.
b. Contractor representatives who have a responsibility or significant role in accident prevention on the project must attend the preconstruction conference. This includes the project superintendent, SSHO, quality control supervisor, or any other assigned safety and health professionals who participated in the development of the APP (including the Activity Hazard Analyses (AHAs) and special plans, program and procedures associated with it).
c. Discuss the details of the submitted APP to include incorporated
SECTION 01 35 26.00 25 Page 8 plans, programs, procedures, and a listing of anticipated AHAs that will be developed and implemented during the performance of the Contract. This list of proposed AHAs will be reviewed at the conference and an agreement will be reached between the Contractor and the Contracting Officer's representative as to which phases will require an analysis. In addition, establish a schedule for the preparation, submittal, review, and acceptance of AHAs to preclude project delays.
d. Deficiencies in the submitted APP will be brought to the attention of the Contractor at the Preconstruction conference, and the Contractor must revise the plan to correct deficiencies and re-submit it for acceptance. Do not begin work until there is an accepted APP.
1.6.3.2 Safety Meetings
Conduct weekly safety meetings at the project site for all employees as required by EM 385-1-1. The Contracting Officer must be informed of the meeting in advance and be allowed attendance. Minutes showing Contract title, signatures of attendees, and a list of topics discussed must be attached to the Daily Contractor Quality Control Report.
1.6.3.3 Work Phase Meetings
Appropriate AHA’s must be discussed during CQC work phase meetings as required in Section 01 45 00.00 25, QUALITY CONTROL.
1.7 TRAINING
1.7.1 New Employee Indoctrination
New employees (prime and subcontractor) must be informed of specific site hazards before they begin work. Documentation of this orientation must be kept on file at the project site.
1.7.2 Periodic Training
Provide Safety and Health Training in accordance with EM 385-1-1 and the accepted APP. Ensure all required training has been accomplished for all onsite employees.
1.7.3 Training Plan
Prior to beginning a new phase, training must be provided to all affected employees to include a review of the AHA to be implemented. Contractors can chose to utilize Job Hazard Analyses in lieu of AHAs as long as the JHA meets the requirements of an AHA to include a Risk Assessment.
1.7.4 Hazardous Energy Control Plan and HEC Procedures Training Certification
a. Provide annual Hazardous Energy Control Plan and Procedure AP training to all Contractor and subcontractor personnel working under, or in the vicinity of, clearances as defined in CENWP-OD-SAF-385-1.
See Attachment J4.
b. All costs for this training shall be considered incidental to the work, and therefore, no additional payment will be made. Cost for the training is $55 per individual. Training is provided by Vivid Learning
SECTION 01 35 26.00 25 Page 9
Systems and is available on line at http://contractor.vividlms.com/.
Submit the training completion certification a minimum of seven days prior to the individuals arrival at site. Maintain training documentation on site, including the individual's name and date of training completion, in accordance with CENWP-OD-SAF-385-1.
1.7.5 Fall Protection Training Program
Institute a fall protection training program. As part of the Fall Hazard Protection and Prevention Program, provide training for each employee who might be exposed to fall hazards, see paragraph FALL HAZARD PROTECTION AND PREVENTION PROGRAM. Provide training by a Competent person for fall protection must be in accordance with EM 385-1-1, section 21. Training and evaluations for fall protection and rescue must be documented and retained for the current training program per ASSE/SAFE Z359-PKG.
1.8 ACCIDENT PREVENTION PLAN (APP)
1.8.1 General Information
a. Use a Qualified person to prepare the written site-specific APP.
See Appendix Q of EM 385-1-1 for definition of Qualified Person.
Prepare the APP in accordance with the format and requirements of EM 385-1-1 and as supplemented herein. Cover all paragraph and subparagraph elements in EM 385-1-1, Appendix A, entitled Minimum Basic Outline for Accident Prevention Plans. Specific requirements for some of the APP elements are described below:
(1) The APP must be job-specific and must address any unusual or unique aspects of the project or activity for which it is written.
(2) The APP must interface with the Contractor's overall safety and health program. Include any portions of the Contractor's overall safety and health program referenced in the APP in the applicable APP element and made site-specific.
(3) The Government considers the Prime Contractor to be the "controlling authority" for all work site safety and health of the subcontractors.
(4) Contractors must inform their subcontractors of the safety provisions under the terms of the Contract and the penalties for noncompliance, coordinating the work to prevent one craft from interfering with or creating hazardous working conditions for other crafts, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.
(5) The APP must be signed by the person and firm (senior person) preparing the APP, the Contractor, the on-site superintendent, the designated SSHO.
b. Submit the APP to the Contracting Officer 15 calendar days after Notice to Proceed for acceptance. Work cannot proceed without an accepted APP. The Contracting Officer will review and comment on the Contractor's submitted APP and accept it when it meets the requirements of the Contract provisions.
c. Once accepted by the Contracting Officer, the APP and appendices will be enforced as part of the Contract. Disregarding the provisions
SECTION 01 35 26.00 25 Page 10 of this Contract or the accepted APP will be cause for stoppage of work, at the discretion of the Contracting Officer, until the matter has been rectified.
d. Once work begins, changes to the accepted APP must be made with the knowledge and concurrence of the Contracting Officer, project superintendent, SSHO, and quality control manager. Should any severe hazard exposure, i.e. imminent danger, become evident, stop work in the area, secure the area, and develop a plan to remove the exposure and control the hazard. Notify the Contracting Officer, both verbally and in writing, within 24 hours of discovery. In the interim all necessary action must be taken by the Contractor to restore and maintain safe working conditions in order to safeguard on-site personnel, visitors, the public (as defined by ASSE/SAFE A10.34), and the environment.
e. Copies of the accepted APP must be maintained at the CO's office and at the work site. Continuously review and amend the APP, as necessary, throughout the life of the Contract. Incorporate unusual or high-hazard activities not identified in the original APP in the plan as they are discovered.
1.8.2 EM 385-1-1 Contents
In addition to the requirements above and those outlined in Appendix A of EM 385-1-1, the following is required:
a. Names and qualifications (resumes including education, training, experience and certifications) of all site safety and health personnel designated to perform work on this project to include the designated site safety and health officer and other Competent and Qualified personnel to be used. The duties of each position must be specified.
b. Qualifications of Competent and Qualified persons. As a minimum, designate Competent persons and submit qualifications for each of the following major areas: excavation; scaffolding; fall protection;
hazardous energy; confined space; health hazard recognition, evaluation and control of chemical, physical and biological agents; personal protective equipment and clothing to include selection, use and maintenance.
c. Confined Space Entry Plan. Develop a confined space entry plan in accordance with EM 385-1-1, applicable OSHA standards 29 CFR 1910, 29 CFR 1910.146, 29 CFR 1915, and 29 CFR 1926, and any other Federal, State, and local regulatory requirements identified in this Contract.
Identify the Qualified person's name and qualifications, training, and experience. Delineate the Qualified person's authority to direct work stoppage in the event of hazardous conditions. Include procedure for rescue by Contractor personnel and the coordination with emergency responders. (If there is no confined space work, include a statement that no confined space work exists and none will be created.)
d. Health Hazard Control Program. Designate a Competent and Qualified person to establish and oversee a Health Hazard Control Program in accordance with EM 385-1-1, Section 6. The program must ensure that employees, on-site Government representatives, and others, are not adversely exposed to chemical, physical, and biological agents and that necessary controls and protective actions are instituted to ensure health.
SECTION 01 35 26.00 25 Page 11
e. A Drug and Alcohol Use Prevention Program. Provide description of the on-site prevention program.
f. Training Records and Requirements. List of mandatory training and certifications which are applicable to this project (e.g. explosive actuated tools, confined space entry, fall protection, crane operation, hazardous energy control, vehicle operator, forklift operators, personal protective equipment); list of requirements for periodic retraining/certification; outline requirements for supervisory and employee safety meetings.
g. Fall Protection and Prevention (FP&P) Plan. The plan must be site specific and address all fall hazards in the work place and during different phases of construction (paragraph entitled FALL HAZARD PROTECTION AND PREVENTION PROGRAM). It must address how to protect and prevent workers from falling to lower levels when they are exposed to fall hazards above 6 feet. A Competent Person For Fall Protection or a Qualified Person for Fall Protection prepare and sign the plan. See Appendix Q of EM 385-1-1 for definitions of Competent and Qualified Person for Fall Protection. The plan must include fall protection and prevention systems, equipment and methods employed for every phase of work, responsibilities, self-rescue, rescue and escape equipment and operations, evacuation procedures, training requirements, and monitoring methods. For Horizontal Lifelines, see EM 385-1-1, section 21 and ASSE/SAFE Z359-PKG. Revise the Fall Protection and Prevention Plan every six months for lengthy projects, reflecting any changes during the course of construction due to changes in personnel, equipment, systems, or work habits. The accepted Fall Protection and Prevention Plan must be kept and maintained at the job site for the duration of the project.
h. Occupant Protection Plan. The safety and health aspects of lead-based paint removal, prepared in accordance with EM 385-1-1, Section 06.
i. Asbestos Hazard Abatement Plan. The safety and health aspects of asbestos work, prepared in accordance with EM 385-1-1, Section 06, and Section 02 82 14.00 25, ASBESTOS CONTAINING MATERIAL (ACM) REMOVAL AND
DISPOSAL.
j. Site Safety and Health Plan. The safety and health aspects prepared in accordance with EM 385-1-1.
k. Excavation Plan. The safety and health aspects prepared in accordance with EM 385-1-1.
l. Crane Critical Lift Plan. Prepare and sign weight handling critical lift plans for lifts over 75 percent of the capacity of the crane or hoist (or lifts over 50 percent of the capacity of a barge mounted mobile crane's hoists) at any radius of lift; lifts involving more than one crane or hoist; lifts of personnel; and lifts involving non-routine rigging or operation, sensitive equipment, or unusual safety risks.
Submit 15 calendar days prior to on-site work and include the requirements of EM 385-1-1, Section 16, ASME B30-PKG, and the following:
(1) For lifts of personnel, the plan must demonstrate compliance with the requirements of EM 385-1-1, Section 16.
SECTION 01 35 26.00 25 Page 12
(2) For barge mounted mobile cranes, a Naval Architectural Analysis (NAA) must be performed to determine barge stability calculations identifying barge list and trim based on anticipated loading; and load charts based on calculated list and trim. The amount of list and trim must be within the crane manufacturer's requirements.
m. Standard Lift Plan. For all crane activities a written standard lift plan (SLP) must be prepared for every lift or series of lifts (if duty cycle or routine lifts are being performed). The SLP must be developed, reviewed and accepted by all personnel involved in the lift in accordance with EM 385-1-1, Section 16.
n. Fatigue Management Plan (FMP). A FMP must be completed as part of the APP whenever work hours:
(1) exceed 10-hours a day for more than four consecutive days;
(2) exceed 50-hours in a 7-day work week;
(3) exceed 12-hours a day for more than three consecutive days, or
(4) exceed 58-hours a week for sedentary (to include office) work.
1.9 ACTIVITY HAZARD ANALYSIS (AHA)
1.9.1 General
a. The Activity Hazard Analysis (AHA) format must be in accordance with EM 385-1-1. Submit the AHA for review at least 15 calendar days prior to the start of each phase. Format subsequent AHAs as amendments to the APP. The analysis must be used during daily inspections to ensure the implementation and effectiveness of the activity's safety and health controls. Develop an AHA for every operation involving a type of work presenting hazards not experienced in previous project operations or where a new work crew or subcontractor is to perform work. The analysis must identify and evaluate hazards and outline the proposed methods and techniques for the safe completion of each phase of work. At a minimum, define activity being performed, sequence of work, specific safety and health hazards anticipated, control measures (to include personal protective equipment) to eliminate or reduce each hazard to acceptable levels, equipment to be used, inspection requirements, training requirements for all involved, and the Competent and Qualified persons in charge of that phase of work. For work with fall hazards, include fall hazards associated with scaffold erection and removal, identify the appropriate fall arrest systems. For work with materials handling equipment, address safeguarding measures related to materials handling equipment. For work requiring excavations, include requirements for safeguarding excavations. For work with commissioning, address safeguarding measures related to commissioning.
b. An activity requiring an AHA must not proceed until the AHA has been accepted by the Contracting Officer and a meeting has been conducted by the Contractor to discuss its contents with everyone engaged in the activity, including on-site Government representatives. The Contractor must document meeting attendance at the preparatory, initial, and follow-up phases of quality control inspection.
SECTION 01 35 26.00 25 Page 13
c. The AHA must be continuously reviewed and, when appropriate, modified to address changing site conditions or operations.
d. Develop the activity hazard analyses using the project schedule as the basis for the activities performed. Any activities listed on the project schedule will require an AHA. The AHAs will be developed by the Contractor, supplier, or subcontractor and provided to the Prime Contractor for submittal to the Contracting Officer.
e. Contractor may use Job Hazard Analyses, Job Safety Analyses, or similar Risk Management procedures in lieu of an AHA, provided the data collected is the same as that required by the AHA.
1.9.2 Periodic AHA Review and Updating
Review the AHAs periodically (at least monthly) at the Contractor supervisory safety meeting and update when…