AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See Block 14 Continuation Page for details. All other terms and conditions remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Aug-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N19R0017
X 9B. DATED (SEE ITEM 11)
11-Jul-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Aug-2019
CODE
USACE PORTLAND DISTRICT
333 SW 1ST AVE
PORTLAND OR 97204-3440
W9127N 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9127N19R0017
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0003
1) Specification 26 05 00.00 25 paragraph 2.15 is revised to reflect AGAR as the manufacture of the Leakwise controller and sensors (previously listed as GE).
2) Section 22 25 00.00 25 paragraph 2.1 is updated to remove the reference to TABLE I.
3) Plan drawing E-607 is updated. Revision block one has been placed in the area where updates were made, which are as follows:
Manufacturer and equipment descriptions has been updated in the EQUIPMENT LIST (located on bottom left)
Updated description of sensors from GE LEAKWISE ID-221 SHEEN SENSOR to match current manufacturer description (located on bottom right of drawing).
Updated description of safety barriers from generic GE part numbers MTL 770+ and MTL 7715+ to match current manufacturer description (located on top right of drawing).
4) Attachment A (Offeror’s Experience Form) and Attachment B (Past Performance Questionnaire Form) are incorporated.
(End of Summary of Changes)
Contract to coordinate with Government to size type of I/O module and correct number of inputs/outputs required for installation. Pumps power feeders are to be fed from existing CQ1 MCC cubicles, one from Bus 1 and one from Bus 2 for the unwatering pumps and one from Bus 1 for both the primary and lower level drainage pumps, and controlled from the existing PLC cabinet and new control panels. Contractor must install new buckets with motor starters and all pertinent equipment in existing cubicles.
Final terminations will be made by Government personnel.
2.15 OIL DETECTOR AND CONTROLLER
Furnish and install a new oil detector, cable, and, conduit in both the new drainage unwatering side of the sump. Furnish and install new hydrocarbon detector control panel in place of existing monitor capable of tracking inputs from both new hydrocarbon detectors. Hydrocarbon controller must annunciate/alarm oil conditions by using new cables installed from controller to government installed existing annunciation and powerhouse PLC. Controller must have an LCD display screen displaying state of detectors, alarms, and allow for adjustment and calibration of settings for detectors. Hydrocarbon monitor sensors must be AGAR brand model Leakwise ID-221 for both the unwatering sump and drainage sump, or approved equal.
The controller must be AGAR brand model SLC-220 Multi LCD or approved equal.
2.16 HYDROCARBON DETECTOR AND CONTROLLER
Furnish and install a new hydrocarbon detector, cable, and, conduit to the new oil water separator units in the powerhouse yard. Furnish and install new hydrocarbon detector control panel in free standing Hoffman or approved equal enclosure per the contract drawing. Hydrocarbon controller must annunciate/alarm oil conditions by using new cables installed from controller to existing government annunciation cabinet and powerhouse PLC.
Hydrocarbon controller must also sample oil condition data and gather/log data into a Endress+Hauser RSG30 data logger or approved equal for government collection. Controller and datalogger must have an LCD display screen displaying state of detectors, alarms, and allow for adjustment and calibration of settings for detectors. Hydrocarbon monitor must be Turner Designs Hydrocarbon Instruments TD-120 or approved equal.
2.17 WIRING DEVICES
2.17.1 General
Wiring devices must conform to NEMA WD 1. Dimensional requirements of wiring devices must conform with and NEMA WD 6.
2.17.2 Receptacles
Receptacles must be hospital grade, 20A, 125V AC, 2-pole, 3-wire duplex (NEMA 5-20R). Wiring terminals must be screw type, side or back wired with two screws per terminal, with a green grounding screw connected directly to the receptacle yoke. Not more than one receptacle must be installed in a single gang box.
2.17.3 Ground Fault Circuit Interrupter
Ground fault interrupter type receptacles must comply with UL 943, Class A, Specification 26 05 00.00 25 g2ecdpwi Highlight Updated manufacturer from GE to current AGAR.
Instructors must be thoroughly familiar with all parts of the installation and must be trained in operating theory as well as practical operation and maintenance work.
b. Instruction must be given during the first regular work week after the equipment or system has been accepted and turned over to the Government for regular operation. The number of man-days (8 hours per day) of instruction furnished must be as specified in the individual section. When more than four man-days of instruction are specified, use approximately half of the time for classroom instruction. Use other time for instruction with the equipment or system.
c. When significant changes or modifications in the equipment or system are made under the terms of the contract, provide additional instruction to acquaint the operating personnel with the changes or modifications.
1.9 ACCESSIBILITY OF EQUIPMENT
Install all work so that parts requiring periodic inspection, operation, maintenance, and repair are readily accessible. Install concealed valves, expansion joints, controls, dampers, and equipment requiring access, in locations freely accessible through access doors.
1.10 MODIFICATIONS TO EXISTING PIPING SYSTEMS
This contract requires modification of existing piping systems. In this case, provide piping materials and ancillary equipment in-kind to existing piping system to make one cohesive and congruent system.
PART 2 PRODUCTS
2.1 MATERIALS
Materials for various services must be in accordance with TABLE II. Pipe schedules must be selected based on service requirements. Pipe fittings must be compatible with the applicable pipe materials. Pipe threads (except dry seal) must conform to ASME B1.20.1. Grooved pipe couplings and fittings must be from the same manufacturer.
2.1.1 Pipe Joint Materials
Grooved pipe and hubless cast-iron soil pipe must not be used under ground. Solder containing lead must not be used with copper pipe. Cast iron soil pipe and fittings must be marked with the collective trademark of the Cast Iron Soil Institute. Joints and gasket materials must conform to the following:
a. Coupling for Cast-Iron Pipe: for hub and spigot type ASTM A74, AWWA C606. For hubless type: CISPI 310.
b. Coupling for Steel Pipe: AWWA C606.
c. Couplings for Grooved Pipe: Ductile Iron ASTM A536 (Grade 65-45-12); Copper ASTM A536.
d. Flange Gaskets: Gaskets must be made of non-asbestos material in
Section 22 25 00.00 25 g2ecdpwi Highlight Removed TABLE I from sentence.
NOTES
(TRANSPARENT COVER NOT SHOWN)
FRONT PANEL
(TRANSPARENT COVER SHOWN)
FRONT PANEL
THE TRANSPARENT COVER)
FRONT PANEL (BENEATH
THIS SHEET
SLC-220 MAIN BOARD
TO J9 ON
THIS SHEET
OUTPUT BOARD #1
TO J11 ON
EA
EA
EA
EA
EA
ITEM QUAN UNIT DESCRIPTION
EQUIPMENT LIST (PRIMARY ITEMS SHOWN)
OIL DETECTION PANEL
OIL DETECTION PANEL
DRAINAGE SUMP
UNWATERING SUMP
OIL DETECTION PANEL INPUT WIRING
INCLUDING ARTICLE 409.
4. CONTROL PANEL SHALL HAVE LABELLING COMPLIANT WITH NFPA 70,
INSTRUCTIONS TO ASSEMBLE A COMPLETE AND OPERABLE SYSTEM.
3. CONTRACTOR MUST FOLLOW MANUFACTURER'S WIRING DIAGRAM AND
2. FOR CABLE AND CONDUIT SCHEDULES SEE E-604 AND E-701.
1. ALL ITEMS SHOWN ARE NEW UNLESS INDICATED OTHERWISE.
MATERIALS AS REQ'D FOR COMPLETE SYSTEM. AGAR LEAKWISE OIL DETECTION SYSTEM OR APPROVED EQUAL.
CABINET LAYOUT AND EQUIPMENT LIST IS APPROXIMATE. VERIFY ALL DIMENSIONS AND QUANTITIES AND PROVIDE
OIL DETECTION PANEL OUTPUT BOARD WIRING
NOT USED
NOT USED
NOT USED
NOT USED
NOT USED
AGAR SLC-220 SENSOR OUTPUT BOARDS
AGAR ID-221 HYDROCARBON (OIL) ON WATER DETECTOR W/INTEGRATED CABLE
AGAR ZENER SFETY BARRIERS FOR SLC-220
AGAR 115/ 230 VAC SLC-220 SMART LEAKWISE CONTROLLER ASSEMBLY W/NEMA 4X ENCLOSURE 1
BARRIER
ZENER SAFETY
BARRIER
ZENER SAFETY
BARRIER
ZENER SAFETY
BARRIER
ZENER SAFETY
(ODP)
PANEL
OIL DETECTION
J1
J2 DISPLAY
LIGHTS
B12 24V 12V GND OUT+ - 1 2 IN
J7
J9
MODEM OUTPUT BUZZER
TB3:
POWER SUPPLY
TB5: DIG.
FOR PC
RS-232
MODEM
WIRELESS
RS-232:
SENSOR #1
SENSOR #2
SENSOR #3
SENSOR #4
S
S
S
S
INPUTS
SENSORS
TB10
MAIN BOARD
SLC-220
24V GND 24V GNDIN
GND
NL FG
CN1-2 CN1-1
MWS65-12
TDK
POWER SUPPLY:
CN51-2CN51-3
CONVERTER
12-24V DC
ONLY
OUTPUTS BOARD #1
S
S
NO
NC
NO
NC
NO
NC
NO
NC
NO
NC
COM
COM
COM
COM
COM
J11
IN
P
U T
IOUTVOUT GND
TB19: ANALOG OUTPUT
J12
O U
T P
U T
TB14
TB15
TB16
TB17
TB18
OUTPUT BOARD #1
NO
NC
NO
NC
NO
NC
NO
NC
NO
NC
COM
COM
COM
COM
COM
J11
IN
P
U T
IOUTVOUT GND
TB19: ANALOG OUTPUT
J12
O U
T P
U T
TB14
TB15
TB16
TB17
TB18
OUTPUT BOARD #2
FLAT CABLE FLAT CABLE
FLAT CABLE
TO ANNUCIATOR PANEL
ON / OFF
V
G N
D
BOARD
DISPLAY
SUMP
DRAINAGE
OIL IN
SUMP
UNWATERING
OIL IN
SENSOR FAIL
SUMP
DRAINAGE
SENSOR FAIL
SUMP
UNWATERING
NO. 2
WATER DETECTOR
DTR ID-221 OIL ON
NO. 1
WATER DETECTOR
DTR ID-221 OIL ON
DRAWING PLOT SIZE: ANSI F
D
C
A
B
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
1 2 3 4 5 6
E
D E
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R of Engineers
US Army Corps
/1
/2
BORDER VERSION UPDATE [09-2012]
E-607SHEET NAME:g2ecdpwi BY USERNAME:DATE AND TIME PLOTTED: 8/12/2019 3:40:39 PM
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D D
IS
T R
IC
T
H
IL
L S C
R E
E K D
A M A
N D R
E S
E R
V O
IR
P O
W E
R H
O U
S E
O
IL
S
P
IL
L P
R E
V E
N T
IO
N S
Y S
T E
M G
E
C D
D E
R
P
IN
D R
A
G E
C D
T R
S
A N
S I- F
W
IL
L
IA
M F
O R
T U
N Y P .E
:1
E-607
/2
/2
H L P .1
E -6
X X
X .d g n
G E S
L C -2
P
A N
E L L
A Y
O U
T A
N D
W
IR
IN
G D
IA
G R
A M
W
N
R
A D
V E
R T
IS
E -0
-2
U P
D A
T E
D M
A N
U F
A C
T U
R E
R A
N D D
E S
C R
IP
T
IO
N O
N E
Q U
IP
M E
N T L
IS
T S
E N
S O
R S
A N
D S
A F
E T
Y B
A R
R
IE
R S
W B
F A -1
PORTLAND DISTRICT
USACE Form PPQ will be made accessible on FBO website as a separate attachment.
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST
REFLECT YOUR EVALUATION OF THE CONTRACTOR’S
PERFORMANCE
(If liquidated damages were assessed or the schedule was not met, please address below)
If no, please explain in Remarks section.
Indicate if show cause or cure notices were issued, or any default action in comment section below.
If yes, please explain below.
(explain if specific issues)
(If no, please explain below) if applicable
(please attach additional pages if necessary)
File details come from the government source that posted it.