A.07.23_W9127N18R0012.pdf

PDF 6 MB Posted

Attached to
Bonneville Powerhouse 1 Control Room Fire Protection
Solicitation number
W9127N18R0012
Issued by

About this file

Solicitation

View the file

Other files

File Type Posted
A.07.24_W9127N18R00120002.pdf PDF
A.07.24_W9127N18R00120001.pdf PDF
Sign-In_Sheet.pdf PDF
ATTACHMENT_A-_OFFERORS_EXPERIENCE_FORM.docx DOCX document
Advertise_set_20180112.pdf PDF
ATTACHMENT_B-_PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSAL

W9127N18R0012

BONNEVILLE DAM

MULTNOMAH COUNTY, OREGON

BONNEVILLE POWERHOUSE I

CONTROL ROOM FIRE PROTECTION

PROJECT MANUAL

TOC-1

BONNEVILLE POWERHOUSE I CONTROL ROOM FIRE PROTECTION

MULTNOMAH COUNTY, OREGON

TABLE OF CONTENTS

00 10 00 SOLICITATION, OFFER, AND AWARD (SF 1442)

SF 30 INFORMATION ON AMENDMENT: NOT USED

00 10 00 SOLICITATION

00 21 00 INSTRUCTIONS

00 45 00 REPRESENTATION AND CERTIFICATIONS

00 72 00 GENERAL CONDITIONS

00 73 00 SUPPLEMENTARY CONDITIONS

GENERAL AND TECHNICAL SPECIFICATION REQUIREMENTS

ATTACHMENTS

A1: Submittal Register (ENG FORM 4288-R)

A2: Transmittal Form (ENG FORM 4025-R)

A3: Construction Project Identification Sign

A4: Spill Emergency - Initial Report Form

A5: Oregon Wage Rates

A6: BRZ Policy

A7: Bonneville Design Basis

PROJECT TITLE: Bonneville Pow erhouse 1 Control Room Fire Protection

LOCATION OF PERFORMANCE: Bonneville Pow erhouse 1, Cascade Locks, OR

MAGNITUDE OF CONSTRUCTION: Betw een $5,000,000 and $10,000,000

SOCIO-ECONOMIC: None

THOMAS J COHICK

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

23-Jan-2018

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________52.211-10 AltI

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________3 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________23 Feb 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

USACE PORTLAND DISTRICT

333 SW 1ST AVE

PORTLAND OR 97204-3440

W9127N

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

03:00 PM (hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W9127N18R0012 56

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

Section 00 10 00 - Solicitation

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job

Mobilization and Demobilization

FFP

a. Measurement: Measurement will be made as a job for mobilizing and demobilizing all plant, equipment, fuel, supplies, materials, and personnel to and from the job site. This Contract Line Item Number (CLIN) applies to the Prime Contractor and all subcontractor mobilization and demobilization.

b. Payment: Payment will be made at the Contract amount under CLIN 0001 at a rate of 60 percent for mobilization and 40 percent for demobilization as defined in Contract Clause 252.236-7004, PAYMENT FOR MOBILIZATION AND DEMOBILIZATION (Dec 1991). Submit a schedule of mobilization and demobilization costs prior to submitting the first request for payment.

FOB: Destination

SIGNAL CODE: A

NET AMT

00 10 00-3

0002 1 Job

Configuration of Fire Protection System

FFP

a. Measurement: Measurement will be made as a job providing all labor, plant, equipment, materials, and incidentals required for review, investigation, evaluation, design, preparation of the plans and specifications, performance of engineering during construction activities, and preparation of as-built drawings for the complete design of all components and areas defined in the scope of work for a proper operating system as specified in the contract drawings and specification section 28 31 64.00 25.

b. Payment: Payment will be made at the Contract amount under CLIN 0002.

FOB: Destination FOB: Destination

SIGNAL CODE: A

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0003 1 Job

Demolitions - Removals & Dust Protection

FFP

a. Measurement: Measurement will be made as a job providing all labor, plant, equipment, materials, and incidentals required to remove or demolish and dispose of existing control room walls and ceiling per the contract specifications and drawings. Work under this CLIN includes providing all labor, plant, equipment, materials, and incidentals required to procure, install, remove and dispose of a dust protection system in the control room meeting the contract drawings and specifications. The system will allow the Control Room operator to continue uninterrupted work while demolition and installation work on walls and doors is completed.

b. Payment: Payment will be made at the Contract amount under CLIN 0003.

FOB: Destination

SIGNAL CODE: A

00 10 00-4

0004 1 Job

Renovations and Roof Repairs

FFP

a. Measurement: Measurement will be made as a job providing all labor, plant, equipment, materials, and incidentals required to procure, and install the new 2-hr rated walls around the control room as designated on contract drawings, and any "betterments" added to the Contract. Work under this CLIN also includes providing all labor, plant, equipment, materials and incidentals required to remove or demolish and dispose of the roof where the new fan inlet is installed and designated in contract drawings.

b. Payment: Payment will be made at the Contract amount under CLIN 0004.

FOB: Destination FOB: Destination

SIGNAL CODE: A

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0005 1 Job

Mechanical

FFP

a. Measurement: Measurement will be made as a job providing all labor, plant, equipment, materials, and incidentals required to procure, and install or upgrade mechanical equipment including fans, control room pressurization fan and associated equipment, ductwork, and dampers per the Contract drawings.

b. Payment: Payment will be made at the Contract amount under CLIN 0005.

FOB: Destination FOB: Destination

SIGNAL CODE: A

00 10 00-5

0006 1 Job

Fire Protection - Firestopping

FFP

a. Measurement: Measurement will be made as a job providing all labor, plant, equipment, materials, and incidentals required to procure, and install 2-hr rated firestopping in all penetrations around the control room, including roof and floor, per the Contract drawings and specifications.

b. Payment: Payment will be made at the Contract amount under CLIN 0006.

FOB: Destination FOB: Destination

SIGNAL CODE: A

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0007 1 Job

Fire Protection- Devices

FFP

a. Measurement: Measurement will be made as a job providing all labor, plant, equipment, materials, and incidentals required to procure, and install the fire protection devices per the Contract drawings and specification section 28 31 64.00 25 and the design generated under CLIN 0002. Work includes detectors, interface modules, releasing devices, and dampers.

b. Payment: Payment will be made at the Contract amount under CLIN 0007.

FOB: Destination

SIGNAL CODE: A

00 10 00-6

0008 1 Job

Fire Protection - Detection System

FFP

Fire Protection - Panels and Air Sampling Detection System

a. Measurement: Measurement will be made as a job providing all labor, plant, equipment, materials, and incidentals required to procure, and install fire protection panels per the Contract drawings and specification section 28 31 64.00 25 and the design generated under CLIN 0002. Panels work includes fire alarm panels, fire status panels and all other panels installed per the design. Air Sampling Detection System work includes air sampling detectors, sensing tubes, mounting equipment, protective enclosures, power supplies, and all associated equipment.

b. Payment: Payment will be made at the Contract amount under CLIN 0008.

FOB: Destination FOB: Destination

SIGNAL CODE: A

00 10 00-7

0009 1 Job

Electrical

FFP

Electrical - Conduit and Wiring, Lighting, Fiber Optic Cable and Miscellaneous

a. Measurement: Measurement will be made as a job providing all labor, plant, equipment, materials, and incidentals required to procure, and install electrical conduit, wiring, electrical equipment, electrical equipment for lighting, and fiber optic cable designated in the Contract drawings and Division 26 specifications.

Conduit and wiring work SECTION 01 22 00.00 25 Page 4 Bonneville Control Room Fire Protection Upgrades includes all conduits, raceways and wiring.

Lighting work includes all emergency lighting units, control room lighting fixtures and all other lighting installed in stairwells. Fiber Optic Cable work includes installing new connectors on fiber optic terminations in powerhouse 1 and powerhouse 2. Miscellaneous work includes grounding wires and equipment, all small panels required for electrical distribution and all electrical equipment not covered under another CLIN.

b. Payment: Payment will be made at the Contract amount under CLIN 0009.

FOB: Destination

SIGNAL CODE: A

00 10 00-8

0010 1 Job

Start-Up, Training and Commissioning

FFP

a. Measurement: Measurement will be made as a job for providing all labor, plant, equipment, materials, and incidentals required to provide start-up, training and commissioning of the installed equipment per the Contract specifications. Start-up and commissioning work includes testing and balancing of HVAC equipment, electrical testing, and Fire Protection system operational testing. Provide training for Government employees in accordance with the Contract specifications.

b. Payment: Payment will be made at the Contract amount under CLIN 0010.

FOB: Destination FOB: Destination

SIGNAL CODE: A

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0011 1 Job

One Year System Maintenance

FFP

a. Measurement: Measurement will be made as a job providing all labor, plant, equipment, materials, and incidentals required to provide all maintenance of the installed fire protection system in accordance with codes and standards as well as the Contract specifications and approved operations and maintenance manuals.

b. Payment: Payment will be made at the Contract amount under CLIN 0011.

FOB: Destination FOB: Destination

SIGNAL CODE: A

00 10 00-9

Section 00 21 00 - Instructions

BIDDER INQUIRY INFORMATION

All inquiries regarding this solicitation are to be submitted via ProjNet-Bid. Telephone and email inquiries will not be accepted. ProjNet-Bid is a web-based program that allows offerors to post questions regarding the solicitation, and to view all questions by other offerors, and answers by the U.S. Army Corps of Engineers.

ProjNet-Bid can be accessed through the ProjNet website: https://www.projnet.org/projnet/.

To access the ProjNet-Bid website the first time:

1) Register.

2) Click Quick Add Key. (The Agency is USACE.)

3) Enter the following information for access:

The Bidder Inquiry Key: Q6EZ8H-WN8YD5

Valid business contact information (e.g. Company name, contact person, business address, phone number and email address). (required on first project only)

Establish secret question and answer which will be used as a password (required on first project only)

4) For subsequent access use your email address, the Bid Inquiry Key and response to the secret question to access the ProjNet-Bid Module 00100.

5) Submit questions or review questions and answers. (A bidder who submits a question will receive an automated email notification that their question has been received. When an answer is posted to a question, the question and answer is then available for all other bidders to review.

6) For a specific step-by-step for POSTING YOUR INQUIRIES, is available in the Reference link on the Contract Viewer.

7) For questions about the ProjNet-Bid, please contact the Call Center help desk. The contact information is listed on the ProjNet website.

No response will be posted to inquiries after the Close of Business on the seventh business day preceding the solicitation due date. All bidders will be held to have reviewed the questions and responses in ProjNet-Bid prior to bid submission. Nothing in the solicitation is changed unless an amendment is sent out.

INSTRUCTIONS TO OFFERORS

1. BASIS FOR AWARD

A. General.

(1) This solicitation is an unrestricted competitive acquisition using the Lowest Price Technically Acceptable (LPTA) source selection process for the award of a firm-fixed-price contract. Award will be made on the basis of the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-cost factors. This acquisition will utilize FAR Part 15 LPTA source selection procedures, leading to selection of the proposal representing the best value to the Government.

00 21 00-1

(2) In the context of this proposal, the “Offeror” refers to the proposed prime contractor. A major subcontractor is defined as a subcontractor that the offeror proposes to perform 25% or more of the work required under the solicitation.

(3) The Government intends to make an award without discussions, but reserves the right to conduct discussions should discussions prove to be necessary or advantageous to the Government. Because the Government does not intend to hold discussions, Offerors are encouraged to include their best pricing in their initial proposal.

(4) All proposals received will stand alone and be considered complete and final. The evaluation board will not consider any information or data incorporated by reference or otherwise referred to. The successful Offeror will be selected solely on the basis of the evaluation factors set forth below.

Accordingly, proposals submitted in response to this solicitation should provide clear, complete, concise, and straightforward responses to the evaluation factors. Elaborate proposals, color brochures, and other excesses are discouraged.

(5) Joint Ventures (JV). A joint venture is defined as a legal business entity formed between two or more companies (parties) to undertake the performance activities of a contract together. This does not include other arrangements such as “teaming agreements” or “strategic alliances,” which are not recognized as bona fide joint ventures for the purposes of this solicitation. An Offeror that is a joint venture will submit a copy of its legally binding joint venture agreement signed by an authorized officer from each of the firms comprising the joint venture with the chief executive of each entity identified. If submitting a proposal as a joint venture, the experience and past performance of each of the joint venture partners can be submitted for the joint venture entity. The experience for each joint venture partner will be considered the experience of the joint venture entity. Page and project form limits apply to the joint venture as a whole. Offerors that submit proposals may not change their firm (including Letters of Commitment (LOC) and proposed subcontractors) or their Joint Venture firms, if selected to submit Final Proposal Revisions (FPR).

(6) Subcontracting Plan (Large Businesses Only). Other-than-small business offerors (i.e., large businesses) must also submit a small business subcontracting plan meeting the requirements of FAR 52.219-9 and DFARS 252.219-7003 contained in Section 00 72 00, Contract Clauses. In accordance with FAR 19.702, if any apparently successful offeror fails to negotiate a subcontracting plan acceptable to the Contracting Officer within the time limit prescribed by the Contracting Officer, the offeror will be ineligible for award. See Volume II Tab 6 for more information

B. Evaluation Ratings.

(1) The principal objective of the evaluation process is to make award of a contract to the responsible Offeror whose proposal is determined to be the “best value” to the Government, price and other factors considered. The Government will evaluate each proposal for acceptability in accordance with FAR 15.101- 2, Lowest Price Technically Acceptable Source Selection Process. Award will be made on the basis of the lowest evaluated price of proposals meeting the acceptability standards of non-cost factors. Tradeoffs are not permitted. The failure of a proposal to meet any of the acceptability standards for non-cost factors will result in a technically unacceptable rating and thus preclude award.

(2) The non-price, non-past performance factors will be rated as “Acceptable” or “Unacceptable” using the ratings in Table 1.

Tab 1 – Factor 1: Experience

Tab 2 – Factor 2: Past Performance

Tab 3 – Factor 3: Schedule

00 21 00-2

Table 1. Technical Acceptable/Unacceptable Ratings

Rating Description

Acceptable Proposal clearly meets the minimum requirements of the solicitation.

Unacceptable Proposal does not clearly meet the minimum requirements of the solicitation.

(3) Past performance will be rated as “Acceptable” or “Unacceptable” using the ratings in Table 2.

Table 2. Past Performance Acceptable/Unacceptable Rating Method

Rating Description

Acceptable Based on the Offeror’s performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort, or the Offeror’s performance record is unknown. (See note below.)

Unacceptable Based on the Offeror’s performance record, the Government has no reasonable expectation that the Offeror will be able to successfully perform the required effort.

Note: In the case of an Offeror without a record of relevant past performance or for which information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a)(2)(iv)). Therefore, the Offeror will be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” will be considered “acceptable.”

2. SUBMISSION OF PROPOSALS

A. Administrative Details and General Instructions. Proposals are due no later than the time and date specified in Block 13 of Standard Form 1442.

(1) General Proposal Format. Submit each copy of the proposal in tabbed, 3-ring binders with a “D” ring or locking closures.

Title Page. Each copy must include the Offeror’s name and address, phone number, email address, title of the solicitation, solicitation number, and date of submittal clearly identified on the front cover of the binder.

Table of Contents. Each binder of the proposal will contain a detailed table of contents. The complete table of contents will be included in each binder.

Printed Matter Submissions. Pages containing text will be 8 ½ x 11 inches with at least one-inch margins at the top, bottom, and both sides. Paragraphs will be separated by at least one blank line. A standard 11-point font in either Arial or Times New Roman fonts is required.

Organization charts or schedules. A folded 11” x 17” format may be used. Larger format drawings or tables may be added by folding them to fit within the binder.

All information must be confined to the appropriate volume. If the materials do not fit within a single volume, they should be separated in additional binders, but clearly identified as such. Each volume of the proposal is expected to contain a table of contents, summary section with a brief abstract of the volume, and the narrative discussion.

00 21 00-3

THE OFFEROR WILL SUBMIT AN ELECTRONIC VERSION OF EACH PROPOSAL as one

(1) .pdf file. The electronic version will be on a readable CD. Any discrepancies between the electronic and paper copies will give precedence to the paper copy.

(2) Proposal Content Limitations.

The Offeror must confine the proposal to relevant information and documentation sufficient to provide an adequate basis for evaluation. Offerors are responsible for including sufficient details, in a concise manner, to permit a complete and accurate evaluation of the proposal.

The page count is at the discretion of the Offeror; however Volume I, Technical Proposal may not be more than thirty-five (35) pages total. The thirty-five (35) page limitation does NOT include past performance information submitted in Factor 2, Past Performance.

The evaluation panel for the Government will evaluate the non-price proposal factors on the basis of the information provided. Extraneous information provided in the proposals will not be considered in the evaluations; therefore, the Offeror should provide only information that satisfies the solicitation requirements. Merely restating the specifications without sufficient elaboration demonstrates a lack of understanding of the requirement.

DO NOT cross reference past performance information. It is acceptable to repeat data, project information, or experience in more than one non-price area as long as it satisfies the requirements of the factor.

Proprietary information must be clearly marked.

(3) English Language Requirement.

In order for a proposal to be considered, it MUST be prepared in ENGLISH.

B. Content of Proposals. All proposals must be prepared in two (2) volumes: a Technical Proposal (Volume I) and a Price Proposal (Volume II). Each of the volumes will be separate and complete in itself so that evaluation of one may be accomplished independently from evaluation of the other. Offerors that fail to submit a complete proposal may be excluded and thus receive no further consideration for award.

The successful offeror will be selected solely on the basis of the evaluation factors set forth below. Accordingly, proposals submitted in response to this solicitation should provide clear, complete, concise, and straightforward responses to the evaluation factors. The awardee’s Technical Proposal will be incorporated into the awarded contract.

(1) Technical Proposal, Volume I: Provide one (1) original and three (3) copies, and one (1) .pdf file on a CD-ROM. Volume I will consist of information for the three (3) factors listed in tabular form, as noted below. The Technical Proposal must not contain reference to price. The narrative and content structure of the proposal will follow the format shown for Volume I below.

Volume I – Technical (Non-Price) Factors

Tab 1 – Factor 1: Experience

Tab 2 – Factor 2: Past Performance

Tab 3 – Factor 3: Schedule

00 21 00-4

(2) Price Proposal, Volume II: Provide one (1) original and one (1) .pdf file on a CD-ROM. Provide pricing and complete all line items on Standard Form 1442 (SF 1442). The Price Proposal must be prepared in accordance with the following and must include:

Tab 1 - SF1442, Solicitation, Offer, and Award.

The SF1442 will be filled out completely by the Offeror and signed by an official that is authorized to bind the company. The Offeror will also acknowledge all amendments to the solicitation in accordance with the instructions on the Standard Form 30 or Block 19 of SF1442.

Tab 2 – Section 00010, Proposal Price / Bid Schedule.

The Offeror will fully complete this section.

Tab 3 - Representations, Certifications and Other Statements of Offerors.

The Offeror will complete all representations and certifications in Section 00600 and also ensure current registration and completed/updated Annual Representations and Certifications on the System for Award Management (SAM) website, www.sam.gov.

Tab 4 – Banking and Bonding Points of Contact.

The Government is required to determine a contractor’s responsibility. Accordingly, the Offeror will provide contact information (company name, point of contact, address, email, and phone number) for the Offeror’s bank and bonding institutions.

Tab 5 - Bid/Offer Guarantee. The Bid Bond will be at least 20% of the bid price, but will not exceed $3 million. See FAR Clause 52.228-1 – Bid Guarantee.

Tab 6 - Subcontracting Plan (Large Businesses Only). Other than U.S. small business offerors (i.e., large businesses) must also submit a small business subcontracting plan meeting the requirements of FAR 52.219-9 and DFARS 252.219-7003 contained in Section 00700, Contract Clauses. In accordance with FAR 19.702, if any apparently successful Offeror fails to negotiate a subcontracting plan acceptable to the Contracting Officer within the time limit prescribed by the Contracting Officer, the Offeror will be ineligible for award.

Annual Subcontracting Report. Large businesses shall provide a completed subcontracting plan and most recent annual subcontracting report.

C. Submission of Proposals. Proposals must arrive at the location designated in the solicitation for receipt of such proposals prior to the time and date established in Block 13, SF 1442. There will not be a public proposal opening.

BY HAND OR COURIER TO:

U. S. ARMY CORPS OF ENGINEERS, NWP

Block 300 (10th Floor USACE Security Desk) 333 SW First Avenue Portland, Oregon 97204 Attention: Thomas Cohick – CECT-NWP-C, W9127N18R0012

OR SURFACE MAIL ADDRESS:

U. S. ARMY CORPS OF ENGINEERS, NWP

P. O. Box 2946 Portland, OR 97208-2946 Attention: Thomas Cohick– CECT-NWP-C, W9127N18R0012

NOTE: EMAIL SUBMISSIONS WILL NOT BE CONSIDERED. If the electronic CD-ROM proposal differs from the hard copy, the hard copy will take precedence.

00 21 00-5 http://www.sam.gov/

MARK THE OUTSIDE ENVELOPE(S) AS FOLLOWS:

Envelope(s) will be plainly marked with the following information:

Solicitation No. W9127N18R0012 Proposal Due Date: ____________________________________ Number of each amendment that has been received: _________

3. EVALUATION FACTORS

Volume I – Technical Proposal Submission Requirements and Evaluation Method:

FACTOR 1 (TAB 1) – Experience

Submission Requirements:

Submit information for two (2) projects that best demonstrate the Offeror’s experience performing projects in the last ten (10) years that are similar in size, scope, and complexity to this project, as described in the solicitation specifications. Information submitted for each project must include the information outlined in Offeror’s Experience Form, Attachment A.

To be evaluated, each project must have been completed or must be substantially complete within ten (10) years of the date that proposals are due. Substantially complete is defined as being 75% complete by the date that proposals are due. If an Offeror submits a project that it represents is “substantially complete,” the Offeror must reasonably explain why the project is considered at least 75% complete. If an Offeror submits an ongoing project without providing an accompanying reasonable explanation that explains how the project is at least 75% complete, the Government reserves the right to reject the project.

Only two (2) projects will be evaluated. If an Offeror disregards these instructions and submits more than two projects, only the first two projects listed will be evaluated for meeting the requirements. Offeror’s should describe each project with enough detail to ensure that the Government can meaningfully assess whether the projects submitted meet the minimum evaluation criteria outlined below.

Instructions on the use of major subcontractors to fulfill more than 25% of the work:

Offeror’s may use the past experience of major subcontractors to demonstrate experience. If the offeror submits experience of major subcontractors, the offeror must submit a letter of commitment from the subcontractor on the letterhead of the firm to be subcontracted. The letter of commitment must be signed by an authorized individual from the subcontractor who is proposed to perform the work. If a letter of commitment is not submitted, the experience will not be considered.

Evaluation Method:

Experience will be rated on an “Acceptable” or “Unacceptable” basis:

Table 1. Technical Acceptable/Unacceptable Ratings Rating Description

Acceptable Proposal clearly meets the minimum requirements of the solicitation.

Unacceptable Proposal does not clearly meet the minimum requirements of the solicitation.

Acceptable: To be determined “Acceptable,” the Offeror’s proposal must demonstrate that the Offeror has completed or substantially completed the installation of two (2) fire alarm systems in the past ten (10) years. In addition, the installation of each fire alarm system must have:

• Required the Offeror to select the equipment manufacturer;

00 21 00-6

• Included a capacity of at least 100 addressable intelligent Signaling Line Circuit (SLC) Points;

• Included an interface with a smoke pressurization system; and

• Included aspirating smoke detection.

Unacceptable: The Offeror’s experience fails to meet the minimum acceptability criteria outlined above.

FACTOR 2 (TAB 2) – Past Performance

Submission Requirements:

Provide past performance information for each project submitted by the Offeror under Factor 1 – Experience:

• If a completed Contractor Performance Assessment Reporting System (CPARS) evaluation is available, the Offeror will submit it with the proposal.

• If there is not a completed CPARS evaluation, the Offeror will submit a Past Performance Questionnaire (PPQ) for the project. See Attachment B. Do not submit a PPQ when a completed CPARS is available.

o If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s).

o Offerors should follow up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact, Thomas Cohick, via email at thomas.j.cohick@usace.army.mil prior to proposal closing date. The offerors will instruct the clients to refer to the solicitation number (W9127N18R0012) in the subject line.

o PPQs are source selection materials. All successfully submitted PPQs will receive an email confirmation upon receipt. If the Offeror does not receive the confirmation, it is the Offeror’s responsibility to follow up to ensure the government has received the information.

Offerors will not incorporate by reference into their proposal PPQs or CPARS previously submitted for other procurements. However, this does not preclude the Government from utilizing previously submitted past performance information in the past performance evaluation.

Offerors may provide explanation on problems encountered on past projects and the corrective actions taken by the offeror.

In addition to the above, the Government may review other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the PPIRS, including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), FAPIIS, telephone interviews with organizations familiar with the offeror’s performance, Government personnel with personal knowledge of the offeror’s performance capability, and any other known sources not provided by the offeror.

While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.

00 21 00-7 mailto:thomas.j.cohick@usace.army.mil

Evaluation Method:

The past performance evaluation results is an assessment of the offeror’s probability of meeting the minimum past performance solicitation requirements. This assessment is based on the offeror’s record of relevant and recent past performance information that pertain to the project outlined in the solicitation requirements.

There are three aspects to the past performance evaluation: recency, relevancy, and quality.

The first aspect is to evaluate whether the Offeror’s past performance is recent, and relevant or not relevant to the solicitation requirements. For this solicitation, recent projects are those projects:

• Completed or substantially completed (as defined above) within ten years of the date that proposals are due.

The second aspect is to determine how relevant the Offeror’s past performance projects are to the solicitation requirements. For this solicitation, relevant projects are those projects that included the installation of a fire alarm system, and:

• Required the Offeror to select the equipment manufacturer;

• Included a capacity of at least 100 addressable intelligent Signaling Line Circuit (SLC) Points;

• Included an interface with a smoke pressurization system; and

• Included aspirating smoke detection.

The third aspect of the past performance evaluation is to determine how well the contractor performed on its past performance projects. The Government will evaluate the offeror’s past performance to ensure previous work performance satisfactorily met the contract requirements, performance schedules, prescribed quality of work, safety requirements, and other customer expectations on these projects.

The Government reserves the right to obtain or verify offeror’s past performance information from references and other sources available to the Government.

Based on a consideration of those three aspects, the Government will evaluate Factor 2 – Past Performance on an “acceptable” or “unacceptable” basis using the ratings stated in Table 2:

Table 2. Past Performance Acceptable/Unacceptable Rating Method

Rating Description

Acceptable Based on the Offeror’s performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort, or the Offeror’s performance record is unknown. (See note below.)

Unacceptable Based on the Offeror’s performance record, the Government has no reasonable expectation that the Offeror will be able to successfully perform the required effort.

Note: In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a)(2)(iv)). Therefore, the Offeror will be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” will be considered “acceptable.”

FACTOR 3 (TAB 3) – Schedule

Submission Requirements:

00 21 00-8

Submit a detailed schedule in Gantt chart format using Microsoft Office Project format (version 2013, 2016 or PDF), or Primavera P6 PDF printout. NOTE: All control room work must NOT be performed Mondays through Thursdays from 0630 to 1700 PST (see Section 01 10 10.00 25 Part 1.5).

The Gantt chart must include the following tasks (for all tasks, include task durations and relationships):

• Material procurement.

• Existing equipment removal and disposal/relocation.

• New equipment installation.

• New wall construction performed around the control room (include clock hours for work restrictions, as specified in specification section 01 10 10.00 25 Part 1.5)

• Testing and Commissioning.

• As-builts and Operational and Maintenance manuals.

Evaluation Method:

The Government will evaluate the Offeror’s schedule to assess the Offeror’s ability to execute the project within the time constraints established in the solicitation.

The Schedule will be rated on an “Acceptable” or “Unacceptable” basis:

Table 1. Technical Acceptable/Unacceptable Ratings Rating Description

Acceptable Proposal clearly meets the minimum requirements of the solicitation.

Unacceptable Proposal does not clearly meet the minimum requirements of the solicitation.

Acceptable: To be determined “Acceptable,” the Offeror’s schedule must:

• Be in Gantt chart format;

• Include all work activities outlined in the submission requirements above;

• Demonstrate the contractor can complete the work within the required timeframes described in the solicitation;

• Include realistic durations; and

• Be in a logical sequence.

Unacceptable: The Offeror’s schedule fails to meet the minimum acceptability criteria outlined above.

Volume II – Price Proposal Evaluation Method:

Award will be made on the basis of the lowest evaluated proposed price proposal (sum of all CLINs) meeting or exceeding the acceptability standards for non-cost factors.

The Price Proposal will be evaluated to determine fairness and reasonableness. For evaluation purposes, the total evaluated price will be calculated by adding the total price for all optional items to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the options.

The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.

00 21 00-9

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2016 52.204-22 Alternative Line Item Proposal JAN 2017 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 252.215-7008 Only One Offer OCT 2013

CLAUSES INCORPORATED BY FULL TEXT

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a firm-fixed price construaction contract resulting from this solicitation.

(End of provision)

52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY

2014)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of provision)

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

4.5% (Multnomah County) 6.9%

00 21 00-10

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is in the geographical area of the Bonneville Dam located in Multnomah County, OR.

(End of provision)

52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT--CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American --Construction Materials” (Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

00 21 00-11

(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested--

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

(End of provision)

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3M, whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

00 21 00-12

(End of provision)

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:

Contracting Officer Attn: CECT-NWP-C (Mitchell J. Johnson) P.O. Box 2946 Portland, OR 97208-2946

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(End of provision)

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An…

This is the start of the file's text. The full file is on GovTribe.