AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

1 6

2. AMENDMENT/MODIFICATION NO.

W9127822B0001-0001

3. EFFECTIVE

27 JAN 2022

4. REQUISITION/PURCHASE 5. PROJECT NO. (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY(If other than item 6)

CODE

Corps of Engineers 109 St. Joseph St.

Mobile, AL 36602

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP code) 9A. AMENDMENT OF SOLICITATION

NO.

W9127822B0001

9B. DATED (SEE ITEM 11)

6 JANUARY 2022

10A. MODIFICATION OF

CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b)

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)

The subject solicitation for: INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) SINGLE AWARD TASK ORDER CONTRACT (SATOC) FOR RENTAL OF 30-INCH CUTTERHEAD PIPELINE DREDGE FOR DREDGING IN MOBILE DISTRICT NAVIGATION PROJECTS IN ALABAMA, MISSISSIPPI,p AND FLORIDA.

Is modified in the following: REFER TO THE ENCLOSED REVISED SPECIFICATION FOR AMENDMENT NO. 0001

NOTE: THE BID OPENING DATE IS HEREBY EXTENDED BY THIS AMENDMENT.

Except as provided herein, all terms and conditions of the document reference in item 9A or 10A, as Heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICE (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

BY

16C. DATE SIGNED

(Signature of contracting officer)

NSN 7540-01-152-8070

30-105

STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

IDIQ Contract for Rental of 30-inch Cutterhead Pipeline Solicitation No.

Dredge for Dredging in Alabama, Mississippi, and Florida W9127822B0001

PART I-REVISIONS MADE BY ADDED AND/OR REPLACEMENT PARAGRAPHS/PAGES/SECTIONS

The items listed below are to be replaced by the corresponding added and/or revised paragraphs/pages or sections. Added and/or revised paragraphs/pages or sections are indicated by a note in bottom right-hand corner of each paragraph or page. Added sections are hereby made a part of the contract and are to be inserted in the specification in the proper numerical/alphabetical sequence.

Within the specifications, deletions from the specifications are indicated by strikethrough, e.g.: deletions are marked with strikethrough and additions to the specifications including revisions/substitutions are indicated in bold, italic and underlined, e.g.: additions are indicated thus.

Corresponding Added or Revised Paragraph SECTION Page, and/or Section

TABLE OF CONTENTS Replaced in its Entirety

SF1442 Revised Paragraph 13

Section 00 00 10 Replaced in its Entirety

Section 01 00 00 Replaced in its Entirety

Section 01 00 01 Revised Paragraph 30

Attachment 1 Project Maps

Revised via Amendment No 0001

IDIQ Contract for Rental of 30 Inch Cutterhead Pipeline Dredge for Dredging in Alabama, Mississippi, and Florida

Solicitation No.

W9127822B0001

TABLE OF CONTENTS

NOTICE TO BIDDERS

SECTIONS

00 00 10

00 21 13 00 45 00 00 70 00

Standard Form 1442 - Solicitation, Offer, and Award Proposal Data Sheet Bid Schedule

Required Forms Standard Form 24 – Bid Bond Standard Form 28 – Affidavit of Individual Surety Standard Form LLL - Disclosure of Lobbying Activities

Instructions to Bidders Representations and Certifications Conditions of the Contract

DIVISION 01 – GENERAL REQUIREMENTS & SPECIFICATIONS

01 00 00 Statement of Work / Specifications Coastal Projects Project Sign Instructions

01 00 01 General Contract Requirements CESAM Form 1151 – Prompt Payment Certification

01 33 00 Submittal Procedures ENG Form 4288-R ENG Form 4025-R

01 35 26 Governmental Safety Requirements 01 45 01 USACE Quality Control 01 45 00.15 10 Resident Management System (RMS) Contractor Mode (CM)

01 57 20.00 01 57 20.01 01 57 20.02 01 57 20.03

35 20 23.33

CESAM Form 696 – Contractor Quality Control Report

ENG 4267

SAD 1437a-R Environmental Protection (Mobile Harbor) Environmental Protection (Gulfport) Environmental Protection (Panama) Environmental Protection (Pensacola Harbor) Turbidity Monitoring Daily Report Disposal Environmental Protection (Pascagoula Harbor) National Dredging Quality Management Program

WAGE RATES

Current wage rates will be assigned for each individual task order.

01 57 20.04

Attachment 1 Project Maps

SOLICITATION, OFFER

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

W9127822B0001

2. TYPE OF

SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED

6 JAN 2022

PAGES OF PAGES

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

7. ISSUED BY CODE CT 8. ADDRESS OFFER TO

U S ARMY ENGINEER DISTRICT, MOBILE

CONTRACTING DIVISION (CESAM-CT)

(109 ST. JOSEPH ST. 36602) P.O. BOX 2288

MOBILE, AL 36628-0001

REFER TO SECTION 01 00 01, PARAGRAPH 30

9. FOR INFORMATION

CALL :

A. NAME B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no.,date):

Indefinite Delivery Indefinite Quantity (IDIQ) Single Award Task Order Contract (SATOC), Contract for Rental of 30-lnch Cutterhead Pipeline Dredge for Dredging in Mobile District Navigation Projects In Alabama, Mississippi, and Florida.

Designation of a Contracting Officer's Representative (COR) will be established per task order.

IDIQ Period of Performance will be fourteen (14) months.

The contractor must be registered on the System for Award Management website (www.sam.gov).

The guaranteed minimum quantity of work which will be required under this contract and which will be initiated by one or more task orders will not be less than $10,000.00 for the term of the contract.

* See Section 00 70 00, Clause 52.211-10 "Commencement, Prosecution and Completion of Work"

11. The Contractor shall begin performance within _*_________ calendar days and complete it within __*________ calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See _*Task Order__ .)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES NO

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and _1______ copies to perform the work required are due at the place specified in Item 8 by__14:00___ (hour) local time 08 10 FEB 2022 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than 120___________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442(REV. 4-85)

Prescribed by GSA FAR(48 CFR) 53.236-1(e)

K5CT9SGL

Cross-Out

00010-1

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within _________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

20B. SIGNATURE 20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (contractor is required to sign this document and return _______ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation, is hereby accepted as to the items listed. This award con-summates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED

TO SIGN (Type or print)

31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE 30C. DATE 31B. UNITED STATES OF AMERICA

BY

31C. AWARD

DATE

00010-2

STANDARD FORM 1442 BACK (REV. 4-85)

IDIQ Contract for Rental of 30 Inch Cutterhead Pipeline Dredge for Solicitation No.

Dredging Mobile District Navigation Projects in Alabama, Mississippi and Florida W9127822B0001

00 00 10 - 1 Revised via Amendment No 0001

Section 00 00 10

BIDDING SCHEDULE

CONTRACTOR NAME: _____________________________________________________________________

Item No.

Description

Estimated Quantity Unit

Unit Price Estimated Amount

1. DREDGING 100% Pay Time (For estimated quantity, see table in Sec. 01 00 00, par. 2.2) _________ HRS _______ _______________

2.

DREDGING 100% Pay Time, Work For Others (For estimated quantity, see table in Sec. 01 00 00, par. 2.2) _________ HRS _______ _______________

2.

MOBILIZATION BAR TO BAR (See Sect. 01 00 00 paragraph entitled PAYMENTS) 500 MI _______ _______________

3.

MOBILIZATION AND DEMOBILIZATION

(Dredge and Plant) See Note 7 Below 1 JOB XXXX _______________

4.

INTERMEDIATE MOBILIZATION AND

DEMOBILIZATION OF PIPELINE

See Note Below

150 UNIT ________ _______________

5. MISSISSIPPI STATE TAX 1 JOB XXXX $50,000.00

TOTAL

BID

Offeror elects to waive the price evaluation preference for Hubzone Small Business Concerns: ( ) Yes ( ) No (This applies only to Small Business certified as a Hubzone Small Business by the Small Business Administration).

NOTES:

1. To better facilitate the public bid opening process, all modifications to bids are to be submitted on copies of the latest bid schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to bid items, all bidders should state their revised prices for each item. The company name should be indicated on the face of the bid schedule to preclude being misplaced.

2. Bidders must insert a price on all numbered items of the bidding schedule. Failure to do so will disqualify the bid.

3. All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and extension, the unit price will be considered to be the bid.

4. The number of hours indicated on the Bidding Schedule is approximate. The contractor may be required to work either more or less than the number specified and these items are not subject to the Variations in Estimated Quantities Clause.

5. Refer to Section 00 00 10 paragraph entitled “BID EVALUATION” for information about the bid items.

IDIQ Contract for Rental of 30 Inch Cutterhead Pipeline Dredge for Solicitation No.

00 00 10 - 2

6. For Bid Item entitled INTERMEDIATE MOBILIZATION AND DEMOBILIZATION OF PIPELINE, each UNIT is equivalent to 1,000 feet of pipeline.

7. For the purposes of bidding, the dredge Mobilization Point is the mouth of the Mobile River, Mobile, AL.

8. For Bid Item entitled, MISSISSIPPI STATE TAX, the Government will reimburse the Contractor for the actual taxes collected by the State of Mississippi for work performed under this contract. It cannot be left blank. Also, the State of Mississippi will enforce an equipment tax on equipment new to the State of Mississippi. This equipment tax will not be reimbursed by the Government. For information regarding the computation of the Mississippi State Tax please refer to the following link:

https://www.dor.ms.gov/business/guide-construction-contractors.

BID EVALUATION:

(1) It is the intent of the Government to secure a dredge meeting the requirements set forth in the Statement of Work of the specifications.

The table in the paragraph entitled DREDGE AND ATTENDANT PLANT REQUIREMENTS indicates the estimated average output for dredges of various power based on average theoretical conditions under which this work is to be accomplished. Bids will be evaluated and award will be made on the basis of employment of the plant that will result in the lowest overall total price, as described hereinafter, to the Government for the equipment. This is not to be construed by the Contractor that the Government guarantees this number of hours and linear feet will be worked.

(2) Bidders should insert into the bid schedule the appropriate number of hours for 100% Pay Time from the table in section 01 00 00, paragraph 2.2.

(3) Bids based on dredges smaller than those listed in the Table will be considered non-responsive.

(4) The Government will check the bidder's computation for accuracy and to insure that the bidder's computation was made in accordance with the above evaluation procedures. In case of variation between the bidder's computation procedures and those prescribed above, the Government will correct the bidder's computation and the bid will be evaluated by the corrected computation.

IDIQ Contract for Rental of 30 Inch Cutterhead Pipeline Dredge for Solicitation No.

00 00 10 - 3

INFORMATION TO BE SUBMITTED WITH BID: Each bidder shall furnish the information required below by filling in the blank spaces:

Dredge Name or Number__________________________________________________ _

Fair Market Value of the Dredge___________________________________________

Bunker Capacity (gallons/tons)____________________________________________

Hull: Material of Construction____________________________________________ Length (ft)_________________________________________________________ Breadth (ft)________________________________________________________ Depth (ft)__________________________________________________________ Diameter of Spuds (in)______________________________________________ Distance between spuds, athwartship(ft)_____________________________ Distance of spuds from stern of dredge (ft)_________________________ Conventional Spuds______ Traveling Spuds________ (Check one) Draft under normal working conditions (ft)__________________________ When built__________________________________________________________ When and where last dry docked______________________________________ Length of time of last dry docking( months)_________________________

Min. width of channel in which dredge can successfully operate (ft)_______

Max. depth of water in which dredge will operate(ft)______________________

Max. draft of dredge (ft)_________________________________________________

Max. current in which dredge can successfully operate:

Miles per hour (for 11 feet of water)___________________________ Depth to which dredge will dig(Max./Min.)(ft)__________________________

LADDER:

Material of construction:________________________________________ Length (ft)_______________________________________________________ Type of flexible suction pipe connection to hull___________________ Maximum continuous swing width (ft)________________________________ Diameter of cutter shaft (in)_______________________________________ Cutter actuating device: Size:_____________________________________ Type:_________________________________________ Power:________________________________________ Type of cutter______________________________________________________ Horsepower of cutter motor__________________________________________ Normal R.P.M. of cutter_____________________________________________

LADDER PUMP:

Type and Make________________________________________________________ Diameter discharge, as originally designed(in)_______________________ Diameter of impeller (Max./Min.) (in)________________________________ Max. R.P.M. of impeller______________________________________________ Brake H.P. applied to pump impeller__________________________________

IDIQ Contract for Rental of 30 Inch Cutterhead Pipeline Dredge for Solicitation No.

00 00 10 - 4

DREDGING PUMP: (MAIN DREDGE PUMP)

Type and Make____________________________________________________ Diameter suction (in)________________________________________________ Diameter discharge, as originally designed(in)____________________________ Diameter of impeller (Max./Min.) (in)__________________________________ Max. R.P.M. of impeller_____________________________________________ Method of actuating impeller_________________________________________ Brake H.P. applied to pump impeller___________________________________

MAIN ENGINE: (DESCRIBE FULLY)

Make_______________________________________________________________ Type________________________________________________________________ Size_________________________________________________________________ Age_________________________________________________________________ B.H.P._______________________________________________________________ R.P.M._______________________________________________________________ Estimated amount of fuel consumed per day__________________________________

LIGHTING PLANT:

K.W.________________________________________________________________

ATTENDANT PLANT:

Quarterboat, size_____________________________________________________ Launch or launches, size_______________________________________________ Skiffs, number_______________________________________________________ Method of supporting discharge pipe_____________________________________ Type and number of pontoons__________________________________________ Dredge Tender, size__________________________________________________ Dredge Tender, horsepower____________________________________________ Dredge Tender, size__________________________________________________ Dredge Tender, horsepower____________________________________________ Towing Vessel, size__________________________________________________ Towing Vessel, horsepower____________________________________________ Total H.P. of all fuel consuming units in the makeup of the total dredging plant (horsepower)__________________________________________

The plant was last operated in _________________at________________________________ The plant offered is owned by __________________________________________________ The plant may be inspected at __________________________________________________ The period of time of lay up in the past 12 months__________________________________

IDIQ Contract for Rental of 30 Inch Cutterhead Pipeline Dredge for Solicitation No.

00 00 10 - 5

DREDGE CREW

(A complete listing of proposed personnel in compliance with the responsibilities in Section 01 00 00, paragraph entitled

CREW)

POSITION NUMBER

SUBSISTENCE: The plant ( ) will ( ) will not have the facilities for furnishing the meals as referred to by the “Accommodations and Meals for Inspectors” clause of the contract.

The rental rate to be charged for the above plant, complete with full operating personnel and in operating status on a 24-hour day, 7 days per week basis, will be set forth in Bidding Schedule.

DREDGE PLANT OPERATION: The number of shifts to be worked per day on a 24-hour basis, 7 days per week is _______.

IDIQ Contract for Rental of 30 Inch Cutterhead Pipeline Dredge for Solicitation No.

01 00 00 - 1 Revised via Amendment No. 0001

Section 01 00 00

Statement of Work – Description/Specifications

INDEX

PARA NO. PARAGRAPH TITLE

1. SCOPE OF WORK

2. DREDGE AND ATTENDANT PLANT REQUIREMENTS

3. PERFORMANCE

4. PHYSICAL DATA

5. WORK LAYOUT AND ORDER OF WORK

6. RESERVED

7. DREDGING (EXCAVATING OF SHOALS)

8. DISPOSAL OF EXCAVATED MATERIALS

9. QUALITY CONTROL

10. QUALITY ASSURANCE

11. CONTRACT INVOICES/RECEIVING OFFICE

12. RESERVED

13. RESERVED

14. BIDDER’S QUALIFICATIONS AND PRE-AWARD INSPECTION OF

PLANT

15. PLANT

16. COMMUNICATION

17. EQUIPMENT OWNERSHIP AND OPERATING EXPENSE

SCHEDULE

18. PRECONSTRUCTION CONFERENCE/ADDITIONAL SAFETY

REQUIREMENTS

19. CREW

20. GENERAL SAFETY REQUIREMENTS

21. SPECIAL SAFETY REQUIREMENTS

22. PAYMENTS

23. TASK ORDER PROCEDURES

IDIQ Contract for Rental of 30 Inch Cutterhead Pipeline Dredge for Solicitation No.

01 00 00 - 2

SECTION 01 00 00

STATEMENT OF WORK – DESCRIPTION/SPECIFICATIONS

1. SCOPE OF WORK:

1.1. DREDGING: The work to be performed under this contract consists of dredging at various locations within the Mobile District. These sites include both deep and shallow draft projects and the Gulf Intracoastal Waterway as well as coastal restoration projects, beach nourishment projects and any other project requiring the use of a dredge in Alabama, Mississippi, and Florida. These sites include deep draft coastal inlets along the Gulf Coast, as well as coastal restoration projects, beach nourishment projects and any other project requiring the use of a dredge in Alabama, Mississippi, and Florida. The scope of this contract also provides for any other type or size dredge other than those specifically called for in the specifications. The scope also includes supplying dredge related supplies and equipment such as tugs, barges, cranes, geotextile tubes, sheet pile, land based heavy equipment for disposal operations, and other marine equipment associated with channels and coastal restoration projects. Other marine equipment or materials such as geotextile tubes, sheet pile, additional hand labor crews, environmental monitors, divers, etc., that are not specifically called for within these specifications will be negotiated with the individual task order. The Contracting Officer may elect to negotiate cubic yard task orders for some projects in lieu of the standard dredge rental rate.

1.2. DREDGE PLANT: The work to be performed under this contract consists of furnishing an ocean certified hydraulic cutterhead pipeline dredge with pump discharge of not less than 30-inch diameter and must be able to work in exposed marine environments along the Gulf Coast that are exposed to rough sea conditions such as the outer Mobile Bar channel. The dredge will be complete with all necessary materials, supplies, (including fuel, power, and water) labor, and transportation for maintenance dredging operations as specified in the above paragraph. More specific dredge and attendant plant requirements are discussed below.

1.3. DREDGED MATERIAL DISPOSAL: All removed materials will be placed in approved disposal areas as directed by the Contracting Officer or his Authorized Representative and as discussed in these specifications.

1.4. GENERAL: All work, material and services not expressly called for in these specifications which may be necessary for complete and proper operations to carry out the contract in good faith shall be performed, furnished and installed by the Contractor at no increase in cost to the Government. The Contracting Officer or his Authorized Representative may at any time require the Contractor to

IDIQ Contract for Rental of 30 Inch Cutterhead Pipeline Dredge for Solicitation No.

01 00 00 - 3 relocate to a different dredging site should shoaling rates, or other circumstances so dictate. The Government reserves the right to contract additional dredges to perform dredging work on the same projects and geographical area.

2. DREDGE AND ATTENDANT PLANT REQUIREMENTS:

2.1. DREDGE REQUIREMENTS: The dredge offered shall be equipped with a ladder pump and be capable of continuous operation with a minimum horsepower rate as shown below which includes the horsepower applied on the main dredge pump and ladder pump (A ladder pump is defined by Mobile District as a dredge pump installed no less than one-third of the distance down the ladder.) Additional pump size and/or horsepower above the minimum listed below does not justify a competitive advantage in the number of hours in the bid schedule. The dredge shall be capable of efficiently dredging the Mobile Bar channel that at times experiences high velocity currents, ground swells, etc. The Contractor shall have available for use at all times a variety of serviceable interchangeable pump impellers (2 minimum), a spare pump case, and a spare serviceable cutter to permit the dredge to operate efficiently under varying conditions described in paragraph entitled, "PHYSICAL DATA". The dredge shall be capable of dredging upstream as well as downstream and will so operate as directed by the Contracting Officer. The dredge shall be capable of dredging the full bottom dimension of up to 400 feet and depth of 52 feet, plus minimal over-swinging through one swing (cut) of the cutterhead from a given set of the dredge subject to a velocity of less than 2 feet per second given normal conditions. The cut coverage shall be accomplished in one set of the dredge and at or before the dredge reaches its normal set-ahead dredge spud positioning. That cut coverage is expected to be made while at the dredge’s maximum walking speed.

The swing of the cutterhead will be accomplished through the use of conventional dredge swing anchors or previously placed “deadmen”. The dredge shall be equipped with an electronic positioning system and include the equipment which will record such data.

2.2. HORSEPOWER REQUIREMENTS: Dredge Minimum Horsepower -

Horsepower is equal to the correlating connected brake horsepower applied to the dredge pump. Those dredges which have less horsepower or have less discharge diameter than the minimum shown below will be considered non-responsive.

30-inch Discharge main pump(s) 5000 H.P. (min) ladder pump 1200 H.P. (min)

For the purpose of bidding and evaluating bids, it will be considered the dredge will be used for the number of hours (100% Pay Time) given in the following table. However, this is not to be construed by the Contractor that the Government guarantees that the dredge will be used for this number of hours. The number of

IDIQ Contract for Rental of 30 Inch Cutterhead Pipeline Dredge for Solicitation No.

01 00 00 - 4 hours shown in the TABLE is estimated. The actual hours may be more or less than what is shown.

Dredge Size 100% Hours 30 inch Basic Dredge 3411 With traveling spuds 2899

Additional allowance in dredge production will be given for dredges with traveling spuds (spud carriage). A 15% reduction is shown in the table hours for traveling spuds.

The traveling spud must have a minimum of 20’ of travel to be considered for bid purposes. A pre-award inspection of the dredge will be conducted by the Government and the contractor must adequately demonstrate the dredge is capable of traveling 20’ utilizing a traveling spud while the Government representative is present. If it is determined that the traveling spud does not meet this requirement then the contractors bid price will revert to the converted price based on the number of hours in the table above without a traveling spud. In addition, the contractor may elect to bid based on the number of 100% pay hours without a traveling spud and elect to add a traveling spud later in the contract.

The 100% bid price for the dredge will then be converted based on the number of hours with a traveling spud provided the traveling spud meets the requirements herein. The following equation was used to calculate the hours in the table for the bid schedule.

Equation: (1-(0.15 for traveling spud)) X Basic Dredge hours for the dredge = Number of hours for bid schedule

Example: Dredge A is equipped with a traveling spud. Applying the equation yields: (1-(0.15)) X 3411 = 2899 hours.

2.3. ATTENDANT PLANT:

2.3.1. Attendant plant shall be composed of such barges, fuel, water, pipe derrick, anchor, etc., floating, submerged, and slip joint discharge pipe, and other attendant or auxiliary plant as may be required for operations under these specifications whether or not these items are specifically mentioned. The auxiliary and attendant plant shall be in good condition and of sufficient size and capability to efficiently serve the dredge.

2.3.2. The Contractor will have available at all times during the duration of work a minimum amount of 30,000 feet combination of floating and submerged pipeline.

The Contractor shall determine for himself the lengths of floating and submerged line necessary. If the Contractor’s combination of floating and submerged line lengths is found to be inefficient, the Contractor may be directed to adjust the

IDIQ Contract for Rental of 30 Inch Cutterhead Pipeline Dredge for Solicitation No.

01 00 00 - 5 combination thereof to a more efficient combination all at no increase in cost to the contract.

2.3.3. The attendant plant shall include a minimum of two vessels, each a twin-screw shallow draft dredge tender. Both vessels shall be of sufficient size and horsepower, capable of performing all duties necessary to efficiently carry out dredging operations in normal currents and conditions and both shall be available at all times with one operator and one deckhand each to insure efficient operations. In the event the dredge is not self-propelled, the attendant plant shall include one additional towing vessel, with sufficient horsepower to be determined by the Contractor, to be available at all times to adequately move the dredging plant to allow passage of traffic, to move the dredging plant from one location to another, to completely move the dredge plant to safe harbor in case of adverse weather condition, and to assist in the total dredging operation. No division in pay will be made for the additional towing vessel and the two dredge tenders.

They will be considered as part of the dredging plant and shall be in operation at all times regardless of the pay status of the dredge.

2.3.3(b). Spill Barge: The Contractor must also have, as part of the dredging plant, a “controllable spill barge” to disperse the dredged material in the open water D/A(s). The Contractor must have the mechanism built into the spill barge to allow full control of the barge’s movements, side to side, and forward/backward. The Contractor must have an electronic tracking system on-board this spill barge, with which the spill barge operator will know where the barge is at all times and be able to make controlled movements. The Contractor should submit information, as part of his DEPOSITION PLAN, explaining how this requirement will be met, mechanically, technically and functionally.

2.3.4. Reserved

2.3.5. Transport Vessel/Survey Boat: The Contractor shall provide one deep "V" hull transport vessel/survey boat, with twin propellers, not less than 40 feet in overall length, with enclosed space for three passengers after installation of all required Contractor furnished survey equipment and survey party crew (Survey Equipment/Personnel defined elsewhere), to adequately operate and survey in all channels included in the scope of work limits along with accompanying disposal areas. This vessel must have an operator and deckhand on site at all times; be capable of traveling at a speed of 20 knots (23 MPH) or greater in good weather and capable of traveling safely at night and in intense fog; (such vessel shall meet or exceed US Coast Guard regulations for vessels 65 feet or less in length); and the vessel shall have a Certificate of Inspection by the US Coast Guard, or at least from a Marine Surveyor. This vessel shall be for the primary use of Government Inspector shift changes and Government directed hydrographic surveying. The use of this vessel for Contractor’s crew changes, or any other use of this vessel by the Contractor shall be secondary to Government Inspector shift changes and Government directed hydrographic surveys. This

IDIQ Contract for Rental of 30 Inch Cutterhead Pipeline Dredge for Solicitation No.

01 00 00 - 6 vessel shall be equipped with the following at a minimum: built-in fuel tanks with correctly operating fuel gauges; marine and company radios; windshield wipers;

running and spot lights; and all required survey equipment. The Contractor shall secure satisfactory landing location for this vessel. The Contacting Officer’s Representative may approve a transport/survey vessel that does not meet the above requirements if he deems the replacement vessel can adequately perform the required duties stated above.

2.3.6. Survey Party: The Contractor shall furnish one full survey party available for 12 hr/day survey operations 7 days a week. The minimum full-time crew for the survey boat shall be one qualified survey boat operator for the daylight shift, plus up to a 4 man survey party to perform surveys to support the entire dredging process. Also, a person responsible for plotting of surveys should be on board the dredge during the daylight shift. The survey party should have a sufficient number of qualified personnel in order to adequately survey under any condition.

The party shall survey the current conditions of the area being dredged and perform the survey assignments, operating all necessary electronic positioning and computer equipment.

2.3.7. Survey Equipment: The Contractor furnished survey equipment must meet or exceed all requirements listed below as well as any other requirements referred to in these specifications:

2.3.7(a). Positioning System: The positioning system must be capable of providing positional accuracies of the vessel within three meters or less. This system must have a proven track record and have the manufacturer’s written backing stating the accuracy thereof. The system utilized must be capable of providing twenty-four hour, seven days a week positional coverage within the above stated accuracies. The contractor, if properly equipped with a Global Positioning System, may utilize such a system as long as the accuracies are confirmed and documented during the use of the system. The positioning system and survey software will have the capability of providing visual guidance to the vessel operator and acquire positioning and guidance updates on no more than one second time increments.

2.3.7(b). Sounding Equipment: The sounding equipment will consist of a sounding machine/device capable of providing updated soundings on no more than 1/20 second intervals and have an accuracy rating of not less than +/-0.5 feet. Sounding device will have analog charting (real time) within the device and will have all the capabilities of calibrating to a bar check utilizing the Norfolk Method of bar checking. All depths acquired will consist of dual frequency soundings utilizing a high operating 208 kHz frequency transducer and a low operating 41 kHz or 24 kHz frequency transducer. All digitally acquired sounding data for the channel surveys and D/A surveys will be those acquired, as directed by the Contracting Officer Representative, utilizing either high operating 208 kHz frequency transducer or 41 kHz/24 kHz transducer, as applicable. The high

IDIQ Contract for Rental of 30 Inch Cutterhead Pipeline Dredge for Solicitation No.

01 00 00 - 7 frequency soundings will be shown in conjunction with the 41 kHz /24 kHz soundings on the analog chart of the sounding device. All soundings will be acquired on a continuous basis with plotting of data based on the scale and size of the plot and in clearly legible print.

2.3.7(c). Soundings: Soundings for the surveys for the channel and disposal areas as required by this contract shall be made by an electronic sounding device. The electronic sounding device shall be similar and equal to the Teledyne Odom Echotrac MKIII echo sounder, as requirements dictate. All costs associated with the required soundings and data compilation will be included in the contract price for dredging.

2.3.7(d). Acquired and Processed Data: The survey system shall use a computer and software capable of handling all required data points and plotting of those data points. If the Contractor is utilizing HYPACK to perform his required surveys, the Contractor shall use the Government provided channel files. The Contractor shall submit the HYPACK project files for the specific survey performed. These files contain all the files that make up the survey including raw and edited, line, log, and tide files associated with each survey among others. Otherwise, the Contractor shall utilize a system capable of acquiring or converting all, unedited raw data (horizontal and vertical) to an IBM, ASCII compatible format prior to submittal to the Government. The ASCII format shall be compatible with the MS DOS Operation system. Sounding files shall contain single line records. Each record shall contain the easting, northing, depth, date, and time for one sounding. Each item in the record shall be separated by a space character (ASCII 32 (10)) and the record shall be terminated by a line feed with carriage return. All records shall conform to the format shown below:

EASTING NORTHING DEPTH DATE TIME

123456.78 876543.21 -42.3 01/15/91 14:22:13.3

Said survey system shall provide a means of plotting all data points for submittal in hard copy form according to the requirements listed herein.

Routine/verification surveys shall be submitted within 24 hours of the survey and larger surveys, such as for open water disposal areas, shall be submitted within 48 hours of the survey. Both surveys shall include plots and data collection information. All plots submitted shall be provided on full size 22” x 34” (ANSI ‘D’ size) plot paper (half size, 11” x 17” if approved by the Authorized Representative) and delineate no less than the following: all nav aids; north arrow; station data (corrected to MLLW); date of survey; grid ticks; surveyor’s name; vessel name; channel lines and any other pertinent information. Scale of plan view plots shall be 1” = 200’ and cross-sectional plots as specified by the Authorized Representative. Plan view plots shall delineate actual vessel track along the specific route taken and print depths acquired along the route on a scale clearly legible; cross-sectional plots shall be plotted on hard copies which

IDIQ Contract for Rental of 30 Inch Cutterhead Pipeline Dredge for Solicitation No.

01 00 00 - 8 delineate the channel dimensions in a template format. All hard copy plots shall be in the form of CADD drawing files in Microstation SE format. The CADD drawing files and data (Hypack files/folder) used to produce the hard copy plots shall be provided on a CD in the format previously specified and in unedited form. All submittals shall include both raw and edited data and all supporting field notes, squat tables, tide data, and scrolls, both in electronic form on a CD and a printed/plotted format on paper.

2.3.7(e). Dredge Electronic Tracking Position: The Contractor shall be able to visually display continuous real time positioning of the dredge, by track plot or CRT screen, in relation to the before-dredging surveyed shoals and/or more updated surveyed shoals. Dredge location accuracy shall meet the requirement of the Corps' "Manual of Survey Instructions". An identical dredge electronic tracking system shall be provided to the Government inspector and equipped in the inspector’s office.

A written discussion of the method the Contractor intends to use in order to satisfy these requirements shall be included in the Contractor's bidding schedule discussions.

3. PERFORMANCE:

3.1. GENERAL: Upon initiation of work, the Contractor shall prosecute the work assigned him with faithfulness and energy, and at all times endeavor to meet the schedule of excavation (dredging) and disposal operations as determined by the Contracting Officer. The Contractor shall be expected to conduct excavation dredging and disposal operations seven days per week, twenty-four hours per day, including those days, which have been declared by Congress to be legal holidays for per diem employees of the Federal Government (applies only to the rental portion of this contract). The order of work to be performed under this contract cannot be determined except as the work progresses. The Contractor shall be expected to pre-construct dredge pipelines needed for this work. The Government will facilitate this by issuing excavation assignments far enough in advance for the Contractor to accomplish the pre-positioned pipeline construction. The Contractor shall bear all direct, overhead and collateral expenses incidental to the operation, upkeep and repair of all items of plant. He shall maintain the plant in a good state of repair, shall arrange for a supply of renewal parts to be on hand when needed for all plant and shall provide and maintain efficient personnel for each item of plant employed in connection with the work. Equipment will be in condition to render efficient, economical and continuous service and shall be equipped with all mechanical devices and equipment required by Federal, State and local authorities, provided that nothing in the paragraph shall be construed to limit the authority of the Contracting Officer to prohibit the use of any piece of equipment which, in the opinion of the Contracting Officer, is mechanically unsafe for use. Equipment which the

IDIQ Contract for Rental of 30 Inch Cutterhead Pipeline Dredge for Solicitation No.

01 00 00 - 9

Contracting Officer or his authorized representative considers does not perform in a satisfactory or efficient manner shall be repaired or replaced by the Contractor at the Contractor's expense within 24 hours after notification by the Contracting Officer or his authorized representative. Failure of the equipment to perform to the satisfaction of the Contracting Officer, and failure by the Contractor to effect timely replacement of the unsatisfactory equipment, shall be sufficient cause for the Government to procure replacement equipment and charge the Contractor for any excess costs associated therewith. The equipment shall be registered by the Contractor with all Federal, State and local authorities requiring registration, and registration plates or other evidence of registration shall be displayed in accordance with the requirements of the registering authority.

3.2. INSPECTION OF PLANT: Upon arrival of the dredge and attendant plant, it will be inspected for any deficiency in safety or health requirements. The Contractor should have already inspected the plant and corrected all deficiencies found. In the absence of any deficiencies, the plant will be put to work. In the event that any plant is deficient safety wise or health wise to prevent safe operations, the plant will not be put to work, but will continue in a nonpayment status until the safety deficiencies are corrected to the satisfaction of the Contracting Officer, at which time the plant will be put to work.

3.3. TERMINATION OF WORK: It is anticipated that upon completion of the excavation assignment(s) all the plant will be released to the Contractor.

However, the Contracting officer, by written notice, may terminate any task order, in whole or in part, when it is in the Government's interest. If any task order is terminated, the Government shall be liable only for payment under the payment provisions of this contract for services rendered before the effective date of termination.

3.4 Plant Delivery: For bidding purposes, the assumed mobilization point will be the mouth of the Mobile River, Mobile, AL however the actual mobilization point will be determined upon issuance of the first task order. If the actual mobilization point differs from this assumed mobilization point, then an adjustment for mobilization will be determined by computing the actual mileage difference between the two sites (either plus or minus depending upon whether the contractor’s plant transits more or less distance to the actual site from their original dredge location), by the paid rate for the Mobilization Bar to Bar bid item.

The actual point of delivery may be determined by the Contracting Officer as any location within the Mobile Harbor as described in paragraph 1 of this section on the basis of shoaling rates and channel conditions.

3.5. PRIVATE WORK RELEASE: By mutual agreement of both the Contractor and the Contracting Officer, the dredge may be released from this contract for short periods of time to perform work for others in the same vicinity. The dredge

IDIQ Contract for Rental of 30 Inch Cutterhead Pipeline Dredge for Solicitation No.

01 00 00 - 10 shall, however, be returned to operations under this contract within 48 hours after notice by the Contracting Officer to resume such contract work.

4. PHYSICAL DATA:

Data and information furnished or referred to below is for the Contractor's information. The Government will not be responsible for any interpretation or conclusion drawn therefrom by the Contractor.

4.1. General: The indications of physical conditions on the drawings (if provided in the solicitation package) and in the specifications are the result of site investigations and surveys.

4.2. Location: The work to be done under these specifications is located anywhere within the boundaries of the Mobile Harbor project.

4.3. Subsurface Investigation: Contractor's Investigation Responsibility: The Contractor should make his own investigation of submerged, surface and overhead structures in the work areas and other locations he finds necessary to traverse. The exact location, depths and heights of submarine cables, pipes, highlines, docks, piers, bulkheads bridges, etc. (as applicable), are not known and it will be necessary for the Contractor to ascertain interference problems and notify the respective owners in advance of dredging operations. The Contractor shall make all arrangements with the respective owners of the structure to assure satisfactory completion of dredging in the vicinity with a minimum interruption of service, and shall perform his operations in such a manner as will avoid damage to these facilities. Considering the above specified structures and any others the Contractor might find in the work areas, the Contractor shall not dredge within 50 feet of and/or dispose of dredged material in the vicinity of any marine structure.

If the marine structures are damaged by the dredging operations, it will be the responsibility of the Contractor to repair or rebuild the damaged facility at no cost to the Government.

4.4. Weather Conditions: The sites of the work are exposed to local disturbances in Mobile Bay and upper Gulf of Mexico which may cause suspension of the work for short periods of time. Generally the sites of the work do not provide safe refuge from tropical hurricanes which may occur from June to December. Should a hurricane occur during the course of the work, it will be the responsibility of the Contractor to select a safe harbor. There are no known unusual currents at any of the sites except during extreme tidal events when velocities of 2 to 4 miles per hour may be expected; however, the Contractor should investigate all the sites of the work and determine for himself the requirements of the work. The mean tidal range is approximately 1.5 feet. The working season extends over the entire year. However, the work area(s) are affected by extended periods of strong winds, predominately from the South or Southeast. Lost time due to opposing

IDIQ Contract for Rental of 30 Inch Cutterhead Pipeline Dredge for Solicitation No.

01 00 00 - 11 adverse natural elements as outlined above will be considered justification for an extension of the contract time.

4.5. Transportation Facilities: The work areas are accessible…