Attachment_1_PRS.pdf

PDF 30 KB Posted

Attached to
History of Dredge Upland Placement Sites
Solicitation number
W9127N-17-Q-0060
Issued by

About this file

Attachment 1 Performance Requirements Summary

View the file

Other files

File Type Posted
QA2.pdf PDF
Amendment_1.pdf PDF
Q&A_1.pdf PDF
Attachment_2_Deliverables_Schedule.pdf PDF
Technical_Exhibit_3_Placement_Sites.docx DOCX document
Technical_Exhibit_2_Data_Dictionary.xlsx XLSX spreadsheet
Technical_Exhibit_1_Map.pdf PDF
Solicitation_W9127N-17-Q-0060.pdf PDF
Attachment_3_QASP.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

History of Dredge Upland Placement Sites and an examination of in-water resources of the Columbia River from river mile 3-106.5

ATTACHMENT 1

PERFORMANCE REQUIREMENTS SUMMARY

Performance Objective Standard Performance Threshold Method of Surveillance Incentive / Remedy

PRS #1 PWS paragraph 5.1 Submit a work plan and QCP with the required details within 10 calendar days after receipt of award.

Submitted within 10 calendar days after receipt of award.

100% Inspection Contract discrepancy report will be issued for non-performance, which will require the contractor to submit a corrective action plan. Uncorrected or reoccurring discrepancies may lead to a Termination for Cause.

PRS #2 PWS paragraph 5.2 Schedule kick-off meeting within 10 days of contract award, and attend meeting.

Scheduled within 10 days of contract award.

Direct Observation Contract discrepancy report will be issued for non-performance, which will require the contractor to submit a corrective action plan. Uncorrected or reoccurring discrepancies may lead to a Termination for Cause.

PRS #3 PWS paragraph 5.3.1 Draft GIS data submitted in accordance with PWS paragraph 5.3.1 within 120 days from date of contract award.

100% 100% Inspection Contract discrepancy report will be issued for non-performance, which will require the contractor to submit a corrective action plan. Uncorrected or reoccurring discrepancies may lead to a Termination for Cause.

PRS #4 PWS paragraph 5.3.2 Initial draft report submitted in accordance with PWS paragraph 5.3.2 within 120 days from date of contract award.

100% 100% Inspection Contract discrepancy report will be issued for non-performance, which will require the contractor to submit a corrective action plan. Uncorrected or reoccurring discrepancies may lead to a Termination for Cause.

PRS #5 PWS paragraph 5.3.3 Government comments incorporated in secondary draft and submitted within 180 days from date of contract award.

100% 100% Inspection Contract discrepancy report will be issued for non-performance, which will require the contractor to submit a corrective action plan. Uncorrected or reoccurring discrepancies may lead to a Termination for Cause.

History of Dredge Upland Placement Sites and an examination of in-water resources of the Columbia River from river mile 3-106.5

Performance Objective Standard Performance Threshold Method of Surveillance Incentive / Remedy

PRS #6 PWS paragraph 5.4.1 Final GIS data submitted in accordance with PWS paragraph 5.4.1 within 200 days from date of contract award.

100% 100% Inspection Contract discrepancy report will be issued for non-performance, which will require the contractor to submit a corrective action plan. Uncorrected or reoccurring discrepancies may lead to a Termination for Cause.

PRS #7 PWS paragraph 5.4.2 Acceptance of Final Report from DAHP and SHPO within 230 days from date of contract award.

100% 100% Inspection Contract discrepancy report will be issued for non-performance, which will require the contractor to submit a corrective action plan. Uncorrected or reoccurring discrepancies may lead to a Termination for Cause.

File details come from the government source that posted it. Updated .