Steel Pile Supply Specifications

1. General

1.1 Project Description

Provide (20) steel pipe piles that are 24-inch diameter, 1/2-inch wall thickness, 80-foot long. Provide (16) conical tip attachments, (14) open end cutting shoes and (2) rock crusher driving shoes.

All provided material shall be delivered and offloaded to the specified location. If delivery is by truck, the government will offload and stack the material. If delivery is by barge, the contractor is required to offload and stack the material.

Include cost for products, fabrication, testing, delivery, offloading, and material stacking in quote.

1.2 References

AMERICAN INSTITUTE OF STEEL CONSTRUCTION

AISC 325 (2011) Steel Construction Manual

AMERICAN WELDING SOCIETY (AWS)

AWS D1.1/D1.1M (2015; Errata 1 2015; Errata 2 2016) Structural Welding Code - Steel

ASTM INTERNATIONAL (ASTM)

ASTM A148 (2014) Standard Specification for Steel Castings, High Strength, for Structural Purposes

ASTM A252 (2010) Standard Specification for Welded and Seamless Steel Pipe

Piles

ASTM A36 (2014) Standard Specification for Carbon Structural Steel

1.3 Submittal Requirements

Submittals shall be submitted 10 calendar days after contract award.

o Fabrication Drawings of item 2.2.3 o Welding Procedure Specifications (WPS) in accordance with AWS D1.1

2. Products

2.1. Steel Pipe

Material shall conform to ASTM A252, Grade 3, and minimum yield strength is 45 KSI.

Contractor to provide (20) steel pipe piles that are 24-inch diameter, 1/2-inch wall thickness, and 80-foot long.

Piles shall be seamless or welded. The contractor has the option to deliver full length piles or may splice piles at delivery location. For on-site welding, any welding equipment shall be compatible with available power. Available power at T2 is 440V/220V/110V.

Piles shall be open-ended, and one end prepared (square cut) for attachment of a steel pile toe attachment.

2.2. Steel Pile Toe Attachments

All pile toe attachments shall be sized to fit on the specified steel pipe pile.

2.2.1 Conical tip attachment

Material shall conform to ASTM A148 or approved equivalent and minimum yield strength is 40

KSI.

Contractor to provide (16) pointed conical tips. Conical tips shall be similar to Associated Pile & Fitting Model P13006. Rounded conical tips shall not be permitted.

2.2.2 Open End Cutting Shoe

Material shall conform to ASTM A148 or approved equivalent and minimum yield strength is 40

Contractor to provide (14) cutting shoes. Cutting shoes shall be similar to Associated Pile & Fitting Model O-14001. Cutting shoes may be inside or outside flange mounted.

2.2.3 Rock crusher driving shoes

Material shall conform to ASTM A36 or approved equivalent, and minimum yield strength is 36

Contractor to provide (2) rock crusher driving shoes. Driving shoes shall be fabricated according to the following drawing:

2.3. Fabrication

Fabrication shall be in accordance with the applicable provisions of AISC 325. Pile splices shall include a backing ring and full penetration groove welds.

2.4. Coating

Piles and steel pile toe attachments shall be uncoated. If products come coated the coating does not need to be removed.

3. Execution

3.1. Welding

Welding shall be in accordance with AWS D1.1. Provide AWS D1.1 qualified welders and welding operators. Use E70XX low hydrogen electrodes.

Develop and submit the Welding Procedure Specifications (WPS) for all welding, including welding done using prequalified procedures.

After welding is complete, notify contracting officer within (3) business days for inspection. All welds shall be 50% dye penetrant tested by the contractor and 100% of the welds visual inspected by the government. All testing shall be done in accordance with AWS D1.1.

Any welds that do not pass dye penetrant or visual inspection shall be repaired and retested at the contractor’s expense.

3.2 Storage

Provide and deliver cribbing to be used for material storage at the destination. Material shall be stored out of contact with the ground in such manner and location as will minimize deterioration.

Stack piles during delivery and storage so that each pile is maintained in a straight position and is supported every 10 feet or less along its length (ends inclusive) to prevent exceeding the maximum camber or sweep.

Do not stack piles more than 5 feet high.

3.3 Product Delivery

Notify the Contracting Officer 7 days prior to delivery. Government will inspect and accept product at time of delivery.

Contractor is required to transport the material to the destination. If delivery is by truck, the government will offload and stack the material. If delivery is by barge, the contractor is required to offload and stack the material.

Deliver to the following location:

US Army Corps of Engineers – Terminal 2 3556 NW Front Ave Portland, OR 97209

Deliver finished product no later than 29 August 2019.