This federal contract opportunity is a request for proposal for construction services at Hurlburt Field in Florida. The scope of work includes constructing a combat aircraft parking area with three C-130 capable spots, along with supporting facilities such as utilities, site improvements, airfield pavements, communications, storm water drainage, and wetland remediation. The estimated cost range is $25-100 million and the period of performance is 1080 calendar days. Contractors must register in SAM to download solicitation documents from beta.SAM.gov between now and the response due date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AM03.pdf | ||
| W9127821R0045 AM02.pdf | ||
| PreBid CAPA North - Agenda_SignIn_7.21.2021.pdf | ||
| W9127821R0045 AM01.pdf | ||
| EM 385-1-1.pdf | ||
| RTA DRAWINGS.pdf | ||
| VOL2.PDF | ||
| VOL1.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers®
MOBILE DISTRICT
109 SAINT JOSEPH STREET
MOBILE, AL 36602
FTEV153011
SOF COMBAT AIRCRAFT PARKING APRON - NORTH
HURLBURT FIELD
20 1
21 06
SOLICITATION 21R0045
AMENDMENT NO. 0003
X
X
X X X
X X
X X
X X X
X X
X X
X X
X X
POND #3
BOTTOM EL. 28.8
E
W
T A
X I W
A Y
NORTH-SOUTH RUNWAY9,600' x 150'N02º55’25.108”W
AC-130J
AC-130J
AC-130J
AC-130J
R E
T E
N T
I O
N
P
O N
D
C P
C P
C P
C P
C P
C P
C P
C P
EX. STORM INLET
TOP=30.90
BOTTOM OF STRUCTURE =20.0
TEM
PO
RARY BENCHM
ARK
ASPHALT SHOULDER WIDTH VARIES
ASPHALT SHOULDER WIDTH VARIES
TAXIW
AY SIG
N
EX. STORM INLET
TOP=28.06
BOTTOM OF STRUCTURE= 16.38
T E
M P
O R
A R
Y B
E N
C H
M A
R K
BERM
C O
N C
R E
T E
X
I W
A Y
CONCRETE TAXIW
AY
ED
G
E O
F ASPH
ALT
W
O
O
D
L
I N
E
B E
R M
BERM
CONCRETE TAXIW
AY
CONCRETE TAXIWAY WIDTH
VARIES
C P
C P
A S
P H
A
LT
A C
C E
S S
R O
A D
S
P
H
A
L
H
O
U
L
D
E
R
P
H
A
O
U
L
D
E
R
TAXIW
AY LIGHT
(TYPICAL)
CONCRETE TAXIWAY
CONCRETE TAXIWAY
C O
N C
R
ETE
(TYPICAL )
CONCRETE TAXIWAY
Y E
LLO
W
STR
IPIN
G
YELLO
W
STR
IPIN
G
Y E
LLO
W
STR
IPIN
G
CONCRETE
(TYPICAL)
YELLO
W
STR
IPIN
G
YELLO
W
STR
IPIN
G
YELLO
W
STR
IPIN
G
YELLO
W
STR
IPIN
G
Y E
LLO
W
STR
IPIN
G
Y E
LLO
W
STR
IPIN
G
Y E
LLO
W
STR
IPIN
G
YELLO
W
STR
IPIN
G
ED
G
E O
F ASPH
ALT
ED
G
E O
F ASPH
ALT
YELLO
W
STR
IPIN
G
EDG
E O
F ASPHALT
ED
G
E O
F ASPH
ALT
Y E
LLO
W
STR
IPIN
G
(TYPICAL)
Y E
LLO
W
STR
IPIN
G
YELLO
W
STR
IPIN
G
(TYPICAL)
Y E
LLO
W
STR
IPIN
G
Y E
LLO
W
STR
IPIN
G
Y E
LLO
W
S T
R
IP
IN
G
36" X 48" BOX SD
36" X 48" BOX SD
RETENTION BASIN
TAXIW
AY LIG
HT
(TYPICAL)
TAXIW
AY LIGHT
(TYPICAL)
U N
D E
R G
R O
U N
D
E L E
C T
R I C
A L
V A
U L T
U N
D E
R G
R O
U N
D
E L E
C T
R I C
A L
V A
U L T
W
ELECTRICAL
SERVICE VAULT
LIGHT POLE
(TYPICAL)
W
O
O
D
L
I N
E
HH
HH
HH
HH
HH
C
U
C
U
C
U
CU CU CU CU CU
HH
C
U
C
U
C
U
C
U
C
U
EU
C U
C U
C U
C
U
C
U
C
U
HH
T
MH
E
U
E
U
E
U
E
U
E
U
E
U
E U
E U
E U
E U
CU
HH HH HHHH
HH
T
HH
HH
HH HH
Z:\CLIENTS\ANF\USCOE\SAM\115862_NORTH-CAPA\DESIGN\CIVIL\SHEETS\115862_GC005.DWG 8/10/2021 9:41 AM CFRANZEN
A
M
A S
H E
K
G
C
D
W G
K
R
O B
E R
T S
J S
C H
N E
I D
E R
R
B
A R
U T
H
S T
A G
I N
G
A
N
Y
D O
W
P
A
N
GC005
CONSTRUCTION STAGING
& PHASING NOTES:
1. SEE CIVIL LEGEND ON SHEET GC001. SEE CONSTRUCTION
SEQUENCE NOTES ON GC007.
2. TRUCK WASHOUT AREA TO BE CONSTRUCTED, MAINTAINED,
AND CLEANED IN ACCORDANCE WITH FLORIDA DEPT OF
ENVIRONMENTAL PROTECTION REGULATIONS. PROVIDE
DETAILS AND MAINTENANCE PLAN AS PART OF THE
STORMWATER POLLUTION PREVENTION PLAN.
3. ALL TEMPORARY TRAFFIC BARRIERS TO BE INSTALLED AND
MAINTAINED TO CLOSE ROADS TO ALL NON-CONSTRUCTION
TRAFFIC SHALL BE INSTALLED AND MAINTAINED BY THE
CONTRACTOR. COORDINATE WITH HURLBURT SECURITY AND
POLICE.
4. CONTRACTOR TO STOCKPILE REQUIRED MATERIALS AND
EQUIPMENT WITHIN LIMITS OF THE STAGING AREA OR WORK
LIMITS AS INDICATED ON THE DRAWINGS, AND RESTORE THE
AREA TO PRE-CONSTRUCTION CONDITIONS.
5. CONTRACTOR TO COORDINATE UTILITY WORK WITH THE
CONTRACTING OFFICER. COORDINATE TO MINIMIZE IMPACTS
TO EXISTING UTILITIES IN ACCORDANCE WITH THE
SPECIFICATIONS.
6. ONLY THE CONSTRUCTION CONTRACTORS QUALITY CONTROL
MANAGER IS AUTHORIZED TO TAKE PHOTOS ON THE PROJECT
SITE. PHOTOS ARE ONLY TO BE TAKEN OF CONSTRUCTION
ACTIVITIES. ANYONE ELSE TAKING PHOTOS WILL BE ESCORTED
OFF THE BASE AND NOT ALLOWED TO RETURN.
7. COORDINATE ALL CONSTRUCTION RADIOS WITH THE COR AND
HURLBURT FIELD FREQUENCY MANAGER.
8. SMOKING SHALL ONLY OCCUR IN THE DESIGNATED SMOKING
AREAS. AREAS TO BE CLEARLY SIGNED AND COORDINATED
WITH THE COR AND FIRE DEPARTMENT.
9. ALL WORK WITHIN 125 FEET OF APRON TAXIWAY CENTER LINE
AND T/W G CENTERLINE SHALL BE COORDINATED WITH COR
AND AIRFIELD MANAGEMENT. LIMIT DURATION OF ACTIVITIES TO
MINIMIZE IMPACT ON AIRCRAFT OPERATIONS ON THE
APRON/TAXIWAY. ADJUST LOCATION OF LOW PROFILE
BARRICADES AND TEMPORARY FENCES TO COINCIDE WITH
PHASED CONSTRUCTION ADJACENT TO THE ACTIVE
APRON/TAXIWAY, SEE PHASING PLANS, GC101 - GC104.
10. SEE GRADING DRAWINGS CG301-CG305 FOR CLEARING, FILL
CONSTRUCTION, AND SITE EMBANKMENTS.
11.NOT USED.
12.DISPOSAL AREAS FOR RUBBLE, UNSUITABLE EXCESS SOIL
MATERIALS, OR OTHER CONSTRUCTION DEBRIS ARE NOT
AVAILABLE ON THE BASE FOR THE CONTRACTOR'S USE.
DISPOSAL IS THE RESPONSIBILITY OF THE CONTRACTOR AT
SITES OFF GOVERNMENT CONTROLLED LANDS.
13.BORROW SITES ARE NOT AVAILABLE FOR USE BY THE
CONTRACTOR ON HURLBURT FIELD. ALL BORROW FILL
MATERIALS SHALL BE OBTAINED FROM THE EGLIN RANGE
BORROW PITS AS INDICATED ON DRAWINGS GC011 - GC012 OR
OBTAINED BY THE CONTRACTOR FROM COMMERCIAL SOURCES
FROM OFF-SITE LOCATIONS.
14.CONTRACTOR'S STAGING AREAS SHALL BE RETURNED TO THE
ORIGINAL CONDITIONS AS APPROVED BY THE CONTRACTING
OFFICER'S REPRESENTATIVE (COR) AT THE COMPLETION OF
CONSTRUCTION.
15.CONTRACTOR SHALL NOT BE PERMITTED TO ACCESS THE
EXISTING PCC SURFACE WITH EQUIPMENT OR VEHICLES
EXCEPT WHERE SHOWN IN PLANS.
16.EQUIPMENT SHALL BE STORED IN THE LAYDOWN/STAGING
AREA IF EQUIPMENT IS TO BE IDLE FOR MORE THAN 48 HOURS.
LEGEND
HAUL ROUTE
A1
STAGING AND LAYDOWN PLAN
SCALE: 1" = 100'
100' 200'0
A4
GC501
CONSTRUCTION ENTRANCE
H U
R L
B U
F
I E
L D
F
L O
R I D
A
M O
B I L
E
D
I S
T R
I C
T
M O
B I L
E
A
L A
B A
M A
Mobile District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R N
O
U
M
Y
C
O R
O
E N
G I N
E E
R S
1 2 3 4 5
D
C
B
A
O
W N
W
A R
D
P
A R
K W
A Y
K A
N S
C
T
Y
M
O
B U
R N
M c D
O N
N E
L L
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
S B
B
P L O
T
S
C A
L E
S I Z
E x
F I
M
E
C K
D
B
Y
P L O
T
D
A T
E
D A
T E
S O
L I C
I T
A T
I O
N
N
U M
B E
R
P R
O J E
M
B E
R
C A
D
E
J U
N E
W R
F T
E V
J U
N E
S O
F
C
O M
B A
T
A
I R
C R
A F
T
P
A R
K I N
G
A
P R
A P
A
N
O R
T H
P R
O J E
F
T E
V
AMENDMENT NO. 0003
R
B
M I T
T A
L
SHEET
IDENTIFICATION
M E
F
N
125.00'
SEE NOTE 9
T A
X I W
A Y
C O
N N
E C
T I O
N
S E
E
N
O T
E
CONSTRUCTION
ENTRANCE
HAUL ROUTE
ON SHOULDER
(SEE GC010)
WETLAND
DISTURBANCE LIMITS
RUNWAY 18-36
EXISTING
HCP
TAXIWAY G
APRON
WETLAND DISTURBANCE LIMITS
TEMPORARY
SIGNAL
SEE NOTE 15
INTERLINE DISTANCE KEYED NOTES:
180 FT. BUFFER AROUND STATIONARY LOADED
AC-130 AT HOT CARGO PAD.
180 FT. BUFFER AROUND PROPOSED HAMS PAD, FOR
MUNITIONS TRAILER.
1250 FT. BUFFER FOR AMMO LOADING OPERATIONS.
180 FT. BUFFER AROUND TEMPORARY HAMS PAD,
FOR MUNITIONS TRAILER. (DOES NOT IMPACT
HAULING.)
INTERLINE DISTANCE NOTES (QD ARCS):
1. QD SAFETY ARCS ARE ONLY IN EFFECT FOR CERTAIN AIRCRAFT
OPERATIONS ON THE HOT CARGO PAD. CONTRACTING OFFICER
AND AIR OPERATIONS WILL COORDINATE THESE TIMES WITH THE
CONTRACTOR IN ADVANCE DURING WEEKLY COORDINATION
MEETINGS. CONSTRUCTION ACTIVITIES ARE SUSPENDED WITHIN
THESE ARCS AT THESE TIMES. SEE INTERLINE DISTANCE NOTES
THIS DRAWING.
2. THE INTERLINE DISTANCE IS THE EXPLOSIVE ARC DISTANCE
WHEN MUNITIONS ARE PRESENT AT DIFFERENT LOCATIONS AND
SCENARIOS.
3. CONTRACTOR IS TO COORDINATE WITH AIR TRAFFIC CONTROL
AND COR FOR LOADING TIMES AND PRESENCE OF LOADED
AIRCRAFT AND MUNITIONS TRAILERS.
4. CONTRACTOR IS NOT ALLOWED TO WORK IN AMMO LOADING
BUFFER ZONE WHEN AIRCRAFT MUNITIONS ARE BEING LOADED
AND UNLOADED. (CONTRACTOR SHOULD ASSUME THIS OCCURS
3-6 TIMES A DAY FOR DURATIONS OF 30 MINS. EACH
OCCURRENCE.
5. THERE WILL BE A WEEKLY MEETING TO COORDINATE A 1 WEEK
LOOK AHEAD FOR THE FLYING SCHEDULE. MUNITIONS LOADING
OPERATIONS OFTEN OCCUR FROM 1000-1100 HRS AT THE HOT
CARGO PAD ON A DAILY BASIS. THE POTENTIAL FOR DOWNLOAD
OPERATIONS OF ANY UNEXPECTED HIGH EXPLOSIVE ROUNDS
COULD OCCUR A FEW HOURS LATER. LOADING/UNLOADING
OPERATIONS ALSO OCCUR A FEW HOURS LATER.
LOADING/UNLOADING OPERATIONS ALSO OCCUR IN THE EARLY
EVENING. HOWEVER, AIR OPERATIONS RESERVES THE RIGHT TO
CONDUCT MUNITIONS LOADING/UNLOADING AS THE SITUATIONS
DICTATE THAT COULD IMPACT THE 180 FT OR 1250 FT BUFFERS.
IT IS ANTICIPATED THAT THESE SITUATIONS WOULD BE MINIMAL
AND ONLY TO MAINTAIN A SAFE ENVIRONMENT FOR AIRCRAFT
AND CREW PERSONNEL.
HAMS PAD
BY OTHERS
A
M E
N D
M E
AutoCAD SHX Text F1-58-J
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text N529872.92
AutoCAD SHX Text E1276990.75
AutoCAD SHX Text
ELEV.32.03
AutoCAD SHX Text
WOODED MARSH AREA
AutoCAD SHX Text
FIR 7191 CONTROL POINT N: 530212.44 E: 1277548.44 EL= 29.46 (NAVD88)
AutoCAD SHX Text
FAC IN CONCRETE STAMPED E1-58J N: 529872.87 E: 1276990.64 EL= 29.46 (NAVD88)
AutoCAD SHX Text e d
H o r s e
R o a d
R e d
H o r s e
R o a d
R e d
H o r s e
R o a d
C O
C O
D
B U
IL
D
IN
G
F.
F.
E L
.7
D
W
W
F
F
S
D
C
C
C O
C
F
W
P
F
F
O P
E N
H A
N G
A R
F F
E .3
A S
P H
A L T
R E
D
H
O R
I V
E
D E
B R
IS
P
IL
E
TYPE "F" CURB
& GUTTER
TYPE "F" CURB & GUTTER
TYPE "F" CURB
& GUTTER
TYPE "F" CURB
& GUTTER
TYPE "F" CURB
& GUTTER
TYPE "F
" C
URB
& G
UTTER
A C
J
A C
J
A C
J
A C
J
A C
J
A C
J
X X
X
X X
X X
X
X
X
X X
X
X X
X
X
X
X
X
STOP FOD
CHECK
STOP FOD
CHECK
STOP FOD
CHECK
A C
J
A C
J
A C
J
A C
J
X
X
X
X
X
X X
X X
X X
X
X
X
X X
X
X X
X
X
X
X
X
A C
J
A C
J
Z:\CLIENTS\ANF\USCOE\SAM\115862_NORTH-CAPA\DESIGN\CIVIL\SHEETS\115862_GC010.DWG 8/10/2021 10:05 AM CFRANZEN
A
M
A S
H E
K
G
C
D
W G
K
R
O B
E R
T S
J S
C H
N E
I D
E R
R
B
A R
U T
H
O V
E R
A L
L
T
R A
F F
A
N
GC010
FY18
HAMS PAD
FY18 CAPA SOUTH
TAXIWAY PHASE 4
CLOSURE
BUILDING #90839
U
S
H
O
U
L
D
E
R
R E
D
H
O R
LEGEND:
HAUL ROUTE
WETLAND MITIGATION LIMITS
A1
OVERALL TRAFFIC PLAN
SCALE: 1" = 200'
N
NOTES:
1. SEE CONSTRUCTION PHASING NOTES ON
GC101-GC104.
2. TAXIWAYS WILL BE CLOSED DAILY FOR
EARTHWORK, HAULING, AND PAVING
OPERATIONS UNLESS OTHERWISE NOTED
IN THE PROJECT PHASING NOTES. INSTALL
REQUIRED TRAFFIC CONTROL DEVICES.
CLOSE TAXIWAY GOLF AND ALPHA DAILY IN
ORDER TO UTILIZE HAUL ROUTE. PLACE
BARRICADES DAILY. TAXIWAY CLOSURES
AND BARRICADES SHALL BE REMOVED AT
THE END OF THE WORK DAY, UNLESS
APPROVED BY THE COR.
3. CONTRACTOR SHALL NOT BE PERMITTED
TO ACCESS THE EXISTING PCC SURFACE
OF THE HOT CARGO, HAMS PAD, OR
TAXIWAY WITH EQUIPMENT OR VEHICLES.
4. CONTRACTOR IS TO AVOID TAXIWAY
LIGHTING ALONG HAUL ROUTE.
CONTRACTOR IS RESPONSIBLE FOR
REPLACEMENT OF DAMAGED LIGHTS AT NO
ADDITIONAL COST TO THE GOVERNMENT.
5. COORDINATE WITH COR FOR ACCESS AND
MAINTENANCE OF HAUL ROUTES. PROVIDE
FULL TIME AIRFIELD SWEEPER TO CLEAN
ASPHALT SHOULDER PAVEMENTS
CONTINUOUSLY THROUGHOUT DURATION
OF CONSTRUCTION. AT THE END OF EACH
DAY GET APPROVAL OF THE CONDITIONS
FROM COR AND AIR OPS THAT SURFACES
HAVE BEEN SUFFICIENTLY CLEANED.
6. CONCRETE PLANT: CONTRACTOR TO USE
THE PLANT AREAS FOR
EQUIPMENT/MATERIAL STAGING. SEE
GC004. CONTRACTOR TO PROVIDE BATCH
PLANT EQUIPMENT AND OBTAIN ALL
PERMITS. COORDINATE ANY TREE
CLEARING WITH CONTRACTING OFFICER
AND BASE CE. DUE TO PROXIMITY OF THE
AIRFIELD REPLANTING OF TREES IS NOT
REQUIRED.
7. THE JOB TRAILER NEEDS TO BE LOCATED
OUTSIDE THE AIRFIELD FENCE, TO
FACILITATE DAY TO DAY MEETING,
DELIVERIES, ETC. SEE GC005.
8. REMOVE ALL TEMPORARY TRAFFIC
CONTROL MARKING AT COMPLETION OF
CONSTRUCTION. REPAIR ALL EXISTING
MARKINGS IMPACTED BY TEMPORARY
MARKINGS.
9. CONTRACTOR SHALL PROVIDE A SMOOTH
ASPHALT HAUL ROUTE PROFILE WITH AN
ELEVATION THAT IS BELOW THE OVERRUN
AND GENERALLY FOLLOWS EXISTING
GRADE. CONTRACTOR SHALL MAINTAIN
POSITIVE DRAINAGE AWAY FROM THE
OVERRUN.
10. THE CONTRACTOR SHALL SUBMIT A
PROJECT SCHEDULE FOR RUNWAY
OVERRUN MODIFICATIONS FOR APPROVAL.
THIS SCHEDULE SHALL BE COORDINATED
WITH THE PHASING PLAN PROVIDED FOR
THIS PROJECT, NO WORK SHALL PROCEED
UNTIL PERMISSION IS GRANTED.
EAST AIRFIELD
GATE AREA SEE
GC004
MAINTAIN GRAVEL HAUL ROUTE. UTILIZE
FOR ALL CONSTRUCTION ACCESS.
SEE NOTE 12 ON GC004. SEE DRAWINGS
V-110 AND V-111 FOR WETLAND LIMITS
FY18 CAPA PROJECT
BY OTHERS
TAXIWAY
RUNWAY
H U
R L
B U
E
L D
F
L O
R I D
A
M O
B I L
E
D
I S
T R
I C
T
M O
B I L
E
A
L A
B A
M A
Mobile District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R N
O
M
Y
C
O R
E N
G I N
E E
R S
1 2 3 4 5
D
C
B
A
O
W N
W
A R
D
P
A R
K W
A Y
K A
N S
T
Y
M
O
B U
R N
D
O N
N E
L L
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
S B
P L O
T
S
C A
L E
S I Z
E x
F I
M
E
C K
D
B
Y
P L O
T
D
A T
E
D A
T E
S O
L I C
I T
A T
I O
N
N
U M
B E
R
P R
O J E
M
B E
R
C A
D
E
J U
N E
W R
F T
E V
J U
N E
S O
F
C
O M
B A
T
A
I R
C R
A F
T
P
A R
K I N
G
A
P R
A P
A
N
O R
T H
P R
O J E
F
T E
V
AMENDMENT NO. 0003
R
B
M I T
T A
L
SHEET
IDENTIFICATION
M E
F
ASPHALT ROAD
400'0 200'
MAINTAIN GRAVEL HAUL
ROAD (13" GCA WITH
GEOGRID) ALONG
EXISTING GRAVEL ROAD
TAXIWAY CLOSURE FOR HAULING
OPERATIONS (DAILY)
MAINTAIN SILT FENCE
BOTH SIDES OF HAUL
ROUTE
1015'
PHASE 1 - GC101
INSTALL 6" TAXIWAY SHOULDER YELLOW
EDGE STRIPE. DO NOT CROSS. SEE NOTE 5.
MAINTAIN SHOULDER AREA (2" ASPH/6"
BASE) TO SUPPORT CONSTRUCTION
TRAFFIC THROUGHOUT DURATION.
PHASE 4 - GC104
UPON COMPLETION OF ALL HAULING
OPERATIONS REMOVE 2" ASPH/6" BASE,
RECOMPACT SUBGRADE, INSTALL 6" GCA
AND 2" ASPH SURFACE . REMOVE 6"
YELLOW STRIPE AND ALL BARRICADES.
MAINTAIN 26 FT WIDE ROAD
SECTION WITH 3" ASPH AND
12" GCA BASE. REMOVE AT
CONSTRUCTION
COMPLETION. SEE NOTE 9,10
A3
GC502
A3
GC502
TAXIWAY CLOSURE FOR
HAULING OPERATIONS
(DAILY)
25' ASPHALT TIE IN
TO T/W SHOULDER
TAXIWAY CLOSURES BY FY18 CAPA
SOUTH PROJECT PHASE 2A, 2B,
AND 3 SHOWN FOR REFERENCE
SEE NOTE 11
GC005
X
FY20 HANGAR BY
OTHERS
INSTALL LOW PROFILE
BARRICADES EACH
SIDE OF ASPHALT
DRIVE
EXISTING HOT
CARGO PAD
CAPA NORTH
USE 14' OF
SHOULDER
MAINTAIN SILT FENCE BOTH
SIDES OF HAUL ROUTE
A
M E
N D
M E
AutoCAD SHX Text
1"PVC ON TOP OF GROUND
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text A/C
AutoCAD SHX Text C
AutoCAD SHX Text
TOP=32.14
AutoCAD SHX Text
TOP=32.60
AutoCAD SHX Text E
AutoCAD SHX Text
5-ELECTRICAL BOXES (TOTAL)
AutoCAD SHX Text E
AutoCAD SHX Text
TB
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text
GV
AutoCAD SHX Text
GV
AutoCAD SHX Text G
AutoCAD SHX Text
SO
AutoCAD SHX Text
SO
AutoCAD SHX Text T
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text
BFP
AutoCAD SHX Text
BFP
AutoCAD SHX Text
BFP
AutoCAD SHX Text
STORM INLET TOP EL=32.10 W INV.= 28.06
AutoCAD SHX Text
MITERED END SECTION 18" RCP FL= 27.07
AutoCAD SHX Text
FL= 25.55
AutoCAD SHX Text
NE FL= 25.46 NW FL= 25.41
AutoCAD SHX Text
TRANSFORMER
AutoCAD SHX Text
UTILITY SERVICE BOX
AutoCAD SHX Text
GATE KEY PAD
AutoCAD SHX Text
GATE KEY PAD
AutoCAD SHX Text
ELECTRICAL STUB OUT
AutoCAD SHX Text
UTILITY VAULT
AutoCAD SHX Text
SLUDGE DISPOSAL
AutoCAD SHX Text
LIFT STATION TOP EL= 30.14
AutoCAD SHX Text
TRANSFORMER
AutoCAD SHX Text
UTILITY SERVICE BOX
AutoCAD SHX Text
UTILITY SERVICE BOX
AutoCAD SHX Text
TRANSFORMER
AutoCAD SHX Text
TRANSFORMER
AutoCAD SHX Text
UTILITY SERVICE BOX
AutoCAD SHX Text
SE FL= 25.55 SW FL= 25.56
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
PROJECT SITE
OKALOOSA ISLAND
BORROW PIT B-40
PROJECT SITE
L
E
W
R
N
V
D
M
I D
G
M
I
D
G
N
N
E
C
T
O
R
J
O
K
W
Y
F O
R E
H
NICEVILLE
VALPARAISO
E
G
L
W
Y
R
O
G
J
A
Y
EGLIN AFB
LAKE LORRAINE
FORT WALTON BEACH
OCEAN CITY
WRIGHT
HURLBURT FIELD
MARY ESTHER
OKALOOSA ISLAND
M
I R
A
C
R
H I L L
A
V
M
A
T
H
E
R
C
HWY 188
HWY 189
OKALOOSA
CHOCTAWHATCHEE BAY
DESTIN
H
H
H
EGLIN FIELD NR 2
18 MILES ±
FROM PROJECT
TO BORROW PITS
2.4 MILES ±
N
A1
BORROW PIT LOCATION
N.T.S.
GC011
B O
R R
C
A T
I O
N
C
F
R A
N Z
E N
R
B
A R
U T
H
B D
R h e e t d w g
E T
C H
E C
K E
D
B Y
A
M
A S
H E
K
Z:\Clients\ANF\USCOE\SaM\115862_North-CAPA\Design\Civil\Sheets\115862_GC011.dwg_8/10/2021 10:08:50 AM_cfranzen
H U
R L
B U
E
L D
F
L O
R I D
A
M O
B I L
E
D
I S
T R
I C
T
M O
B I L
E
A
L A
B A
M A
Mobile District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R N
O
M
Y
C
O R
E N
G I N
E E
R S
1 2 3 4 5
D
C
B
A
O
W N
W
A R
D
P
A R
K W
A Y
K A
N S
T
Y
M
O
B U
R N
D
O N
N E
L L
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
S B
P L O
T
S
C A
L E
S I Z
E x
F I
M
E
C K
D
B
Y
P L O
T
D
A T
E
D A
T E
S O
L I C
I T
A T
I O
N
N
U M
B E
R
P R
O J E
M
B E
R
C A
D
E
J U
N E
W R
F T
E V
J U
N E
S O
F
C
O M
B A
T
A
I R
C R
A F
T
P
A R
K I N
G
A
P R
A P
A
N
O R
T H
P R
O J E
F
T E
V
AMENDMENT NO. 0003
R
B
M I T
T A
L
SHEET
IDENTIFICATION
M E
F
NOTES:
1. ESTABLISH BORROW PIT FOR STRUCTURAL FILL MATERIAL
FOR THE CAPA NORTH SITE DEVELOPMENT. DISPOSAL AT
EGLIN RANGE BORROW PITS DOES NOT INCLUDE TREES,
SHRUBS, BRANCHES OR GROUND COVER AS DIRECTED BY
THE CONTRACTING OFFICER.
2. CONTRACTOR TO TEST MATERIAL FROM THE PROJECT SITE
PER SPECIFICATION SECTION 31 00 00 FOR APPROVAL PRIOR
TO HAULING TO THE EGLIN RANGE BORROW PITS FOR
DISPOSAL.
3. CONTRACTOR TO PROVIDE ALL EQUIPMENT FOR HAULING AND
EXCAVATING ALL BORROW MATERIAL AT THE EGLIN RANGE
BORROW PITS.
4. EGLIN JACKSON GUARD FORESTRY OFFICE WILL HARVEST THE
TIMBER (NOT GRUB) IN THE AREAS WHERE THE CONTRACTOR
PLAN TO EXPAND THE EGLIN RANGE BORROW PITS. ONLY THE
AREA REQUIRED TO PROVIDE THE VOLUME OF FILL MATERIAL
REQUIRED BY THE CONTRACTOR WILL HAVE TREES REMOVED
BY THE GOVT. NO GRUBBING OR STUMP REMOVAL WILL BE
DONE BY THE GOVT. COORDINATE THE EXTENTS NEEDED
BASED ON AMOUNT OF BORROW MATERIAL TO BE EXCAVATED.
5. CONTRACTOR TO PERFORM GRADING OF BORROW PIT AREAS
TO LEVEL RUTTING PRIOR TO SEEDING.
6. CONTRACTOR TO OBTAIN ALL PERMITS RELATED TO
ESTABLISHING, OPERATING, AND CLOSING THE BORROW PIT.
SUBMIT AND COORDINATE THE FDEP ENVIRONMENTAL
RESOURCE PERMIT REQUIREMENTS AND SWPPP FOR EGLIN
RANGE BORROW PITS WITH EGLIN CE ENV AND EGLIN RANGE
OFFICES. CONTRACTOR IS RESPONSIBLE FOR OBTAINING
FDEP ERP FOR BORROW PIT.
7. PROVIDE ALL EROSION CONTROL MEASURES IN ACCORDANCE
WITH FDEP ENVIRONMENTAL RESOURCE PERMIT
REQUIREMENTS AND PROVIDE PLANS WITH SWPPP
SUBMITTAL.
BORROW/FILL MATERIAL NOTE:
CONTRACTOR MAY DISPOSE OF ALL EXTRA ORGANIC SOIL
MATERIAL AT THE EGLIN RANGE BORROW PITS OR OFF
GOVERNMENT PROPERTY AT A COMMERCIAL SITE.
CONTRACTOR HAS OPTION TO OBTAIN STRUCTURAL FILL
MATERIAL AT EGLIN BORROW PITS OR PURCHASE BORROW
MATERIALS FROM COMMERCIAL BORROW SOURCES. IF
CONTRACTOR CHOOSES TO OBTAIN FILL FROM EGLIN BORROW
PITS THEN ALL PERMITTING FOR THIS ACTION WILL BE THE
CONTRACTOR'S RESPONSIBILITY TO OBTAIN. SEE NOTES 6 AND 7
THIS DRAWING. ANY SURCHARGE MATERIAL OR EXCESS
MATERIAL REMOVED FROM EGLIN BORROW PIT IS
CONTRACTOR'S RESPONSIBILITY FOR DISPOSAL OFF
GOVERNMENT PROPERTY. COORDINATE FILL MATERIALS
TESTING AND SOIL REQUIREMENTS WITH SPECIFICATION
SECTION 31 00 00 EARTHWORK.
0 10000'5000'
A
M E
N D
M E
GC012
O
R R
C
F
R A
N Z
E N
R
B
A R
U T
H
B D
R h e e t d w g
E T
C H
E C
K E
D
B Y
A
M
A S
H E
K
Z:\Clients\ANF\USCOE\SaM\115862_North-CAPA\Design\Civil\Sheets\115862_GC012.dwg_8/10/2021 10:10:19 AM_cfranzen
H U
R L
B U
E
L D
F
L O
R I D
A
M O
B I L
E
D
I S
T R
I C
T
M O
B I L
E
A
L A
B A
M A
Mobile District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R N
O
M
Y
C
O R
E N
G I N
E E
R S
1 2 3 4 5
D
C
B
A
O
W N
W
A R
D
P
A R
K W
A Y
K A
N S
T
Y
M
O
B U
R N
D
O N
N E
L L
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
S B
P L O
T
S
C A
L E
S I Z
E x
F I
M
E
C K
D
B
Y
P L O
T
D
A T
E
D A
T E
S O
L I C
I T
A T
I O
N
N
U M
B E
R
P R
O J E
M
B E
R
C A
D
E
J U
N E
W R
F T
E V
J U
N E
S O
F
C
O M
B A
T
A
I R
C R
A F
T
P
A R
K I N
G
A
P R
A P
A
N
O R
T H
P R
O J E
F
T E
V
AMENDMENT NO. 0003
R
B
M I T
T A
L
SHEET
IDENTIFICATION
M E
F
N
A1
BORROW PIT B-40
SCALE: 1" = 300'
H
STABILIZE / CLEARING
REQUIRED FOR TRUCK TRAFFIC
EXISTING HWY
MEDIAN CUT
ACCESS
ROUTE
PIT B-40:
EAST OF HWY 85 NORTH
PLOT NUM 87N84
30.6 ACRES
· UNKNOWN AMOUNT OF FILL IS AVAILABLE IN BORROW PIT 40
· REQUIRES TIMBER HARVEST/CLEAR GRUB TO ACCESS SAND
· ACCESS ENTRANCE FOR MUCK DISPOSAL REQUIRES WORK
FOR TRUCK/EQUIPMENT ACCESS.
· PIT IS BEING USED BY OTHER PROJECTS.
600'0 300'
18 MILES ± TO
HURLBURT
18 MILES ± TO
HURLBURT
NOTES:
1. SEE NOTES ON GC011.
EXPANSION AREA
COORDINATE
EASEMENT WITH
ELECTRICAL COMPANY
TO CROSS OVERHEAD
LINE CORRIDOR WITH
CONSTRUCTION
TRAFFIC
A
M E
N D
M E
POND #3
BOTTOM EL. 28.8
E
E
W
F
AC-130J
AC-130J
AC-130J
AC-130J
AC-130J
AC-130J
AC-130J
AC-130J
R E
T E
N T
I O
N
P
O N
D
C P
C P
C P
C P
C P
C P
C P
C P
EX. STORM INLET
TOP=30.90
BOTTOM OF STRUCTURE =20.0
ASPHALT SHOULDER WIDTH VARIES
ASPHALT SHOULDER WIDTH VARIES
TAXIW
AY SIG
N
EX. STORM INLET
TOP=28.06
BOTTOM OF STRUCTURE= 16.38
BERM
C O
N C
R E
X
I W
A Y
CONCRETE TAXIW
AY
ED
G
E O
F ASPH
ALT
W
O
O
D
L
I N
E
BERM
BERM
CONCRETE TAXIW
AY
CONCRETE TAXIWAY WIDTH
VARIES
C P
C P
A S
P H
A
LT
A C
C E
S S
R O
A
P
H
A
O
U
L
D
E
P
H
A
O
U
L
D
E
R
TAXIW
AY LIGHT
(TYPICAL)
CONCRETE TAXIWAY
CONCRETE TAXIWAY
C O
N C
R
ETE
(TYPICAL )
CONCRETE TAXIWAY
YELLO
W
STR
IPIN
G
Y E
LLO
W
S T
R
IP
IN
G
YELLO
W
STR
IPIN
G
CONCRETE
(TYPIC
AL)
Y E
LLO
W
STR
IPIN
G
YELLO
W
STR
IPIN
G
YELLO
W
STR
IPIN
G
YELLO
W
STR
IPIN
G
YELLO
W
STR
IPIN
G
Y E
LLO
W
STR
IPIN
G
YELLO
W
STR
IPIN
G
YELLO
W
STR
IPIN
G
ED
G
E O
F ASPH
ALT
ED
G
E O
F ASPH
ALT
YELLO
W
STR
IPIN
G
ED
G
E O
F ASPH
ALT
EDG
E O
F ASPHALT
Y E
LLO
W
STR
IPIN
G
(TYPICAL)
Y E
LLO
W
STR
IPIN
G
YELLO
W
STR
IPIN
G
(TYPICAL)
Y E
LLO
W
STR
IPIN
G
YELLO
W
STR
IPIN
G
Y E
LLO
W
STR
IPIN
G
36" X 48" BOX SD
36" X 48" BOX SD
RETENTION BASIN
TAXIW
AY LIG
HT
(TYPICAL)
TAXIW
AY LIGHT
(TYPICAL)
U N
D E
R G
R O
U N
D
E L E
C T
R I C
A L
V A
U L T
U N
D E
R G
R O
U N
D
E L E
C T
R I C
A L
V A
U L T
W
ELECTRICAL
SERVICE VAULT
LIG
H
T PO
LE
(TYPICAL)
W
O
O
D
L
I N
E
125.00'
SEE NOTE 2
CONSTRUCTION
ENTRANCE
25' SHOULDER
FOR HAUL ROUTE
WETLAND
DISTURBANCE LIMITS
RUNWAY 18-36
EXISTING
HCP
TAXIWAY G
SURCHARGE LIMITS 5
FEET ABOVE FINAL GRADE
INDICATED AT MAX 3:1
SLOPE SEE CG305
LOW PROFILE
BARRICADES AT
SHOULDER EDGE
HAMS
PAD
W
O
O
D
L
I N
E
W
OODLIN
E
W
W
S E
E
N
O T
E
PROPOSED
FINAL GRADE
ELEVATIONS
SD SD SD SD SD SD SD
FLARED END SECTION
WITH RIP RAP
INV. = 23.63
2 3
25 25
TAWIWAY CLOSURE
BARRICADES. SEE NOTES
ON GC010 FOR CLOSURE
OF TW/ G DAILY DURING
ALL HAULING OPERATIONS.
REOPEN T/W G EACH DAY.
EXISTING SHOULDER
REMOVE TOPSOIL
AND GRUB EXISTING
SLOPES SEE CG305
TAWIWAY CLOSURE
BARRICADES. SEE NOTES
ON GC010 FOR CLOSURE
OF TW/ G DAILY DURING
ALL HAULING OPERATIONS.
REOPEN T/W G EACH DAY.
TEMPORARY PRECAST
STORM DRAIN MANHOLE TO
CONNECT EXISTING BOX
CULVERT TO 48" HDPE PIPE
TEMPORARY 48"
CORRUGATED HDPE PIPE TO
ALLOW BACKFILL OPERATION
FOR APRON WORK AND
DURING SURCHARGE
SETTLEMENT PERIOD.
P
P
P
C
E U
P
P
P
C
C U
P
P
CU
J
E
GFI
W
GFI
W
GFI
W
GFI
W
GFI
W
GFI
W LP
LP
LPLPLP
LPLPLP
HAMS-15
3#10, 3/4"C
(RECEPTACLES)
HAMS-2
4#10, 3/4"C
(LIGHTING)
T A
X I W
Z:\CLIENTS\ANF\USCOE\SAM\115862_NORTH-CAPA\DESIGN\CIVIL\SHEETS\115862_GC102.DWG 8/10/2021 10:13 AM CFRANZEN
A
M
A S
H E
K
G
C
D
W G
K
R
O B
E R
T S
J S
C H
N E
I D
E R
R
B
A R
U T
H
C O
N S
T R
U C
T I O
N
P
H A
S I N
G
P
L A
N
P H
A S
E
GC102
CONSTRUCTION PHASING NOTES:
1. SEE CIVIL LEGEND ON SHEET GC001. SEE CONSTRUCTION SEQUENCE NOTES ON GC007 SEE
STAGING AND LAYDOWN NOTES ON GC005.
2. WORK WITHIN 125 FEET OF APRON CENTER LINE AND T/W G CENTERLINE SHALL BE COORDINATED
WITH COR AND AIRFIELD MANAGEMENT. ADJUST LOCATION OF LOW PROFILE BARRICADES TO
COINCIDE WITH EACH PHASE OF CONSTRUCTION ADJACENT TO THE ACTIVE APRON/TAXIWAY, SEE
PHASING PLANS.
3. SEE GRADING DRAWINGS CG301-CG305 FOR CLEARING, FILL CONSTRUCTION SURCHARGE LIMITS
AND SITE EMBANKMENTS.
4. CONTRACTOR SHALL NOT BE PERMITTED TO ACCESS THE EXISTING PCC SURFACE WITH
EQUIPMENT OR VEHICLES WITHOUT WRITTEN APPROVAL FROM THE COR.
5. INSTALL REQUIRED TRAFFIC CONTROL DEVICES. PLACE THE BARRICADES DAILY AS REQUIRED
FOR ROAD AND TAXIWAY CLOSURES. TAXIWAY CLOSURES AND BARRICADES SHALL BE
REMOVED BY THE CONTRACTOR DAILY PRIOR TO THE OPENING OF THE AIRFIELD UNLESS
INDICATED OTHERWISE ON THE PHASING PLANS, OR UNLESS APPROVED BY THE COR.
LEGEND
HAUL ROUTE
100' 200'0
A4
GC501
CONSTRUCTION ENTRANCE
H U
R L
B U
E
L D
F
L O
R I D
A
M O
B I L
E
D
I S
T R
I C
T
M O
B I L
E
A
L A
B A
M A
Mobile District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R N
O
M
Y
C
O R
E N
G I N
E E
R S
1 2 3 4 5
D
C
B
A
O
W N
W
A R
D
P
A R
K W
A Y
K A
N S
T
Y
M
O
B U
R N
D
O N
N E
L L
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
S B
P L O
T
S
C A
L E
S I Z
E x
F I
M
E
C K
D
B
Y
P L O
T
D
A T
E
D A
T E
S O
L I C
I T
A T
I O
N
N
U M
B E
R
P R
O J E
M
B E
R
C A
D
E
J U
N E
W R
F T
E V
J U
N E
S O
F
C
O M
B A
T
A
I R
C R
A F
T
P
A R
K I N
G
A
P R
A P
A
N
O R
T H
P R
O J E
F
T E
V
AMENDMENT NO. 0003
R
B
M I T
T A
L
SHEET
IDENTIFICATION
M E
F
N
WETLAND DISTURBANCE LIMITS
A1
CONSTRUCTION PHASING PLAN - PHASE 2
SCALE: 1" = 100'
C1
GC502
LOW PROFILE BARRICADE
PHASE 2 NOTES:
1. A LAYER OF CLEAN SAND (SEE SPECIFICATION 31 00 00 "SELECT GRANULAR MATERIAL") WILL BE
PLACED IN ONE LIFT 15 TO 20 INCHES THICK, IN ACCORDANCE WITH SPEC SECTION 31 00 00, FOLLOWED BY ANOTHER LAYER OF GEOGRID. THE GRID SHALL EXTEND TO DAYLIGHT AT THE
OUTER SLOPE OF THE PLANNED EMBANKMENT FILL.
2. SETTLEMENT PLATE, INCLINOMETERS AND PIEZOMETER INSTRUMENTATION SHOULD BE
INSTALLED AT THIS LEVEL (ELEVATION) TO ALLOW INSTRUMENTATION MONITORING TO CAPTURE
THE SETTLEMENT AS IT OCCURS DURING THE CONSTRUCTION OF THE EMBANKMENT. WHERE
POSSIBLE, INSTRUMENT CABLES FROM PIEZOMETERS SHALL BE EXTENDED LATERALLY TO A
POINT OUTSIDE THE EMBANKMENT/SURCHARGE PLAN AREA. CABLES EXTENDING THROUGH THE
EMBANKMENT SHALL BE PROTECTED FROM BREAKAGE BY INSTALLING THE CABLE INSIDE 3"
DIAMETER RIGID PVC PIPE. ADEQUATE LOOPS OF CABLE SHALL BE PROVIDED INSIDE THE PIPE TO
ALLOW FOR 12" OF EXTENSION DURING EMBANKMENT CONSTRUCTION AND SETTLEMENT. ONCE
INSTALLED, THE INSTRUMENTATION SHALL BE PROTECTED FROM FURTHER SITE WORK
ACTIVITIES. SETTLEMENT MONITORING PAINTS ON THE EXISTING T/W G AND HCP CONCRETE
SHALL BE MONITORED DURING FILL PLACEMENT SEE SHEET CG301.
3. A SECOND 15 INCH THICK LAYER OF CLEAN SAND WILL BE PLACED IN ACCORDANCE WITH SPEC
SECTION 31 00 00.
4. HAVING THIS 30" LAYER OF SAND AND GRIDS WITH THE ADDED EXISTING ROOT MAT SHOULD
ALLOW TRACKED EQUIPMENT TO TRAVERSE ACROSS THE SITE. THE SIZE/WEIGHT OF THIS
EQUIPMENT MAY DEPEND ON THE CONSISTENCY OF THE PLACED FILL AND CONTRACTOR'S
DEVELOPMENT PLAN.
5. TO CONSTRUCT THE EMBANKMENT SUBSEQUENT LIFTS OF SELECT FILL SHALL BE COMPACTED
TO 95% OF THE MATERIAL'S MODIFIED PROCTOR DENSITY UNTIL A HEIGHT OF 1 FOOT ABOVE THE
FINISHED CONCRETE ELEVATION IS ATTAINED. GENERALLY, THIS SHOULD REQUIRE
APPROXIMATELY 6.5 TO 10 VERTICAL FEET OF FILL SOILS. THE EMBANKMENT WILL BE
CONSTRUCTED IN TWO STAGES. THE FIRST FILL LAYER WILL DEVELOP THE 30" INITIAL FILL
BEDDING FOR THE EMBANKMENT. THE NEXT LAYER WILL BE A 36" THICK SELECT FILL LAYER
WHICH WILL BE THE FIRST STAGED LEVEL. AFTER PLACEMENT OF EACH ADDITIONAL STAGE, FILL
PLACEMENT WILL HALT UNTIL THE SOILS HAVE CONSOLIDATED AND IT IS DETERMINED BY NEW
INSTRUMENTATION READINGS THAT EXCESS PORE PRESSURES HAVE RELAXED TO ALLOW
FURTHER FILL PLACEMENT. THE TIME FOR THE UNDERLYING SOILS TO RELAX MAY RANGE FROM 2
WEEKS TO SEVERAL MONTHS AND WILL BE DEPENDENT ON SOIL CHARACTERISTICS, STRENGTH
GAIN AND STABILITY OF THE EMBANKMENT FILL. AS THE EMBANKMENT INCREASES IN HEIGHT IT IS
ANTICIPATED THAT THE DURATION OF EACH HOLD PERIOD WILL INCREASE. IN ADDITION, THE
THICKNESS OF THE NEXT STAGE WILL BE DETERMINED BY THE INSTRUMENTATION RESPONSES
FROM THE CURRENT STAGE. IT IS PROJECTED THAT THE EMBANKMENT WILL REQUIRE TWO
STAGES TO CONSTRUCT. THE 5' SURCHARGE WILL REQUIRE TWO OR THREE STAGES.
6. CONSTRUCTION OF THE SURCHARGE SHALL USE SATISFACTORY FILL MATERIAL OR ONSITE
MATERIAL WHICH HAS A MINIMUM UNIT WEIGHT OF 100 PCF. THE SLOPES OF THE SURCHARGE
SHALL BE COMPOSED OF SOILS WHICH HAVE 20 TO 30 PERCENT PASSING THE NO. 200 SIEVE AND
IS A MINIMUM OF 12 INCHES IN THICKNESS. THIS WILL IMPROVE THE ERODABILITY RESISTANCE OF
THE COVERING SOILS. TEMPORARY SEEDING OF DISTURBED AREAS TO BE IN ACCORDANCE WITH
FLORIDA DOT SPECS FOR HYDROSEEDING. NO HAY, STRAW, OR MULCH TO BE USED ON THE
AIRFIELD.
7. SURCHARGE TO REMAIN IN PLACE FOR APPROXIMATELY 12 MONTHS OR UNTIL SETTLEMENT IS
APPROVED BY THE CONTRACTING OFFICER.
A
M E
N D
M E
AutoCAD SHX Text F1-58-J
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text N529872.92
AutoCAD SHX Text E1276990.75
AutoCAD SHX Text
ELEV.32.03
AutoCAD SHX Text
WOODED MARSH AREA
AutoCAD SHX Text W
AutoCAD SHX Text X
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text C
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text 8" W
AutoCAD SHX Text 8" W
8" SD
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
E 1277000
E 1277125
E 1277250
N
N
N
N
39 @ 20.00' = 780.00'
W
V
X
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
U
T
S
R
Q
P
O
N
M
L
K
J
I
H
G
F
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
B
D
E
E
A1
A1
D
D
C C
C
LEGEND:
DOWELED
CONSTRUCTION JOINT
DUMMY
CONTRACTION JOINT
NEW PCC TO
NEW AC JOINT
REINFORCED SLAB
THICKENED EDGE
ISOLATION JOINT
TRANSITION SLAB
C3
CS503
C1
CS503
B4
CS503
B4
CS501
C4
CS501
B1
CS503
DOWELED
CONTRACTION JOINT
B3
CS503
GROUNDING POINT
(SEE ELECTRICAL)
AIRCRAFT TIE DOWN
C1
CS502
E
D
A1
B
G
C
Z:\CLIENTS\ANF\USCOE\SAM\115862_NORTH-CAPA\DESIGN\CIVIL\SHEETS\115862_CP101.DWG 8/10/2021 9:57 AM CFRANZEN
A
M
A S
H E
K
C
P
D
W G
K
R
O B
E R
T S
J S
C H
N E
I D
E R
R
B
A R
U T
H
P A
V E
M E
I N
T I N
G
P
L A
N
G
R
CP106
H U
R L
B U
E
L D
F
L O
R I D
A
M O
B I L
E
D
I S
T R
I C
T
M O
B I L
E
A
L A
B A
M A
Mobile District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R N
O
M
Y
C
O R
E N
G I N
E E
R S
1 2 3 4 5
D
C
B
A
O
W N
W
A R
D
P
A R
K W
A Y
K A
N S
T
Y
M
O
B U
R N
D
O N
N E
L L
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
S B
P L O
T
S
C A
L E
S I Z
E x
F I
M
E
C K
D
B
Y
P L O
T
D
A T
E
D A
T E
S O
L I C
I T
A T
I O
N
N
U M
B E
R
P R
O J E
M
B E
R
C A
D
E
J U
N E
W R
F T
E V
J U
N E
S O
F
C
O M
B A
T
A
I R
C R
A F
T
P
A R
K I N
G
A
P R
A P
A
N
O R
T H
P R
O J E
F
T E
V
AMENDMENT NO. 0003
R
B
M I T
T A
L
SHEET
IDENTIFICATION
M E
F
PAVEMENT JOINTING PLAN GRID 6
SCALE: 1" = 20'
M A
T C
H L I N
E
S
E
F
N
T I N
U A
T I O
N
MATCHLINE - SEE SHEET CP103 FOR CONTINUATION
MATCHLINE - SEE SHEET CP109 FOR CONTINUATION
20' 40'0
N
KEY PLAN
NOT TO SCALE
N
1 2 3
4 5 6
7 8 9
GENERAL NOTES:
1. SEE SHEETS CS150 AND CS151 FOR STATIC GROUND AND
AIRCRAFT TIE DOWN LAYOUT.
2. ALL JOINT LAYOUT CHANGES SHALL BE APPROVED BY COR.
A
M E
N D
M E
E
T E
N T
I O
N
P
O N
D
C P
C P
C P
C P
C P
C P
C P
C P
C P
C P
C P
C P
C P
C P
C P
C P
EX. STORM INLET
TOP=30.90
BOTTOM OF STRUCTURE =20.0
TEM
PO
R
AR
Y BEN
C
H M
AR
K
ASPHALT SHOULDER WIDTH VARIES
ASPHALT SHOULDER WIDTH VARIES
TA
X
IW
A
Y S
IG
N
C O
N C
R E
X
I W
A Y
C O
N C
R
ETE TAXIW
AY
ED
G
E O
F ASPH
ALT
C O
N C
R E
TE
TA
X
IW
A Y
C P
C P
C P
C P
C P
C P
C P
C P
A S
P H
A
LT
A C
C E
S S
R O
A
P
H
A
O
U
L
D
E
R
TA
X
IW
A
Y
LIG
H T
(TYPIC
AL)
CONCRETE TAXIWAY
CONCRETE TAXIWAY
C O
N C
R
ETE
(TYPIC
AL )
CONCRETE TAXIWAY
YELLO
W
STR
IPIN
G
Y E
LLO
W
S
TR
IP
IN
G
YELLO
W
STR
IPIN
G
C O
N C
R
ETE
(TYPIC
AL)
Y E
LLO
W
S
TR
IP
IN
G
Y E
LLO
W
S
TR
IP
IN
G
Y E
LLO
W
S
TR
IP
IN
G
Y E
LLO
W
S
TR
IP
IN
G
YELLO
W
STR
IPIN
G
YELLO
W
STR
IPIN
G
YELLO
W
STR
IPIN
G
YELLO
W
STR
IPIN
G
ED
G
E O
F ASPH
ALT
E D
G E
O F A
S P
H A
LT
YELLO
W
STR
IPIN
G
E D
G E
O F A
S P
H A
LT
E D
G E
O F A
S P
H A
LT
YELLO
W
STR
IPIN
G
(TYPIC
AL)
YELLO
W
STR
IPIN
G
Y E
LLO
W
S
TR
IP
IN
G
YELLO
W
STR
IPIN
G
36" X 48" BOX SD
36" X 48" BOX SD
TA
X
IW
A
Y
LIG
H T
(TY
P
IC
A
L)
TA
X
IW
A
Y
LIG
H T
(TY
P
IC
A
L)
U N
D E
R G
R O
U N
D
E L E
C T
R I C
A L
V A
U L T
W
W
W
W
W
W
W
W
ELEC
TR
IC
AL
SER
VIC
E VAU
LT
W
O
O
D
L
I N
E
± 60' ASPHALT SHOULDER
± 60' ASPHALT SHOULDER
A
S P
H A
O
U L
D E
R
E D
G E
O F A
S P
H A
LT
ED
G
E O
F ASPH
ALT
ED
G
E O
F ASPH
ALT
' A
S P
H A
L T
S H
O U
L D
E R
ASPHALT SHOULDER WIDTH VARIES
ED
G
E O
F ASPH
ALT
W
O
O
D
L
I N
E
W
OODLIN
E
D
ITC
H
C O
N C
R
ETE
(TYPIC
AL )
± 60' ASPHALT SHOULDER
YELLO
W
S
TR
IP
IN
G
C O
N C
R
ETE
TAXIW
AY LIG
H T
(TYPIC
AL)
YELLO
W
STR
IPIN
G
Y E
LLO
W
S
TR
IP
IN
G
W
W
W
W
W
W
W W
W W
W W
W W
W
W W
W
W W
W W
W W
N
N
N
E 1277000
E 1277500
SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD
48" SD
FLARED END
SECTION WITH
RIP RAP
INV. = 23.63
Z:\CLIENTS\ANF\USCOE\SAM\115862_NORTH-CAPA\DESIGN\CIVIL\SHEETS\115862_CG301.DWG 8/10/2021 9:44 AM CFRANZEN
A
M
A S
H E
K
C
G
D
W G
K
R
O B
E R
T S
J S
C H
N E
I D
E R
R
B
A R
U T
H
C O
N S
T R
U C
T I O
N
B
A C
K F
I L
L
P
L A
N
CG301
H U
R L
B U
E
L D
F
L O
R I D
A
M O
B I L
E
D
I S
T R
I C
T
M O
B I L
E
A
L A
B A
M A
Mobile District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R N
O
M
Y
C
O R
E N
G I N
E E
R S
1 2 3 4 5
D
C
B
A
O
W N
W
A R
D
P
A R
K W
A Y
K A
N S
T
Y
M
O
B U
R N
D
O N
N E
L L
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
S B
P L O
T
S
C A
L E
S I Z
E x
F I
M
E
C K
D
B
Y
P L O
T
D
A T
E
D A
T E
S O
L I C
I T
A T
I O
N
N
U M
B E
R
P R
O J E
M
B E
R
C A
D
E
J U
N E
W R
F T
E V
J U
N E
S O
F
C
O M
B A
T
A
I R
C R
A F
T
P
A R
K I N
G
A
P R
A P
A
N
O R
T H
P R
O J E
F
T E
V
AMENDMENT NO. 0003
R
B
M I T
T A
L
SHEET
IDENTIFICATION
M E
F
CONSTRUCTION BACKFILL PLAN
SCALE: 1" = 60'
N
GENERAL NOTES:
1. SEE SHEET GC007 EROSION CONTROL NOTES AND GC009 FOR GRADING
NOTES.
2. INSTALL TEMPORARY 48" CORRUGATED HDPE PIPE TO ALLOW BACKFILL
OPERATION FOR APRON WORK AND DURING SURCHARGE SETTLEMENT
PERIOD. REMOVE TEMPORARY STORM PIPE AFTER REMOVING
SURCHARGE BACKFILL AND INSTALLING NEW 36" X 48" BOX CULVERT
ACROSS THE APRON TO THE WEST. REMOVE PRIOR TO CONSTRUCTING
ANY LAYERS OF THE APRON OR TAXIWAY CONNECTOR PAVEMENT
SECTIONS.
3. LAYOUT OF THE SETTLEMENT PLATES SHOWN IS CONCEPTUAL AND FINAL
LOCATION AND INSTALLATION IS BASED ON THE CONTRACTOR'S
GEOTECHNICAL ENGINEER WITH REVIEW BY THE MOBILE COE GEOTECH
BRANCH.
4. SEE CONSTRUCTION SEQUENCE NOTES ON PHASING PLANS GC101 -
GC104.
5. MARK AND SURVEY 3 LOCATIONS ON THE EXISTING CONCRETE OF T/W G
AND 3 LOCATION ON THE EXISTING CONCRETE OF THE HCP. SURVEY AND
MONITOR POTENTIAL SETTLEMENT OF THESE POINTS THROUGHOUT
CONSTRUCTION OF EMBANKMENT FILL AND SURCHARGE MATERIAL.
NOTIFY CONTRACTING OFFICER IMMEDIATELY OF ANY SETTLEMENT OR
MOVEMENT OF SURVEYED LOCATIONS.
60' 120'0
CG305
C1
CG305
A1
LIMIT OF TREE
CLEARING
PROPOSED SETTLEMENT
PLATE LOCATIONS (TYP)
(SEE DETAILS ON CG303)
SEE NOTE 2
WETLAND DISTURBANCE LIMITS
SURCHARGE LIMITS - LIMITS OF FILL
UP AT A 3:1 SLOPE TO 5FT ABOVE
FINAL PAVEMENT GRADE. SEE GC102
AND GRADING PLANS.
SP#11
SP#10
SP#8
SP#1
SP#2
SP#3
SP#5
SP#7
SP#4
SP#6
SP#9
SP#12
SEE NOTE 5.
(TYP 6)
SEE NOTE 5.
(TYP 6)
T/W G
HCP
SETTLEMENT ACTION:
· 0 TO 1/2" DO NOTHING
· 1/2" TO 1" STOP ADDING SURCHARGE MATERIAL
· 1" OR MORE REMOVE SURCHARGE MATERIAL IMMEDIATELY. NOTIFY
CONTRACTING OFFICER. PROVIDE REPAIR PLAN FOR DAMAGED AIRFIELD
PAVEMENTS.
A
M E
N D
M E
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
WOODED MARSH AREA
AutoCAD SHX Text
FIR 7191 CONTROL POINT N: 530212.44 E: 1277548.44 EL= 29.46 (NAVD88)
AutoCAD SHX Text
FAC IN CONCRETE STAMPED E1-58J N: 529872.87 E: 1276990.64 EL= 29.46 (NAVD88)
AutoCAD SHX Text W
15.0
20.0
25.0
30.0
35.0
40.0
15.0
20.0
25.0
30.0
35.0
40.0
-0+250+00
1+00
2+00
3+00
4+00
5+00
6+00
7+00
8+00
9+00
10+00
11+00
12+00
FINAL CONSTRUCTION ELEVATION
PAVEMENT SECTION
SEE NOTE 6
INITIAL FILL (15"-20")
SEE NOTE 4
CONSTRUCTION BERM
ELEV: 30.00'
SEE NOTE 11 & 12
STRUCTURAL FILL
SEE NOTE 5
GEOGRID (2 LAYERS):
ONE AT EXISTING GRADE
SECOND AT THE TOP OF THE FIRST INITIAL FILL LAYER
SEE NOTE 3
INITIAL FILL (15" MIN)
SEE NOTE 4
X X
25.00'
25.00' 31.80'
2%
4%
10%
VARIES
10%
43.20' 30.00'
6" TOPSOIL
OVER GEOGRID
125.00'
PHASE 4A
HCP T/L ℄
SURCHARGE LIMITS
REMOVE TOPSOIL/GRUB
EXISTING SLOPE
AIRFIELD FENCE
15.0
20.0
25.0
30.0
35.0
40.0
15.0
20.0
25.0
30.0
35.0
40.0
-0+250+00
1+00
2+00
3+00
4+00
5+00
6+00
7+00
8+00
9+00
10+0010+25
FINAL CONSTRUCTION ELEVATION
PAVEMENT SECTION
SEE NOTE 6
PAVEMENT
SECTION
INITIAL FILL (15"-20")
SEE NOTE 4
CONSTRUCTION BERM
ELEV: 30.00'
SEE NOTE 11 & 12
STRUCTURAL FILL
SEE NOTE 5
GEOGRID (2 LAYERS):
ONE AT EXISTING GRADE
SECOND AT THE TOP OF THE FIRST INITIAL FILL LAYER
SEE NOTE 3
INITIAL FILL (15" MIN)
SEE NOTE 4
2%
4%
10%
25.00' 25.00'
X X
SURCHARGE LIMITS
125.00'
PHASE 4B
T/W G ℄
AIRFIELD FENCE
REMOVE TOPSOIL/GRUB
EXISTING SLOPE
Z:\CLIENTS\ANF\USCOE\SAM\115862_NORTH-CAPA\DESIGN\CIVIL\SHEETS\115862_CG305.DWG 8/10/2021 9:49 AM CFRANZEN
A
M
A S
H E
K
C
G
D
W G
K
R
O B
E R
T S
J S
C H
N E
I D
E R
R
B
A R
U T
H
A P
R O
N
S
E C
T I O
N S
CG305
H U
R L
B U
E
L D
F
L O
R I D
A
M O
B I L
E
D
I S
T R
I C
T
M O
B I L
E
A
L A
B A
M A
Mobile District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R N
O
M
Y
C
O R
E N
G I N
E E
R S
1 2 3 4 5
D
C
B
A
O
W N
W
A R
D
P
A R
K W
A Y
K A
N S
T
Y
M
O
B U
R N
D
O N
N E
L L
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
S B
P L O
T
S
C A
L E
S I Z
E x
F I
M
E
C K
D
B
Y
P L O
T
D
A T
E
D A
T E
S O
L I C
I T
A T
I O
N
N
U M
B E
R
P R
O J E
M
B E
R
C A
D
E
J U
N E
W R
F T
E V
J U
N E
S O
F
C
O M
B A
T
A
I R
C R
A F
T
P
A R
K I N
G
A
P R
A P
A
N
O R
T H
P R
O J E
F
T E
V
AMENDMENT NO. 0003
R
B
M I T
T A
L
SHEET
IDENTIFICATION
M E
F
60' 120'00 5' 10'
HORZ:VERT:
60' 120'00 5' 10'
HORZ:VERT:
EMBANKMENT CONSTRUCTION NOTES:
1. REFER TO SECTION 31 00 00 OF THE SPECIFICATIONS FOR FILL
MATERIAL AND COMPACTION REQUIREMENTS. SEE THE
CONSTRUCTION SEQUENCE NOTES ON GC007.
2. INSTRUMENTATION (I.E. PIEZOMETER, INCLINOMETER,
SETTLEMENT PLATES) SHALL BE INSTALLED PER
SPECIFICATION SECTION 31 00 00 EARTHWORK AND PER THE
MANUFACTOR'S RECOMMENDATION.
3. INITIAL BIAXIAL GEO-GRID LAYER SHALL BE PLACED AT
MINIMUM OF 15 INCHES ABOVE EXISTING GRADE. GEO-GRID
SHOULD EXTEND 4 FEET OUTSIDE SLOPED EMBANKMENT.
FIRST LAYER OF INITIAL FILL MATERIAL WILL VARY WITH
LOCATION. REGARDLESS OF THE LOCATION, FINAL ELEVATION
OF THE FIRST LAYER OF INITIAL FILL SHOULD EXTEND TO
ALLOW FOR LEVEL WORKING SURFACE FOR PLACEMENT OF
GEO-GRID.
4. INITIAL FILL: SHALL BE PLACED AFTER CLEARING AND
INSTALLATION OF FIRST LAYER OF GEOGRID. ONE 15-20 INCH
LAYER PER SPECIFICATION 31 00 00, THEN ANOTHER GEOGRID,
THEN SECOND LAYER OF 15" PER SPECIFICATION 31 00 00.
REFER TO SPECIFICATIONS FOR REQUIREMENTS. IF USING #57
STONE FOR INITIAL FILL MATERIAL THEN A FILTER FABRIC
SEPARATION LAYER IS REQUIRED WRAPPED BELOW AND
ABOVE THE STONE MATERIAL.
5. STRUCTURAL FILL/SATISFACTORY FILL: 12 INCH LIFT
THICKNESS MAXIMUM ABOVE ELEVATION 26.0 FEET, REFER TO
SPECIFICATIONS FOR REQUIREMENTS.
6. SUBGRADE FILL: MINIMUM 24 INCH LAYER AND MAXIMUM 8 INCH
LOOSE LIFTS PLACEMENT, REFER TO SPECIFICATIONS
SECTION 31 00 00 EARTHWORK FOR REQUIREMENTS (100
PERCENT COMPACTION).
7. TOP OF SUBGRADE FILL: EMBANKMENT SURFACE ELEVATION
SHALL BE CONSTRUCTED TO THE BOTTOM OF THE PAVEMENT
SECTION AS INDICATED ON CS501.
8. SOIL BORING LOGS AND LABORATORY DATA CAN BE FOUND IN
APPENDIX TO THE SPECIFICATIONS.
9. REFER TO SECTION 31 00 00 FOR STORMWATER POND
SUBGRADE COMPACTION REQUIREMENTS.
10. INSTALL SETTLEMENT PLATES THROUGHOUT LIMITS OF
EMBANKMENT FILL MATERIAL AS RECOMMENDED BY
GEOTECHNICAL ENGINEER. SEE CG301 FOR CONCEPT
LAYOUT.
11. CONSTRUCTION BERM IS INTENDED TO PROVIDE LATERAL
SUPPORT FOR FILL MATERIAL, TO FILTER WATER ORIGINATING
WITHIN THE CONSTRUCTION SITE PRIOR TO DISCHARGING
INTO THE WETLANDS, AND TO HELP CONTAIN MUD WAVE
WHICH MAY BE GENERATED DURING THE CONSTRUCTION
FILLING BENEATH THE PROJECT SITE.
12. CONSTRUCTION BERM MAY BE USED AS CONSTRUCTION
ACCESS ROAD. THE CONTRACTOR TO INSTALL GEOGRID
REINFORCEMENT IN THE CONSTRUCTED BERM TO ENSURE A
STABLE ROAD (ELEV. 26.00 AND 28.00).
13. CONTRACTING OFFICER AND GOVERNMENT GEOTECHNICAL
ENGINEER TO FIELD VERIFY CONDITIONS OF MULCHED
SUBGRADE PRIOR TO ANY FILL OPERATIONS.
14. BACKFILLING OF THE SITE IS TO BE DONE AS ONE MASS FILL
OPERATION INCLUDING THE SURCHARGE LOAD TO MONITOR
SETTLEMENT. EXCAVATION MATERIAL/MUCK IS NOT TO BE
USED FOR FILL MATERIAL. MATERIAL MAYBE USED FOR
TOPSOIL IF PROPERTIES MEET THE SPECIFICATION
REQUIREMENTS.
15. EXCESS SATISFACTORY OR ORGANIC MATERIAL TO BE TESTED
IN ACCORDANCE WITH SPECIFICATIONS REQUIREMENTS FOR
OFFSITE BORROW MATERIAL PRIOR TO BEING APPROVED FOR
DISPOSAL AT THE EGLIN RANGE BORROW PITS.
16. THE SLOPES OF THE EMBANKMENT AND THE TOP OF THE
SURCHARGE SURFACE SHALL BE SEEDED TEMPORARILY TO
CONTROL EROSION DURING THE SETTLEMENT PERIOD. THE
CONTRACTOR SHALL MOW AND MAINTAIN THE SURFACE
DURING THE SETTLEMENT PERIOD.
C1
SECTION C1
SCALE: AS INDICATED
A1
SECTION A1
SCALE: AS INDICATED
A
M E
N D
M E
D
O E
E
D
W G
P
O
G O
R M
A N
R
T
A N
N E
H I L
L
D
R
I D
L E
Y
E L
E C
T R
I C
G
E N
D
E-001
H U
R
LB
U R
T
FI
EL
D
, F
LO
R
ID
A
M O
B I L
E
D
I S
T R
I C
T
M O
B I L
E
A
L A
B A
M A
Mobile District
US Army Corps of Engineers ®
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R N
O
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
1 2 3 4 5
D
C
B
A
O
W N
W
A R
D
P
A R
K W
A Y
K A
N S
T
Y
M
O
B U
R N
S
M cD
O N
N
EL
L
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
S B
P L O
T
S
C A
L E
S I Z
E x
F I
M
E
C K
D
B
Y
P L O
T
D
A T
E
D A
T E
S O
L I C
I T
A T
I O
N
N
U M
B E
R
P R
O J E
M
B E
R
C A
D
E
J U
N E
W
1R
F T
E V
J U
N E
SO
F
C O
M B
A T
A
IR
C R
A
FT
P A
R K
IN
G
A
PR
O N
(C A
PA
) N
O R
TH
P
R O
J E
F
T E
V
AMENDMENT NO. 0003
R
B
M I T
T A
L
SHEET
IDENTIFICATION
M E
F
SYMBOLS - LIGHTING
CONNECTION
CONTINUATION
SEPARABLE CONNECTOR OR CONNECTION
FOR DRAWOUT ASSEMBLIES
FUSED DISCONNECT SWITCH
TRANSFORMER
GROUND
DELTA - WYE TRANSFORMER CONNECTION
DIGITAL METER
TRANSIENT VOLTAGE SURGE SUPPRESSION
VARIABLE FREQUENCY DRIVE
SHUNT TRIP
KILOWATT HOUR METER
VOLTMETER SELECTOR SWITCH
AMMETER SELECTOR SWITCH
VOLTMETER
AMMETER
CIRCUIT BREAKER
SWITCH
DISCONNECT SWITCH
PANELBOARD (PANELBOARD NAMED 'M')
LIGHTNING ARRESTOR
MULTI-FUNCTION DIGITAL UTILITY METER
NEUTRAL CONNECTION TO GROUND
RELAY
CONTACTOR
Y
M
KWH
V
SWITCHES
DISCONNECT SWITCH
MOTOR-RATED SWITCH
M
VFD
ST
VS
AS
A
SYMBOLS - ONE-LINE DIAGRAM
DM
N
G
SYMBOLS - GROUNDING / LIGHTNING
PROTECTION
LPS CONDUIT
AIR TERMINAL
GROUND ROD
GROUND TEST WELL
LIGHTNING PROTECTION CATENARY
BOLTED GROUND CONNECTION
EXOTHERMIC WELDED CONNECTION
SYMBOL MODIFIERS
AC
C
CB
CO
DW
EP OR EXP
F
FPD
GD
GFI
IG
MW
P
POP
PR
PROJ
REF
SB
SFX-#
SH
SW: XX
TV
VM
WC
WF
WP
WPIU
XX" AFF
XX" AFP
ABOVE COUNTER MOUNTING
RECESSED IN CEILING
COFFEE BREWER
COPIER
DISHWASHER
EXPLOSION PROOF
RECESSED IN FLOOR
FLAT PANEL DISPLAY
GARBAGE DISPOSAL
GROUND FAULT CIRCUIT INTERRUPTER
ISOLATED GROUND
MICROWAVE
NIGHT LIGHT
POPCORN MAKER
PRINTER
PROJECTOR
REFRIGERATOR
SMART BOARD
SYSTEMS FURNITURE CONNECTION
SF1 - LARGE WORKSTATION
SF2 - SMALL WORKSTATION
# INDICATES QUANTITY OF
WORKSTATIONS SERVED FROM
CONNECTION
SHREDDER
CONTROLLED BY SWITCH LABELED "XX"
TELEVISION
VENDING MACHINE
WALL-MOUNTED CLOCK
WATER COOLER
WEATHERPROOF, WITH GFI
WEATHERPROOF IN USE, WITH GFI
MOUNT XX" AFF
MOUNT XX" AFP
SYMBOLS - POWER
EQUIPMENT
LP11
R
C
MFM
LEGEND NOTES
TVSS
UNDERGROUND ELECTRICAL (EXISTING)
PAD MOUNTED TRANSFORMER
EU
SYMBOLS - SITE
1. SYMBOLS ORIENTATION DOES NOT IMPLY DEVICE OR
EQUIPMENT ORIENTATION UNLESS NOTED AS SUCH.
2. SEE REFLECTED CEILING PLANS FOR LIGHT FIXTURE
POSITIONS AND ORIENTATIONS.
3. SYMBOL SIZE DOES NOT IMPLY EQUIPMENT SIZE, UON.
4. MOUNTING HEIGHT INDICATED IN LEGEND AND ON THE
DRAWINGS SHALL BE THE DISTANCE MEASURED FROM
THE CENTER OF THE DEVICE TO THE FINISHED FLOOR.
5. NOT ALL SYMBOLS ON THIS SHEET ARE USED AS PART
OF THIS PROJECT.
· ELECTRICAL EQUIPMENT INCLUDING, BUT NOT
LIMITED TO, TRANSFORMERS, SWITCHBOARDS AND
PANELBOARDS ARE DRAWN TO SCALE IN THE
PLANS AND ARE CALLED OUT WITH A UNIQUE
IDENTIFIER.
EQUIPMENT IDENTIFIER
GROUNDING COUNTERPOISE/CONDUCTOR
· BURIED, BARE CABLE (EXTERIOR)
· COPPER, #4/0 AWG MINIMUM, UON
GROUND BAR
MGB, TMGB, TGB = TELECOM GROUNDING
MPG = LAB MULTIPOINT GROUND (AND STATIC)
TWO WAY 5" UNDERGROUND PRIMARY ELECTRICAL
DUCTBANK (CONCRETE ENCASED)
EP
UNDERGROUND SECONDARY ELECTRICAL
DUCTBANK (CONCRETE ENCASED)
ES
SINGLE WAY 4" UNDERGROUND
COMMUNICATIONS DUCTBANK
(CONCRETE ENCASED)
CU
E
N D
M E
/1
0/
XXXXXXXXX
X
X
XXXX
X X
X X
X
X
T
E
P
E
P
E
P
E P
E P
E P
EP EP EP EP EP EP
E P
E P
E P
E P
E P
E P
E P
EP
EU EU EU
E U
E U
E U
E U
E U
E U
E U
E U
EU EU EU EU EU EU
E U
E U
E S
E S
E S
E S
E S
E S
E S
E S
HH
T
E S
E S
ES ES ES ES ES ES ES
ES ES
E S
ES ES ES ES ES
ES ES
E S
E S
HH
HH
\\BMCD\DFS\CLIENTS\ANF\USCOE\SAM\115862_NORTH-CAPA\DESIGN\ELEC\SHEETS\115862_ES101.DWG 8/5/2021 2:58 PM RPTANNEHILL
A R
D
O E
E
S
D
W G
P
O
G O
R M
A N
R
T
A N
N E
H I L
L
D
R
I D
L E
Y
E L
E C
T R
I C
R
K
ES101
H U
R
LB
U R
T
FI
EL
D
, F
LO
R
ID
A
M O
B I L
E
D
I S
T R
I C
T
M O
B I L
E
A
L A
B A
M A
Mobile District
US Army Corps of Engineers ®
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R N
O
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
1 2 3 4 5
D
C
B
A
O
W N
W
A R
D
P
A R
K W
A Y
K A
N S
T
Y
M
O
B U
R N
S
M cD
O N
N
EL
L
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
S B
P L O
T
S
C A
L E
S I Z
E x
F I
M
E
C K
D
B
Y
P L O
T
D
A T
E
D A
T E
S O
L I C
I T
A T
I O
N
N
U M
B E
R
P R
O J E
M
B E
R
C A
D
E
J U
N E
W
1R
F T
E V
J U
N E
SO
F
C O
M B
A T
A
IR
C R
A
FT
P A
R K
IN
G
A
PR
O N
(C A
PA
) N
O R
TH
P
R O
J E
F
T E
V
AMENDMENT NO. 0003
R
B
M I T
T A
L
SHEET
IDENTIFICATION
M E
F
A1
ELECTRICAL NEW WORK
SCALE: 1" = 40'
M A
T C
H L I N
E
S
E
F
N
T I N
U A
T I O
N
MATCHLINE - SEE SHEET ES103 FOR CONTINUATION
N
PROVIDE LOAD BREAK FEED-THRU
BUSHING AND CONNECT NEW PRIMARY
CONDUCTOR AT EXISTING TRANSFORMER.
PULL NEW POWER AND CONTROL CABLES
FROM LIFT STATION WET WELL TO NEW
CENTRAL PANEL LOCATION. PULL AND CAP
NEW CABLES PRIOR TO RELOCATION OF
LIFT STATION CONTROL
PANEL.COORDINATE WITH BASE ON
RELOCATE AND FINAL CONNECTION OF
LIFT STATION CENTRAL PANEL WITHIN
TIMEFRAME DESIGNATED BY BASE.
AREA TO BE LIT BY HIGH MAST LIGHTING IS
BOUNDED BY DASHED LINE.
KEYED NOTES:
KEY PLAN
NOT TO SCALE
N
SCALE IN FEET
40'20' 80'
HAMS PAD
AIRCRAFT RATED HANDHOLE
(TYP OF 2 FOR LIFT STATION CABLING)
RELOCATED LIFT STATION
PUMP CONTROL PANEL
NEW SERVICE
TRANSFORMER
NEW 2-5" PRIMARY
DUCTBANK
EXISTING HAMS
SUPPORT BLDG
EXISTING 25KVA
TRANSFORMER
(INSTALLED BY CAPA
SOUTH PROJECT)
EXISTING PRIMARY
3-2"C FOR LIFT STATION
POWER AND CONTROLS
HIGHMAST
LIGHT
POLE
HIGHMAST
LIGHT
POLE
AREA "A" AREA "B"
AREA "C" AREA "D"
PANEL LP1
AIRCRAFT RATED HANDHOLE
(TYP OF 3 FOR HIGH MAST POWER)
A2
ES501
A1
ES501
TYP OF 4
E
N D
M E
/1
0/
ES
S
E S
ES ES ES ES ES ES
E S
E S
HH HH
\\BMCD\DFS\CLIENTS\ANF\USCOE\SAM\115862_NORTH-CAPA\DESIGN\ELEC\SHEETS\115862_ES101.DWG 8/5/2021 2:58 PM RPTANNEHILL
A R
D
O E
E
S
D
W G
P
O
G O
R M
A N
R
T
A N
N E
H I L
L
D
R
I D
L E
Y
E L
E C
T R
I C
R
K
ES102
H U
R
LB
U R
T
FI
EL
D
, F
LO
R
ID
A
M O
B I L
E
D
I S
T R
I C
T
M O
B I L
E
A
L A
B A
M A
Mobile District
US Army Corps of Engineers ®
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R N
O
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
1 2 3 4 5
D
C
B
A
O
W N
W
A R
D
P
A R
K W
A Y
K A
N S
T
Y
M
O
B U
R N
S
M cD
O N
N
EL
L
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
S B
P L O
T
S
C A
L E
S I Z
E x
F I
M
E
C K
D
B
Y
P L O
T
D
A T
E
D A
T E
S O
L I C
I T
A T
I O
N
N
U M
B E
R
P R
O J E
M
B E
R
C A
D
E
J U
N E
W
1R
F T
E V
J U
N E
SO
F
C O
M B
A T
A
IR
C R
A
FT
P A
R K
IN
G
A
PR
O N
(C A
PA
) N
O R
TH
P
R O
J E
F
T E
V
AMENDMENT NO. 0003
R
B
M I T
T A
L
SHEET
IDENTIFICATION
M E
F
A1
ELECTRICAL NEW WORK
SCALE: 1" = 40'
M A
T C
H L I N
E
S
E
F
N
T I N
U A
T I O
N
N
KEY PLAN
NOT TO SCALE
N
SCALE IN FEET
40'20' 80'
HIGHMAST
LIGHT
POLE (TYP)
AREA "A" AREA "B"
AREA "C" AREA "D"
AIRCRAFT RATED
HANDHOLE (TYP OF 3
FOR HIGH MAST POWER)
AREA TO BE LIT BY HIGH MAST LIGHTING
IS BOUNDED BY DASHED LINE.
KEYED NOTES:
MATCHLINE - SEE SHEET ES104 FOR CONTINUATION
E
N D
M E
/1
0/
T R
Y
C
O N
T R
I N
T
W
ARNING
RESTRICTED AREA
AC-130J
AC-130J
AC-130J
AC-130J
E S
E S
E S
HH
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
\\BMCD\DFS\CLIENTS\ANF\USCOE\SAM\115862_NORTH-CAPA\DESIGN\ELEC\SHEETS\115862_ES101.DWG 8/5/2021 8:49 AM RPTANNEHILL
A R
D
O E
E
S
D
W G
P
O
G O
R M
A N
R
T
A N
N E
H I L
L
D
R
I D
L E
Y
E L
E C
T R
I C
R
K
ES103
H U
R
LB
U R
T
FI
EL
D
, F
LO
R
ID
A
M O
B I L
E
D
I S
T R
I C
T
M O
B I L
E
A
L A
B A
M A
Mobile District
US Army Corps of Engineers ®
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R N
O
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
1 2 3 4 5
D
C
B
A
O
W N
W
A R
D
P
A R
K W
A Y
K A
N S
T
Y
M
O
B U
R N
S
M cD
O N
N
EL
L
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
S B
P L O
T
S
C A
L E
S I Z
E x
F I
M
E
C K
D
B
Y
P L O
T
D
A T
E
D A
T E
S O
L I C
I T
A T
I O
N
N
U M
B E
R
P R
O J E
M
B E
R
C A
D
E
J U
N E
W
1R
F T
E V
J U
N E
SO
F
C O
M B
A T
A
IR
C R
A
FT
P A
R K
IN
G
A
PR
O N
(C A
PA
) N
O R
TH
P
R O
J E
F
T E
V
AMENDMENT NO. 0003
R
B
M I T
T A
L
SHEET
IDENTIFICATION
M E
F
A1
ELECTRICAL NEW WORK
SCALE: 1" = 40'
MATCHLINE - SEE SHEET ES101 FOR CONTINUATION
N
INTERCEPT EXISTING 3-2" AND INSTALL AIRCRAFT
RATED HANDHOLE.
PULL NEW POWER AND CONTROL CABLES FROM
LIFT STATION WET WELL TO NEW CONTROL
PANEL LOCATIONS.
AREA TO BE LIT BY HIGH MAST LIGHTING IS
BOUNDED BY DASHED LINE.
KEYED NOTES:
KEY PLAN
NOT TO SCALE
N
SCALE IN FEET
40'20' 80'
EXISTING LIFT STATION
WET WELL
NEW AIRCRAFT RATED HANDHOLE
(TYP OF 2 FOR LIFT STATION CABLING)
3-2"C FOR LIFT STATION
POWER AND CONTROLS
EXISTING 3-2" XLPE
DUCTS
AREA "A" AREA "B"
AREA "C" AREA "D"
M A
T C
H L I N
E
S
E
F
N
T I N
U A
T I O
E
N D
M E
/1
0/
\\BMCD\DFS\CLIENTS\ANF\USCOE\SAM\115862_NORTH-CAPA\DESIGN\ELEC\SHEETS\115862_ES501.DWG 8/5/2021 1:45 PM RPTANNEHILL
D
O E
E
S
D
W G
P
O
G O
R M
A N
R
T
A N
N E
H I L
L
D
R
I D
L E
Y
E L
E C
T R
I C
T
A I L
S
ES501
H U
R
LB
U R
T
FI
EL
D
, F
LO
R
ID
A
M O
B I L
E
D
I S
T R
I C
T
M O
B I L
E
A
L A
B A
M A
Mobile District
US Army Corps of Engineers ®
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R N
O
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
1 2 3 4 5
D
C
B
A
O
W N
W
A R
D
P
A R
K W
A Y
K A
N S
T
Y
M
O
B U
R N
S
M cD
O N
N
EL
L
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
S B
P L O
T
S
C A
L E
S I Z
E x
F I
M
E
C K
D
B
Y
P L O
T
D
A T
E
D A
T E
S O
L I C
I T
A T
I O
N
N
U M
B E
R
P R
O J E
M
B E
R
C A
D
E
J U
N E
W
1R
F T
E V
J U
N E
SO
F
C O
M B
A T
A
IR
C R
A
FT
P A
R K
IN
G
A
PR
O N
(C A
PA
) N
O R
TH
P
R O
J E
F
T E
V
AMENDMENT NO. 0003
R
B
M I T
T A
L
SHEET
IDENTIFICATION
M E
F
C1
TYPICAL TWO-WAY CONCRETE ENCASED DUCTBANK
SCALE: NTS
TOP OF PAVEMENT SUBGRADE OR GRADE
NOTES:
SELECT BACKFILL
WARNING TAPE,
6" BELOW GRADE
PVC CONDUIT SIZE
AS INDICATED
ELECTRICAL CONDUCTORS SHALL
BE LOCATED IN DUCTS AS SHOWN.
CONDUCTOR SIZE AS INDICATED.
3000 PSI CONCRETE
GREENLEE MULTIPLEX
POLYESTER ROPE OR
EQUIVALENT
M
I N
3" 3"
1. USE PLASTIC CONDUIT SPACERS
AT 5'-0" OC.
6"
L3 1/2 X 3 1/2 X 1/4
ST3 X 6.25
L7 X 4 X 3/8 X 9" LONG
SUMP
SLOPE FL. TO
IRON
7/8"Ø PULLING-IN
1'-0"
A
L 6 X 3 1/2 X 5/16
1/4"
6" X 3/8" X 4'-6" PL
PAVING
3"
6"
10"
A
10"
E.F. SIDES & BOTTOM
#4 @ 12" E.W. &
SECTION A-A
1'-0"
6"
10"
L7 X 4 X 3/8 X 9" LONG
W8 X 40 REMOVABLE
SECTION B-B
1'-0"X1'-0"X6"
SUMP
& CLAMP
GROUND ROD
BOTTOM
E.F. SIDES &
#4 AT 12" E.W.
ANCHOR @ 1'-6" O.C.
1 1/4" X 1/8"
PAVING OR GRADE
1/2" P.E.J. ALL AROUND
SECTION C-C
3/16
T
ST 3 X 6.25
L 3 1/2X3 1/2X1/4
ANCHOR @ 1'-6"
1 1/4" X 1/8
1/2"Ø STEEL ROD
2"
4"
1"
6"6"
C
C
7"
9"
THE PROJECT DRAWING
TO BE AS INDICATED ON
DUCT ENTRANCE. LOCATION
B
B
A A
3" X 3/8" X 8" PL
REMOVABLE W 8 X 40
SUMP
AT 6" O.C.
1/2" Ø PLUG WELD
1/2" Ø PLUG WELD
3" X 3/8" X 4'-6" PL
& COVER
HINGE-WELDED TO FRAME
AT 6" O.C.
1/2" Ø PLUG WELD
PL
PLAN
DIMENSIONSHANDHOLE
TYPE
3'-0"
A
(SEE NOTE 4)
#4 @ 12"
E.W. & E.F.
1/2" PL
VARIES
NOTE: STIFFENERS SHOWN
TYP. BOTH SIDES
TYPE 3, 1'-1"
TYPE 4, 1'-7"
O.C.
WATERSTOP AT ALL
CONSTR. JTS. (TYP.)
NOTES:
1. ENTRANCE OF DUCTS INTO HANDHOLE MAY
BE MADE ON SIDE FACES OR CORNERS AS
REQUIRED.
2. HANDHOLE AND COVER MUST BE
DESIGNED FOR MAXIMUM SINGLE WHEEL
LOAD OF 50,000 LB OR DUAL WHEEL LOAD
OF 90,000 LB.
3. COVER SHALL BE MADE OF STRUCTURAL
STEEL CONFORMING TO ASTM A 36/A 36M.
4. MINIMUM COMPRESSIVE STRENGTH OF
CONCRETE SHALL BE 3000 PSI.
A2
STANDARD HANDHOLE (TRAFFIC/AIRFIELD)
SCALE: NTS
COMMUNICATIONS
OR ELECTRICAL
TOP OF PAVEMENT SUBGRADE OR GRADE
NOTES:
SELECT BACKFILL
WARNING TAPE,
6" BELOW GRADE
PVC CONDUIT SIZE
AS INDICATED
ELECTRICAL CONDUCTORS SHALL
BE LOCATED IN DUCTS AS SHOWN.
CONDUCTOR SIZE AS INDICATED.
3000 PSI CONCRETE
GREENLEE MULTIPLEX
POLYESTER ROPE OR
EQUIVALENT
M
I N
3" 3"
1. USE PLASTIC CONDUIT SPACERS
AT 5'-0" OC.
C3
TYPICAL SINGLE-WAY CONCRETE ENCASED DUCTBANK
SCALE: NTS
C4
TYPICAL 3-WAY CONCRETE ENCASED DUCTBANK
SCALE: NTS
TOP OF PAVEMENT SUBGRADE OR GRADE
NOTES:
SELECT BACKFILL
WARNING TAPE,
6" BELOW GRADE
PVC CONDUIT SIZE
AS INDICATED
ELECTRICAL CONDUCTORS SHALL
BE LOCATED IN DUCTS AS SHOWN.
CONDUCTOR SIZE AS INDICATED.
3000 PSI CONCRETE
GREENLEE MULTIPLEX
POLYESTER ROPE OR
EQUIVALENT
M
I N
3" 3"
1. USE PLASTIC CONDUIT SPACERS
AT 5'-0" OC.
E
N D
M E
/1
0/
\\BMCD\DFS\CLIENTS\ANF\USCOE\SAM\115862_NORTH-CAPA\DESIGN\ELEC\SHEETS\115862_ES502.DWG 8/10/2021 10:45 AM RPTANNEHILL
D
O E
E
S
D
W G
P
O
G O
R M
A N
R
T
A N
N E
H I L
L
D
R
I D
L E
Y
E L
E C
T R
I C
T
A I L
S
ES502
H U
R
LB
U R
T
FI
EL
D
, F
LO
R
ID
A
M O
B I L
E
D
I S
T R
I C
T
M O
B I L
E
A
L A
B A
M A
Mobile District
US Army Corps of Engineers ®
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R N
O
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
1 2 3 4 5
D
C
B
A
O
W N
W
A R
D
P
A R
K W
A Y
K A
N S
T
Y
M
O
B U
R N
S
M cD
O N
N
EL
L
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
S B
P L O
T
S
C A
L E
S I Z
E x
F I
M
E
C K
D
B
Y
P L O
T
D
A T
E
D A
T E
S O
L I C
I T
A T
I O
N
N
U M
B E
R
P R
O J E
M
B E
R
C A
D
E
J U
N E
W
1R
F T
E V
J U
N E
SO
F
C O
M B
A T
A
IR
C R
A
FT
P A
R K
IN
G
A
PR
O N
(C A
PA
) N
O R
TH
P
R O
J E
F
T E
V
AMENDMENT NO. 0003
R
B
M I T
T A
L
SHEET
IDENTIFICATION
M E
F
HIGH MAST POLE AND FIXTURE RACK NOTES:
G
G R
E E
N
G N
D
GND
A
1/P 2/W 30A NEMA TWISTLOCK PLUG
B
G
#6
1/P 2/W 30A NEMA TWISTLOCK CONNECTOR
1 2
5 6 7 8
LUMINAIRE Y-AIM ANGLE
1,2,3,4 70°
AIMING TABLE
5,6,7,8 65°
LUMINAIRE Z-AIM ANGLE
1,5 30°
AIMING TABLE
2,6 10°
3,7 -10°
4,8 -30°
180°
0°
SECTION A
A1
TYPICAL HIGH MAST POLE DETAIL
SCALE: NTS
A2
POLE ELEVATION LOOKING PLAN SOUTH
SCALE: NTS
B4
TYPICAL LIGHT FIXTURE DIAGRAM
SCALE: NTS
ENCLOSED 30A CIRCUIT
BREAKER/DISCONNECT
FOUNDATION, REFER TO
DETAIL A4 ON DRAWING CS504
ACCESS DOOR TO
WIRING
MAINTENANCE PLATFORM,
10' BELOW RACK ASSEMBLY,
MAXIMUM 70' AFG TO
PLATFORM LANDING
GALVANIZED STEEL
SECTIONAL HIGH MAST
POLE, 80' ABOVE
FINISHED GRADE (AFG TO
TOP OF POLE FIXTURE
RACK ASSEMLY)
FIXTURE RACK SHALL
INCORPORATE A
WORK PLATFORM ON
THE BACK SIDE (NOT
SHOWN FOR CLARITY)
1. HIGH MAST POLE SHALL BE INSTALLED PER MANUFACTURERS RECOMMENDATIONS. ANCHOR BOLTS
SHALL BE SUPPLIED BY THE POLE MANUFACTURER AND SHALL BE INSTALLED AND TORQUED PER
MANUFACTURER DIRECTION.
2. POLE INPUT CIRCUIT BREAKER SHALL BE LOCATED IN THE BASE OF THE POLE AND ACCESSIBLE FROM
THE HANDHOLE. BREAKER SHALL HAVE GFCI FUNCTION.
3. BOND POLE TO GROUND ROD AND FEEDER EQUIPMENT GROUNDING CONDUCTOR PER
MANUFACTURERS DIRECTION.
4. HIGH MAST POLE AND RACK DETAILS ARE TYPICAL. CONTRACTOR SHALL COORDINATE WITH
MANUFACTURER FOR FINAL CONFIGURATION AND INSTALLATION REQUIREMENTS.
5. CONTRACTOR SHALL PERFORM LIGHTING CALCULATIONS UTILIZING THE PHOTOMETRIC
CHARACTERISTICS OF THE FIXTURE SELECTED BY THE CONTRACTOR. THE DESIGN CRITERIA IS AS
FOLLOWS (PER UFC 3-535-01):
MINIMUM ILLUMINATION (FOOTCANDLES): 0.5FC
AVERAGE TO MINIMUM UNIFORMITY: NOT MORE THAN 4:1(IN 100' BANDS)
6. AREA TO BE LIT IS INDICATED ON SITE PLAN ES101 THROUGH ES104.
7. FLOOD LIGHTING FIXTURE SHALL BE MINIMUM 65,000 LM, 4000K, 240V WITH A MEDIUM ASYMMETRIC
DISTRIBUTION. FIXTURE SELECTED BY THE CONTRACTOR SHALL BE DESIGNED FOR USE IN AIRFIELD
APPLICATIONS OR "SPORTS LIGHTERS" AND SHALL INCLUDE GLARE CONTROL LOUVERS AND SHIELDS.
8. LIGHTING CALCULATIONS REQUIRED BY NOTE 5 SHALL BE SEALED BY A LICENSED PROFESSIONAL
ELECTRICAL ENGINEER (REGISTERED IN THE UNITED STATES). LIGHTING CALCULATIONS SHALL
COMPLY WITH THE REQUIREMENTS OF UFC 3-535-01 AND SHALL INCLUDE:
a. POINT-BY-PONT SHOWING ENTIRE APRON HAS MINIMUM ILLUMINATION INDICATED.
b. LIGHT FIXTURE AIMING DETAILS INDICATING HORIZONTAL AND VERTICAL AIMING ANGLE.
c. LIGHT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .