W9127821R0053 Amendment No. 0001.pdf
PDF 334 KB Posted
- Attached to
- Control Cabinets for USACE SAD Federal contract opportunity
- Solicitation number
- W9127821R0053
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W9127821R0053 0002 CHA_WG_GCU_03_23_01_E-004(2).pdf | ||
| W9127821R0053 0002 Amendment.pdf | ||
| W9127821R0053 0002 CHA_WG_GCU_03_23_00_E-004.pdf | ||
| W9127821R0053 0002 CHA_WG_GCU_03_23_00_E-617.pdf | ||
| W9127821R0053 0002 CHA_WG_GCU_03_23_01_E-616.pdf | ||
| W9127821R0053 Amendment 0001 Seed Task Order Bid Schedule 17 may 21.xlsx | XLSX spreadsheet | |
| W9127821R0053 Amendment 0001CHA_WG_GCU_03_23_01_E-004.pdf | ||
| W9127821R0053 Solicitation.pdf | ||
| W9127821R0053 Seed Task Order Bid Schedule 5 may 21.xlsx | XLSX spreadsheet | |
| W9127821R0053 SATOC Base Bid Schedule 5 May 21.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is issued to provide for the follow ing revised attachment.
1 SAD Control SATOC Specifications revised 17 May 2021 2, Seed Task Order Bid Schedule revised 17 May 2021
3. WFG and HTW Task Order SOW revised 17 May 2021
4. Revised Draw ing CHA_WG_GCU_03_23_01_E-004.pdf The time and date for receipt of proposals remains unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 40
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-May-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127821R0053
X 9B. DATED (SEE ITEM 11)
06-May-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-May-2021
CODE
ENDIST MOBILE CONTRACTING DIVISION
109 ST JOSEPH ST
MOBILE AL 36602
W91278 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
South Atlantic Division USACE 19MU12
W9127821R0053
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
SAD CONTROL SATOC SPECIFICATIO
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 10 10.00 25 CONTRACTOR'S REQUIREMENTS AND PERFORMANCE OF WORK
01 10 10.00 25 CONTRACTOR'S OPERATIONS AND REQUIREMENTS
01 22 00.00 26 MEASUREMENT AND PAYMENT
DIVISION 26 - ELECTRICAL
26 05 19.00 26 INSULATED WIRE AND CABLE
DIVISION 40 - PROCESS INTEGRATION
40 95 00.00 26 PROCESS CONTROL
-- End of Project Table of Contents –
01 10 10.00 25
CONTRACTOR'S REQUIREMENTS AND PERFORMANCE OF WORK
1.1 DESCRIPTION OF WORK
The U.S. Army Corps of Engineers (USACE), South Atlantic Division (SAD) has identified a requirement for the upgrade of its generator control system.
This contract and effort extents to 13 hydropower facilities in the SAD region (Virginia, South Carolina, Georgia, Alabama, and Florida).
This is critical to the Southeastern Power Administration (SEPA) mission to support the power needs of its customers in the Southeast and operate the electric grid reliably. The award will result in a Firm Fixed Price Indefinite Delivery Indefinite Quantity (IDIQ) Single Award Task Order Contract (SATOC). The SATOC will have a performance period of five(5) years or until capacity is exhausted. Capacity will be $15 million. This contract will not be subject to Cost Accounting Standard, nor will certified cost or pricing information be required. Contractor tasks and required submittals will be specified under each Task Order executed under this contract. This contract will provide immediate response capacity for order of control cabinets specified herein. These control cabinets will be used as Remote Terminal Units (RTU) for a Programable Logic Control (PLC) system. Task Orders will be issued on an as-required basis.
1.2 General Services.
The contractor will provide assembled cabinets to the hydropower facilities specified in each task order. Certain specified brands must be used internal to the cabinets. The following specific brands will be used in the task orders: SoftPLC Corporation Hardbook, Monaghan Engineering Sequence of Events Recorder, Cisco Network equipment, SEL Protective Relays and Revenue Meters, Allen-Bradley ControlLogix Platform, ProSoft Modbus Communication Module, and LuxLink IRIG Transmitter/Receiver. All other components of the cabinets will not be brand specific but must meet the minimum requirements of the specifications herein. The brands used in the initial task order must maintain consistent with future task orders. This is to maintain consistency across the region.
1.3 CONTRACTING OFFICER
The Contracting Officer who signed this contract is the primary Contracting Officer for the contract. Nevertheless, any Contracting Officer assigned to the Mobile District and acting within his/her authority may take formal action on this contract when a contract action needs to be taken and the primary Contracting Officer is unavailable.
1.3 General
U.S. Army, Corps of Engineers, Mobile District, 109 Saint Joseph St, Mobile, AL 36602. Letters shall be signed by the Project Manager or by assistants designated to act for the Project Manager. A list of personnel so designated shall be furnished. SATOC duration shall be 5 years. The contractor will be required to deliver 3 completed cabinets at a minimum of every 3 months from task order award until task order completion.
2.0 PERFORMANCE OF SERVICES
2.1 Rendering Service
The Contractor shall render the required services as entailed by the individual Task Order Performance Work Statement, as ordered by the Contracting Officer during the contract period. The Contractor shall be capable of supporting the delivery of one completed line item or three completed cabinets no more than90 days after issuance of the task order and approval of submittals. The contractor must be able to support three simultaneous task orders at the same time or nine cabinets. SATOC duration shall be 5 years.
2.2 Designation of Program Manager
Within five (5) calendar days from the date of contract award of the base contract, the Contractor(s) shall notify the Government as to whom it has designated as the Program Manager for the services to be received under this contract. The Program Manager shall serve as the point of contact between the Government and the Contractor and shall have full authority to act on behalf of the Contactor.
2.3 Travel
Travel will not be required for this contract. The cabinets will be drop shipped to the projects.
2.4 Quality Control
The contractor, not the Government, is responsible for quality control actions necessary to meet the quality standards set forth by the contract.
The contractor shall develop and submit his Quality Control Plan (QCP) for Government approval after Task Order Issuance in compliance with the statement of work. The Government reserves the right under the Contract Terms and Conditions—Commercial Items (FAR 52.212-4) to inspect and test the services called for by the contract, to the extent practicable at all times and places during the term of the contract. Non-conforming services shall be rejected.
3.0 ORDERING PROCEDURES FOR INDIVIDUAL TASK ORDERS
3.1 Requests for Proposals (RFPs).
When the Government requires work under this SATOC, a Request for Proposal will be issued. The RFP will include a statement of work describing the work to be performed, any special instructions and conditions, specifications and/or drawings, guide specifications, attachments, information pertaining to a site visit, and any other requirements necessary for submission. In the event the contractor is unable to submit an offer in response to a Task Order RFP, the Contractor shall immediately notify the Contracting Officer in writing.
3.2 Competition.
Any Task Orders will be awarded on a Firm Fixed-Price basis. Task Order proposals will be evaluated to determine price reasonability and to ensure the SOW is accurately considered in the proposal’s preparation.
3.2.1 Whenever possible, award will be made without discussions. However, if discussions are required, the Contractor will be requested to submit a final proposal revision. The awarded Task Order will be firm-fixed price with a specific completion date.
3.3 Site-Visits.
Site visits will not be required
1. PERIOD OF SERVICE
(a) This contract will consist of a base ordering period with five one-year option periods. Each ordering period shall not exceed one year, for a total contract period not to exceed five years.
(b) The Government reserves the right to exercise an option at any time during the ordering period provided it notifies the Contractor
(c) The base ordering period shall begin upon the date of contract award and shall continue for a period of one year from that date, unless it is either terminated sooner in accordance with the TERMINATION contract clause, or the Contracting Officer exercises an option before that date.
(d) Contract capacity is only limited to the overall amount of $15,000,000.00 and may be utilized within any ordering period so long as total contract capacity does not exceed this amount.
2. QUALITY CONTROL
The contractor shall establish and maintain quality control for task orders.
The contractor shall record on required projects any problem in complying with laws, regulations, and ordinances and corrective action taken.
52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 60 calendar days; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 calendar days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 5 years and 6 months.
(End of clause)
01 10 10.00 25
CONTRACTOR'S OPERATIONS AND REQUIREMENTS
1.1 DESCRIPTION OF WORK
This section covers general requirements applicable to specific Contractor's delivery of equipment for this contract.
1.2 CONTRACTING OFFICER
The Contracting Officer who signed this contract is the primary Contracting Officer for the contract. Nevertheless, any Contracting Officer assigned to the Mobile District and acting within his/her authority may take formal action on this contract when a contract action needs to be taken and the primary Contracting Officer is unavailable.
1.3 General
U.S. Army, Corps of Engineers, Mobile District, 109 Saint Joseph St, Mobile, AL 36602. Letters shall be signed by the Project Manager or by assistants designated to act for the Project Manager. A list of personnel so designated shall be furnished.
1.4 SUBMITTALS
Government review and approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Prework Submittals
Schedule for Work;
Contractor's quality control (CQC) plan
1.5 SCHEDULE FOR WORK
The Contractor shall submit a schedule for accomplishing the work in this contract. The schedule will not be used by the Government to select a Contractor; rather it will be used to ensure that the Contractor is capable of accomplishing the necessary work in the allotted time periods. Schedules must be in Gantt chart format and be in Pdf, Excel, or MS Projects.
1.6 Contractor's quality control
The Contractor shall maintain an effective quality control system. The Contractor's system shall encompass all actions involving selection of construction material sources and suppliers, on-site and off-site fabrication of Contractor furnished items to be included in the work, on-site and off- site production of construction materials, work placement procedures, workmanship, inspection, and testing. The system shall provide the necessary supervision, inspection, and tests of all items of work, including that of its suppliers and subcontractors, that will assure the compliance of all work with applicable requirements and drawings in respect to the Contractor furnished equipment, materials, workmanship, construction, finish, functional performance, and identification. The Contractor's system shall encompass all management and supervisory actions taken by its staff that affect quality of the finished construction work, including all inspection controls and tests required for compliance with the contract, except for those inspections and tests specifically reserved to be accomplished by the Government. Contractor shall submit Contractor's quality control (CQC) plan
POINT OF CONTACT
Technical point of contact for communication with the COE shall be:
Nathan Britt Project Manager, Hydropower Technical Services Center U.S. Army Corps of Engineers, Mobile District Phone: 706-566-9673
(251) 694-3705
E-mail: Justin.n.Britt@usace.army.mil
SECTION 01 22 00.00 26
MEASUREMENT AND PAYMENT
1.1 GENERAL INFORMATION
In each instance the contract price for an item will constitute full compensation as herein specified, as shown, or as otherwise approved. The contract price and payment will also constitute full compensation for all work incidental to completion of the item, unless such work is otherwise specifically mentioned for separate payment under another bid item. In the event any work is required by the specification sections or by the drawings and not specifically mentioned in the measurement and payment paragraphs, separate or direct payment will not be made and all costs thereof are incidental to and included in the contract prices and payments for all items listed in the bid schedule.
1.2 MEASUREMENT
Items measured as per JOB will be measured for payment as a completed job, in place, in the locations indicated. This measurement includes measurement of all incidental work and materials that are necessary to make a complete job. Unless the payment paragraph makes a specific exception of an item, incidental items will not be measured under another item, even though there is another listing for the work or material.
1.2.1 JOB PAYMENT ITEMS
All costs for items of work, which are not specifically mentioned to be included in a particular job payment item, must be included in the listed job payment item most closely associated with the work involved.
The job payment price and payment made for each item listed will constitute full compensation for furnishing all labor, materials, and equipment; performing all associated Contractor quality control, environmental protection, commissioning, preparation of as-builts, O&M manuals, tests and reports, meeting safety requirements; and for performing all work required for which separate payment is not otherwise provided. A schedule of values for job payment items shall be provided with each payment request.
1.3 PAYMENT
Payment for all work specified, shown, or incidental to complete the work will be made as follows:
1.3.1 Providing Completed Control Cabinets
Payment shall be made for delivery and acceptance of completed control cabinets and their as-delivered drawings. All cabinets specified in a task order must be delivered before payment.
1.3.2 Providing Spare Parts
Payment will be made for delivery of spare parts listed in the base bid schedule. Payment will be made after all parts specified in a task order have been delivered.
1.3.3 Providing Miscellaneous Assembly Supplies
Payment will be made for the miscellaneous assembly supplies to go from the base parts listed in the initial task order to possible upgraded or changed model numbers in the future.
SECTION 26 05 19.00 26 Page
SAD GDACS RTU Cabinets SADRTUSATOC19
PART 1
GENERAL
SECTION 26 05 19.00 26
INSULATED WIRE AND CABLE
09/17
1.1.1 General
This Section covers the wire and cable to be used in the fabrication of the control cabinets specified in Section 40 95 00.00 26.
1.1.2 Related Documents
Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 00 Specification Sections apply to this Section.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM B3 (2013) Standard Specification for Soft or Annealed Copper Wire
ASTM B33 (2010; R 2014) Standard Specification for Tinned Soft or Annealed Copper Wire for Electrical Purposes
ASTM B8 (2011; R 2017) Standard Specification for Concentric-Lay-Stranded Copper Conductors, Hard, Medium-Hard, or Soft
INSULATED CABLE ENGINEERS ASSOCIATION (ICEA)
ICEA S-100-685 (2016) Thermoplastic Insulated and Jacketed Telecommunications Station Wire For Indoor/Outdoor Use
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE 1202 (2006) Flame-Propagation Testing of Wire and Cable
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA WC 57/ICEA S-73-532 (2004) Control, Thermocouple Extension, and Instrumentation Cables
NEMA WC 66/ICEA S-116-732 (2013) Category 6 and 6A, 100 Ohm, Individuality Unshielded Twisted Pairs, Indoor Cables (With Or Without An Overall Shield) For Use In Lan Communication Wiring Systems
NEMA WC 70/ICEA S-95-658 (2009) Non-Shielded Power Cables Rated 2000 Volts or less for the Distribution of Electrical Energy
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2017) National Electrical Code UNDERWRITERS LABORATORIES (UL) UL 44 (2014; Reprint Feb 2015) Thermoset-Insulated Wires and Cables
UL 1685 (2000) Vertical-Tray Fire-Propagation and Smoke-Release Test for Electrical and Optical-Fiber Cables
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Submit within 60 days after Notice To Proceed:
Signal and Communications Cable; G HDC Control Panel Shop Wiring; G HDC Ground Conductors Wire Marking Terminations; G, HDC Ethernet Cable; G, HDC SD-06 Test Reports Submit three certified copies within 10 days after completion of tests:
Factory Inspection and Tests; G HDC
1.4 INSPECTION AND TESTS
1.4.1 General
Inspection and tests of wire and cable furnished under these specifications shall be made by and at the plant of the manufacturer. Testing in general shall comply with Section 6 of NEMA WC 57/ICEA S-73-532 or Section 6 of NEMA WC 70/ICEA S-95-658 as applicable. Specific tests required for particular materials, components, and completed cables shall be as specified in the sections of the above standards applicable to those materials, components, and cable types. Tests shall also be performed in accordance with the additional requirements specified below. In addition to the manufacturer's routine sample testing, each reel provided must have passed an insulation resistance test and a shield continuity test. No wire or cable may be shipped until after the manufacturer's test reports have been submitted and approved.
1.4.2 Flame Tests
All multiple-conductor and single-conductor cable assemblies shall pass IEEE 1202 flame tests (formerly under IEEE 383) or UL 1685 flame tests.
Single-conductor cables and individual conductors of multiple-conductor cables shall pass the flame test of Section 6.16 of NEMA WC 57/ICEA S-73-532 or Section 7.3 of NEMA WC 70/ICEA S-95-658 as applicable. If such tests, however, have previously been made on identical cables, these tests need not be repeated. Instead, certified reports of the original qualifying tests shall be submitted.
1.4.3 Independent Tests
The Government may at any time make visual inspections, continuity or resistance checks, insulation resistance readings, partial discharge tests, dissipation factor tests, or DC high-potential tests at field test values.
A cable's failure to pass these tests and inspections, or failure to produce readings consistent with acceptable values for the application, will be grounds for rejection of the cable.
PART 2 PRODUCTS
2.1 INSULATED WIRE AND CABLE
2.1.1 General
All wire and cable shall be provided by the Contractor and shall conform to the requirements specified herein. Characteristics, including conductor size, stranding, number of conductors, rated circuit voltage, cabling, and other requirements for each type of service, shall be as indicated on the drawings, or as specified under the detailed requirements of these specifications for the particular construction or use, unless otherwise stated.
2.1.2 Governing Standards
Materials, construction and tests, unless otherwise specified, shall conform to the applicable requirements of NEMA WC 57/ICEA S-73-532 and NEMA WC 70/ICEA S-95-658 as applicable.
2.2 MATERIALS
2.2.1 Submittal Requirements
The Contractor shall submit catalog data to the Contracting Officer for review and/or approval as indicated in the submittal register. Data shall demonstrate compliance with the specifications requirements for all wire and cable types to be provided.
2.2.2 Rated Circuit Voltages
All wire and cable shall have minimum 600 volt rated circuit voltages in accordance with NEMA WC 70/ICEA S-95-658.
2.2.3 Conductors
2.2.3.1 Material for Conductors
Conductors shall conform to all the applicable requirements of Section 2 of NEMA WC 70/ICEA S-95-658 and shall be annealed copper wire conforming to ASTM B3. Copper conductors may be bare, or tin- or lead-alloy-coated, if required by the type of insulation used. Tin-coated copper conductors shall conform to ASTM B33. Conductors shall be solid or stranded as required by subparagraph entitled Stranding. Aluminum conductors will not be accepted.
2.2.3.2 Wire Size
Minimum wire size shall be No. 12 AWG for power and lighting circuits; No.
10 AWG for current transformer secondary circuits; No. 12 AWG for potential transformer circuits; No. 14 AWG for relaying, control, and annunciation circuits; and No. 16 AWG for RTD, RTU, and PLC circuits. No.
18 AWG may be submitted as a variance for PLC module interconnection wiring if required by terminal size limitations, but shall not be run outside the PLC enclosure. The submittal shall include the reason for the variance request.
2.2.3.3 Stranding
Conductor stranding classes cited herein shall be as defined in Appendix G of NEMA WC 70/ICEA S-95-658. Conductors No. 10 AWG and smaller shall be solid for 120 volt lighting and receptacles, and for all other uses shall have Class B or Class C stranding as defined in Table 1 of ASTM B8. Any conductors used between stationary and moving devices, such as hinged doors or panels, shall be Class H or K stranding. All other conductors shall have class C stranding.
2.2.4 Insulation
2.2.4.1 Insulation Voltage Rating and Insulation Level
The rated voltage of the insulation shall be 600 volts for all circuits.
2.2.4.2 Insulation Material
Except as otherwise specified under paragraph SPECIAL WIRE AND CABLE, insulation shall be cross-linked thermosetting polyethylene (XLPE) type or an ethylene-propylene rubber (EPR) type meeting the requirements of Section 3 of NEMA WC 70/ICEA S-95-658. Cables accepted as a variance for No.
18 under paragraph WIRE SIZE may have a non-PVC thermoplastic insulation and shall be UL Listed. Polyvinyl Chloride (PVC) insulation will not be accepted.
2.2.4.3 Insulation Thickness
The insulation thickness for each conductor shall be based on its insulation material.
a. Single-Conductor Cables - The insulation thickness for single-conductor cables shall be as required by
NEMA WC 70/ICEA S-95-658 Section 3.3 Tables for Insulation Classes R, X, and E.
b. Multiple-Conductor Control Cables - The insulation thickness of the individual conductors of multiple-conductor (multiconductor) cables shall be as required by NEMA WC 70/ICEA S-95-658 Section 3.3 Tables for Insulation Classes R, X, or E for cables used for power, or NEMA WC 57/ICEA S-73-532 Section 3.3 Tables for insulations XLPE, ER, SR, CSPE, or EP composites for cables used for control and related purposes.
2.2.4.4 Insulation Shielding
Shielding, where specified for control cables, shall conform to the requirements of Section 4.1 of NEMA WC 57/ICEA S-73-532.
2.2.5 Jackets
All cables shall have jackets meeting the requirements of Section 4.2 of NEMA WC 57/ICEA S-73-532 or Section 4.1 of NEMA WC 70/ICEA S-95-658, and as specified herein. Individual insulated conductors listed in UL 44 Table 19 as optional or none for jacket type need not be jacketed.
Individual conductors of multiple-conductor cables shall be required to have jackets only if they are necessary for the conductor to meet other specifications herein. Jackets of single-conductor cables and of individual conductors of multiple-conductor cables, except for shielded cables, shall be in direct contact and adhere or be vulcanized to the conductor insulation. Multiple-conductor cables and shielded single-conductor cables shall be provided with a common overall jacket, which shall be tightly and concentrically formed around the core.
Repaired jacket defects found and corrected during manufacturing are permitted if the cable, including jacket, afterward fully meets these specifications and the requirements of the applicable standards.
2.2.5.1 Jacket Material
The jacket shall be one of the materials listed below, in accordance with the applicable paragraphs of NEMA WC 70/ICEA S-95-658. Polyvinyl chloride compounds will not be permitted. Variations from the materials required below will be permitted only if approved for each specific use, upon submittal of sufficient data to prove that they exceed all specified requirements for the particular application.
a. Heavy-duty black neoprene (CR).
b. Heavy-duty chlorosulfonated polyethylene (CSPE).
c. Heavy-duty cross-linked (thermoset) chlorinated polyethylene
(XL-CPE).
Cables accepted as a variance for No. 18 under paragraph WIRE SIZE may have a thermoplastic jacket if it is UL listed and is rated for low smoke and/or zero halogen. PVC jackets will not be accepted.
2.2.5.2 Jacket Thickness
The minimum thickness of the jackets at any point shall be not less than 80 percent of the respective nominal thicknesses specified below:
a. Thickness of the jackets of the individual conductors of multiple-conductor cables shall be as required by Section 4.1 of NEMA WC 70/ICEA S-95-658, and shall be in addition to the conductor insulation thickness for the insulation used. Thickness of the outer jackets or sheaths of the assembled multiple-conductor cables shall be as required by Section 4.1 of NEMA WC 70/ICEA S-95-658.
b. Single conductor cables, if nonshielded, shall have a jacket thickness as specified in Section 4.1 of NEMA WC 70/ICEA S-95-658. If shielded, the jacket thickness shall be in accordance with the requirements of Section 4.1 of NEMA WC 70/ICEA S-95-658.
2.2.6 Cabling
Individual conductors of multiple-conductor cables shall be assembled with flame-and moisture-resistant fillers, binders, and a lay conforming to Section 5 of NEMA WC 57/ICEA S-73-532 or Section 5 of NEMA WC 70/ICEA S-95-658 as applicable, except that flat twin cables will not be permitted. Fillers shall be used in the interstices of multiple-conductor round cables with a common covering where necessary to give the completed cable a substantially circular cross section. Fillers shall be non-hygroscopic material, compatible with the cable insulation, jacket, and other components of the cable. The rubber-filled or other approved type of binding tape shall consist of a material that is compatible with the other components of the cable and shall be lapped at least 10 percent of its width.
2.2.7 Dimensional Tolerance
The outside diameters of single-conductor cables and of multiple-conductor cables shall not vary more than 5 percent and 10 percent, respectively, from the manufacturer's published catalog data.
2.2.8 Color-Coding
Only one color-code method shall be used for each cable construction type.
Colored braids will not be permitted. Control cable color-coding shall be in accordance with Table E-2 of NEMA WC 57/ICEA S-73-532. Power cable color-coding for 208/120 volt systems shall be black for Phase A, red for Phase B, blue for Phase C, and white for grounded neutral. Color coding for 480/277 volt systems shall be brown for Phase A, orange for Phase B, yellow for Phase C, and gray for grounded neutral. Green shall be used only for grounding conductors if insulated.
2.3 SPECIAL WIRE AND CABLE
2.3.1 Control Panel Shop Wiring
Wiring for factory assembled control panels shall be type SIS conforming to the applicable requirements of NEMA WC 70 for 600-volt single conductor power cable. Conductor size shall be No. 16 AWG minimum. The completed installation shall conform to all requirements of NFPA 70. “UL 44 VW-1” requirement for the rating of the SIS wire to be used for the panel wiring
2.3.2 Signal and Communications Cable
The cable shall conform to the applicable requirements of UL 44 and NEMA WC 57/ICEA S-73-532. Conductors shall be tinned copper conforming to Section 2.3 of NEMA WC 57/ICEA S-73-532 with Class C or Class K stranding as defined in Appendix G of NEMA WC 70/ICEA S-95-658. Minimum conductor size shall be No. 18 AWG. Conductors shall be insulated for 600 volts with a thermoset insulation conforming to NEMA WC 57/ICEA S-73-532 Section
3.3 Tables for insulations XLPE, ER, SR, CSPE, or EP composites. Overall shielding shall be provided by aluminum-Mylar tape to provide 100 percent coverage. A drain wire in continuous contact with the shield shall be provided as described in NEMA WC 57/ICEA S-73-532 Section 4.1 for metal thickness of 0.001 inch or less. Overall shields shall be provided for multiple-shielded pair or triplet cables. A thermoset jacket shall also be provided over shielded pairs or triplets of multiple-grouped cables in accordance with Section 4.2 and Table 4-1 of NEMA WC 57/ICEA S-73-532 for equivalent diameter of single conductor cables. Individual conductors of shielded and jacketed twisted pairs and triplets and jackets over paired or tripled conductors shall be color coded in accordance with Appendix E of NEMA WC 57/ICEA S-73-532. Polyvinyl chlorine (PVC) insulation or jacketing will not be accepted. Individual conductors and cable assemblies shall pass the flame tests described in paragraph FLAME TESTS.
2.3.3 Ground Conductors
Ground conductors shall be bare, soft-drawn, Class A or B stranded copper cables sized in accordance with NFPA 70. Ground conductors size No. 10 and smaller shall be solid. Ground conductors size No. 6 and larger shall be Class A stranded.
2.3.4 Ethernet Cable
Ethernet cable shall be unshielded twisted pair (UTP), four-pair 24 AWG solid copper, color-coded wire complying with ICEA S-100-685, plenum-rated (CMP) throughout. Category shall be CAT 6 conforming to NEMA WC 66/ICEA S-116-732. Individual conductor insulation shall be a polyolefin material rated at least 300 volts. PVC insulation will not be accepted. Overall core foil shields are not required, but must be grounded at one end only during installation, if provided as a variance.
Cable outer jackets shall comply with NEMA WC 66/ICEA S-116-732 Section
5.1.2 for low halogen materials. PVC jackets will not be accepted.
PART 3 EXECUTION
3.1 INSTALLATION INSTRUCTIONS
3.1.1 General
For the purposes of this contract, the term "internal wiring" shall be used to designate the Contractor's factory installed wiring furnished with the furnished equipment. Different voltages shall not be run within the same multiconductor cable.
3.1.2 Bends
The minimum radius to which an insulated conductor or a multiconductor cable may be bent, without specific approval, whether permanently or temporarily during installation, shall be 12 times the overall diameter of the completed cable for tape shielded cables and 10 times the overall diameter for other cables. In these instances where this radius is not possible, approval will be required for minimum radii as specified in NFPA
70. For multiconductor cable, follow manufacturer's recommendation for type of cable involved.
3.1.3 Splices
Splices will not be permitted any where inside the control cabinet.
3.1.4 Terminations
All internal wire terminations shall be made using wire ferrules with the exception of PT/CT signal wires. PT/CT signal wires shall terminate on post terminals using ring tongue terminals and devices using wire ferrules.
Submit all terminals and associated cimping tools that will be used. The shield and shield insulating jacket of shielded signal cables and conductors, if applicable, shall be maintained to a point as close to the terminals as possible. The shield insulating jacket shall not be stripped from the shield except where necessary to make the ground connection. All signal cable shields shall be grounded at one end only.
Spare conductors shall be terminated on an available unused terminal of a terminal block and labled as SPARE at both ends, or if left unterminated shall have the exposed ends wrapped in insulating tape and labled as SPARE at both ends.
3.1.5 Wire Marking
All wires and cables shall be identified on both ends by the designations as shown on the Contract drawings or as otherwise shown on approved shop drawings. All wires and cables shall be clearly identified with the cable designation by tube-type markers as described in subparagraph Marking.
Wires, cables and individual conductors of multiconductor cables shall be identified with markers at each termination. Installed markers shall be uniform in position on the wire and cable, and legends shall be visible when conductors are terminated at the equipment.
3.1.5.1 Marking
Tubing shall be sized to fit the wire being marked and shall have permanent black marking on a light colored background. Tube-type markers shall be suitable for contact with the type of insulation material used. The markers shall have been tested by an independent testing laboratory or by the manufacturer to indicate that the markers will not stain or discolor when subjected to an accelerated aging test while in contact with wire insulating materials and ultraviolet light exposure.
-- End of Section --
SECTION 40 95 00.00 26 Page 1
PART 1 GENERAL
1.1.1 General
SECTION 40 95 00.00 26
PROCESS CONTROL
10/07
This Section covers the fabrication of the control cabinets for the equipment specified in Section 40 63 43.00 27. Supply all additional equipment necessary to install the components in the configuration shown in the Contract drawings and in accordance with the manufacturers' recommendations.
1.1.2 Related Documents
Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 00 Specification Sections apply to this Section.
1.1.3 Related Sections
a. Section 26 05 19.00 26, INSULATED WIRE AND CABLE
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D709 (2013) Laminated Thermosetting Materials
BUILDERS HARDWARE MANUFACTURERS ASSOCIATION (BHMA)
ANSI/BHMA A156.2 (2011) Bored and Preassembled Locks and Latches
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE C37.90 (2005; R 2011) Standard for Relays and Relay Systems Associated With Electric Power Apparatus
IEEE Stds Dictionary (2009) IEEE Standards Dictionary: Glossary of Terms & Definitions INTERNATIONAL ELECTROTECHNICAL
COMMISSION (IEC)
IEC 60068-2-6 (2007) Environmental testing – Part 2-6:
Tests – Test Fc: Vibration (sinusoidal)
SECTION 40 95 00.00 26 Page 2
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA ICS 1.1 (1984; R 2003) Safety Guidelines for the Application, Installation, and Maintenance of Solid State Control
NEMA ICS 6 (1993; R 2011) Enclosures
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2014; AMD 1 2013; Errata 1 2013; AMD 2 2013; Errata 2 2013; AMD 3 2014; Errata
3-4 2014; AMD 4-6 2014) National Electrical Code UNDERWRITERS LABORATORIES (UL) UL 50 (2007; Reprint Apr 2012) Enclosures for Electrical Equipment, Non-environmental Considerations
UL 508A (2013; Reprint Jan 2014) Industrial Control Panels
UL 508 (1999; Reprint Oct 2013) Industrial Control Equipment
UL 94 (2013; Reprint Jan 2016) Standard for Tests for Flammability of Plastic Materials for Parts in Devices and Appliances
1.3 DEFINITIONS
Definitions, Symbols, and engineering unit abbreviations shall conform to IEEE Stds Dictionary, as applicable.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government; "HDC" for Hydroelectric Design Center. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Shop Drawings; G, HDC
As-Shipped Drawings; G, HDC SD-03 Product Data Manufacturer's Catalog Data; G HDC Materials and Equipment List; G HDC Factory Test Procedure; G HDC
SECTION 40 95 00.00 26 Page 3
List of Spare Parts; G HDC Escutcheons And Nameplates; G, HDC SD-06 Test Reports
Factory Test Report; G HDC
1.5 GENERAL REQUIREMENTS
1.5.1 Materials, Equipment and Installation
New materials and equipment must be furnished and any defective material or equipment damaged in the course of installation must be replaced or repaired. Testing must be performed to check the installation of and the proper operational functions of the electrical equipment. The installations must be in accordance with the National Electrical Code, NFPA 70, and the National Electrical Safety Code, IEEE C2, except where otherwise specifically shown or specified, in which case the drawings and specifications must govern. Omission of details on the drawings or in the specifications must not be construed as permitting deviations from Code requirements.
1.5.2 Standard Products
Material and equipment must be the standard products of manufacturers regularly engaged in the manufacture of these products and must essentially duplicate items that have been in satisfactory use for at least 5 years prior to proposal due date.
1.5.3 Corrosion Prevention
1.5.3.1 General
All equipment must be protected to prevent deterioration from corrosion.
The general requirements are specified below; however, other corrosion-resisting treatments that are the equivalent of those specified may be used. Materials used for corrosion prevention must be submitted for approval under SD-03 Product Data.
1.5.3.2 Fastenings and Fittings
Screws, bolts, nuts, pins, studs, springs, washers and other miscellaneous fastening and fittings must be of corrosion-resistant material or must be treated in an approved manner to render them resistant to corrosion. All fastenings which are to be exposed directly to the weather must be of corrosion-resisting material.
1.5.3.2.1 Corrosion-Resisting Materials
Corrosion-resisting steel, copper, brass, bronze, copper-nickel-copper alloys are acceptable corrosion-resisting materials.
1.6 QUALITY ASSURANCE
a. Control panels supplied under this Section shall be provided by a single manufacturer, unless provided with equipment specified under other Divisions.
SECTION 40 95 00.00 26 Page 4
b. Prior to shipment to the project site, test completed control panels in panel fabricators shop as specified in paragraph entitled
FACTORY TEST.
1.7 STORAGE AND HANDLING
a. After completion of shop assembly and testing, enclose panels in heavy-duty polyethylene envelopes or secured sheeting to provide complete protection from dust and moisture. Place dehumidifiers inside the polyethylene covering.
b. Skid-mount the equipment for final transport. Show shipping weight on shipping tags, together with instructions for unloading, transporting, storing, and handling on job site.
c. Carefully package and clearly mark all spare parts and accessories.
1.8 SYSTEM DESCRIPTION
1.8.1 Design Requirements
The cabinet shall include racks, central processing units (CPUs), input/output (I/O) modules, communication models, power supplies, and associated accessory items to provide a complete and functional control system. Systems to be controlled include: hydroelectric power generator unit, plant station services, and auxiliary river and flood control sites.
Cabinets will have differing equipment requirements and quantities based on system as shown in Contract drawings.
1.8.2 Programming
The PLC code will be programmed by Government personnel.
1.9 CONTRACT DRAWINGS
1.9.1 General
a. The contract drawings indicate the work to be accomplished in as much detail as is practical. Except for such modifications as may be required for coordination with equipment actually furnished, they constitute the working drawings for construction and for purchase of required materials. The contract drawings must be superseded by manufacturer's shop drawings when available.
b. Field verify all existing dimensions, details, and features relevant to requirements for equipment, apparatus, and other coordinating features required for the design, manufacture, and installation of the new equipment and accessories.
1.9.2 Departure From Drawings
If departures from the contract drawings are necessary, details of such departures and reasons for them must be submitted not later than 90 days before scheduled delivery date. No such departures will be made without prior written approval. The control schemes shown on the contract drawings are not intended to exclude the Contractor's method for accomplishing the functions indicated. However, if any alternate equipment is approved, the Contractor must bear the cost and be
SECTION 40 95 00.00 26 Page 5 responsible for furnishing and installing any additional wiring devices that are required.
1.10 SHOP DRAWINGS
Shop drawings for construction shall be furnished in PDF format 45 calendar days after the date of issuance of Notice to Proceed. Provide as-shipped drawings at the time of final factory testing. The drawings shall be submitted in PDF and AutoCad (.DWG) format. The Owner's Representative shall review the drawings against the panel construction at the time of final factory testing. Drawings which do not reflect the actual construction of the panel will need to be revised and reviewed again by the Owner's Representative against the actual construction prior to shipment of the panel to the job site. 'As shipped' drawings which require revisions shall be submitted to the Owner's Representative for review prior to the actual field review of these drawings against the panel construction.
This process of revision and review of the drawings will be repeated as necessary to produce drawings which reflect the actual construction of the panel at the time of shipment. Do not ship panels to the site until the 'as-shipped' drawings are updated, complete, and reflect the actual 'as-shipped' status of the panel. Provide an 11"x17" paper copy of the final as-shipped drawings inside the shipped cabinet.
Shop drawings shall be dimensioned and to-scale where appropriate, and show:
a. Enclosure details
b. Panel layout
c. Arrangement, connection, and interconnection of PLC system components
d. Wiring access locations
e. Wiring diagrams
f. Instrument loop diagrams.
PART 2 PRODUCTS
All drawings and devices will be the property of the government and shall be capable of being altered as needed by government personnel. There will be no devices that have code or settings that are locked out as propietary and unavailable for changes.
2.1 MATERIALS AND EQUIPMENT
Provide Manufacturer's Catalog Data for all materials and equipment provided. Manufacturer's Catalog Data composed of catalog cuts, brochures, circulars, specifications, product data, and printed information in sufficient detail and scope to verify compliance with the requirements of the Contract documents. Standard catalog data will not be acceptable unless irrelevant parts are marked out and relevant parts are clearly identified.
Manufacturer's catalog data shall be included in the required Operation and Maintenance data as indicated above.
One Materials and Equipment List shall be provided per cabinet type 30 calendar days after the date of issuance of Notice to Proceed. The Materials and Equipment List shall consists of a list of all Materials and
SECTION 40 95 00.00 26 Page 6
Equipment used in the construction of the cabinet. At minimum the list shall include quantities, model numbers, descriptions.
2.1.1 Compliance with Standards
Equipment shall be new and meet all applicable NEMA and UL construction and rating requirements. No equivalent will be acceptable. Immediately notify the Contracting Officer of any requirements of the specifications or Contractor proposed materials or assemblies that do not comply with UL or NEMA. International Electrotechnical Commission (IEC) rated equipment will not be considered an acceptable alternative to specified NEMA ratings.
2.1.2 Standard Products
Materials and equipment must be standard unmodified products of a manufacturer regularly engaged in the manufacturing of such products.
Units of the same type of equipment shall be products of a single manufacturer. Items of the same type and purpose shall be identical and supplied by the same manufacturer, unless replaced by a new version approved by the Government.
2.1.3 Nameplates
Each major component of equipment shall have the manufacturer's name and address, and the model and serial number in a conspicuous place.
Laminated plastic nameplates shall be provided for equipment devices and panels furnished. Each nameplate shall identify the device. Labels shall be coordinate with the schedules and the process and instrumentation drawings. Laminated plastic shall be 1/8 inch thick. Nameplates shall be a minimum of 1 by 3 inches with minimum 1/4 inch high engraved block lettering. Nameplates for devices smaller than 1 by 3 inches shall be attached by a nonferrous metal chain. All other nameplates shall be attached to the device.
2.2 GENERAL REQUIREMENTS
Equipment and wiring must be in accordance with NFPA 70, with proper consideration given to environmental conditions such as moisture, dirt, corrosive agents, and hazardous area classification.
Conform to NEMA ICS 1.1 for installation and application of the PLC system.
The equipment shall consist of fully integrated microprocessor units specifically designed for operation in unconditioned audible noise and be able to withstand vibration testing of 2g in the frequency range of 10 to 500Hz as described in IEC 60068-2-6
2.3 ACCESSORIES
Provide all accessories and appurtenances required, whether indicated or not, for completely functioning PLC control systems capable of accomplishing the requirements of the Contract documents.
2.4 CONTROL PANELS
2.4.1 Enclosures
The enclosure for each control panel shall conform to the requirements of NEMA ICS 6 and NEMA 250 unless otherwise specified. Control cabinets
SECTION 40 95 00.00 26 Page 7 shall be rated NEMA 12 unless otherwise indicated. Finish color shall be the manufacturer's standard, unless otherwise indicated. Cabinets, boxes, and enclosures with volume greater than 100 cubic inches shall be in accordance with UL 50. Damaged surfaces shall be repaired and refinished using original type finish. Painted steel shall not be allowed for use in a corrosive environment. Control Panel Enclosures shall be factory UL labeled enclosures fabricated into a rigid self-supporting structure.
Hot-dip galvanizing shall be performed after fabrication. Galvanization damaged during installation or drilling shall be repaired with galvanizing repair compound. Sheet steel shall be not lighter than No. 12 U.S.
Standard gauge. Screw-tight or welded hubs shall be provided at conduit entrances. Knockouts will not be permitted. Drilling in the field will only be permitted with specific approval. Cabinets shall be furnished with doors, gaskets and trim.
Stainless steel junction boxes and wall mount enclosures shall be constructed from 16- or 14-gauge Type 304 or 316L stainless steel. The seams shall be continuously welded and ground smooth with no holes or knockouts. Stainless steel enclosures shall meet the requirements of UL 508.