REQUEST FOR PROPOSAL

W9127N18R0006

JOHN DAY DAM

SHERMAN COUNTY, OREGON

JOHN DAY MAIN UNIT 6 GENERATOR REPAIR

PROJECT MANUAL

TOC-1

JOHN DAY MAIN UNIT 6 GENERATOR REPAIR

JOHN DAY DAM

SHERMAN COUNTY, OREGON

TABLE OF CONTENTS

00 10 00 SOLICITATION, OFFER, AND AWARD (SF 1442)

SF 30 INFORMATION ON AMENDMENT: NOT USED

00 10 00 SOLICITATION

00 21 00 INSTRUCTIONS

00 45 00 REPRESENTATION AND CERTIFICATIONS

00 72 00 GENERAL CONDITIONS

00 73 00 SUPPLEMENTARY CONDITIONS

GENERAL AND TECHNICAL SPECIFICATION REQUIREMENTS

ATTACHMENTS

A1: Submittal Register (ENG FORM 4288-R)

A2: Transmittal Form (ENG FORM 4025-R)

A3: Construction Project Identification Sign

A4: Spill Emergency - Initial Report Form

A5: Oregon Wage Rates

A6: Tolerance Sheets

PROJECT TITLE: John Day Main Unit 6 Generator Repair

LOCATION OF PERFORMANCE: John Day Lock and Dam, Sherman County, Oregon

MAGNITUDE OF CONSTRUCTION: Betw een $1,000,000 and $5,000,000

SOCIO-ECONOMIC: Unrestricted, Full and Open Competition

JOSHUA D FELLWOCK

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

31-May-2018

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10AltI

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________3 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________02 Jul 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

USACE PORTLAND DISTRICT

333 SW 1ST AVE

PORTLAND OR 97204-3440

W9127N

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

04:00 PM (hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W9127N18R0006 55

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

Section 00 10 00 - Solicitation

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job

Mobilization and Demobilization

FFP

Mobilization and Demobilization in accordance with the contract documents.

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Job

Furnish Winding Materials

FFP

Winding in accordance to the contract documents.

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0003 1 Job

Engineering Analysis

FFP

Perform Engineering Analysis in accordance with the contract documents.

FOB: Destination

NET AMT

00 10 00-3

0004 1 Job

Isolate Bars and Test Winding

FFP

Inspect Bars amd test the remainder of the Winding in accordance with the contract documents.

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Test GF Stator Bars

FFP

Test Government-Furnished Stator Bars in accordance with the contract documents.

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0005AA 30 Each

Test First 30 GF Stator Bars

FFP

Test government furnished Stator Bars in accordance with the contract documents.

00 10 00-4

0005AB 10 Each

Test Over 30 GF Stator Bars

FFP

Test over 30 Stator Bars in accordance with the contract documents. Note:

Quantity is estimated.

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0006 1 Job

Clean and Test Stator Winding

FFP

Clean and Test Stator Winding in accordance with the contract documents.

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Replace Stator Bars

FFP

Replace Stator Bars in accordance with the contract documents.

00 10 00-5

0007AA 30 Each

Replace First 30 Stator Bars

FFP

Replace First 30 Stator Bars in accordance with the contract documents. Note:

Quantity is estimated.

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0007AB 10 Each

Replace Over 30 Stator Bars

FFP

Replace Over 30 Stator Bars in accordance with the contract documents. Note:

Quantity is estimated.

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0008 1 Job

Stator Core Work

FFP

Inspect and Clean Stator Core in accordance with the contract documents.

00 10 00-6

0009 1 Job

Rotor Work

FFP

Inspect and Clean Rotor Parts and Test Field Winding in accordance with the contract documents.

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0010 1 Job

Partial Discharge Analyzer (PDA)

FFP

Furnish Partial Discharge Analyzer (PDA) Test Set in accordance with the contract documents.

00 10 00-7

0011 1 Job OPTION Refurbish One (1) Set of UGGB Shoes

FFP

Refurbish One (1) Set of Upper Generator Guide Bearing Shoes in accordance with the contract documents.

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0012 1 Job OPTION Refurbish One (1) Set of LGGB Shoes

FFP

Refurbish One (1) Set of Lower Generator Guide Bearing Shoes in accordance with the contract documents.

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0013 1 Job OPTION Refurbish One (1) Set of TB Shoes

FFP

Refurbish One Set (1) of Thrust Bearing Shoes in accordance with contract documents.

00 10 00-8

0014 1 Job OPTION Resurface Running Side of Thrust Runner

FFP

Resurface the Running Surface of the Thrust Runner in accordance with the contract documents.

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0015 1 Job OPTION Resurface Both Sides of Thrust Runner

FFP

Resurface Both Sides of the Thrust Runner in accordance with the contract documents.

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0016 1 Job OPTION Refurbish Thrust Runner

FFP

Refurbish Thrust Runner in accordance with the contract documents.

00 10 00-9

0017 1 Job OPTION Furnish Thrust Runner Keys

FFP

Furnish Thrust Runner Keys in accordance with the contract documents.

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0018 1 Job OPTION Furnish Thrust Runner Bolts

FFP

Furnish Thrust Runner Bolts in accordance with the contract documents.

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0019 1 Job OPTION Refurbish Thrust Bearing Collar

FFP

Refurbish Thrust Bearing Collar in accordance with the contract documents.

FOB: Destination

TOTAL PROPOSED PRICE

00 10 00-10

SUBTOTAL FOR MANDATORY LINE ITEMS $__________________

SUBTOTAL FOR OPTIONAL LINE ITEMS $ __________________

TOTAL PROPOSED PRICE FOR ALL LINE ITEMS $___________________

00 10 00-11

Section 00 21 00 - Instructions

BASIS FOR AWARD

1. BASIS FOR AWARD.

A. General.

(1) This solicitation is an unrestricted, full and open acquisition using Lowest Price Technically Acceptable (LPTA) source selection process for the award of a firm fixed-price contract. Award will be made on the basis of the lowest evaluated price of proposals meeting or exceeding the acceptable standards for non-cost factors. This acquisition will utilize FAR Part 15 LPTA source selection procedures, leading to selection of the proposal representing the best value to the Government.

(2) In the context of this proposal, the “Offeror” refers to the proposed prime contractor. A “major subcontractor” is defined as a subcontractor that the offeror proposes to perform 25% or more of the work required under the solicitation.

(3) Offerors shall submit a technical proposal, and a price proposal. The evaluation results of the non-price and price proposals will determine an awardee. In order to be considered awardable, the offeror’s proposal must receive an “acceptable” rating in every non-price factor.

(4) The Government intends to make an award without discussions, but reserves the right to conduct discussions should discussions prove to be necessary or advantageous to the Government. Because the Government does not intend to hold discussions Offerors are encouraged to include their best pricing in their initial proposal.

(5) All proposals received will stand alone and be considered complete and final. The evaluation board will not consider any information or data incorporated by reference or otherwise referred to. The successful offeror will be selected solely on the basis of the evaluation factors set forth below. Accordingly, proposals submitted in response to this solicitation should provide clear, complete, concise, and straightforward responses to the evaluation factors. Elaborate proposals, color brochures, and other excesses are discouraged.

2. SUBMISSION OF PROPOSALS AND EVALUATION.

A. Administrative Details and General Instructions. Proposals are due no later than the time and date specified in Block 13 of Standard Form 1442.

(1) General Proposal Format.

Submit each copy of the proposal in tabbed, 3-ring binders with a “D” ring or locking closures.

Title Page. Each copy must include the offeror’s name and address, phone number and email address, title of the solicitation, solicitation number and date of submittal clearly identified on the front cover of the binder.

Table of Contents. Each binder of the proposal shall contain a detailed table of contents. The complete table of contents shall be included in each binder.

Printed Matter Submissions. Pages containing text are expected to be 8 ½ x 11 inches with at least one-inch margins at the top, bottom, and both sides. Paragraphs should be separated by at least one blank line. A standard 11-point font in either Arial or Times New Roman is required.

00 21 00-1

Organization charts or schedules. A folded 11” x 17” format may be used. Larger format drawings or tables may be added by folding them to fit within the binder.

All information must be confined to the appropriate volume. If the materials do not fit within a single volume, they should be separated in additional binders, but clearly identified as such. Each volume of the proposal is expected to contain a table of contents, summary section with a brief abstract of the volume, and the narrative discussion.

THE OFFEROR SHALL SUBMIT AN ELECTRONIC VERSION OF EACH PROPOSAL. The electronic version shall be on a readable CD. Any discrepancies between the electronic and paper copies shall give precedence to the paper copy.

(2) Proposal Content Limitations.

The offeror must confine the proposal to relevant information and documentation sufficient to provide an adequate basis for evaluation. Offerors are responsible for including sufficient details, in a concise manner, to permit a complete and accurate evaluation of the proposal. The page count is at the discretion of the offeror; however the proposal may not be more than twenty-five (25) pages total. The twenty-five (25) page limitation does NOT include past performance information submitted in Factor 2, Past Performance.

The evaluation panel for the Government will evaluate the non-price proposal factors on the basis of the information provided. Extraneous information provided in the proposals will not be considered in the evaluations; therefore, the offeror should only provide information that satisfies the solicitation requirements. Merely restating the specifications without sufficient elaboration demonstrates a lack of understanding of the requirement.

DO NOT cross reference past performance information. It is acceptable to repeat data, project information or experience in more than one non-price area as long as it satisfies the requirements of the factor.

Proprietary information must be clearly marked.

(3) English Language Requirement.

In order for the proposal to be considered, it MUST be prepared in ENGLISH.

B. Content of Proposals.

All proposals must be prepared in two volumes: a technical proposal (Volume I), a price proposal (Volume II).

Each of the volumes shall be separate and complete in itself so that evaluation of one may be accomplished independently from evaluation of the other. Offerors who fail to submit a complete proposal may be excluded and thus receive no further consideration for award.

(1) Technical Proposal, Volume I: Provide one (1) original and three (3) copies and one (1) pdf. file on a CD-ROM. Volume I shall consist of information for the two (2) factors, listed in tabular form, as noted below. The technical proposal (Volume I) must not contain reference to price. The narrative and content structure of the proposal shall follow the format shown under Volume I below.

Volume I – Technical (Non-Price) Factors and Sub-factors:

Tab 1 – Factor 1 – Experience

Tab 2 – Factor 2 – Past Performance

00 21 00-2

(2) Price Proposal, Volume II: Provide one (1) original and one (1) pdf. file on a CD-ROM. Provide pricing and complete all line items on Standard Form 1442 (SF 1442). The Price Proposal must be prepared in accordance with the following and must include:

Tab 1 – SF1442, Solicitation, Offer, and Award.

The SF1442 shall be filled out completely by the offeror and signed by an official that is authorized to bind the company. The offeror shall also acknowledge all amendments to the solicitation in accordance with the instructions on the Standard Form 30 or Block 19 of SF1442.

Tab 2 – Section 00 10 00, Solicitation.

The offeror shall fully complete this section.

Tab 3 – Representations, Certifications and other Statements of Offerors.

The offeror shall complete all representations and certifications in Section 00 45 00 and also ensure current registration and completed/updated Annual Representations and Certifications on the System for Award Management (SAM) website, www.sam.gov.

Tab 4 – Banking and Bonding Points of Contact.

The Government is required to determine Contractor’s responsibility. Accordingly, the offeror shall provide contact information (company name, point of contact, address, email address, and phone number) for the offeror’s bank and bonding institutions.

Tab 5 – Bid/Offer Guarantee.

The Bid Bond shall be at least 20% of the bid price, but shall not exceed $3 million. See FAR Provision 52.228-1 Bid Guarantee.

Tab 6 – Subcontracting Plan (Large Businesses Only). Other than U.S. small business offerors (i.e., large businesses) must also submit a small business subcontracting plan meeting the requirements of FAR 52.219-9 and DFARS 252.219-7003 contained in Section 00 72 00, General Conditions. In accordance with FAR 19.702, if any apparently successful Offeror fails to negotiate a subcontracting plan acceptable to the Contracting Officer within the time limit prescribed by the Contracting Officer, the Offeror will be ineligible for award.

Annual Subcontracting Report. Large businesses shall provide a completed subcontracting plan and most recent annual subcontracting report.

A model subcontracting plan is included as an attachment to this solicitation. For information on the evaluation of subcontracting plans, see Army Federal Acquisition Regulation Supplement (AFARS), Appendix DD.

C. Submission of Proposals.

Proposals must arrive at the location designated in the solicitation for receipt of such proposals prior to the time and date established in Block 13, SF 1442. There will not be a public proposal opening.

BY HAND OR COURIER TO:

U. S. ARMY CORPS OF ENGINEERS, NWP

Block 300 (10th Floor USACE Security Desk) 333 SW. First Avenue Portland, Oregon 97204 Attention: Joshua D. Fellwock – CECT-NWP-C

OR SURFACE MAIL ADDRESS:

U. S. ARMY CORPS OF ENGINEERS, NWP

P. O. Box 2946

00 21 00-3 http://www.sam.gov/

Portland, OR 97208-2946 Attention: Joshua D. Fellwock – CECT-NWP-C

NOTE: E-MAIL SUBMISSIONS WILL NOT BE CONSIDERED. If the electronic CD-ROM proposal differs from the hard copy, the hard copy will take precedence.

THE OFFEROR SHALL MARK THE OUTSIDE ENVELOPE(S) AS FOLLOWS:

Envelope(s) shall be plainly marked with the following information:

Solicitation No. W9127N18R0006 Proposal Due Date:

Number of each amendment that has been received:

3. EVALUATION FACTORS.

Volume I – Technical (Non-Price) Submission Requirements and Evaluation Method:

FACTOR 1 (TAB 1) – Experience

Submission Requirements:

The offeror shall submit information on at least two (2) and no more than four (4) projects that demonstrate the offeror’s experience performing work similar in size, scope, and complexity to the work required by this solicitation. Information submitted for each project must include the information outlined in Attachment A6, Offeror’s Experience Form.

To be evaluated, each project must have been completed or must be substantially complete within 15 years of the date that proposals are due. Substantially complete is defined as being 75% complete by the date that proposals are due. If an offeror submits a project that it represents as “substantially complete,” the offeror must reasonably explain why the project is considered at least 75% complete. If an offeror submits an ongoing project without providing an accompanying reasonable explanation that explains how the project is at least 75% complete, the Government reserves the right to reject the project.

A maximum of four (4) projects will be evaluated. If an offeror disregards these instructions and submits more than four projects, only the first four projects will be evaluated.

NOTE: It is up to the offeror to demonstrate in its proposal that it meets the minimum evaluation criteria outlined below. Therefore, offerors must describe each project with enough detail to ensure that the Government can meaningfully assess whether the projects submitted meet the minimum evaluation criteria outlined below.

Instructions on the use of major subcontractors to demonstrate experience: Offerors may use the past experience of major subcontractors to demonstrate experience. If the offeror submits experience of a major subcontractor, the offeror must submit a letter of commitment from the subcontractor on the letterhead of the firm to be subcontracted. The letter of commitment must be signed by an authorized individual from the subcontractor that is proposed to perform the work. If a letter of commitment is not submitted, the experience will not be considered.

The Government may consider past experience information regarding predecessor companies and key personnel who have relevant experience.

Evaluation Method:

Experience will be rated on an “Acceptable” or “Unacceptable” basis:

00 21 00-4

Table 1. Technical Acceptable/Unacceptable Ratings Rating Description

Acceptable Proposal clearly meets the minimum requirements of the solicitation.

Unacceptable Proposal does not clearly meet the minimum requirements of the solicitation.

Acceptable: To be determined “Acceptable,” the Offeror’s proposal must demonstrate that the Offeror (or its committed subcontractor) has performed projects meeting the following criteria:

• Two separate projects involving:

o Diagnosis of a stator fault on hydrogenerator units with a capacity of 50 MW or greater;

AND

• Two separate projects involving:

o Repair on hydrogenerator units with a capacity of 50 MW or greater consisting of:

Removal of the failed stator bars;

Installation of new stator bars; and Testing of the entire winding.

Unacceptable: The Offeror’s experience fails to meet the minimum acceptability criteria outlined above.

FACTOR 2 (TAB 2) – Past Performance

Submission Requirements:

The Offeror shall provide past performance information for each project listed by the Offeror under Factor 1 – Experience:

• If a completed Contractor Performance Assessment Reporting System (CPARS) evaluation is available, the offeror shall submit it with the proposal.

• If there is not a completed CPARS evaluation, the offeror shall submit a Past Performance Questionnaire (PPQ) for the project. See Attachment A7. Do not submit a PPQ when a completed CPARS is available.

o If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror shall complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s).

o Offerors should follow up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact, Mr. Joshua D. Fellwock, via email at Joshua.D.Fellwock@usace.army.mil prior to proposal closing date. The offerors shall instruct the clients to refer to the solicitation number (W9127N18R0006) in the subject line.

o PPQs are source selection materials. All successfully submitted PPQs will receive an email confirmation upon receipt. If the offeror does not receive the confirmation, it is the offeror’s responsibility to follow up to ensure the government has received the information.

Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other procurements. However, this does not preclude the Government from utilizing previously submitted past performance information in the past performance evaluation.

Offerors may provide explanation on problems encountered on past projects and the corrective actions taken by the offeror.

00 21 00-5 mailto:Joshua.D.Fellwock@usace.army.mil

In addition to the above, the Government may review other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the PPIRS, including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), FAPIIS, telephone interviews with organizations familiar with the offeror’s performance, Government personnel with personal knowledge of the offeror’s performance capability, and any other known sources not provided by the offeror.

While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.

Evaluation Method:

The past performance evaluation results is an assessment of the offeror’s probability of successful performance of the solicitation requirements. This assessment is based on the offeror’s record of recent and relevant past performance of projects that pertain to the project outlined in the solicitation requirements.

There are three aspects to the past performance evaluation: recency, relevancy, and quality.

The first aspect is to evaluate the recency of the Offeror’s past performance projects. For this solicitation, recent projects are those projects completed or substantially completed (as defined above) within fifteen

(15) years of the date that proposals are due.

The second aspect is to determine how relevant the Offeror’s past performance projects are to the solicitation requirements. For this solicitation, relevant projects are those that meet the requirements for acceptability under Factor 1. For example, if a submitted project demonstrates the diagnosis of a stator fault on hydrogenerator units with a capacity of 50 MW or greater, it would be considered relevant.

The third aspect of the past performance evaluation is to determine how well the contractor performed on its past performance projects. The Government will evaluate the offeror’s past performance to ensure previous work performance satisfactorily met the contract requirements, performance schedules, prescribed quality of work, safety requirements, and other customer expectations on these projects.

Based on a consideration of those three aspects, the Government will evaluate Factor 2 – Past Performance on an “Acceptable” or “Unacceptable” basis:

Table 2. Past Performance Acceptable/Unacceptable Rating Method

Rating Description

Acceptable Based on the Offeror’s performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort, or the Offeror’s performance record is unknown. (See note below.)

Unacceptable Based on the Offeror’s performance record, the Government has no reasonable expectation that the Offeror will be able to successfully perform the required effort.

Note: In the case of an Offeror without a record of relevant past performance or for which information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a)(2)(iv)). Therefore, the Offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable.”

Volume II – Price Proposal Evaluation Method:

00 21 00-6

Award will be made on the basis of the lowest evaluated price (sum of all CLINs) of proposals meeting or exceeding the acceptability standards for non-cost factors.

The Price Proposal will be evaluated to determine fairness and reasonableness. For evaluation purposes, the total evaluated price will be calculated by adding the total price for all optional items to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the options.

The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.

BIDDER INQUIRIES

(All inquiries regarding this solicitation are to be submitted via ProjNet-Bid. Telephone and email inquiries will not be accepted. ProjNet-Bid is a web-based program that allows offerors to post questions regarding the solicitation, and to view all questions by other offerors, and answers by the U.S. Army Corps of Engineers.

ProjNet-Bid can be accessed through the ProjNet website: https://www.projnet.org/projnet/.

To access the ProjNet-Bid website the first time:

1) Register.

2) Click Quick Add Key. (The Agency is USACE.)

3) Enter the following information for access:

The Bidder Inquiry Key: TIUMND-V7954A

Valid business contact information (e.g. Company name, contact person, business address, phone number and email address). (required on first project only)

Establish secret question and answer which will be used as a password (required on first project only)

4) For subsequent access use your email address, the Bid Inquiry Key and response to the secret question to access the ProjNet-Bid Module 00100.

5) Submit questions or review questions and answers. (A bidder who submits a question will receive an automated email notification that their question has been received. When an answer is posted to a question, the question and answer is then available for all other bidders to review.

6) For a specific step-by-step for POSTING YOUR INQUIRIES, is available in the Reference link on the Contract Viewer.

7) For questions about the ProjNet-Bid, please contact the Call Center help desk. The contact information is listed on the ProjNet website.

No response will be posted to inquiries after the Close of Business on the 7th business day preceding the solicitation due date. All bidders will be held to have reviewed the questions and responses in ProjNet-Bid prior to bid submission.

00 21 00-7 https://www.projnet.org/projnet/

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2016 52.204-22 Alternative Line Item Proposal JAN 2017 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 52.217-5 Evaluation Of Options JUL 1990 252.215-7008 Only One Offer OCT 2013

CLAUSES INCORPORATED BY FULL TEXT

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a firm-fixed-price construction contract resulting from this solicitation.

(End of provision)

52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY

2014)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of provision)

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority Goals for female

00 21 00-8 participation for each trade participation for each trade

Sherman County 3.8% Sherman County 6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is John Day Lock and Dam located in Sherman County, Oregon.

(End of provision)

52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT--CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American --Construction Materials” (Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a

00 21 00-9 determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested--

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

(End of provision)

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be at least 20 percent of the bid price but shall not exceed $3 million.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

00 21 00-10

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of provision)

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:

U.S. ARMY CORPS OF ENGINEERS, PORTLAND DISTRICT

ATTN: CECT-NWP-C (David Boone) P.O. Box 2946 Portland, Oregon 97208-2946

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(End of provision)

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for Tuesday, June 12, 2018 at 10:00 AM to 2:00 PM.

(c) Participants will meet at:

John Day Lock and Dam, 4th Floor Conference Room I-84 Exit 109 Rufus, OR 97050

(d) Due to security requirements at the powerhouse, you must RSVP by close of business 7 June 2018 in order to attend the site visit. The following information should be submitted to Joshua D. Fellwock, Contract Specialist at Joshua.D.Fellwock@usace.army.mil and Patrick W. Tormala at Patrick.W.Tormala@usace.army.mil

Name of person attending site visit;

Company Name;

Phone Number;

E-mail Address;

Date of Birth;

Place of Birth; and U.S. Citizen? (Y / N)

Personally Identifiable Information will be very closely held in accordance with Army policy.

(e) Hard hats and Photo ID will be required. Please observe posted speed limits while on project.

00 21 00-11 mailto:Patrick.W.Tormala@usace.army.mil

(f) Interested offerors shall submit photocopies of the Passport and Permanent Resident Card of all Contractor employees who are foreign born and have non-US citizen status. These photocopies shall be submitted at least thirty (30) calendar days in advance of the scheduled site visit to the USACE Security Office. This allows the USACE Security Office sufficient time to run a security check on these affected personnel. The Contractor personnel who fit the above description of non-citizenship shall not be permitted access to the Project until the Foreign Visitor Authorization is received. The Foreign Visitor Authorization for contractor personnel who are non- US citizens may require up to ninety (90) days for some countries. This will NOT warrant an extension to the proposal due date or to the site visit date. The contractor is expected to provide appropriate representation at the site visit.

(End of provision)

52.236-28 PREPARATION OF PROPOSALS--CONSTRUCTION (OCT 1997)

(a) Proposals must be (1) submitted on the forms furnished by the Government or on copies of those forms, and (2) manually signed. The person signing a proposal must initial each erasure or change appearing on any proposal form.

(b) The proposal form may require offerors to submit proposed prices for one or more items on various bases, including--

(1) Lump sum price;

(2) Alternate prices;

(3) Units of construction; or

(4) Any combination of paragraphs (b)(1) through (b)(3) of this provision.

(c) If the solicitation requires submission of a proposal on all items, failure to do so may result in the proposal being rejected without further consideration. If a proposal on all items is not required, offerors should insert the words “no proposal” in the space provided for any item on which no price is submitted.

(d) Alternate proposals will not be considered unless this solicitation authorizes their submission.

(End of provision)

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

Federal Acquisition Regulation: http://farsite.hill.af.mil/vffara.htm

Defense Federal Acquisition Regulation Supplement: http://farsite.hill.af.mil/vfdfara.htm

00 21 00-12 http://farsite.hill.af.mil/vffara.htm http://farsite.hill.af.mil/vfdfara.htm

(End of provision)

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any DFARS (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

(End of provision)

UAI 5152.211-9000 EVALUATION OF SUBDIVIDED ITEMS (MAR 1995)

Item No. 0005 & 0007 are subdivided into two or more estimated quantities and are to be separately priced. The Government will evaluate each of these items on the basis of total price of its sub-items.

00 21 00-13

Section 00 45 00 - Representations and Certifications

REPS AND CERTS

A. CORPORATE CERTIFICATE/AUTHORITY TO BIND PARTNERSHIP

If the proposal is submitted by a corporation, the Corporate Certificate below must be submitted. If the proposal is submitted by a partnership, the Authority to Bind Partnership below must be completed and a copy of the partnership agreement included with the proposal. If the proposal is submitted by a Joint Venture, the Corporate Certificate below must be completed by each member of the Joint Venture and a copy of the Joint Venture Agreement showing the percentage of ownership of each firm included with the proposal.

CORPORATE CERTIFICATE

I, , certify that I am the (Title) of the corporation named as Proposer/Contractor herein; that

, who signed this proposal/contract on behalf of the Proposer/Contractor was then (Title) of said corporation; that said proposal/contract was duly signed for and on behalf of said corporation by authority of its governing body and within the scope of its corporate powers.

(Corporate Seal) (Signature)

AUTHORITY TO BIND

PARTNERSHIP

This is to certify that the names and signatures of all partners are listed below and that the person signing the proposal had authority to actually bind the partnership pursuant to its partnership agreement. Each of the partners individually has full authority to enter into and execute contractual instruments on behalf of said partnership, with the United States of America except as follows: (State "none" or describe limitations, if any).

This authority shall remain in full force and effect until such time as the revocation of authority by any cause whatsoever has been furnished in writing to and acknowledged by the Contracting Officer.

Names and signatures of all partners:

(End of Certification)

52.204-16 Commercial and Government Entity Code Reporting JUL 2016

00 45 00-1

52.204-19 Incorporation by Reference of Representations and Certifications.

DEC 2014

252.203-7005 Representation Relating to Compensation of Former DoD Officials

NOV 2011

252.204-7008 Compliance With Safeguarding Covered Defense Information Controls

OCT 2016

CLAUSES INCORPORATED BY FULL TEXT

52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2017)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 237990.

(2) The small business size standard is $36,500,000.

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in System for Award Management (SAM), and has completed the Representations and Certifications section of SAM electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:

( ) Paragraph (d) applies.

( ) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.

(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements--Representation. This provision applies to all solicitations.

00 45 00-2

(iv) 52.204-3, Taxpayer Identification.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.