SEE ADDENDUM

(No Collect Calls)

W9127821R0053 06-May-2021

b. TELEPHONE NUMBER

251-441-6172

8. OFFER DUE DATE/LOCAL TIME

02:00 PM 29 Jun 2021

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912789. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

JOAN A RENSINK

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED ORX

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

ENDIST MOBILE CONTRACTING DIVISION

109 ST JOSEPH ST

MOBILE AL 36602

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 16. ADMINISTERED BY

SEE SCHEDULE

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

NAICS:

335314

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF38

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W9127821R0053

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Control Cabinet SAD

FFP

Indefinite Delivery Quantity Contract (SATOC) for the Hydropower Section for the South Atlantic District. (See Bid Sheet)

FOB: Destination

PSC CD: 5999

NET AMT

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 N/A N/A N/A Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 N/A N/A N/A N/A

INSTRUCTIONS TO OFFERORS

This acquisition will be conducted in accordance with all applicable provisions of the Federal

Acquisition Regulation (FAR) procedures in FAR Part 15, and the terms and provisions of the solicitation as a Lowest Price Technically Acceptable source selection process. An informal source selection process will be followed during the procurement. This Lowest Price Technically

Acceptable ( LPTA) will be conducted in accordance with FAR Part 15, the applicable provisions of the DoD FAR Supplement (DFARS), Army FAR Supplement (AFARS), and U.S

Army Corps of Engineers Acquisition Instruction (UAI), and will follow the guidance from the

DoD Source Selection Guide. A Source Selection Evaluation Board (SSEB) will be established to conduct the acceptability of proposals and a Source Selection Authority (SSA) will make the final source selection decision.

TO ENSURE RECEIPT OF YOUR PROPOSAL, IT SHALL BE SUBMITTED VIA EMAIL

TO: CTHYDRO-PROPOSALS@usace.army.mil Include the solicitation number

(W9127821R0053) in the subject line of the e-mail.

Facsimile responses are NOT authorized for this procurement.

Requests for Information regarding this solicitation shall be submitted to ProjNet.

This is a Lowest Priced Technically Acceptable procurement. Refer to 52.212-2 for evaluation factors.

Period for acceptance of offers. Addendum to FAR Clause 52.212-1(c). The offeror agrees to hold the prices in its offer firm for 90 calendar days from the date specified for receipt of offers.

Registration at www.sam.gov is required. If not registered, please do so. Step-by-step help information on how to register is detailed on the website, along with frequently asked questions

(FAQs). Lack of registration in the SAM database will make an offeror ineligible for award.

Completion of the required FAR 52.212-3, Offeror Representations and certifications –

Commercial Items is required. When you complete your SAM registration, the link to complete your Representations and Certifications is also available. Please do not hesitate to contact me or the SAM web site if you need assistance or have questions. Lack of registration in the SAM

Database will make an offeror ineligible for award. Information on how to register and the time required is detailed in the clause. Start by going to www.sam.gov, and then click on the SAM

HELP tab. Under User Help you will find the full User Guide as well as Quick Start Guides and

Helpful Hints that will help you create an account, migrate your roles, perform updates, and search for the information you need.

Proposals are due in accordance with the date on the Solicitation. Any proposals received after this time will be considered non-responsive and shall not be considered for award.

Proposals shall include the following:

mailto:CTHYDRO-PROPOSALS@usace.army.mil

1. Signed and dated Standard Form 1449* (Solicitation/Contract/Order for Commercial

Items)

2. Signed and dated Standard Form 30, if applicable, for any Amendments to the

Solicitation

3. Completed bid schedule (pricing information) for all contract line item numbers

a. Bid Sheet for the SATOC Base Bid

b. Bid Sheet for Seed Project

4. Completed Proposal Data Sheet (See Attachment 1)

5. Completed Clause 52.212-3 and Alt I, “Offeror Representations and Certifications—

Commercial Items” as noted above

6. Proposal information required to evaluate the quote, as stated in FAR Clause 52.212-2.

BIDDER INQUIRY: All inquiries regarding this solicitation are to be submitted via Bidder

Inquiry. Telephone and email inquiries will not be accepted. Bidder Inquiry is a website that allows bidders to post questions regarding the solicitation and view all questions by other bidders and responses by USACE. Bidder Inquiry can be accessed through ProjNet at

(https://www.projnet.org)

To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment

All questions will receive an acknowledgement of their comment/question via email. Another email to the same address will notify the prospective vendor once the reply is available for viewing.

The project identification number is W9127821R0053. The Bidder Inquiry Key is 2AI22R-

U78EFG

The portal will be closed at close of business 5 days before proposal due date.

Specific Instructions for ProjNet Bid Inquiry Access:

1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

2. Identify the Agency. This should be marked as USACE.

3. Key. Enter the Bidder Inquiry Key listed above.

4. Email. Enter the email address you would like to use for communication.

5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.

6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system

Instructions for Entering Questions:

After you are logged in click on the "post new inquiry", it is on the left side of the window under the Word "Submit".

a.) This is the window where you will enter your questions b.) Comment Classification: Click on the down arrow to the right of the words

“Please select from below”, select “Public” c.) Discipline: This is where you select who this question should be directed to. Example: if the question is about an electrical drawing or specification select: “Electrical” from the pull-down list.

d.) Sheet. Enter the sheet number of the drawing you are asking about.

e.) Detail. Enter the detail name of the detail shown on the drawing that you are asking about f.) Specification. Enter the Specification number and paragraph number.

g.) File. Use this if you are going to attach a pdf file.

h.) Question. Enter your question here.

2. For questions about the ProjNet Bidder Inquiry, please contact the Call Center help desk toll free at 1‐800‐428‐ HELP, which operates from 8AM to 5PM (Central US time zone). Bidder inquiry help questions can also be emailed to the helpdesk at staff@projnet.info

This procurement is for a Base and Four Option periods.

ATTACHMENT 1

PROPOSAL DATA SHEET

In addition to the completed and signed SF1449, submit the Proposal Data Sheet and include in

Volume III Administrative Requirements.

1. Name of Solicitation:

2. Offering Firm’s Name as it appears on the SF1449:

Offering Firm’s DUNS number as it appears on the SF1449:

Offering Firm’s CAGE Code as it appears on the SF1449:

3. Mailing Address:

4. Telephone Number:

5. Fax Number:

6. E-mail Address to use for all correspondence:

7. AUTHORIZED NEGOTIATORS. The Offeror represents that the following person(s) are authorized to negotiate on its behalf with the Government in connection with this Request for Proposal (RFP).

List name(s), title, and telephone numbers of authorized negotiator(s).

Name of Person(s) Authorized to Negotiate:

Negotiator’s Address:

Negotiator’s Telephone:

Negotiator’s E-mail:

End of ATTACHMENT 1

ATTACHMENT 2

NOTICE OF EXCEPTIONS

Any exceptions, deviations or waivers from the solicitation shall be specifically identified below.

If none, state so. Any exception, deviation or waiver not specifically identified below, regardless of whether it is included in the proposal, shall be deemed invalid. May supplement with additional pages if necessary.

South Atlantic Division USACE 19MU12

SPECIFICATIONS FOR IDIQ SATOC

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 10 10.00 25 CONTRACTOR'S REQUIREMENTS AND PERFORMANCE OF WORK

01 10 10.00 25 CONTRACTOR'S OPERATIONS AND REQUIREMENTS

01 22 00.00 26 MEASUREMENT AND PAYMENT

DIVISION 26 - ELECTRICAL

26 05 19.00 26 INSULATED WIRE AND CABLE

DIVISION 40 - PROCESS INTEGRATION

40 95 00.00 26 PROCESS CONTROL

-- End of Project Table of Contents –

01 10 10.00 25

CONTRACTOR'S REQUIREMENTS AND PERFORMANCE OF WORK

1.1 DESCRIPTION OF WORK

The U.S. Army Corps of Engineers (USACE), South Atlantic Division (SAD) has identified a requirement for the upgrade of its generator control system. This contract and effort extents to 13 hydropower facilities in the SAD region (Virginia, South Carolina, Georgia, Alabama, and Florida).

This is critical to the Southeastern Power Administration (SEPA) mission to support the power needs of its customers in the Southeast and operate the electric grid reliably. The award will result in a Firm Fixed Price

Indefinite Delivery Indefinite Quantity (IDIQ) Single Award Task Order

Contract (SATOC). The SATOC will have a performance period of five(5) years or until capacity is exhausted. Capacity will be $14 million. This contract will not be subject to Cost Accounting Standard, nor will certified cost or pricing information be required. Contractor tasks and required submittals will be specified under each Task Order executed under this contract. This contract will provide immediate response capacity for order of control cabinets specified herein. These control cabinets will be used as Remote Terminal Units (RTU) for a Programable

Logic Control (PLC) system. Task Orders will be issued on an as-required basis.

1.2 General Services.

The contractor will provide assembled cabinets to the hydropower facilities specified in each task order. Certain specified brands must be used internal to the cabinets. The following specific brands will be used in the task orders: SoftPLC Corporation Hardbook, Monaghan Engineering

Sequence of Events Recorder, Cisco Network equipment, SEL Protective

Relays and Revenue Meters, Allen-Bradley ControlLogix Platform, ProSoft

Modbus Communication Module, and LuxLink IRIG Transmitter/Receiver. All other components of the cabinets will not be brand specific but must meet the minimum requirements of the specifications herein. The brands used in the initial task order must maintain consistent with future task orders.

This is to maintain consistency across the region.

1.3 CONTRACTING OFFICER

The Contracting Officer who signed this contract is the primary

Contracting Officer for the contract. Nevertheless, any Contracting

Officer assigned to the Mobile District and acting within his/her authority may take formal action on this contract when a contract action needs to be taken and the primary Contracting Officer is unavailable.

1.3 General

U.S. Army, Corps of Engineers, Mobile District, 109 Saint Joseph St, Mobile, AL 36602. Letters shall be signed by the Project Manager or by assistants designated to act for the Project Manager. A list of personnel so designated shall be furnished. SATOC duration shall be 5 years. The contractor will be required to deliver 3 completed cabinets at a minimum of every 3 months from task order award until task order completion.

2.0 PERFORMANCE OF SERVICES

2.1 Rendering Service

The Contractor shall render the required services as entailed by the individual Task Order Performance Work Statement,as ordered by the

Contracting Officer during the contract period. The Contractor shall be capable of supporting the delivery of one completed line item or three completed cabinets no more than90 days after issuance of the task order and approval of submittal. The contractor must be able to support three simultaneous task orders at the same time or nine cabinets. SATOC duration shall be 5 years.

2.2 Designation of Program Manager

Within five (5) calendar days from the date of contract award of the base contract, the Contractor(s) shall notify the Government as to whom it has designated as the Program Manager for the supplies to be received under this contract. The Program Manager shall serve as the point of contact between the Government and the Contractor and shall have full authority to act on behalf of the Contactor.

2.3 Travel

Travel will not be required for this contract. The cabinets will be drop shipped to the projects.

2.4 Quality Control

The contractor, not the Government, is responsible for quality control actions necessary to meet the quality standards set forth by the contract. The contractor shall develop and submit his Quality Control

Plan (QCP) for Government approval after Task Order Issuance in compliance with the statement of work. The Government reserves the right under the Contract Terms and Conditions—Commercial Items (FAR 52.212-4) to inspect and test the supplies called for by the contract, to the extent practicable at all times and places during the term of the contract. Non-conforming supplies shall be rejected.

3.0 ORDERING PROCEDURES FOR INDIVIDUAL TASK ORDERS

3.1

Requests for Proposals (RFPs).

tWhen the Government requires work under this SATOC, a Request for Proposal will be issued. The RFP will include a Scope of work describing the work to be performed, any special instructions and conditions, specifications and/or drawings, guide specifications, attachments, information pertaining to a site visit, and any other requirements necessary for submission. In the event the contractor is unable to submit an offer in response to a Task Order RFP, the Contractor shall immediately notify the Contracting Officer in writing.

3.2 Competition.

Any Task Orders will be awarded on a Firm Fixed-Price basis. Task Order proposals will be evaluated to determine price reasonability and to ensure the SOW is accurately considered in the proposal’s preparation.

3.2.1 Whenever possible, award will be made without discussions. However, if discussions are required, the Contractor will be requested to submit a final proposal revision. The awarded Task Order will be firm-fixed price with a specific completion date.

3.3 Site-Visits.

Site visits will not be required

1. PERIOD OF SERVICE

(a) This contract will consist of a base ordering period with four one-year option periods. Each ordering period shall not exceed one year, for a total contract period not to exceed five years.

(b) The Government reserves the right to exercise an option at any time during the ordering period provided it notifies the Contractor

(c) The base ordering period shall begin upon the date of contract award and shall continue for a period of one year from that date, unless it is either terminated sooner in accordance with the TERMINATION contract clause, or the Contracting Officer exercises an option before that date.

(d) Contract capacity is only limited to the overall amount of

$14,000,000.00 and may be utilized within any ordering period so long as total contract capacity does not exceed this amount.

2. QUALITY CONTROL

The contractor shall establish and maintain quality control for task orders.

The contractor shall record on required projects any problem in complying with laws, regulations, and ordinances and corrective action taken.

(a)

01 10 10.00 25

CONTRACTOR'S OPERATIONS AND REQUIREMENTS

1.1 DESCRIPTION OF WORK

This section covers general requirements applicable to specific

Contractor's delivery of equipment for this contract.

1.2 CONTRACTING OFFICER

The Contracting Officer who signed this contract is the primary

Contracting Officer for the contract. Nevertheless, any Contracting

Officer assigned to the Mobile District and acting within his/her authority may take formal action on this contract when a contract action needs to be taken and the primary Contracting Officer is unavailable.

1.3 General

U.S. Army, Corps of Engineers, Mobile District, 109 Saint Joseph St, Mobile, AL 36602. Letters shall be signed by the Project Manager or by assistants designated to act for the Project Manager. A list of personnel so designated shall be furnished.

1.4 SUBMITTALS

Government review and approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00

SUBMITTAL PROCEDURES:

SD-01 Prework Submittals

Schedule for Work;

Contractor's quality control (CQC) plan

1.5 SCHEDULE FOR WORK

The Contractor shall submit a schedule for accomplishing the work in this contract. The schedule will not be used by the Government to select a

Contractor; rather it will be used to ensure that the Contractor is capable of accomplishing the necessary work in the allotted time periods.

Schedules must be in Gantt chart format and be in Pdf, Excel, or MS

Projects.

1.6 Contractor's quality control

The Contractor shall maintain an effective quality control system. The

Contractor's system shall encompass all actions involving selection of construction material sources and suppliers, on-site and off-site fabrication of Contractor furnished items to be included in the work, on-site and off- site production of construction materials, work placement procedures, workmanship, inspection, and testing. The system shall provide the necessary supervision, inspection, and tests of all items of work, including that of its suppliers and subcontractors, that will assure the compliance of all work with applicable requirements and drawings in respect to the Contractor furnished equipment, materials, workmanship, construction, finish, functional performance, and identification. The Contractor's system shall encompass all management and supervisory actions taken by its staff that affect quality of the finished construction work, including all inspection controls and tests required for compliance with the contract, except for those inspections and tests specifically reserved to be accomplished by the Government.

Contractor shall submit Contractor's quality control (CQC) plan

POINT OF CONTACT

Technical point of contact for communication with the COE shall be:

Nathan Britt

Project Manager, Hydropower Technical Services Center

U.S. Army Corps of Engineers, Mobile District

Phone: 706-566-9673

(251) 694-3705

E-mail: Justin.n.Britt@usace.army.mil mailto:Justin.n.Britt@usace.army.mil

SECTION 01 22 00.00 26

MEASUREMENT AND PAYMENT

1.1 GENERAL INFORMATION

In each instance the contract price for an item will constitute full compensation as herein specified, as shown, or as otherwise approved. The contract price and payment will also constitute full compensation for all work incidental to completion of the item, unless such work is otherwise specifically mentioned for separate payment under another bid item. In the event any work is required by the specification sections or by the drawings and not specifically mentioned in the measurement and payment paragraphs, separate or direct payment will not be made and all costs thereof are incidental to and included in the contract prices and payments for all items listed in the bid schedule.

1.2 MEASUREMENT

Items measured as per JOB will be measured for payment as a completed job, in place, in the locations indicated. This measurement includes measurement of all incidental work and materials that are necessary to make a complete job. Unless the payment paragraph makes a specific exception of an item, incidental items will not be measured under another item, even though there is another listing for the work or material.

1.2.1 JOB PAYMENT ITEMS

All costs for items of work, which are not specifically mentioned to be included in a particular job payment item, must be included in the listed job payment item most closely associated with the work involved.

The job payment price and payment made for each item listed will constitute full compensation for furnishing all labor, materials, and equipment;

performing all associated Contractor quality control, environmental protection, commissioning, preparation of as-builts, O&M manuals, tests and reports, meeting safety requirements; and for performing all work required for which separate payment is not otherwise provided. A schedule of values for job payment items shall be provided with each payment request.

1.3 PAYMENT

Payment for all work specified, shown, or incidental to complete the work will be made as follows:

1.3.1 Providing Completed Control Cabinets

Payment shall be made for delivery and acceptance of completed control cabinets and their as-delivered drawings. All cabinets specified in a task order must be delivered before payment.

1.3.2 Providing Spare Parts

Payment will be made for delivery of spare parts listed in the base bid schedule. Payment will be made after all parts specified in a task order have been delivered.

1.3.3 Providing Miscellaneous Assembly Supplies

Payment will be made for the miscellaneous assembly supplies to go from the base parts listed in the initial task order to possible upgraded or changed model numbers in the future.

SAD GDACS RTU Cabinets SADRTUSATOC19

SECTION 26 05 19.00 26 Page 9

PART 1

GENERAL

SECTION 26 05 19.00 26

INSULATED WIRE AND CABLE

09/17

1.1 GENERAL INFORMATION

1.1.1 General

This Section covers the wire and cable to be used in the fabrication of the control cabinets specified in Section 40 95 00.00 26.

1.1.2 Related Documents

Drawings and general provisions of the Contract, including General and

Supplementary Conditions and Division 00 Specification Sections apply to this Section.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM B3 (2013) Standard Specification for Soft or

Annealed Copper Wire

ASTM B33 (2010; R 2014) Standard Specification for

Tinned Soft or Annealed Copper Wire for Electrical Purposes

ASTM B8 (2011; R 2017) Standard Specification for

Concentric-Lay-Stranded Copper Conductors, Hard, Medium-Hard, or Soft

INSULATED CABLE ENGINEERS ASSOCIATION (ICEA)

ICEA S-100-685 (2016) Thermoplastic Insulated and

Jacketed Telecommunications Station Wire For Indoor/Outdoor Use

INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)

IEEE 1202 (2006) Flame-Propagation Testing of Wire and Cable

NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)

NEMA WC 57/ICEA S-73-532 (2004) Control, Thermocouple Extension, and Instrumentation Cables

NEMA WC 66/ICEA S-116-732 (2013) Category 6 and 6A, 100 Ohm, SECTION 26 05 19.00 26 Page

Individuality Unshielded Twisted Pairs, Indoor Cables (With Or Without An

Overall Shield) For Use In Lan Communication Wiring Systems

NEMA WC 70/ICEA S-95-658 (2009) Non-Shielded Power Cables Rated

2000 Volts or less for the Distribution of Electrical Energy

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 70 (2017) National Electrical

Code UNDERWRITERS LABORATORIES (UL)

UL 44 (2014; Reprint Feb 2015)

Thermoset-Insulated Wires and Cables

UL 1685 (2000) Vertical-Tray Fire-Propagation and

Smoke-Release Test for Electrical and Optical-Fiber Cables

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Submit within 60 days after Notice To Proceed:

Signal and Communications Cable; G HDC Control Panel

Shop Wiring; G HDC

Ground Conductors Wire Marking

Terminations; G, HDC

Ethernet Cable; G, HDC SD-06 Test

Reports

Submit three certified copies within 10 days after completion of tests:

Factory Inspection and Tests; G HDC

1.4 INSPECTION AND TESTS

1.4.1 General

Inspection and tests of wire and cable furnished under these specifications shall be made by and at the plant of the manufacturer. Testing in general shall comply with Section 6 of NEMA WC 57/ICEA S-73-532 or Section 6 of NEMA WC 70/ICEA S-95-658 as applicable. Specific tests required for particular materials, components, and completed cables shall be as specified in the sections of the above standards applicable to those materials, components, and cable types. Tests shall also be performed in accordance with the additional requirements specified below. In addition to the manufacturer's routine sample testing, each reel provided must have passed an insulation resistance test and a shield continuity test. No wire or cable may be shipped until after the manufacturer's test reports have been submitted and approved.

1.4.2 Flame Tests

All multiple-conductor and single-conductor cable assemblies shall pass

IEEE 1202 flame tests (formerly under IEEE 383) or UL 1685 flame tests.

Single-conductor cables and individual conductors of multiple-conductor cables shall pass the flame test of Section 6.16 of

NEMA WC 57/ICEA S-73-532 or Section 7.3 of NEMA WC 70/ICEA S-95-658 as applicable. If such tests, however, have previously been made on identical cables, these tests need not be repeated. Instead, certified reports of the original qualifying tests shall be submitted.

1.4.3 Independent Tests

The Government may at any time make visual inspections, continuity or resistance checks, insulation resistance readings, partial discharge tests, dissipation factor tests, or DC high-potential tests at field test values.

A cable's failure to pass these tests and inspections, or failure to produce readings consistent with acceptable values for the application, will be grounds for rejection of the cable.

PART 2 PRODUCTS

2.1 INSULATED WIRE AND CABLE

2.1.1 General

All wire and cable shall be provided by the Contractor and shall conform to the requirements specified herein. Characteristics, including conductor size, stranding, number of conductors, rated circuit voltage, cabling, and other requirements for each type of service, shall be as indicated on the drawings, or as specified under the detailed requirements of these specifications for the particular construction or use, unless otherwise stated.

2.1.2 Governing Standards

Materials, construction and tests, unless otherwise specified, shall conform to the applicable requirements of NEMA WC 57/ICEA S-73-532 and

NEMA WC 70/ICEA S-95-658 as applicable.

2.2 MATERIALS

2.2.1 Submittal Requirements

The Contractor shall submit catalog data to the Contracting Officer for review and/or approval as indicated in the submittal register. Data shall demonstrate compliance with the specifications requirements for all wire and cable types to be provided.

2.2.2 Rated Circuit Voltages

All wire and cable shall have minimum 600 volt rated circuit voltages in accordance with NEMA WC 70/ICEA S-95-658.

2.2.3 Conductors

2.2.3.1 Material for Conductors

Conductors shall conform to all the applicable requirements of Section 2 of

NEMA WC 70/ICEA S-95-658 and shall be annealed copper wire conforming to

ASTM B3. Copper conductors may be bare, or tin- or lead-alloy-coated, if required by the type of insulation used. Tin-coated copper conductors shall conform to ASTM B33. Conductors shall be solid or stranded as required by subparagraph entitled Stranding. Aluminum conductors will not be accepted.

2.2.3.2 Wire Size

Minimum wire size shall be No. 12 AWG for power and lighting circuits; No.

10 AWG for current transformer secondary circuits; No. 12 AWG for potential transformer circuits; No. 14 AWG for relaying, control, and annunciation circuits; and No. 16 AWG for RTD, RTU, and PLC circuits. No.

18 AWG may be submitted as a variance for PLC module interconnection wiring if required by terminal size limitations, but shall not be run outside the

PLC enclosure. The submittal shall include the reason for the variance request.

2.2.3.3 Stranding

Conductor stranding classes cited herein shall be as defined in Appendix G of NEMA WC 70/ICEA S-95-658. Conductors No. 10 AWG and smaller shall be solid for 120 volt lighting and receptacles, and for all other uses shall have Class B or Class C stranding as defined in Table 1 of ASTM B8. Any conductors used between stationary and moving devices, such as hinged doors or panels, shall be Class H or K stranding. All other conductors shall have class C stranding.

2.2.4 Insulation

2.2.4.1 Insulation Voltage Rating and Insulation Level

The rated voltage of the insulation shall be 600 volts for all circuits.

2.2.4.2 Insulation Material

Except as otherwise specified under paragraph SPECIAL WIRE AND CABLE, insulation shall be cross-linked thermosetting polyethylene (XLPE) type or an ethylene-propylene rubber (EPR) type meeting the requirements of Section

3 of NEMA WC 70/ICEA S-95-658. Cables accepted as a variance for No.

18 under paragraph WIRE SIZE may have a non-PVC thermoplastic insulation and shall be UL Listed. Polyvinyl Chloride (PVC) insulation will not be accepted.

2.2.4.3 Insulation Thickness

The insulation thickness for each conductor shall be based on its insulation material.

a. Single-Conductor Cables - The insulation thickness for single-conductor cables shall be as required by

NEMA WC 70/ICEA S-95-658 Section 3.3 Tables for Insulation Classes R, X, and

E.

b. Multiple-Conductor Control Cables - The insulation thickness of the individual conductors of multiple-conductor (multiconductor) cables shall be as required by NEMA WC 70/ICEA S-95-658 Section 3.3

Tables for Insulation Classes R, X, or E for cables used for power, or

NEMA WC 57/ICEA S-73-532 Section 3.3 Tables for insulations XLPE, ER, SR, CSPE, or EP composites for cables used for control and related purposes.

2.2.4.4 Insulation Shielding

Shielding, where specified for control cables, shall conform to the requirements of Section 4.1 of NEMA WC 57/ICEA S-73-532.

2.2.5 Jackets

All cables shall have jackets meeting the requirements of Section 4.2 of

NEMA WC 57/ICEA S-73-532 or Section 4.1 of NEMA WC 70/ICEA S-95-658, and as specified herein. Individual insulated conductors listed in UL 44

Table 19 as optional or none for jacket type need not be jacketed.

Individual conductors of multiple-conductor cables shall be required to have jackets only if they are necessary for the conductor to meet other specifications herein. Jackets of single-conductor cables and of individual conductors of multiple-conductor cables, except for shielded cables, shall be in direct contact and adhere or be vulcanized to the conductor insulation. Multiple-conductor cables and shielded single-conductor cables shall be provided with a common overall jacket, which shall be tightly and concentrically formed around the core.

Repaired jacket defects found and corrected during manufacturing are permitted if the cable, including jacket, afterward fully meets these specifications and the requirements of the applicable standards.

2.2.5.1 Jacket Material

The jacket shall be one of the materials listed below, in accordance with the applicable paragraphs of NEMA WC 70/ICEA S-95-658. Polyvinyl chloride compounds will not be permitted. Variations from the materials required below will be permitted only if approved for each specific use, upon submittal of sufficient data to prove that they exceed all specified requirements for the particular application.

a. Heavy-duty black neoprene (CR).

b. Heavy-duty chlorosulfonated polyethylene (CSPE).

c. Heavy-duty cross-linked (thermoset) chlorinated polyethylene

(XL-CPE).

Cables accepted as a variance for No. 18 under paragraph WIRE SIZE may have a thermoplastic jacket if it is UL listed and is rated for low smoke and/or zero halogen. PVC jackets will not be accepted.

2.2.5.2 Jacket Thickness

The minimum thickness of the jackets at any point shall be not less than

80 percent of the respective nominal thicknesses specified below:

a. Thickness of the jackets of the individual conductors of multiple-conductor cables shall be as required by Section 4.1 of

NEMA WC 70/ICEA S-95-658, and shall be in addition to the conductor insulation thickness for the insulation used. Thickness of the outer jackets or sheaths of the assembled multiple-conductor cables shall be as required by Section 4.1 of NEMA WC 70/ICEA S-95-658.

b. Single conductor cables, if nonshielded, shall have a jacket thickness as specified in Section 4.1 of NEMA WC 70/ICEA S-95-658. If shielded, the jacket thickness shall be in accordance with the requirements of Section 4.1 of NEMA WC 70/ICEA S-95-658.

2.2.6 Cabling

Individual conductors of multiple-conductor cables shall be assembled with flame-and moisture-resistant fillers, binders, and a lay conforming to

Section 5 of NEMA WC 57/ICEA S-73-532 or Section 5 of

NEMA WC 70/ICEA S-95-658 as applicable, except that flat twin cables will not be permitted. Fillers shall be used in the interstices of multiple-conductor round cables with a common covering where necessary to give the completed cable a substantially circular cross section. Fillers shall be non-hygroscopic material, compatible with the cable insulation, jacket, and other components of the cable. The rubber-filled or other approved type of binding tape shall consist of a material that is compatible with the other components of the cable and shall be lapped at least 10 percent of its width.

2.2.7 Dimensional Tolerance

The outside diameters of single-conductor cables and of multiple-conductor cables shall not vary more than 5 percent and 10 percent, respectively, from the manufacturer's published catalog data.

2.2.8 Color-Coding

Only one color-code method shall be used for each cable construction type.

Colored braids will not be permitted. Control cable color-coding shall be in accordance with Table E-2 of NEMA WC 57/ICEA S-73-532. Power cable color-coding for 208/120 volt systems shall be black for Phase A, red for Phase B, blue for Phase C, and white for grounded neutral. Color coding for 480/277 volt systems shall be brown for Phase A, orange for Phase B, yellow for Phase C, and gray for grounded neutral. Green shall be used only for grounding conductors if insulated.

2.3 SPECIAL WIRE AND CABLE

2.3.1 Control Panel Shop Wiring

Wiring for factory assembled control panels shall be type SIS conforming to the applicable requirements of NEMA WC 70 for 600-volt single conductor power cable. Conductor size shall be No. 16 AWG minimum. The completed installation shall conform to all requirements of NFPA 70. “UL 44 VW-1” requirement for the rating of the SIS wire to be used for the panel wiring

2.3.2 Signal and Communications Cable

The cable shall conform to the applicable requirements of UL 44 and

NEMA WC 57/ICEA S-73-532. Conductors shall be tinned copper conforming to

Section 2.3 of NEMA WC 57/ICEA S-73-532 with Class C or Class K stranding as defined in Appendix G of NEMA WC 70/ICEA S-95-658. Minimum conductor size shall be No. 18 AWG. Conductors shall be insulated for 600 volts with a thermoset insulation conforming to NEMA WC 57/ICEA S-73-532 Section

3.3 Tables for insulations XLPE, ER, SR, CSPE, or EP composites. Overall shielding shall be provided by aluminum-Mylar tape to provide 100 percent coverage. A drain wire in continuous contact with the shield shall be provided as described in NEMA WC 57/ICEA S-73-532 Section 4.1 for metal thickness of 0.001 inch or less. Overall shields shall be provided for multiple-shielded pair or triplet cables. A thermoset jacket shall also be provided over shielded pairs or triplets of multiple-grouped cables in accordance with Section 4.2 and Table 4-1 of NEMA WC 57/ICEA S-73-532 for equivalent diameter of single conductor cables. Individual conductors of shielded and jacketed twisted pairs and triplets and jackets over paired or tripled conductors shall be color coded in accordance with Appendix E of

NEMA WC 57/ICEA S-73-532. Polyvinyl chlorine (PVC) insulation or jacketing will not be accepted. Individual conductors and cable assemblies shall pass the flame tests described in paragraph FLAME TESTS.

2.3.3 Ground Conductors

Ground conductors shall be bare, soft-drawn, Class A or B stranded copper cables sized in accordance with NFPA 70. Ground conductors size No. 10 and smaller shall be solid. Ground conductors size No. 6 and larger shall be Class A stranded.

2.3.4 Ethernet Cable

Ethernet cable shall be unshielded twisted pair (UTP), four-pair 24 AWG solid copper, color-coded wire complying with ICEA S-100-685, plenum-rated

(CMP) throughout. Category shall be CAT 6 conforming to

NEMA WC 66/ICEA S-116-732. Individual conductor insulation shall be a polyolefin material rated at least 300 volts. PVC insulation will not be accepted. Overall core foil shields are not required, but must be grounded at one end only during installation, if provided as a variance.

Cable outer jackets shall comply with NEMA WC 66/ICEA S-116-732 Section

5.1.2 for low halogen materials. PVC jackets will not be accepted.

PART 3 EXECUTION

3.1 INSTALLATION INSTRUCTIONS

3.1.1 General

For the purposes of this contract, the term "internal wiring" shall be used to designate the Contractor's factory installed wiring furnished with the furnished equipment. Different voltages shall not be run within the same multiconductor cable.

3.1.2 Bends

The minimum radius to which an insulated conductor or a multiconductor cable may be bent, without specific approval, whether permanently or temporarily during installation, shall be 12 times the overall diameter of the completed cable for tape shielded cables and 10 times the overall diameter for other cables. In these instances where this radius is not possible, approval will be required for minimum radii as specified in NFPA

70. For multiconductor cable, follow manufacturer's recommendation for type of cable involved.

3.1.3 Splices

Splices will not be permitted any where inside the control cabinet.

3.1.4 Terminations

All internal wire terminations shall be made using wire ferrules with the exception of PT/CT signal wires. PT/CT signal wires shall terminate on post terminals using ring tongue terminals and devices using wire ferrules.

Submit all terminals and associated cimping tools that will be used. The shield and shield insulating jacket of shielded signal cables and conductors, if applicable, shall be maintained to a point as close to the terminals as possible. The shield insulating jacket shall not be stripped from the shield except where necessary to make the ground connection. All signal cable shields shall be grounded at one end only.

Spare conductors shall be terminated on an available unused terminal of a terminal block and labled as SPARE at both ends, or if left unterminated shall have the exposed ends wrapped in insulating tape and labled as SPARE at both ends.

3.1.5 Wire Marking

All wires and cables shall be identified on both ends by the designations as shown on the Contract drawings or as otherwise shown on approved shop drawings. All wires and cables shall be clearly identified with the cable designation by tube-type markers as described in subparagraph Marking.

Wires, cables and individual conductors of multiconductor cables shall be identified with markers at each termination. Installed markers shall be uniform in position on the wire and cable, and legends shall be visible when conductors are terminated at the equipment.

3.1.5.1 Marking

Tubing shall be sized to fit the wire being marked and shall have permanent black marking on a light colored background. Tube-type markers shall be suitable for contact with the type of insulation material used. The markers shall have been tested by an independent testing laboratory or by the manufacturer to indicate that the markers will not stain or discolor when subjected to an accelerated aging test while in contact with wire insulating materials and ultraviolet light exposure.

-- End of Section --

SECTION 40 95 00.00 26 Page 1

PART 1 GENERAL

1.1 GENERAL INFORMATION

1.1.1 General

SECTION 40 95 00.00 26

PROCESS CONTROL

10/07

This Section covers the fabrication of the control cabinets for the equipment specified in Section 40 63 43.00 27. Supply all additional equipment necessary to install the components in the configuration shown in the Contract drawings and in accordance with the manufacturers' recommendations.

1.1.2 Related Documents

Drawings and general provisions of the Contract, including General and

Supplementary Conditions and Division 00 Specification Sections apply to this Section.

1.1.3 Related Sections

a. Section 26 05 19.00 26, INSULATED WIRE AND CABLE

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM D709 (2013) Laminated Thermosetting Materials

BUILDERS HARDWARE MANUFACTURERS ASSOCIATION (BHMA)

ANSI/BHMA A156.2 (2011) Bored and Preassembled Locks and

Latches

INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)

IEEE C37.90 (2005; R 2011) Standard for Relays and

Relay Systems Associated With Electric Power Apparatus

IEEE Stds Dictionary (2009) IEEE Standards Dictionary: Glossary of Terms & Definitions INTERNATIONAL ELECTROTECHNICAL

COMMISSION (IEC)

IEC 60068-2-6 (2007) Environmental testing – Part 2-6:

Tests – Test Fc: Vibration (sinusoidal)

SECTION 40 95 00.00 26 Page 2

NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)

NEMA ICS 1.1 (1984; R 2003) Safety Guidelines for the

Application, Installation, and Maintenance of Solid State Control

NEMA ICS 6 (1993; R 2011) Enclosures

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 70 (2014; AMD 1 2013; Errata 1 2013; AMD 2

2013; Errata 2 2013; AMD 3 2014; Errata

3-4 2014; AMD 4-6 2014) National

Electrical Code UNDERWRITERS LABORATORIES (UL)

UL 50 (2007; Reprint Apr 2012) Enclosures for

Electrical Equipment, Non-environmental Considerations

UL 508A (2013; Reprint Jan 2014) Industrial

Control Panels

UL 508 (1999; Reprint Oct 2013) Industrial

Control Equipment

UL 94 (2013; Reprint Jan 2016) Standard for

Tests for Flammability of Plastic Materials for Parts in Devices and

Appliances

1.3 DEFINITIONS

Definitions, Symbols, and engineering unit abbreviations shall conform to

IEEE Stds Dictionary, as applicable.

1.4 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government; "HDC" for Hydroelectric Design

Center. Submit the following in accordance with Section 01 33 00

SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Shop Drawings; G, HDC

As-Shipped Drawings; G, HDC SD-03

Product Data

Manufacturer's Catalog Data; G HDC Materials and Equipment List; G HDC Factory Test

Procedure; G HDC

SECTION 40 95 00.00 26 Page 3

List of Spare Parts; G HDC Escutcheons And

Nameplates; G, HDC

SD-06 Test Reports

Factory Test Report; G HDC

1.5 GENERAL REQUIREMENTS

1.5.1 Materials, Equipment and Installation

New materials and equipment must be furnished and any defective material or equipment damaged in the course of installation must be replaced or repaired. Testing must be performed to check the installation of and the proper operational functions of the electrical equipment. The installations must be in accordance with the National Electrical Code, NFPA

70, and the National Electrical Safety Code, IEEE C2, except where otherwise specifically shown or specified, in which case the drawings and specifications must govern. Omission of details on the drawings or in the specifications must not be construed as permitting deviations from Code requirements.

1.5.2 Standard Products

Material and equipment must be the standard products of manufacturers regularly engaged in the manufacture of these products and must essentially duplicate items that have been in satisfactory use for at least 5 years prior to proposal due date.

1.5.3 Corrosion Prevention

1.5.3.1 General

All equipment must be protected to prevent deterioration from corrosion.

The general requirements are specified below; however, other corrosion-resisting treatments that are the equivalent of those specified may be used. Materials used for corrosion prevention must be submitted for approval under SD-03 Product Data.

1.5.3.2 Fastenings and Fittings

Screws, bolts, nuts, pins, studs, springs, washers and other miscellaneous fastening and fittings must be of corrosion-resistant material or must be treated in an approved manner to render them resistant to corrosion. All fastenings which are to be exposed directly to the weather must be of corrosion-resisting material.

1.5.3.2.1 Corrosion-Resisting Materials

Corrosion-resisting steel, copper, brass, bronze, copper-nickel-copper alloys are acceptable corrosion-resisting materials.

1.6 QUALITY ASSURANCE

a. Control panels supplied under this Section shall be provided by a single manufacturer, unless provided with equipment specified under other Divisions.

SECTION 40 95 00.00 26 Page 4

b. Prior to shipment to the project site, test completed control panels in panel fabricators shop as specified in paragraph entitled

FACTORY TEST.

1.7 STORAGE AND HANDLING

a. After completion of shop assembly and testing, enclose panels in heavy-duty polyethylene envelopes or secured sheeting to provide complete protection from dust and moisture. Place dehumidifiers inside the polyethylene covering.

b. Skid-mount the equipment for final transport. Show shipping weight on shipping tags, together with instructions for unloading, transporting, storing, and handling on job site.

c. Carefully package and clearly mark all spare parts and accessories.

1.8 SYSTEM DESCRIPTION

1.8.1 Design Requirements

The cabinet shall include racks, central processing units (CPUs), input/output (I/O) modules, communication models, power supplies, and associated accessory items to provide a complete and functional control system. Systems to be controlled include: hydroelectric power generator unit, plant station services, and auxiliary river and flood control sites.

Cabinets will have differing equipment requirements and quantities based on system as shown in Contract drawings.

1.8.2 Programming

The PLC code will be programmed by Government personnel.

1.9 CONTRACT DRAWINGS

1.9.1 General

a. The contract drawings indicate the work to be accomplished in as much detail as is practical. Except for such modifications as may be required for coordination with equipment actually furnished, they constitute the working drawings for…