Section 02 41-00 Demolition and Destruction has been Changed to Read.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract.pdf | ||
| W9127N-09-B-0009-0002.pdf | ||
| Davis Bacon - Oregon.pdf | ||
| Davis Bacon - Washington.pdf | ||
| W9127N-09-B-0009-0001.pdf | ||
| W9127N-09-B-0009 Plans.pdf | ||
| W9127N-09-B-0009.pdf | ||
| W9127N-09-B-0009 Informational Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W66QKZ90565078 133730
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Change to section 2 in its entirety
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 29-Jul-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N-09-B-0009
X 9B. DATED (SEE ITEM 11)
03-Jun-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Jul-2009
CODE
US ARMY CORPS OF ENGINEERS
333 SW FIRST AVE
PORTLAND OR 97204-3495
W9127N 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9127N-09-B-0009
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
PART 2 EXECUTION CHANGED TO READ
2.1 EXISTING FACILITIES TO BE REMOVED
Existing construction scheduled to be removed shall be stored or delivered to a collection point for disposal as required.
2.1.1 STS and VBS Removal
The STS's and VBS's shall be removed from the intake deck in one piece. No demolition, disassembly, or cutting is allowed on the Bonneville intake deck. The STS's and VBS'S contain Lead Based Paint and any demolition shall be handled to meet all appropriate State and Federal regulations. Prior to removing the submerged traveling screens, Bonneville Project forces will remove the STS motors.
2.1.2 Structures
a. Remove existing structures indicated to be removed to the extent shown on the drawings.
b. Demolish and Deconstruct structures in a systematic manner from the top of the structure to the ground with support at intermediate levels as necessary. Demolish concrete and masonry walls in small sections. Remove structural members and remove from the project by means of cranes, hoists, or other suitable methods as approved by the Contracting Officer.
c. Locate demolition and deconstruction equipment throughout the structure and remove materials so as to not impose excessive loads to supporting walls, floors, or framing.
2.1.3 Utilities and Related Equipment
2.1.3.1 General Requirements
Do not interrupt existing utilities serving occupied or used facilities, except when authorized in writing by the Contracting Officer. Do not interrupt existing utilities serving facilities occupied and used by the Government except when approved in writing and then only after temporary utility services have been approved and provided.
Do not begin demolition or deconstruction work until the Bonneville Project Hazardous Energy Clearances have been applied and accepted (this is the Bonneville Project's lockout/tagout system to protect workers from hazardous energy). Shut off and cap utilities for future use, as indicated.
2.1.3.2 Disconnecting Existing Utilities
Remove existing utilities as indicated and terminate in a manner conforming to the nationally recognized code covering the specific utility and approved by the Contracting Officer. When utility lines are encountered that are not indicated on the drawings, the Contracting Officer shall be notified prior to further work in that area. Remove meters and related equipment and deliver to a location on the station in accordance with instructions of the Contracting Officer.
2.1.4 Concrete
Saw concrete along straight lines to a depth of a minimum 2 inch. Make each cut in walls perpendicular to the face and in alignment with the cut in the opposite face. Break out the remainder of the concrete provided that the broken area is concealed in the finished work, and the remaining concrete is sound. At locations where the broken face cannot be concealed, grind smooth or saw cut entirely through the concrete.
G2ctcrlm
AMD#3
G2ctcrlm
AMD#3
AMD 3
2.1.5 Structural Steel and Miscellaneous Metal
Dismantle structural steel at field connections and in a manner that will prevent bending or damage. Flame-cutting torches are permitted when other methods of dismantling are not practical. All steel items are to become the property of the Contractor for salvage and off site disposal.
2.1.6 Mechanical Equipment and Fixtures
2.1.6.1 General
Disconnect mechanical hardware at the nearest connection to existing services to remain, unless otherwise noted.
Mechanical equipment and fixtures must be disconnected at fittings. Remove service valves attached to the unit.
Salvage each item of equipment and fixtures as a whole unit; listed, indexed, tagged, and stored. Do not remove equipment until approved.
2.1.6.2 Piping
Disconnect piping at unions, flanges and valves, and fittings as required to reduce the pipe into straight lengths for practical storage. Store salvaged piping according to size and type. If the piping that remains can become pressurized due to upstream valve failure, end caps, blind flanges, or other types of plugs or fittings with a pressure gage and bleed valve shall be attached to the open end of the pipe to ensure positive leak control. Compressed air supply piping shall be capped off wherever it is planned to be cut outside of the sluiceway. Carefully dismantle piping that previously contained gas, gasoline, oil, or other dangerous fluids, with precautions taken to prevent injury to persons and property. Store piping outdoors until all fumes and residues are removed. Box prefabricated supports, hangers, plates, valves, and specialty items according to size and type. Classify piping not designated for salvage, or not reusable, as scrap metal.
2.1.7 Electrical Equipment and Fixtures
2.1.7.1 General
Salvage motors, motor controllers, and operating and control equipment that are attached to the driven equipment.
Salvage wiring systems and components. Box loose items and tag for identification. Disconnect primary, secondary, control, communication, and signal circuits at the point of attachment to their distribution system.
2.1.7.2 Fixtures
Remove and salvage electrical fixtures. Salvage unprotected glassware from the fixture and salvage separately.
Salvage incandescent, mercury-vapor, and fluorescent lamps and fluorescent ballasts manufactured prior to 1978, boxed and tagged for identification, and protected from breakage.
2.1.7.3 Electrical Devices
Remove and salvage switches, switchgear, transformers, conductors including wire and nonmetallic sheathed and flexible armored cable, regulators, meters, instruments, plates, circuit breakers, panel boards, outlet boxes, and similar items. Box and tag these items for identification according to type and size.
2.1.7.4 Wiring Ducts or Troughs
Remove and salvage wiring ducts or troughs. Dismantle plug-in ducts and wiring troughs into unit lengths.
Remove plug-in or disconnecting devices from the busway and store separately.
2.1.7.5 Conduit and Miscellaneous Items
Salvage conduit except where embedded in concrete or masonry. Consider corroded, bent, or damaged conduit as scrap metal. Sort straight and undamaged lengths of conduit according to size and type. Classify supports, knobs, tubes, cleats, and straps as debris to be removed and disposed.
2.2 DISPOSITION OF MATERIAL
Except for salvaged items specified in related Sections, and for materials or equipment scheduled for salvage, all materials and equipment removed and not reused or salvaged, shall become the property of the Contractor and shall be removed from Government property.
2.3 CLEANUP
Apply local regulations regarding hauling and disposal.
PART 3 NOT USED
END OF CHANGE
(End of Summary of Changes)
G2ctcrlm
AMD#3
AMD 3
| D OTHER Specify type of modification and authority: FAR CLAUSE 52.243-4 Changes |
| copies to the issuing office: 1 |
| Text1: X |
| Text2: x |
| Text3: |
| Text4: |
| Text5: 02 41 00-4a |
| Text 5-1: 02 41 00-5 |
| Text 5-2: 02 41 00-6 |
| Text6: |
File details come from the government source that posted it. Updated .