This document is an amendment to a solicitation for the replacement of an HVAC system at the Jim Woodruff Powerhouse in Chattahoochee, Florida. The Corps of Engineers Mobile District is seeking to replace the existing HVAC system with a new system including chillers, chilled water piping, and associated equipment. The amendment provides revised specifications, drawings, and photos related to the project. Bids are due within 240 calendar days of receipt of the notice to proceed, with work to be completed on site between Monday and Saturday from 7:00 to 17:30 Eastern Time. The Corps of Engineers crane may be available with one week's notice for contractor use but powerhouse operations take priority. Battery powered equipment only is allowed in the powerhouse.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE 4. REQUISITION/PURCHASE 5. PROJECT NO. (If applicable)

W9127821R0063-0001 27 JUL 2021 CHC19009

6. ISSUED BY CODE 7. ADMINISTERED BY(If other than item 6)

CODE

Corps of Engineers 109 St. Joseph St.

Mobile, AL 36602

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP code) 9A. AMENDMENT OF SOLICITATION

NO.

W9127821R0063

9B. DATED (SEE ITEM 11)

25 JUN 2021

10A. MODIFICATION OF

CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE

FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority)

THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b)

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)

The subject solicitation for: JIM WOODRUFF POWERHOUSE HVAC REPLACEMENT, CHATTAHOOCHEE, FLORIDA Is modified in the following: REFER TO THE ENCLOSED REVISED SPECIFICATIONS/DRAWING REVISIONS FOR AMENDMENT NO. 0001

Except as provided herein, all terms and conditions of the document reference in item 9A or 10A, as Heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICE (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

BY

(Signature of contracting officer)

16C. DATE SIGNED

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

JIM WOODRUFF POWERHOUSE HVAC REPLACEMENT W9127821R0063

CHATTAHOOCHEE, FLORIDA CHC19009

SF 30 Page 2

W9127821R0063-0001

PART I - REVISIONS MADE BY ADDED AND/OR REPLACEMENT PARAGRAPHS/PAGES/SECTIONS

The items listed below are to be replaced by the corresponding added and/or revised paragraphs/pages or sections. Added and/or revised paragraphs/pages or sections are indicated by a note in bottom right hand corner of each paragraph or page. Added sections are hereby made a part of the contract and are to be inserted in the specification in the proper numerical/alphabetical sequence.

Within the specifications, deletions from the specifications are indicated by strikethrough, e.g.: deletions are marked with strikethrough and additions to the specifications including revisions/substitutions are indicated in bold, italic and underlined, e.g.: additions are indicated thus.

Corresponding Added or Revised Paragraph SECTION Page, and/or Section

Table of Contents Revised as indicated herein.

01 00 00 Revised Paragraph 1.1 Added Paragraph 1.27

Appendix A Added in its entirety

PART II - NOTE: Revised and added drawings are listed below. These revised and added drawings are to be inserted into the folio in the proper numerical sequence. Drawings that have been revised by this amendment shall be deleted from the folio. All drawings listed below are revised unless indicated otherwise.

SHT

REF. TITLE OF DRAWINGS

COVER SHEET

G-102 INDEX OF DRAWINGS

M-001 HVAC LEGEND

MD104A DEMO PLAN – EL 48.5(ADDED)

MD105 DEMO PLAN – HVAC EQUIPMENT ROOM

M-104A NEWWORK PLAN – EL 48.5(ADDED)

M-105 NEWWORK PLAN HVAC EQUIPMENT ROOM

ED103 DEMO PLAN- EL 80.0

E-601 ELECTRICAL ONLINE DIAGRAM

Encl as stated:

Revised pages of the specifications as indicated in Part I.

9 Revised and added drawings as indicated in Part II.

Table of Contents Page 1 Amendment No. W9127821R0063-0001

TABLE OF CONTENTS

CHECKLIST FOR PREPARATION OF OFFERS

BIDDING REQUIREMENTS

STANDARD FORM 1442 - SOLICITATION, OFFER, AND AWARD

BIDDING SCHEDULE

EXPLANATION OF BID ITEMS

STANDARD FORM 24 - BID BOND

STANDARD FORM 28 - AFFIDAVIT OF INDIVIDUAL SURETY

STANDARD FORM LLL - DISCLOSURE OF LOBBYING ACTIVITIES

00 11 00 PROPOSAL SUBMISSION AND INSTRUCTIONS

00 12 00 SELECTION PROCEDURES AND BASIS OF AWARD

00 21 16 INSTRUCTIONS TO PROPOSERS

00 45 00 REPRESENTATIONS & CERTIFICATIONS

00 70 00 CONDITIONS OF THE CONTRACT

SPECIFICATIONS

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 ADDITIONAL SPECIAL CONTRACT REQUIREMENTS

WAGE RATES

01 00 01 GENERAL CONTRACT REQUIREMENTS

CESAM FORM 1151

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

SUBMITTAL REGISTER

ENGINEERING FORM 4025R

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

SAM FORM 696

DIVISION 02 – EXISTING CONDITIONS

02 41 00 DEMOLITION AND DECONSTRUCTION

DIVISION 03 – CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

DIVISION 22 – PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 – HEATING, VENTILATION, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 05 15 COMMON PIPING FOR HVAC

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

Table of Contents Page 2 Amendment No. W9127821R0063-0001

DIVISION 23 – HEATING, VENTILATION, AND AIR CONDITIONING (HVAC) (CONTINUED)

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS

DIVISION 26 – ELECTRICAL

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 24 19.00 40 MOTOR CONTROL CENTERS

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 01 19.61 RESEALING OF JOINTS IN RIGID PAVEMENT

32 05 33 LANDSCAPE ESTABLISHMENT

32 31 13.53 HIGH-SECURITY CHAIN LINK FENCES AND GATES

32 92 23 SODDING

APPENDICES

APPENDIX A PHOTOS

-- END OF TABLE OF CONTENTS --

01 00 00 Revised by Amendment No. W9127821R0063-0001

01 00 00

1.1 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

The Contractor shall be required to (1) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (2) prosecute the work diligently, and (3) complete the entire work ready for use not later than 240 calendar days after receipt of notice to proceed. This time stated for completion shall include final cleanup of the premises. Access to the powerhouse will be Monday through Saturday from 0700 to 1730 Eastern Time Zone. No access will be granted after these hours. USACE powerhouse crane will be available for the contractor. Crane will be operated by USACE personnel. Contractor shall provide a minimum 7 day written notice to use the overhead crane. Powerhouse activities/mission shall supersede contractor’s crane request. Contractor shall only use battery power material handling equipment and personnel lifts in the powerhouse.

1.27 PHOTOS

Refer to Appendix A for powerhouse photos.

(Note: The remainder of the section is unchanged by this amendment.)

This page was intentionally left blank for duplex printing.

Appendix A Added in its entirety by Amendment No. W9127821R0063-0001

APPENDIX A

PHOTOS

This page was intentionally left blank for duplex printing.

Bathroom Access to Exhaust Fan E1-A

East Wall Penetration from Generator Floor

East Wall Penetration from Roof - West View

Elevator Penthouse Exit to Roof

Exhaust Fan E1-A

Ladder Access to E1-A

Machine Shop Exhaust Fan Access

Machine Shop Exhaust Fan - Ceiling Location

Machine Shop Exhaust Fan- Ladder and Access Door

Roof - East View

Roof Access

Roof Access Ladder

Roof - South View

Roof - West View