A.02.02_Synopsis_-_Attachment_B-Example_Org_Chart.pdf
PDF 46 KB Posted
- Attached to
- VAPORHCS A-E Design SATOC
- Solicitation number
- W9127N19R0009_VAPORHCS_A-E_DESIGN_SATOC
About this file
This document provides an example organizational chart for a potential Architect-Engineer Design Single Award Task Order Contract to be awarded by the Department of the Army Corps of Engineers Engineering District Portland to support the Veterans Affairs Portland Health Care System. The example chart outlines the prime contractor and several specialty subcontractors that would provide disciplines including architecture, engineering, medical planning, environmental services, and CAD/BIM/GIS technical support. It includes details such as staff names and titles, subject matter experts, and prime versus subcontracted roles. The intent is to demonstrate the level of information expected in any proposal, not dictate a specific organizational structure.
VAPORHCS A-E Design SATOC Synopsis Attachment B
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Prime Firm Principal 1 Principal 2 Project Manager 1 Project Manager 2 Quality Management Project Controls/Scheduler Admin Support
Architectural / Construction
Architect 1 (SME, O) Architect 2 (Senior, P) Architect 3 (Senior, P) Architect 4 (Staff, P)
Landscape Architect 1 (SME, O) Landscape Architect 2 (Senior, P)
Interior Designer 1 (SME, O) Interior Designer 2 (Senior, P)
Design Sustainability Coord. 1 (SME, O/P)
Construction Manager 1 (SME, O) Construction Manager 2 (Senior, P)
Cost Estimator 1 (SME, O) Cost Estimator 2 (Senior, P)
Certified Value Specialist Fac. (SME, O/P)
Sub 4: (firm “e”, [ref. SF330 Part I, block C])
Discipline A 1 (SME, O) Discipline A 2 (Senior, P)
Discipline B 1 (SME, O) Discipline B 2 (Senior, P)
Sub 2: Medical (firm “c”, [ref. SF330 Part I, block C])
Medical Facility Planner 1 (SME, O) Medical Facility Planner 2 (Senior, P)
Medical Equipment Planner 1 (SME, O) Medical Equipment Planner 2 (Senior, P)
Medical Physicist (X-ray/MRI) 1 (SME, O) Medical Physicist (X-ray/MRI) 2 (Senior, P)
Infection Control Nurse 1 (SME, O/P)
Industrial Hygienist 1 (SME, O/P)
Activation Specialist 1 (SME, O)
Sub 1: Engineering (firm “b”, [ref. SF330 Part I, block C])
Structural 1 (SME, O) Structural 2 (Senior, P) Structural 3 (Senior, P) Structural 4 (Staff, P)
Civil 1 (SME, O) Civil 2 (Senior, P) Civil 3 (Senior, P) Civil 4 (Staff, P)
Geotechnical 1 (SME, O) Geotechnical 2 (Senior, P)
Engineering Geologist 1 (SME, O) Geologist 2 (Senior, P)
Traffic Engineer 1 (SME, O) Traffic Engineer 2 (Senior, P)
Environmental Engineer 1 (SME, O/P)
Mechanical 1 (SME, O) Mechanical 2 (Senior, P) Mechanical 3 (Senior, P) Mechanical 4 (Staff, P)
Fire Protection Engineer 1 (SME, O) Fire Protection Engineer 2 (Senior, P)
Electrical 1 (SME, O) Electrical 2 (Senior, P) Electrical 3 (Senior, P) Electrical 4 (Staff, P)
Communications Systems Professional 1 (SME, O) Communications Systems Professional 2 (Senior, P)
Civil 3 (Senior, P) Civil 4 (Staff, P)
Commissioning Engineer 1 (SME, O/P) Commissioning Engineer 2 (Senior, P)
Prime Management
Prime Disciplines
Subcontractor
ATTACHMENT B: VAPORHCS A-E DESIGN SATOC
EXAMPLE ORG CHART
Sub 3: Environmental (firm “d”, [ref. SF330 Part I, block C])
NEPA Specialist 1 (SME, O) NEPA Specialist 2 (Senior, P)
Architectural Historian 1 (SME, O/P)
Sub 5: (firm “f”, [ref. SF330 Part I, block C])
Discipline C 1 (SME, O) Discipline C 2 (Senior, P)
Discipline D 1 (SME, O) Discipline D 2 (Senior, P)
CADD / BIM / GIS
CADD 1 (Senior, O) CADD 2 (Staff, P)
BIM 1 (Senior, O) BIM 2 (Staff, P)
GIS 1 (Senior, O) GIS 2 (Staff, P)
NOTE: The intent of the example is to demonstrate the level of detail expected by the Government, not to dictate an organizational structure for the team or format for the org chart.
Slide Number 1
File details come from the government source that posted it. Updated .