H.01.04_Technical_Specification_Package.pdf
PDF 3 MB Posted
- Solicitation number
- W9127N-16-Q-0052
About this file
H.01.04 Technical Specification Package
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A.07.23_Solicitation.pdf | ||
| A.04.36_Service_Contract_Act_Wage_Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
Attachment 8 Map Showing Option 2 Previously Recorded Sites
Attachment 9
Previously Recorded Cultural Resources within Survey Areas
Elk Creek Fuels Reduction Site Type Description NRHP Status
35JA27a-c Habitation Site Lithics, housepits Eligible 35JA28 Lithic Scatter Chert flakes nodules, tool Eligible
Elk Creek Option 1 – Riparian Restoration
35JA100 Village Site House Pits, Archaeological District Eligible 35JA106 Lithic Scatter Heavily disturbed site due to dam construction Unevaluated 35JA113 Lithic Scatter Eroded site Unevaluated 35JA234 Village Site House pits Unevaluated 35JA11 Village Site Heavily vandalized village site; Eligible 35JA28 Base Camp Lithic Scatter Unevaluated
Elk Creek Option 2 – Boundary Fence
35JA102 Multi component Lithics, groundstone, multi component Eligible 35JA221 Lithic Scatter Lithic, Scrappers, Possible House Pits Unevaluated
Attachment 2 References
Minor, Rick 2011 Historic Properties Management Plan for the U.S. Army Corps of Engineers Elk Creek Project, Jackson County, Oregon. Heritage Research Associates, Inc., Report No. 354
Attachment 10
GIS DATA
USACE Portland District will provide a blank geodatabase and the data dictionary for use on the project.
Any questions concerning GPS or GIS should be directed to Vanessa van der Borg, (503-808-4684), Vanessa.vanderBorg@usace.army.mil.
ATTACHMENT 1: QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
The KTR will be evaluated periodically during performance of this Contract to ensure compliance with the proposed and accepted performance goals, regulations, and guidance. This evaluation will be performed according to the QASP. The KTR shall review the proposed QASP and propose any desired revisions with the proposal. The QASP will be used by the Government to evaluate the KTR’s performance. Failure to adequately complete any service or submittal to at least a satisfactory level of quality or timeliness may result in repeat of work, a poor performance evaluation, or both.
QUALITY ASSURANCE SURVEILLANCE PLAN FOR CONTRACT NO. W9127N-16-R-0021.
Deliverable of Service
Requirement Measurement / Metric Surveillance Method Frequency
Procedures to be taken when performance standards not met
Pre-Field Activities Compliance with requirements to include timeliness, accuracy, quality, consistency, and functionality
Submittal Review
Draft Submittal Final Submittal
a. Contractor revision of submittal at own expense;
b. Poor performance evaluation
Field Survey Compliance with requirements to
25% fieldwork inspection
Monthly Contract Update Reports
Report Compliance with requirements to
Draft Submittal Final Submittal
CONTRACT MANAGEMENT
Work Plan Timeliness, accuracy, quality, consistency, functionality
Draft and Final a. Contractor revision of submittal;
Quality Control Plan Timeliness, accuracy, quality, Minutes of all significant conversations and meetings
Timeliness, accuracy, quality, CONTRACT ADMINISTRATION AND ACCOUNTING
Monthly Progress Reports
Upon Submission a. KTR revision of
b. Delay in payment
Monthly Invoices Timeliness, accuracy, quality, Monthly Expenditure Reports
Upon Submission a. KTR revision of submittal
Monthly Exposure (man-hours) Report
Upon Submission a. KTR revision of submittal
Release of Claims Timeliness, accuracy, quality,
b. Delay in Final Payment
Attachment 3 Maps Showing Survey Area Base Contract
Attachment 4 Map Showing Option 1 Previously Recorded Sites*
*Site location is based on the 2012 HPMP
Attachment 5 Maps Showing Survey Area Option 1
Attachment 6 Map Showing Option 1 Previously Recorded Sites*
*Site location is based on the 2012 HPMP
Attachment 7a Maps Showing Survey Area Option 2
Attachment 7b Maps Showing Survey Area Option 2
File details come from the government source that posted it. Updated .