About this file

Amendment 0002

View the file

Other files

File Type Posted
Abstract.pdf PDF
W9127N-09-B-0009-0003.pdf PDF
Davis Bacon - Oregon.pdf PDF
Davis Bacon - Washington.pdf PDF
W9127N-09-B-0009-0001.pdf PDF
W9127N-09-B-0009 Plans.pdf PDF
W9127N-09-B-0009.pdf PDF
W9127N-09-B-0009 Informational Plans.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W66QKZ90565078 133730

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Clairif ication of in w ater w ork periods. Also, correction to inconsistency betw een the Bid Schedule and Measurement and Payment. Lastly, up date to Davis Bacon Wage Rates Washington and Oregon.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Jul-2009

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N-09-B-0009

X 9B. DATED (SEE ITEM 11)

03-Jun-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Jul-2009

CODE

US ARMY CORPS OF ENGINEERS

333 SW FIRST AVE

PORTLAND OR 97204-3495

W9127N 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9127N-09-B-0009

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been added by full text:

CLARIFICATION STATEMENT

In the contract specifications, section 01 10 10.00, paragraph 1.4, In-Water Work, the specifications state that the in-water work period for the Ice and Trash Sluiceway is from 1 November 2009 to 28 February 2010.

Bonneville Project staff will begin to dewater the sluiceway starting on 1 November 2009. The sluiceway will be ready for the Contractor to enter and begin work on or about 13 November 2009.

CLARIFICATION STATEMENT

Permits. Unless otherwise identified in the contract specifications, permits/licenses required in Sections 01 57

20.00 and Section 01 10 10.00 are those required by the County or State for doing construction and business activities in those entities. Bidders should already be knowledgeable about those requirements.

G2ctcrlm Amend 2

G2ctcrlm Amend 2

AMD 2

01 22 00.00 10-2

1.4 SERVICES OF SKILLED CRAFTSMAN, Optional Line Item Number 0003

1.4.1 Payment

Payment for the furnishing of equipment and labor per man-hour for performing Government directed supplemental work will be paid for at the contract price per hour under Line Item No. 0003, "SERVICES OF SKILLED CRAFTSMAN." The price and payment will be based upon the average hourly rate for labor and will constitute full compensation for the directed work including supervision, equipment, helper labor, and overhead costs.

Clarification Statement

Skilled Craftsman and Equipment. The CLIN should be priced to include any type of craft, from welder to electrician to carpenter, and should include their small hand tools as the equipment (small welder, electrical testers, threaders, saws, etc.). The description in the measurement and payment section also includes equipment. This is for the rental of equipment not normally included in a craftsman's small tools.

1.4.2 Unit of Measure

Unit of measure: MH - Man hours

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

-- End of Section --

3.4.3 Odors

3.4.4 Sound Intrusions

3.4.5 Burning

3.5 CHEMICAL MATERIALS MANAGEMENT AND WASTE DISPOSAL

3.5.1 General

3.5.2 Solid Wastes

3.5.3 Chemicals and Chemical Wastes

3.5.4 Contractor Generated Hazardous Wastes/Excess Hazardous Materials

3.5.5 Disposal of Hazardous Waste

3.5.6 Fuel and Lubricants

3.5.7 Waste Water

3.6 BIOLOGICAL RESOURCES

3.7 PREVIOUSLY USED EQUIPMENT

3.8 MAINTENANCE OF POLLUTION FACILITIES

3.9 TRAINING OF CONTRACTOR PERSONNEL

3.10 POST CONSTRUCTION CLEANUP

-- End of Section Table of Contents --

01 57 20.00 25-ii

G2ctcrlm Amend 2

AMD 2

pd224
Document1
clarifiction
Document7
W66QKZ90565078 4 REQUISITIONPURCHASE REQ NO:
W9127N:
133730 5 PROJECT NOIfapplicableRow1:
X:
9B DATED SEE ITEM 11 03Jun2009:
X8 NAME AND ADDRESS OF CONTRACTOR No Street County State and Zip Code:
10A MOD OF CONTRACTORDER NO:
CODE:
FACILITY CODE:
XRow2:
10B DATED SEE ITEM 13:
12 ACCOUNTING AND APPROPRIATION DATA If required:
13 THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTSORDERS IT MODIFIES THE CONTRACTORDER NO AS DESCRIBED IN ITEM 14Row1:
A THIS CHANGE ORDER IS ISSUED PURSUANT TO Specify authority THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO IN ITEM 10A:
13 THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTSORDERS IT MODIFIES THE CONTRACTORDER NO AS DESCRIBED IN ITEM 14Row2:
13 THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTSORDERS IT MODIFIES THE CONTRACTORDER NO AS DESCRIBED IN ITEM 14Row3:
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
Text3: x
D OTHER Specify type of modification and authority: Far Clauses 52.243-4 Changes
Text4: X
copies to the issuing office: 1
Text2: AMD #2=
Text1: Permits. Unless otherwise identified in the contract specifications, permits/licenses required in Sections 01 57 20.00

File details come from the government source that posted it. Updated .