Attachment 1 Performance Requirements Summary
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QA2.pdf | ||
| Amendment_1.pdf | ||
| Q&A_1.pdf | ||
| Attachment_2_Deliverables_Schedule.pdf | ||
| Technical_Exhibit_3_Placement_Sites.docx | DOCX document | |
| Technical_Exhibit_2_Data_Dictionary.xlsx | XLSX spreadsheet | |
| Technical_Exhibit_1_Map.pdf | ||
| Solicitation_W9127N-17-Q-0060.pdf | ||
| Attachment_3_QASP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
History of Dredge Upland Placement Sites and an examination of in-water resources of the Columbia River from river mile 3-106.5
ATTACHMENT 1
PERFORMANCE REQUIREMENTS SUMMARY
Performance Objective Standard Performance Threshold Method of Surveillance Incentive / Remedy
PRS #1 PWS paragraph 5.1 Submit a work plan and QCP with the required details within 10 calendar days after receipt of award.
Submitted within 10 calendar days after receipt of award.
100% Inspection Contract discrepancy report will be issued for non-performance, which will require the contractor to submit a corrective action plan. Uncorrected or reoccurring discrepancies may lead to a Termination for Cause.
PRS #2 PWS paragraph 5.2 Schedule kick-off meeting within 10 days of contract award, and attend meeting.
Scheduled within 10 days of contract award.
Direct Observation Contract discrepancy report will be issued for non-performance, which will require the contractor to submit a corrective action plan. Uncorrected or reoccurring discrepancies may lead to a Termination for Cause.
PRS #3 PWS paragraph 5.3.1 Draft GIS data submitted in accordance with PWS paragraph 5.3.1 within 120 days from date of contract award.
100% 100% Inspection Contract discrepancy report will be issued for non-performance, which will require the contractor to submit a corrective action plan. Uncorrected or reoccurring discrepancies may lead to a Termination for Cause.
PRS #4 PWS paragraph 5.3.2 Initial draft report submitted in accordance with PWS paragraph 5.3.2 within 120 days from date of contract award.
100% 100% Inspection Contract discrepancy report will be issued for non-performance, which will require the contractor to submit a corrective action plan. Uncorrected or reoccurring discrepancies may lead to a Termination for Cause.
PRS #5 PWS paragraph 5.3.3 Government comments incorporated in secondary draft and submitted within 180 days from date of contract award.
100% 100% Inspection Contract discrepancy report will be issued for non-performance, which will require the contractor to submit a corrective action plan. Uncorrected or reoccurring discrepancies may lead to a Termination for Cause.
History of Dredge Upland Placement Sites and an examination of in-water resources of the Columbia River from river mile 3-106.5
Performance Objective Standard Performance Threshold Method of Surveillance Incentive / Remedy
PRS #6 PWS paragraph 5.4.1 Final GIS data submitted in accordance with PWS paragraph 5.4.1 within 200 days from date of contract award.
100% 100% Inspection Contract discrepancy report will be issued for non-performance, which will require the contractor to submit a corrective action plan. Uncorrected or reoccurring discrepancies may lead to a Termination for Cause.
PRS #7 PWS paragraph 5.4.2 Acceptance of Final Report from DAHP and SHPO within 230 days from date of contract award.
100% 100% Inspection Contract discrepancy report will be issued for non-performance, which will require the contractor to submit a corrective action plan. Uncorrected or reoccurring discrepancies may lead to a Termination for Cause.
File details come from the government source that posted it. Updated .