PreBid CAPA North - Agenda_SignIn_7.21.2021.pdf
PDF 15 MB Posted
- Solicitation number
- W9127821R0045
About this file
This document provides details for a federal contract solicitation for construction services. The U.S. Army Corps of Engineers Engineering District Mobile is soliciting proposals for the FY21 SOF Combat Aircraft Parking Apron project at Hurlburt Field, Florida. The scope of work involves constructing a combat aircraft parking area with three spots capable of accommodating C-130 aircraft, including associated airfield pavement, lighting, utilities and site improvements. The estimated value of the contract is between $25-100 million. Proposals are due via beta.sam.gov by the specified deadline. Offerors must be registered in SAM.gov prior to submitting a proposal. The solicitation includes bid options that may or may not be awarded.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AM03.pdf | ||
| AM03 DRAWINGS.pdf | ||
| W9127821R0045 AM02.pdf | ||
| W9127821R0045 AM01.pdf | ||
| EM 385-1-1.pdf | ||
| RTA DRAWINGS.pdf | ||
| VOL2.PDF | ||
| VOL1.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Minutes – Pre-bid site visit
Minutes-Pre-Bid site visit Agenda CAPA North Page 1 of 1
USACE
Mobile District
Project: FTEV 153011 SOF Combat Aircraft Parking Apron – North
FY 21
Date: 21 JULY 2021
Location: On Site Hurlburt Field, Florida
Opening Remarks and Introductions @ 1300 at Hurlburt Resident Engineer Office
Lauren Arington, Mobile District COE Engineering Technical Lead o Discussed bid schedule and instructed all to fill out the bid schedule completely or proposal would not be accepted. Proposals due 13 of August.
o Access to the site during construction will need to be coordinated through the project engineer.
o Instructed all questions be input into Dr. Checks as the official process for answering questions concerning the project.
Proceeded to project location @ 1315 hours
Contractor’s shuttled to project site, by base representatives.
End of meeting @ 1345 hours
Sign-in sheet attached