W9127N-16-R-0075-0001.pdf
PDF 130 KB Posted
- Attached to
- History of the Portland District - 2000 to 2015
- Solicitation number
- W9127N-16-R-0075
About this file
Amendment 0001 Change to submission requirements evaluation criteria and clauses
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers__1.pdf | ||
| W9127N-16-R-0075.pdf | ||
| Past_Performance_Questionnaire.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W9127N-16-R-0075 is amended in the Key Personnel requirements, evaluation and clause sections. Please see red verbiage in the Instructions, Conditions and Notices to Offerors and Evaluation Factors for Aw ard; Factor 3, Element 1 (Tab 3). Offerors shall submit w ith their proposal, a copy of this Amendment (page one only) w ith boxes 15 completed and signed.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 14
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-Aug-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N-16-R-0075
X 9B. DATED (SEE ITEM 11)
31-Jul-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
09-Aug-2016
CODE
USACE PORTLAND DISTRICT
333 SW 1ST AVE
PORTLAND OR 97204-3440
W9127N 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9127N-16-R-0075
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been added by reference:
252.204-7004 Alt A System for Award Management Alternate A FEB 2014 252.222-7007 Representation Regarding Combating Trafficking in Persons JAN 2015
The following have been modified:
EVALUATION FACTORS FOR AWARD
EVALUATION FACTORS FOR AWARD
1. INITIAL REVIEW OF PROPOSALS
Proposals will be reviewed for general conformance with the solicitation requirements. Proposals that do not generally conform to the solicitation requirements may be considered to have a deficiency; i.e. a deficiency that cannot be remedied by exchanges and/or permitted proposal revisions. If a proposal is suspected of having a deficiency, it will be brought to the immediate attention of the Source Selection Authority (SSA). If the SSA determines that there is a deficiency, the proposal will not be evaluated further and will be eliminated from further consideration. The affected offeror shall be promptly notified of the decision.
2. SOURCE SELECTION
All proposals conforming to the solicitation requirements will be evaluated in accordance with the requirements of outlined in the Instructions, Conditions and Notices to Offerors section of this solicitation. The principal objective of the evaluation process is to make award of a contract to the responsible offeror whose proposal is determined to be the “best value” to the Government, price and other factors considered. Source selection will be conducted in accordance with FAR 15.101-1 -- Tradeoff Process -- (a) A tradeoff process is appropriate when it may be in the best interest of the Government to consider award to other than the lowest priced offeror or other than the highest technically rated offeror.
3. EVALUATION FACTORS
The following table reflects the proposal format and relative importance of areas that the SSEB will thoroughly review and evaluate.
TECHNICAL FACTORS RELATIVE IMPORTANCE_______
Volume 1 – Technical Proposal; All technical factors are equal in importance. When combined, Factors 1-3 are significantly more important than Factor 4.
Factor 1– Recent Relevant Experience (Tab 1) Equal to Factors 2 and 3.
Factor 2 – Past Performance (Tab 2) Equal to Factors 1 and 3.
Factor 3 – Qualifications Equal to Factors 1 and 2
Element 1 - Key Personnel (Tab 3)
Element 2 - Writing Skills (Tab 4)
Volume 2 – Price Proposal; All evaluation factors, other than price, when combined, are considered to be more important than price.
Factor 4 – Price Proposal
Element 1 – SF1449 and Amendments (Tab 5) Reviewed for completion
Element 2 – Price Schedule (Tab 6) Evaluated for price reasonableness Less important than combined Factors 1-3 Element 3 – Representations and Certifications (Tab 7) Reviewed for completion
3.1 Technical Ratings – Factors 1 and 3
Technical merit, which reflects the Government’s confidence in each offeror’s ability, as demonstrated in its proposal, to perform the requirements stated in the solicitation, will be evaluated based on the following:
3.2 Past Performance Ratings - Factor 2
These ratings assess the risks associated with each offeror’s likelihood of success in performing requirements stated in the solicitation based on the offeror’s demonstrated performance on recent contracts.
Offerors that have no relevant performance record will be given a neutral rating for these factors. There will be both a relevancy and confidence assessment assigned to each past performance rating.
Past Performance Relevancy Ratings
RATING DESCRIPTION
Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Outstanding Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses.
Risk of unsuccessful performance is very low.
Good
Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low.
Acceptable
Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate.
Marginal
Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by the strengths. Risk of unsuccessful performance is high.
Unacceptable
Proposal does not meet the requirements and contains one or more deficiencies. Proposal is unacceptable and unawardable.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Present/past performance effort involved some of the scope and magnitude Relevant of effort and complexities this solicitation requires.
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
Performance Confidence Assessments
Substantial Confidence
Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence
Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Limited Confidence Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.
Unknown Confidence (Neutral)
No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.
3.3 The price portion of the proposal will be subjectively evaluated allowing for a “trade-off” analysis of the proposal as a whole using a trade-off process. Pricing will be analyzed for price reasonableness and unbalanced pricing. All evaluation factors other than cost or price, when combined, are significantly more important than cost or price.
3.4 Overall, evaluators shall assess the proposal’s acceptability to the requirements of the solicitation. If a technical factor/element is not addressed, it may be rated as a deficiency.
3.5 Important Note: The evaluation board will not consider any information or data incorporated by reference or otherwise referred to.
3.6 Definitions
Deficiency. A material failure of a proposal to meet a Government requirement or a combination of weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. See FAR 15.001.
Strength. An aspect of an offeror’s proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.
Weakness. A flaw in the proposal that increases the risk of unsuccessful contract performance. See
FAR 15.001.
4. EVALUATION OF PROPOSALS
The Government will evaluate the proposal submitted in accordance with the Source Selection Plan. The Government will use the following evaluation criteria which were established in the Source Selection Plan.
1.1 Volume 1 - Factor 1 - TAB 1: Recent Relevant Experience
Evaluation is based upon experience demonstrated. More favorable ratings may be assigned for more recent projects or projects with a more comparable technical scope. Less recent and substantially different projects may not achieve the highest rating possible. Only project examples where the offeror was the prime contractor or subcontractor with a large percentage (over 25%) of the work will be evaluated.
A proposal will be rated more favorably if it contains all the Project Information as outlined in section 5, Detail of Content Requirements, found in the Instructions, Conditions and Notices to Offerors portion of this solicitation.
Each offeror shall select a minimum of two projects and a maximum of five successfully completed (or substantially completed) within the past three years that are the same or similar in scope and complexity to this project, and that affirmatively demonstrate the offeror’s and/or major subcontractor’s specialized training, expertise, and ability. Recent or Relevant Experience is defined as experience that is on-going or has occurred within the past three years with preparation of a historical scholarly manuscript similar to the work outlined in the Performance Work Statement. Similar work include research and historical documentation.
Higher ratings will be assigned to offerors who have a greater number of similar projects with increased complexity and/or are larger in scope or complexity. Higher ratings will be given for experience demonstrating expertise in history as it relates to the Unites States government, governmental/Congressional processes, the Pacific Northwest and/or the U.S. Army Corps of Engineers.
1.2 Volume 1 - Factor 2 - TAB 2: Past Performance (Refer to Attachment I) The Government seeks a contractor who maintains a strong commitment to customer satisfaction and superior performance. It is the offeror’s responsibility to affirmatively document these qualities in his technical proposal. In doing so, be mindful that “past performance” and “past experience” are not identical.
Past experience measures what you have done and how many times, or for how long, you have done it.
Past performance, however, measures how well you have performed.
In order to receive a Performance Confidence Assessment rating of 'Satisfactory Confidence,' an offeror must have at least two and no more than five past performance questionnaires with a level of at least 'satisfactory' for the offeror and the primary proposed subcontractor.
Past performance of proposed major subcontractors indicating high levels of customer satisfaction; or completing in advance of original contract schedule; or finding innovative ways to cut costs, or increase value to the customer, may receive a better rating.
Past performance which is recent or similar in size and scope to this project may be considered to be more advantageous to the Government and may receive more credit than older projects, or projects dissimilar to the work required here. A good offeror would demonstrate consistent success in terms of timeliness of performance (include record of meeting milestones and delivery schedules), business relations and teaming, customer satisfaction, and quality of work.
For Business Relations and Teaming, include record of effective management, subcontractor management, meeting socio-economic goals, problem resolution, cooperative and proactive approach with customers, flexibility, submission of reasonably priced change proposals, responsiveness to inquiries, and would prior customers choose to do business with the offeror again.
Teaming Partners: The Government recognizes that completion of a project is often a team effort. Thus, offerors are encouraged to submit past performance information for major subcontractors to help demonstrate that the team they select to perform this project has an acceptable record of past performance.
Indeed, the Government may rate a proposal less favorably where the Government is unable to evaluate the past performance record of major subcontractors.
Other Sources: In addition to information provided in the technical proposal, the Government may consider other sources of past performance information including, but not limited to, Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), references and personal knowledge. These other ources may include telephone interviews with organizations familiar with the offeror’s performance, Government personnel with personal knowledge of the offeror’s performance capability, and any other sources of past performance information. The Government reserves the right to conduct a pre-award survey. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.
In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available, the offeror may not be evaluated favorably or unfavorably on past performance.
Offerors should submit performance appraisals, evaluations, letters of recommendation, or any other information that the offeror believes will affirmatively demonstrate its commitment to customer satisfaction and superior performance. The Government will consider information submitted by the offeror, as well as any other source (including information from government personnel and CPARS). The offeror shall provide the Past Performance Questionnaire (PPQ) found in Attachment I for each project.
Attachment I - Solicitation Submittal Requirement: The standard Past Performance Questionnaire (PPQ) for USACE is Form PPQ-0 (9/30/11). It is provided as Attachment I for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor 2, Past Performance. Ensure correct phone numbers and email addresses are provided for the client point of contact.
(1) Completed PPQs should be submitted with your proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ (Attachment I), which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires.
(2) Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other solicitations. However, this does not preclude USACE from utilizing previously submitted PPQ information in the past performance evaluation. Also include performance recognition documents received within the last three (3) years such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition.
(3) In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the PPIRS, including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), FAPIIS, Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.
(4) While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the offeror.
The proposal will be rated for past performance of the prime contractor. All past performance elements will be rated on the basis of returned Past Performance Questionnaires from previous customers and any
CCASS ratings already in the system. Greater levels of customer satisfaction in the following sub-factors will receive a better rating.
1.3 Volume 1 - Factor 3, Element 1 - TAB 3: Key Personnel
Offerors shall demonstrate that they possess the required personnel in the proper configuration. Resumes that demonstrate more experience relevant to the performance specifications in this solicitation will receive better ratings. This experience shall include demonstrated skills and abilities in applying sound research methodology and analysis that shall be rated on the basis of research experience, and publications. Higher ratings may be given resumes that demonstrate experience based on field of study and expertise in history and more favorably as it relates to the Unites States Government, governmental/Congressional processes, the Pacific Northwest and/or the U.S. Army Corps of Engineers. Higher ratings will be given if the
Historian holds a PH.D.
This Element will be rated based on the experience and qualifications of the offeror’s key personnel who will be performing under the terms of the contract.
Prime contractor personnel. Proposals that include resumes for all key personnel listed under Factor 1 and Factor 2, as outlined in section 5, Detail of Content Requirements, found in the Instructions, Conditions and Notices to Offerors section of this solicitation, may be rated more favorably than those that do not.
Resumes that clearly indicate experience with projects that are similar in scope and complexity to the work required in this solicitation, that indicate an individual has experience in the same role as proposed for this project (for example, the proposed Historical Researcher has been assigned as the Historical Researcher on previous contracts), and/or relevant personnel qualifications may receive more favorable ratings.
Major Subcontractors. The offeror shall demonstrate the expertise of its subcontractors. The Government will more highly rate offers that demonstrate that their subcontractors have expertise completing projects that are similar in technical scope and complexity as compared to the project that is required in this solicitation. Higher ratings may be given to subcontractors who have been in business for a minimum of 5 years or more, and/or have had a past business relationships with the prime contractor.
1.4 Volume 1 - Factor 3, Element 2 - TAB 4: Writing Skills
Offer’s shall demonstrate professional writing skills through submission of examples of historical publications completed; including articles, reviews, books, edited collections, special studies, and staff projects. This requirement is met with submission of two examples. Proposals including more than two examples may be rated more favorably. Examples relating to the Unites States government, governmental/Congressional processes, the Pacific Northwest and/or the U.S. Army Corps of Engineers may be rated more favorably.
1.5 Volume 2 - Factor 4 - TABs 5-7: Price Proposal
For this solicitation, the non-price factors, when combined, are significantly more important than price. The Price Proposal will be evaluated to determine reasonableness. Price will be evaluated based on the total for all line items. Evaluation of price may also include price realism analysis, if such analysis is determined necessary. If determined necessary, price realism will be evaluated on the basis of whether pricing information reflects a clear understanding of the costs and risks associated with the project. Ordinarily, this will include a comparison of the proposed price with the Government Estimate and other proposed prices.
It may also include verification of an offeror’s price, and exchanges with the offeror to determine whether it has an acceptable understanding of the difficulties that may be encountered in performing the contract.
The results of a price realism analysis may impact the evaluation of non-cost factors and the resulting award decision.
4.6.1 Volume 2 – Factor 4, Element 1 - Tab 5: SF1449 and Amendments
The SF1449 shall be filled out completely by the offeror and signed by an official that is authorized to bind the company. The offeror shall also acknowledge all amendments to the solicitation and fill-in the clauses listed in section 6, Detailed Content Requirements for Volume 2: Price Proposal, found in the Instructions, Conditions and Notices to Offerors within this solicitation. This Element is not rated, but is evaluated for completion. Unsigned offers may be considered deficient.
4.6.2 Volume 2 – Factor 4, Element 2 - Tab 6: Price Schedule
The solicitation provides that cost/price will be evaluated as significantly less than the combined importance of the other evaluation factors. Cost realism will be evaluated on the basis of whether pricing information reflects a clear understanding of the costs and risks associated with the project.
Ordinarily, this will include a comparison of the proposed price with the Government Estimate and other proposed prices.
It may also include verification of an offeror’s price and exchanges with the offeror to determine whether it has an acceptable understanding of the difficulties that may be encountered in performing the contract.
The information provided by the offeror will be subjectively evaluated based on the total for all line items to determine the overall best value to the Government.
4.6.3 Volume 2 – Factor 4, Element 3 - Tab 7: Representations and Certifications The offeror shall complete all representations and certifications found in clause 52.204-8, Annual Representations and Certifications and submit them with the proposal. Further, in order to be eligible for award, the offeror is required to be registered with the System for Award Management (SAM) website found at https://www.sam.gov/. The representations and certifications from clause 52.204-8 shall mirror the Annual Representations and Certifications from the SAM website.
2. IMPORTANCE OF VOLUMES
The evaluation process uses adjectival scoring for each volume except for Volume II containing the cost/price information of the proposals. The cost and pricing information found in Volume II will be subjectively evaluated. The relative importance of Volume I is significantly more important than the relative importance of Volume II. Note: All evaluation factors, other than cost or price, when combined, are significantly more important than cost or price.
3. PROPOSAL REVISIONS
At the conclusion of discussions, if required, each offeror still in the competitive range shall be given an opportunity to submit a Final Proposal Revision. These proposal revisions shall be received, in writing, at a time and place established by the Contracting Officer.
4. AWARD OF CONTRACT
4.1 The Government will evaluate proposals and may award without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions.
4.2 The Government intends to award one (1) Firm Fixed-Price Service contract to the responsible offeror whose proposal conforms to the criteria established in this solicitation and the Source Selection Plan, and is considered most advantageous to the Government, price and other factors considered. Contract completion is nine (18) months from date of award with interim due dates as described in the Performance Work Statement and assuming no options are awarded.
INSTRUCTIONS-CONDITIONS-NOTICE
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
5. INTRODUCTION
Your Small Business firm is invited to submit a proposal in response to Solicitation Number W9127N-16-R- 0075 for the project entitled “History of the Portland District – 2000 to 2015.” The Government intends to procure this requirement on a competitive basis in accordance with the provisions set forth in FAR Part 15, Contracting by Negotiation, and within this solicitation. Award will be a Firm-Fixed-Price commercial item service contract to the offeror who provides the best value to the Government.
The offeror’s proposal shall be submitted in digital format as set forth below. The solicitation shall provide the date and time for proposal submittal.
The offeror’s proposal shall consist of two (2) volumes. The Volumes are I – Technical Proposal and II – Price Proposal. Include a separate Excel file with the costs submitted in the Price Proposal. The use of hyperlinks in proposals is prohibited.
Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal. Proprietary information shall be clearly marked. Offerors must be registered to do business with the Government in the System for Award Management (SAM) website found at https://www.sam.gov/ . This is a small business set-aside and only small business offers will be accepted.
6. SITE VISIT
A site visit is not scheduled for this action.
7. SUBMITTING QUESTIONS
Questions shall be submitted to Sue Jones at sue.jones@usace.army.mil. No phone calls accepted. Questions and answers will be published to FedBizOps for all interested parties to see.
8. GENERAL PROPOSAL REQUIREMENTS
A. Electronic Proposal Submittal Requirements
1. File format The electronic proposal shall be Portable Document Format, filename extension: “.pdf” and suitable for viewing in Adobe Reader. Include one Excel document of the Price Proposal costs in either “.xls or .xlsx” format.
2. Number of files
The proposal contents shall be presented in two separate “.pdf” files; one for the Technical Proposal and one for the Price Proposal. In addition, one “.xls or .xlsx” file
3. Method of submission
Electronic Mail: Proposals that contain two “.pdf” files and one “.xls or .xlsx” that total less than 10 MB, shall be submitted via email to Ms. Sue Jones at sue.jones@usace.army.mil. The USACE e-mail system does not accept files greater than 10MB. Do not send two separate emails, both .pdf files shall fit on one email. It is the offeror’s responsibility to confirm receipt of e-mail submitted electronic proposal copies.
B. Organization and Quantity of Volumes
The following volumes of material shall be submitted:
1. Volume 1: Technical Proposal 1 electronic (defined in paragraph A of this Section)
2. Volume 2: Price Proposal
3. Proposal Pricing on an Excel spreadsheet
C. Content – General
The submission shall be clearly indexed and logically assembled. Proposals must set forth full, accurate, and complete information as required by this solicitation. Absence of information will be deemed as if no support for that criterion was provided. Offerors submitting proposals should limit submission to data essential for evaluation of proposals so that a minimum of time and money is expended in preparing information required by the solicitation. Penalty for making false statements in proposals is prescribed in 18 U.S.C. 1001.
Contents of your proposal shall include:
1. Table of Contents A Table of Contents should be incorporated within Volume 1 and Volume 2.
2. Paper size
Proposals are to be on 8 ½ x 11-inch paper, to the maximum extent practicable. Drawings shall be 11x17-inch paper, folded to the same dimensions as the 8 ½ x 11-inch paper. Elaborate artwork, expensive paper and bindings, and expensive/ extensive visual and other presentation aids are not necessary. Each proposal should address the requests for information in the order identified in Section J.
3. Tabs Contents of binders shall be tabbed and labeled to afford easy identification from the proposal Table of Contents. Tabs shall extend beyond the edge of the 8 ½ x 11-inch paper. Tabs are further defined in paragraph J of this Section.
4. Page Numbering
All pages of each volume shall be appropriately numbered and identified by the complete company name, date and solicitation number in the header and/or footer.
5. Page Limits
Each section of the proposal shall not exceed 50 pages.
6. Signatures Original signature from the offeror’s responsible party is required in box 15 of the SF30 submitted with the Price Proposal.
D. Bookmarks
Electronic proposals shall be bookmarked. Bookmark titles shall match the tab numbering and labels and the volume table of contents. Additional bookmarks may be provided, but shall be nested under the appropriate tab bookmark.
E. Hyperlinks Hyperlinks in the electronic copy are not permitted. This includes hyperlinks within document, such as Figure or Table references to the page containing that content, and hyperlinks to websites.
F. Attachments Attachments to the electronic copy are not permitted.
G. Tabs Tabs shall match the following numbering and title, and shall be reflected in the table of contents. Additional tabs are allowed, but not necessary. Additional tabs shall be alpha characters.
REQUIRED TABS FOR VOLUME 1: TECHNICAL PROPOSAL
Table of Contents
Factor 1 – Tab 1: Recent Relevant Experience
Factor 2 - Tab 2: Past Performance
Factor 3 – Qualifications
Element 1 - Tab 3: Key Personnel
Element 2 - Tab 4: Writing Skills
REQUIRED TABS FOR VOLUME 2: PRICE PROPOSAL
Table of Contents
Factor 4 – Price Proposal
Element 1 – Tab 5: SF1449 and Amendments
Element 2 - Tab 6: Price Schedule
Element 3 – Tab 7: Representations and Certifications
5. DETAILED CONTENT REQUIREMENTS FOR VOLUME 1: TECHNICAL
PROPOSAL
Offerors shall submit the information noted below for each tab. This is a minimum requirement. If an offeror fails to provide a piece of information, there shall be a written explanation for its omission: e.g. – for Tab 01 – an offeror without recent relevant experience preparing a scholarly manuscript should note that rather than leaving the section blank. Offeror must be self-performing at least 51% of the work.
Factor 1 - TAB 1: Recent Relevant Experience
Offeror shall submit project information that demonstrates recent or current relevant technical experience with the preparation of a scholarly manuscript in the past 3 years. Recent or relevant experience is defined as experience that is on-going or has occurred within the past 3 years with the preparation of a scholarly manuscript. The information provided in this factor shall reflect whether contractors have performed similar work before, not to be confused with Factor 2 - Tab 2: Past Performance, where the evaluation is based how well contractors performed. At a minimum, the contractor shall submit the following “Project Information” shown below, as well as any additional information deemed necessary, in order to be considered responsive. A minimum of two experiences and a maximum of five experiences shall be submitted. A new business shall submit a list of former projects within similar scope that demonstrates you or your key employees’ recent and relevant experiences and capabilities.
Each project submitted shall include the following content:
1. Contract number and offeror’s and/or major subcontractor’s specific role in the project.
2. Project name and location.
3. Name of customer, agency, or firm.
4. Point of contact (POC) information for the customer, agency, or firm, including name, title, email, and telephone number.
5. Scope of project; including but not limited to a description of the work, end product and number of manuscript pages.
6. Date of project start and completion or anticipated date of completion.
7. Key personnel participating in each project; including, but not limited to, the contractor’s Historical
Researcher and Technical Writer. Key personnel information should include, but not be limited to:
a. Name.
b. Role in contract.
c. Years of experience.
d. Education and/or other relevant qualifications.
e. Current professional registration, if applicable.
Factor 2 - TAB 2: Past Performance
The Government seeks a contractor who maintains a strong commitment to customer satisfaction and superior performance. It is the offeror’s responsibility to affirmatively document these qualities in his technical proposal. In doing so, be mindful that “past performance” and “past experience” are not identical. Past experience measures what you have done and how many times, or for how long you have done it. Past performance, however, measures how well you have performed. Each offeror shall submit past performance information by using the Past Performance Questionnaire (PPQ) found in Attachment I. At a minimum, submit a PPQ for at least two projects and a maximum of five projects successfully completed (or substantially completed) within the last three (3) years that affirmatively demonstrate the offeror’s and major subcontractor’s past performance on projects similar in scope of this project. Each project submitted shall include the following content:
1. Contract number and Offeror’s and/or major subcontractor’s specific role in the project.
2. Project name and location.
3. Name of customer, agency, or firm.
4. Point of contact (POC) information for the customer, agency, or firm, including name, title, email, and telephone number.
5. Scope of project (designed, built, and installed new major features, rebuilt select components, etc.); focus on fabrication aspects of the project.
6. Date of completion or anticipated date of completion.
Factor 3, Element 1 - TAB 3: Key Personnel
Offeror shall provide the qualifications and experience of the offeror’s key personnel of the project team that demonstrate the capabilities of the offeror. The majority of the research and writing for this project shall be completed, at a minimum, by a historian with and overseen by a PH.D. That same historian PH.D will closely supervise research and writing performed by others. Proposal shall address the percentage of work to be performed by the historian, the PH.D and other employees assigned to this project. Successful demonstration should include, at a minimum:
1. Resume of Historical Researcher (historian); including a list of projects performed that are similar in scope and complexity to the requirements in this solicitation.
2. Resume of Technical Writer PH.D.; including a list of projects performed that are similar in scope and complexity to the requirements in this solicitation.
Major Subcontractors: Offeror shall provide resumes of major subcontractors, which include a description of the company, services to be provided by the subcontractor, the number of years the subcontractor has been in business, and the number of contracts that the subcontractor has held with the prime contractor.
Factor 3, Element 2 - TAB 4: Writing Skills
All interested offerors shall demonstrate writing skills by including the number and quality of historical publications comp1eted; including articles, reviews, books, edited collections, special studies, and staff projects.
Offerors shall include a minimum of two and a maximum of five writing samples, each a maximum of four pages and may have a preceding cover/data sheet, for each sample submitted.
6. DETAILED CONTENT REQUIREMENTS FOR VOLUME 2: PRICE PROPOSAL
Volume 2 – Price Proposal
Factor 4, Element 1 - Tab 5: SF1449 and Amendments
This tab will not be rated, but will be evaluated for responsiveness. The SF1449, and any amendments, shall be filled out completely by the offeror and signed by an official that is authorized to bind the company. Submission shall include:
The first page of the SF1449 with boxes 30 completed and signed by an authorized company official;
The first page of the amendment, if applicable, with boxes 15 completed and signed; and The following clauses that are presented in full text within the solicitation and filled in by the offeror:
52.204-17 Ownership of Control of Offeror (NOV 2014) 52.204-20 Predecessor of Offeror (APR 2016) 52.209-2 Prohibition on Contracting with Inverted Domestic Corporations—Representation (NOV
2015) 52.212-3 Offeror Representations and Certifications—Commercial Items (APR 2016)
If your information is already in the System for Award Management at SAM – https://www.sam.gov, it may be submitted instead of completing the clause.
52.219-1 Small Business Program Representations (OCT 2014)
Factor 5, Element 2 - Tab 6: Price Schedule The solicitation provides that cost/price will be evaluated as significantly less important than the combined importance of the other evaluation factors. The criteria used to evaluate cost/price include cost realism. Cost realism will be evaluated on the basis of whether pricing information reflects a clear understanding of the costs and risks associated with the project. Ordinarily, this will include a comparison of the proposed price with the Government Estimate and other proposed prices.
It may also include verification of an offeror’s price and exchanges with the offeror to determine whether it has an acceptable understanding of the difficulties that may be encountered in performing the contract. The information provided by the offeror will be subjectively evaluated based on the total for all line items to determine the overall best value to the Government.
The Price Schedule shall provide a detail of all costs. Detail shall include labor categories, labor rates, hours, overhead, profit, travel, materials and other direct costs. In addition to the “.pdf” version of these costs in the Price Proposal, an Excel spreadsheet containing these costs shall be submitted to assist in analysis of price. In the case a discrepancy exists between the two documents, the “.pdf” version will precedence over the Excel version.
Factor 5, Element 3 - Tab 7: Representations and Certifications
This tab will not be rated, but will be evaluated for responsiveness and completeness. The offeror shall complete the required Annual Representations and Certifications through the System for Award Management (SAM) at http://www.sam.gov/ and include a copy as proof of completion.
7. SUBMISSION INSTRUCTIONS
Proposals must arrive at the location designated in the solicitation for receipt of such proposals prior to the time and date established in Block 8 of the SF1449. There will not be a public proposal opening. In order for the proposal to be considered, it MUST be prepared in ENGLISH, and must be submitted via email (Volume 1 and 2 and the Excel spreadsheet). Send to Sue Jones at sue.jones@usace.army.mil.
FILL THE EMAIL SUBJECT LINE AS FOLLOWS: Solicitation W9127N-16-R-0075
The Government is not responsible for problems arising from electronic systems or equipment failures. Proposals must be received no later than 2:00PM Pacific Standard Time.
The following have been deleted:
52.202-1 Definitions NOV 2013 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-7 Anti-Kickback Procedures MAY 2014 52.203-17 Contractor Employee Whistleblower Rights and Requirement
To Inform Employees of Whistleblower Rights
APR 2014
52.204-19 Incorporation by Reference of Representations and Certifications.
DEC 2014
(End of Summary of Changes)
File details come from the government source that posted it. Updated .