AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Foster Bridge Crane Rehabilitation & Rerating, Linn County, Oregon
1. This Amendment is issued to modify the evaluation criteria for Factor 1 - Experience. Please see continuation page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Dec-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N-16-R-0022
X 9B. DATED (SEE ITEM 11)
23-Nov-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Dec-2015
CODE
US ARMY CORPS OF ENGINEERS - CECT-NWP
333 SW FIRST AVE
PORTLAND OR 97204-3495
W9127N 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9127N-16-R-0022
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SECTION 00100 - BIDDING SCHEDULE / INSTRUCTIONS TO BIDDERS
AMENDMENT 0002
FACTOR 1 – EXPERIENCE
SUBMISSION REQUIREMENTS:
Offerors shall submit project information on a maximum of five (5) recent and relevant projects that best demonstrate the offeror’s experience on projects that require the construction/rehabilitation of a bridge crane or a gantry crane and the uprating of a bridge crane or a gantry crane. Projects must have been completed or substantially completed** within ten (10) years from the date of the RFP. Projects submitted should emphasize the offeror’s experience on the following major features of work required by the RFP:
Construction/rehabilitation of a bridge crane or a gantry crane of at least thirty-five
(35) tons, particularly those projects where a crane was rerated to a higher load rating;
Mechanical work to a crane including designing main hoists, auxiliary hoists, and bridge and trolley drive systems, installing/removing new hoists, and installing/removing components of the bridge and trolley drive systems;
Structural work to a crane including designing new operator cabs, designing structural retrofits, and installing/removing new ladders, walkways, handrails;
Electrical work to a crane including designing new control systems, and installing/removing electrical wiring, conduit, panels, instruments, switches, lights.
**Substantially completed is defined as having completed more than 50% of the project work at the time of proposal submission.
Offerors shall submit past project information using the Offeror’s Experience Form (Attachment A6) included at the end of this section. Offerors may use continuation sheets to the Experience Form if necessary.
EVALUATION PROCEDURES:
Proposals will be evaluated to determine the extent of the offeror’s experience performing work that is relevant to the work required by this RFP. The Government intends to assign the greatest weight to individual projects completed in the last ten (10) years that include 1) construction/rehabilitation of a bridge crane or a gantry crane of at least thirty-five (35) tons,
2) mechanical work including designing main hoists, auxiliary hoists, and bridge and trolley drive systems, installing/removing new hoists, and installing/removing components of the bridge and trolley drive systems, 3) structural work including designing new operator cabs, designing structural retrofits, and installing/removing new ladders, walkways, handrails, 4) electrical work including designing new control systems, and installing/removing electrical wiring, conduit, panels, instruments, switches, lights.
W9127N-16-R-0022
For projects that don’t meet all the criteria above, the Government will evaluate the projects that demonstrate experience in the following areas (in descending order of importance):
Construction/rehabilitation of a bridge crane or a gantry crane of at least thirty-five
(35) tons;
Mechanical work to a crane including designing main hoists, auxiliary hoists, and bridge and trolley drive systems, installing/removing new hoists, and installing/removing components of the bridge and trolley drive systems;
Structural work to a crane including designing new operator cabs, designing structural retrofits, and installing/removing new ladders, walkways, handrails;
Electrical work to a crane including designing new control systems, and installing/removing electrical wiring, conduit, panels, instruments, switches, lights.
Projects older than ten (10) years will be evaluated, but will not be as highly rated.
Projects that involved a bridge crane will be given greater weight.
Projects that were completed in a hydroelectric powerhouse will be given greater weight.
Projects that involved cranes rated at fifty (50) tons or higher will be given greater weight.