W9127819T0001_Solicitation.pdf
PDF 3 MB Posted
- Solicitation number
- W9127819T0001
About this file
W9127819T0001 Solicitation
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W9127819T0001 09-Oct-2018
b. TELEPHONE NUMBER
251-690-3349
8. OFFER DUE DATE/LOCAL TIME
02:00 PM 30 Oct 2018
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912789. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
SOPHIA M CHIN
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
ENDIST MOBILE CONTRACTING DIVISION
109 ST JOSEPH ST
MOBILE AL 36602
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$7,500,000
NAICS:
721211
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
K5CT9SMC
Typewritten Text
02:00PM
K5CT9SMC
Typewritten Text
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF108
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Contractor Data Sheet
Primary Contractor – Person listed in SAM.gov (ALL FIELDS REQUIRED)
Name: Date: ________________
Cage Code: SSN in SAM.gov: ______________________________
Phone Number(s): Yrs Experience: ________
E-Mail: Age: _____
Health (circle one): Excellent Good Under Dr Care Need Assistance Poor
Partner (ALL FIELDS REQUIRED)
Name: Yrs Experience: ________
E-Mail: Age: _____
Health (circle one): Excellent Good Under Dr Care Need Assistance Poor
Are you currently working a gate attendant contract (circle one)? YES or NO
If yes, name of Lake Project? ________________________ Contract end date? _____________
How many gate attendant contracts can you perform concurrently? _______________________
PRIVACY ACT STATEMENT
AUTHORITY: 26 U.S.C. §6041, §6041A, and §6050M; 26 U.S.C. §6109; 31 U.S.C. §7701(c) and §3325(d); 48 CFR, Part 4 (FAR 4.904); 48 CFR, Part 52 (FAR 52.204-3).
PRINCIPAL PURPOSE(S): To obtain a Park Gate Attendant Contractor’s TIN/Social Security Number and other personal information required by the above referenced authorities to allow reporting by the Federal Government of payments made to said Contractor within the line and scope of his/her contract as a Park Gate Attendant at one of the United States Army Corps of Engineers, Mobile District projects.
Mobile District asks for such information to be submitted via the herein Contractor Data Sheet as part of a quote package in response to a solicitation for Park Gate Attendant Services.
ROUTINE USE(S): This Form and the information contained herein will be disclosed as generally permitted under 5 U.S.C. 552a(b), the Privacy Act, and specifically will be disclosed to those Federal Government agencies/entities requiring said information for Government purposes; i.e. the Internal Revenue Service, the Finance Center for the Corps of Engineers located in Millington, Tennessee, Contracting Officers and Representatives assigned to said Contract, and employees of the individual Project(s) where the Contractor is chosen to work. Information contained in this Form will be protected pursuant to the Privacy Act, and within the Corps of Engineers, will only be disclosed to those persons having the authority within the scope of their employment/positions to collect and utilize said information.
DISCLOSURE: Disclosure of the information requested in this form by the Contractor is voluntary.
However, failure to provide all the requested information will hinder and/or delay evaluation of the quote package, and may result in award of said Contract to another Contractor.
W9127819T0001
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
SPRING-SUMMER 2019 GATE ATTENDANTS
FFP
SEE POSITIONS AVAILABLE IN ACCORDANCE WITH ATTACHED
SCOPE OF WORK AND BID SCHEDULE.
FOB: Destination
NET AMT
Mobile District Bid Schedule
Alabama River Lakes
Chilatchee Creek Campground Contract Dates Contract Days
Unit Price
Total Price
Schedule "A" 28 Feb - 30 Oct 19 125 Schedule "B" 28 Feb - 31 Oct 19 122
Gunter Hill Campground Contract Dates Contract Days
Unit Price
Total Price
Schedule "A" 28 Feb 19 - 27 Feb 20 185 Schedule "B" 28 Feb 19 - 23 Feb 20 181
Isaac Creek Campground Contract Dates Contract Days
Unit Price
Total Price
Schedule "A" 28 Feb - 30 Oct 19 125 Schedule "B" 28 Feb - 31 Oct 19 122
Millers Ferry Campground Contract Dates Contract Days
Unit Price
Total Price
Schedule "A" 28 Feb - 30 Oct 19 125 Schedule "B" 28 Feb - 31 Oct 19 122
Prairie Creek Campground Contract Dates Contract Days
Unit Price
Total Price
Schedule "A" 28 Feb - 30 Oct 19 125 Schedule "B" 28 Feb - 31 Oct 19 122
Allatoona Lake Blockhouse # 2 Ramp Contract Dates Contract
Days Unit Price
Total Price
19 Mar - 03 Sep 19 78 Galt's Day Use Contract Dates Contract
Days Unit Price
Total Price
Schedule "A" 19 Mar - 03 Sep 19 61 Schedule "B" 19 Mar - 05 Aug 19 55
McKaskey Creek Campground Contract Dates Contract Days
Unit Price
Total Price
Schedule "A" 18 Mar - 04 Sep 19 89 Schedule "B" 18 Mar - 04 Sep 19 87
McKinney Campground Contract Dates Contract Days
Unit Price
Total Price
Schedule "A" 07 Mar - 28 Oct 19 119 Schedule "B" 07 Mar - 28 Oct 19 120
Old Highway 41 #1 Day Use Contract Dates Contract Days
Unit Price
Total Price
09 Apr - 03 Sep 19 56 Old Highway 41 #3 Campground Contract Dates Contract
Days Unit Price
Total Price
Schedule "A" 09 May - 04 Sep 19 62 Schedule "B" 09 May - 04 Sep 19 60
Allatoona Lake Payne Campground Contract Dates Contract
Days Unit Price
Total Price
Schedule "A" 18 Mar - 04 Sep 19 89 Schedule "B" 18 Mar - 04 Sep 19 87
Sweetwater Creek Campground
Contract Dates Contract Days
Unit Price
Total Price
Schedule "A" 07 Mar - 04 Sep 19 84 Schedule "B" 07 Mar - 04 Sep 19 87
Sweetwater Creek Day Use Contract Dates Contract Days
Unit Price
Total Price
09 Apr - 03 Sep 19 56 Victoria Campground Contract Dates Contract
Days Unit Price
Total Price
Schedule "A" 18 Mar - 28 Oct 19 117 Schedule "B" 18 Mar - 28 Oct 19 113
Victoria Day Use Contract Dates Contract Days
Unit Price
Total Price
Schedule "A" 09 Apr - 03 Sep 19 55 Schedule "B" 09 Apr - 05 Aug 19 52
Black Warrior & Tombigbee Waterway
Burchfield Branch Contract Dates Contract Days
Unit Price
Total Price
27 Feb - 25 Nov 19 159 Deerlick Creek Campground Contract Dates Contract
Days Unit Price
Total Price
27 Feb - 25 Nov 19 159 Rocky Branch Park Contract Dates Contract
Days Unit Price
Total Price
23 May - 02 Sep 19 62
Buford Dam/Lake Lanier Bald Ridge Campground Contract Dates Contract
Days Unit Price
Total Price
Schedule "A" 19 Mar - 20 Oct 19 107 Schedule "B" 19 Mar - 20 Oct 19 106
Duckett Mill Campground Contract Dates Contract Days
Unit Price
Total Price
Schedule "A" 19 Mar - 15 Sep 19 91 Schedule "B" 19 Mar - 15 Sep 19 87
Old Federal Campground Contract Dates Contract Days
Unit Price
Total Price
Schedule "A" 19 Mar - 20 Oct 19 107 Schedule "B" 19 Mar - 20 Oct 19 106
Sawnee Campground Contract Dates Contract Days
Unit Price
Total Price
Schedule "A" 19 Mar - 20 Oct 19 107 Schedule "B" 19 Mar - 20 Oct 19 106
Van Pugh South Campground Contract Dates Contract Days
Unit Price
Total Price
Schedule "A" 19 Mar - 15 Sep 19 91 Schedule "B" 19 Mar - 15 Sep 19 87
Carters Lake Damsite Park Contract Dates Contract
Days Unit Price
Total Price
04 Apr - 03 Sep 19 92 Doll Mountain Campground Contract Dates Contract
Days Unit Price
Total Price
Schedule "A" 01 Apr - 25 Oct 19 108 Schedule "B" 01 Apr - 27 Oct 19 106
Harris Branch Park Contract Dates Contract Days
Unit Price
Total Price
Schedule "A" 02 May - 02 Sep 19 64 Schedule "B" 02 May - 30 Aug 19 61
Woodring Branch Campground Contract Dates Contract Days
Unit Price
Total Price
Schedule "A" 01 Apr - 25 Oct 19 108 Schedule "B" 01 Apr - 27 Oct 19 106
Lake Seminole Eastbank Campground Contract Dates Contract
Days Unit Price
Total Price
Schedule "A" 01 Mar 19 - 29 Feb 20 186 Schedule "B" 01 Mar 19 - 25 Feb 20 182
Hales Landing Campground Contract Dates Contract Days
Unit Price
Total Price
Schedule "A" 01 Mar 19 - 29 Feb 20 186 Schedule "B" 01 Mar 19 - 25 Feb 20 182
Okatibbee Lake Twiltley Branch Contract Dates Contract
Days Unit Price
Total Price
Schedule "A" 01 Mar - 30 Sep 19 108 Schedule "B" 01 Mar - 30 Sep 19 106
Tennessee-Tombigbee Waterway Blue Bluff Campground Contract Dates Contract
Days Unit Price
Total Price
Schedule "A" 13 Feb - 15 Sep 19 111 Schedule "B" 13 Feb - 11 Sep 19 107
DeWayne Hayes Campground Contract Dates Contract Days
Unit Price
Total Price
Schedule "A" 13 Feb - 15 Sep 19 111 Schedule "B" 13 Feb - 11 Sep 19 107
DeWayne Hayes Day Use Area Contract Dates Contract Days
Unit Price
Total Price
11 Apr - 15 Sep 19 71 Old Bridge Beach (Bay Springs) Contract Dates Contract
Days Unit Price
Total Price
Schedule "A" 29 Apr - 29 Aug 19 65 Schedule "B" 29 Apr - 02 Sep 19 62
Pickensville Campground Contract Dates Contract Days
Unit Price
Total Price
Schedule "A" 13 Feb - 15 Sep 19 111 Schedule "B" 13 Feb - 11 Sep 19 107
Tennessee-Tombigbee Waterway Piney Grove Beach (Bay Springs) Contract Dates Contract
Days Unit Price
Total Price
Schedule "A" 29 Apr - 29 Aug 19 65 Schedule "B" 29 Apr - 02 Sep 19 62
Piney Grove Campground (Bay Springs)
Contract Dates Contract Days
Unit Price
Total Price
Schedule "A" 25 Feb - 18 Sep 19 106 Schedule "B" 25 Feb - 22 Sep 19 104
Town Creek Campground Contract Dates Contract Days
Unit Price
Total Price
Schedule "A" 13 Feb - 15 Sep 19 111 Schedule "B" 13 Feb - 11 Sep 19 107
Whitten Campground (Bay Springs) Contract Dates Contract Days
Unit Price
Total Price
Schedule "A" 25 Feb - 18 Sep 19 106 Schedule "B" 25 Feb - 22 Sep 19 104
Walter F. George Bluff Creek Campground Contract Dates Contract
Days Unit Price
Total Price
Schedule "A" 01 Mar - 14 Sep 19 102 Schedule "B" 01 Mar - 15 Sep 19 99
Cotton Hill Campground Contract Dates Contract Days
Unit Price
Total Price
Schedule "A" 01 Mar - 14 Sep 19 102 Schedule "B" 01 Mar - 15 Sep 19 99
Hardridge Creek Campground Contract Dates Contract Days
Unit Price
Total Price
Schedule "A" 01 Mar - 14 Sep 19 102 Schedule "B" 01 Mar - 15 Sep 19 99
Hardridge Creek Day Use Contract Dates Contract Days
Unit Price
Total Price
29 Mar - 02 Sep 19 51 Highland Day Use Contract Dates Contract
Days Unit Price
Total Price
29 Mar - 02 Sep 19 51 White Oak Creek Campground Contract Dates Contract
Days Unit Price
Total Price
Schedule "A" 01 Mar - 14 Sep 19 102 Schedule "B" 01 Mar - 15 Sep 19 99
West Point Lake Amity Campground Contract Dates Contract
Days Unit Price
Total Price
Schedule "A" 08 Apr – 03 Sep 19 77 Schedule "B" 08 Apr – 03 Sep 19 76
Holiday Campground Contract Dates Contract Days
Unit Price
Total Price
Schedule "A" 11 Mar – 3 Sep 19 88 Schedule "B" 11 Mar – 3 Sep 19 86
R. Shaefer Heard Campground Contract Dates Contract Days
Unit Price
Total Price
Schedule "A" 11 Mar – 28 Oct 19 120 Schedule "B" 11 Mar – 28 Oct 19 116
Whitetail Ridge Campground Contract Dates Contract Days
Unit Price
Total Price
Schedule "A" 25 Feb – 01 Dec 19 144 Schedule "B" 25 Feb – 01 Dec 19 140
SPRING-SUMMER 2019 PARK ATTENDANT INFORMATION
FOR
U.S. ARMY CORPS OF ENGINEERS, MOBILE DISTRICT
The following information will apply for the Spring-Summer 2019 Park Attendant Contractor Contracts.
There will be a total of 90 contracts available for bid. They are as follows:
ALABAMA RIVER LAKES will have 10 Park Attendant Positions.
ALLATOONA LAKE will have 19 Park Attendant Positions.
BLACK WARRIOR & TOMBIGBEE WATERWAY will have 3 Park Attendant Positions.
BUFORD DAM/LAKE LANIER will have 10 Park Attendant Positions.
CARTERS LAKE will have 7 Park Attendant Positions.
LAKE SEMINOLE will have 4 Park Attendant Positions.
OKATIBBEE LAKE will have 2 Park Attendant Positions.
TENNESSEE TOMBIGBEE WATERWAY will have 17 Park Attendant Positions.
WALTER F. GEORGE will have 10 Park Attendant Positions.
West Point will have 8 Park Attendant Positions.
PLEASE NOTE: Due to budget constraints for the operation of Government parks, it is requested that you quote your “Best Possible Price.” Bids are due back into the Contracting Office by 2:00PM CDT, Tuesday, October 30, 2018.
The solicitation includes various clauses, one Scope of Work, and individual local policies for each particular Park Attendant Position. It is important that you review this information. In the local policies for each particular lake/site, you will find the name and telephone number of the individual to contact for that particular position for clarification of specifications, directions and locations of the park attendant positions, and to arrange for a tour of the parks.
You must also provide copies of your last three performance evaluations or a reference letter from your last three duty locations.
There is also information supplied in the Scope of Work regarding the amount required for the Surety Bond for each particular Park Gate Attendant Position. Surety Bonds for Park Attendant Positions must be submitted to this office
BEFORE COMMENCEMENT OF WORK.
Please mail your bid package to U.S. Army Corps of Engineers, ATTN: Gate Attendants (CT-S), P.O. Box 2288, Mobile, AL 36628-0001.
Complete and return the “Contractor Data Sheet” and “Bid Schedule” where you will indicate your bid amount.
Please return this along with the 1st Page of the STANDARD FORM 1449, ”SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS” on which BOTH Park Attendant Contractors (PACs) MUST sign in BLOCK 20. A bid must be entered for each Park Attendant Position in which you are interested.
Last…but “Most important”…you are strongly urged to provide a telephone number where you may be reached on the date of Thursday, November 08, 2018, for contract award. If attempts to reach you are unsuccessful, you may not receive a contract award for this Park Attendant Contractor (PAC) Cycle.
INSTRUCTIONS FOR SUBMITTAL OF BIDS
1. IMPORTANT: Please identify each page of the quotation with your name. This is very important for identification purposes. A daily bid amount must be entered in the “Unit Price” space. Bids must be in whole dollar amounts. Bids should only be entered for each park attendant position in which you are interested.
Please be sure to fill in and return your Contractor Data Sheet when you submit your bid(s). You may do this through e-mail or regular postal service. To submit your bid(s) and Contractor Data Sheet by e-mail, please save each document by adding your last name to the document name and save them to your computer. Attach the Contractor Data Sheet and Bid Schedule to your e-mail and send them to mobilegates@usace.army.mil. YOU
MUST SUBMIT ALL OTHER DOCUMENTS BY REGULAR MAIL AS SOON AS POSSIBLE.
2. Each prospective park attendant contractor (PAC) [this includes partner], contractor’s employees, and all associated sub-contractors’ employees must submit a completed Personnel Security Investigation Portal (PSIP) Form, an SF-87 Fingerprint Card, and a completed Declaration for Federal Employment (OF306 Form) for a background check PRIOR to CONTRACT AWARD. All associated costs shall be incurred by the prospective contractor.
a. The blocks highlighted in yellow must be completely filled out on the PSIP Form (Attachment 1 PSIP Form). For US Citizenship Proof, circle one. If proof is other than a Birth Certificate, a Documentation Number must be included.
b. PACs may go to the local Police Department or Sheriff's Department to have their fingerprints collected on an SF-87 Fingerprint Card.
i. The blocks highlighted in yellow must be completely filled out on the Fingerprint Card (Attachment 2 Sample Fingerprint Card).
ii. The following information must be included on the Fingerprint Card under “Reason Fingerprinted”:
SON: A343 DA IPAC: DA-ARMY
SOI: A343
c. The Declaration for Federal Employment (Attachment 3 OF306 Form) must be completely filled out.
d. Background checks will be initiated once a completed PSIP Form and SF-87 Fingerprint Card have been received. The PAC will receive an initial email from the Personnel Security Investigation Center of Excellence (PSICoE) with instructions pertaining to the completion of the online e-QIP form. Within 24 to 48 hours after the initial email, the PAC will receive another email with instructions on how to access the e-QIP form online.
NOTE 1: PACs must complete the e-QIP form within 5 days of receiving the emails from PSICoE to complete the background check process.
NOTE 2: If you have had a background check processed in this manner, then you are not required to submit the documents again unless it has been more than 24 months since you have worked in federal service.
3. You must provide copies of your last three performance evaluations or reference letters from your last three duty locations. If you are new to the Park Attendant Program, past performance documentation is not required.
PLEASE MAIL ALL DOCUMENTS TO: U.S. Army Corps of Engineers, Attn: Gate Attendants (CT-S), P.O. Box 2288, Mobile, AL 36628-0001
4. All PACs, contractor’s employees, and all associated sub-contractors’ employees shall be required to furnish a "Business Services", "Fidelity" or "Dishonesty" bond in the amount of $5,000.00. Before commencement of work, surety bonds (original with seal) for each PAC must be on file in this office. NOTE: If you obtain one bond, all persons must be listed on the single bond.
5. Before commencement of work, all PACs, contractor’s employees, and all associated sub-contractors’ employees must provide a certificate of insurance for automobile coverage as follows:
Comprehensive automobile liability insurance
Bodily injury coverage with minimum limits of $250,000 per person and $500,000 per occurrence
Property damage coverage with a minimum limit of $25,000 per occurrence.
6. Please refer to the “Local Policies” for the following information:
A. Details on work hours and description of duties and facilities.
B. Name and telephone number for a point of contact at each park.
NOTE: All PAC’s must have an active registration (CAGE Code) in the System for Award Management (SAM) at the time of bid. There is NO COST to register at https://www.sam.gov.
FOR ADDITIONAL INFORMATION, YOU MAY CONTACT:
Sophia Chin 251-690-3349 Jeff Mason 251-694-4157
MOBILE DISTRICT, U.S. ARMY CORPS OF ENGINEERS
GENERAL PERFORMANCE SPECIFICATIONS
FOR
PARK ATTENDANT CONTRACTORS SERVICES
I. AVAILABLE POSITIONS & PARK DESCRIPTIONS
A. ALABAMA RIVER LAKES
1.CHILATCHEE CREEK CAMPGROUND, DANNELLY LAKE
2.GUNTER HILL CAMPGROUND, R.E. “BOB” WOODRUFF LAKE
3.ISAAC CREEK CAMPGROUND, CLAIBORNE LAKE
4.MILLERS FERRY CAMPGROUND, DANNELLY LAKE
5.PRAIRIE CREEK CAMPGROUND, R.E. “BOB” WOODRUFF LAKE
B. ALLATOONA LAKE
1.BLOCKHOUSE #2 BOAT RAMP
2.CLARK CREEK NORTH CAMPGROUND
3.GALT’S DAY USE AREA AND RAMP
4.MCCASKEY CREEK CAMPGROUND
5.MCKINNEY CAMPGROUND
6. OLD HIGHWAY 41 #1 RAMP AND DAY USE AREA
7. OLD HIGHWAY 41 #3 CAMPGROUND
8. PAYNE CAMPGROUND & BOAT RAMP
9. SWEETWATER CREEK CAMPGROUND
10. SWEETWATER CREEK DAY USE AREA
11. UPPER STAMP CREEK CAMPGROUND
12. VICTORIA CAMPGROUND
13. VICTORIA RAMP & DAY USE AREA
C. BLACK WARRIOR & TOMBIGBEE
1. BURCHFIELD BRANCH PARK
2. DEERLICK CREEK CAMPGROUND
3. ROCKY BRANCH PARK
D. BUFORD DAM/LAKE SIDNEY LANIER
1. BALD RIDGE CAMPGROUND
2. DUCKETT MILL CAMPGROUND
3. OLD FEDERAL CAMPGROUND
4. VAN PUGH SOUTH CAMPGROUND
E. CARTERS LAKE
1. DAMSITE PARK
2. DOLL MOUNTAIN CAMPGROUND
3. HARRIS BRANCH PARK
4. WOODRING BRANCH CAMPGROUND
F. LAKE SEMINOLE
1. EASTBANK CAMPGROUND
2. HALES LANDING CAMPGROUND
G. OKATIBBEE LAKE
1. TWILTLEY BRANCH CAMPGROUND
H. TENNESSEE TOMBIGBEE WATERWAY
1. BLUE BLUFF CAMPGROUND
2. DEWAYNE HAYES CAMPGROUND
3. DEWAYNE HAYES DAY USE AREA
4. OLD BRIDGE BEACH, BAY SPRINGS
5. PICKENSVILLE CAMPGROUND
6. PINEY GROVE BEACH, BAY SPRINGS
7. PINEY GROVE CAMPGROUND, BAY SPRINGS
8. TOWN CREEK CAMPGROUND
9. WHITTEN CAMPGROUND, BAY SPRINGS
I. WALTER F. GEORGE
1. BLUFF CREEK CAMPGROUND
2. COTTON HILL CAMPGROUND
3. HARDRIDGE CREEK CAMPGROUND
4. HARDRIDGE CREEK DAY USE PARK
5. HIGHLAND PARK DAY USE
6. WHITE OAK CREEK CAMPGROUND
J. WEST POINT LAKE
1. AMITY CAMPGROUND
2. HOLIDAY CAMPGROUND
3. R. SHAEFER HEARD CAMPGROUND
4. WHITETAIL RIDGE CAMPGROUND
II. GENERAL INFORMATION
A. CONTRACTING OFFICER & CONTRACTING OFFICER’S REPRESENTATIVE
B. PERFORMANCE SCHEDULE & CONTRACTOR HOURS
C. CONTRACTOR ORIENTATION
D. PETS
III. GENERAL RESPONSIBILITIES
A. CUSTOMER ASSISTANCE & PUBLIC INTERACTION
B. FEE COLLECTION, ACCOUNTING & PROCESSING
C. CLEANING & MAINTENANCE
D. LIVING AREA
E. SECURITY OF PERSONAL PROPERTY
F. LOST & FOUND
G. COOPERATION WITH OTHERS
IV. CONTRACTOR-FURNISHED EQUIPMENT & PROVISIONS
A. TEMPORARY LIVING QUARTERS
B. CONTRACTOR TRANSPORTATION
C. CONTRACTOR APPEARANCE
D. INSURANCE
E. CHANGE FUND
F. OTHER REQUIRED EQUIPMENT/SUPPLIES
V. GOVERNMENT-FURNISHED EQUIPMENT & PROVISIONS
A. CONTRACTOR SITE
B. GATEHOUSE/ENTRANCE STATION
C. COMMUNICATION EQUIPMENT
D. GATEHOUSE SUPPLIES, FORMS & BROCHURES
E. CONTRACTOR IDENTIFICATION
F. KEYS
G. CLEANING SUPPLIES
VI. PAYMENT FOR PERFORMANCE
A. INVOICES
B. NON-PERFORMANCE
C. FINAL CONTRACT PAYMENTS
VII. CONTRACTOR PERFORMANCE
A. CONTRACTOR DEFICIENCIES
B. TERMINATION
VIII. ADDITIONAL REQUIREMENTS & INFORMATION
A. SYSTEM FOR AWARD MANAGEMENT (SAM)
B. REPRESENTATIONS & CERTIFICATIONS
C. BONDS
D. BACKGROUND CHECKS
IX. ANTITERRORISM AND OPERATIONS SECURITY (AT/OPSEC) REQUIREMENTS
A. ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES
B. PRE-SCREEN CANDIDATES USING E-VERIFY PROGRAM
EXHIBIT 1 - SMALL BUSINESS INVOICE
I. AVAILABLE POSITIONS & PARK DESCRIPTIONS
Park Attendant positions within the Mobile District may consist of two teams performing on a rotating days on/days off schedule or a single team working a specific numbers of days per week. Each team will consist of two persons. Please read the entire description prior to bidding.
Descriptions of local policies are not included in this solicitation but can be found on the on-line solicitation page or can be obtained by contacting the appropriate project representative.
A. ALABAMA RIVER LAKES
1. CHILATCHEE CREEK CAMPGROUND, DANNELLY LAKE
Schedule “A” Schedule “B” Contract Dates: 28 Feb – 30 Oct 19 Contract Dates: 28 Feb – 31 Oct 19 Pre-Work Conference: 28 Feb 19 Pre-Work Conference: 28 Feb 19 Total Number of Performance Days: 125 Total Number of Performance Days: 122
Chilatchee Creek Campground is located on William “Bill” Dannelly Reservoir, Alabama River Lakes, approximately 9 miles east of Alberta, Alabama, off Alabama State Highway 5 and Wilcox County Road 29. Chilatchee Creek contains 47 Class A campsites with water and electrical hookups and six Class “C” primitive campsites. Chilatchee Creek contains restrooms, shower facilities, a sanitary dump station, two group shelters and a fish cleaning station. There is a two lane boat ramp located outside the campground. There are approximately three miles of paved road in the routine patrol area. PACs will submit bills for collections, cashier’s checks, and camper’s personal checks using certified mail. The PACs will be responsible for the cost of the cashier’s checks or money orders, envelopes, and transportation to and from the Post Office. The approximate round-trip mileage from Chilatchee Creek Campground to Catherine Post Office is 34 miles. The approximate round-trip mileage from Chilatchee Creek Campground to Gees Bend Park is 18 miles (Gees Bend shelter is reserved no more than 5 times during contract period).
2. GUNTER HILL CAMPGROUND, R.E. “BOB” WOODRUFF LAKE
Contract Dates: 28 Feb 19 – 27 Feb 20 Contract Dates: 28 Feb 19 – 23 Feb 20
Total Number of Performance Days: 185 Total Number of Performance Days: 181
Gunter Hill Campground is located on R. E. “Bob” Woodruff Lake, Alabama River
Lakes, approximately 5 miles west of downtown Montgomery, Alabama, off U. S. Highway 80 and County Road 7. Gunter Hill contains 142 Class A campsites with water and electrical hookups. The campground is divided into two sections: Antioch and Catoma Loops. Catoma
Loop has75 sites with full hook-ups. Both sections have restrooms, laundry and shower facilities, playground, all-purpose court and group shelter. Each section has a sanitary dump station. A two-lane boat ramp is also provided in Antioch Loop. A tour of the park is approximately 3 miles. This park is credit card only, no deposits will be mailed.
3. ISAAC CREEK CAMPGROUND, CLAIBORNE LAKE
Schedule “A”
Schedule “B”
Isaac Creek Campground is located on Claiborne Lake, Alabama River Lakes, approximately 20 miles northwest of Monroeville, Alabama, off Alabama State Highway 41 and Monroe County Road 17. Isaac Creek contains 60 Class A campsites with water and electrical hookups. Isaac Creek also contains restrooms, shower facilities, and a sanitary dump station. The Day Use Area includes boat ramps, playgrounds, 3 group shelters and a fish cleaning station with restrooms. There are approximately three miles of paved road in the routine patrol area. PACs will submit deposits using certified mail. The PACs will be responsible for the cost of the cashier’s checks or money orders, envelopes, and transportation to and from the Post Office. The approximate round-trip mileage from Isaac Creek Campground to Franklin Post Office is 30 miles.
4. MILLERS FERRY CAMPGROUND, DANNELLY LAKE
Schedule “A”
Schedule “B”
Millers Ferry Campground is located on William “Bill” Dannelly Reservoir, Alabama
River Lakes, approximately 11 miles west of Camden, Alabama, off Alabama State Highway 28.
Millers Ferry contains 66 Class A campsites with water and electrical hookups and nine Class “C” primitive campsites. Millers Ferry Campground contains restrooms, shower facilities, a two lane boat ramp, a sanitary dump station, playground, multipurpose court, and a group shelter.
There are two Day Use facilities located adjacent to the campground. East Bank Beach contains a swimming beach, playground, and two group shelters. Training Dike Park contains one group shelter, a playground, and a waterborne toilet. There are approximately three miles of paved road in the routine patrol area. Approximate round trip mileage to Bridgeport Beach is 20 miles (Bridgeport Beach shelter is reserved no more than 5 times during contract period). PACs will submit deposits using certified mail. The PACs will be responsible for the cost of the cashier’s checks or money orders, envelopes, and transportation to and from the Post Office. The approximate round-trip mileage from Millers Ferry Campground to Camden is 18 miles.
5. PRAIRIE CREEK CAMPGROUND, R.E. “BOB” WOODRUFF LAKE
Prairie Creek Park is located on R. E. “Bob” Woodruff Lake, Alabama River Lakes, approximately 20 miles east of Selma, Alabama, off U. S. Highway 80 and Lowndes County Roads 23 and 40. Prairie Creek Park consists of 308 acres of which 100 acres have been developed for recreational use. The park contains 55 Class A campsites with water and electrical hookups, 7 ten campsites with water and electrical hookups, a group shelter and a fish cleaning station. It also contains 3 restrooms and shower facilities, 2 playgrounds, multipurpose court, sanitary dump station and a two-lane boat ramp. A gatehouse is located at the entrance to the park. There is approximately three miles of paved road in the routine patrol area. PACs will submit deposits using certified mail. The approximate round-trip mileage from Prairie Creek Campground to the Lowndesboro Post Office is 30 miles. The PACs will be responsible for the cost of the cashier’s checks or money orders, envelopes, and transportation to and from the Post Office. The Post Office will only issue money orders up to $700.00 per order, a limit of 3 money orders per day.
B. ALLATOONA LAKE
1. BLOCKHOUSE #2 BOAT RAMP
Contract Dates: 19 Mar – 03 Sep 19 Pre-Work Conference: 19-20 Mar 19 Total Number of Performance Days: 78
Blockhouse Boat Ramp is located approximately three miles from Acworth, Georgia and is adjacent to an I-75 overpass. It has 85 boat trailer parking spaces, 16 car parking spaces, one launching ramp with 3 lanes, and a restroom. Total mileage for an inspection tour is approximately 0.8 mile. Approximate round-trip mileage to bank from this park is 30 miles.
2. GALT’S DAY USE AREA & RAMP
Contract Dates: 19 Mar - 03 Sep 19 Contract Dates: 19 Mar – 05 Aug 19
Pre-Work Conference: 19-20 Mar 19 Pre-Work Conference: 19-20 Mar 19
Total Number of Performance Days: 61 Total Number of Performance Days: 55
Galt’s Day Use Area & Ramp is located approximately seven miles from Acworth, Georgia. It has 133 single parking spaces, 59 boat trailer parking spaces, beach, three launching ramps, group shelter, play ground and restroom. Total mileage for an inspection tour is approximately 1 mile. Approximate round-trip mileage to bank from Galt’s Day Use & Ramp is 30 miles. Attendants are not allowed to have pets in this area.
3. MCKASKEY CREEK CAMPGROUND
Contract Dates: 18 Mar – 04 Sep 19 Contract Dates: 18 Mar – 04 Sep 19 Pre-Work Conference: 18-21 Mar 19 Pre-Work Conference: 18-21 Mar 19 Total Number of Performance Days: 89 Total Number of Performance Days: 87
McKaskey Creek Campground has 51 campsites and is located approximately seven miles from Cartersville, Georgia. Thirty-two of the sites have water and 50 amp electricity. Other amenities include: sanitary dump station, beach, launching ramp, courtesy dock, playground, restroom with showers, washer and dryer. The total mileage for an inspection tour is approximately 1.2 miles. Approximate roundtrip mileage to the Post Office from this park is 11 miles. Attendants will work a rotational four day on/four day off schedule which includes holidays and weekends.
4. MCKINNEY CAMPGROUND
Contract Dates: 07 Mar – 28 Oct 19 Contract Dates: 07 Mar – 28 Oct 19 Pre-Work Conference: 07-13 Mar 19 Pre-Work Conference: 07-13 Mar 19 Total Number of Performance Days: 119 Total Number of Performance Days: 120
McKinney Campground has 150 campsites and is located approximately eight miles from Acworth, Georgia. All sites have water and 50 amp electricity. Other amenities include: two sanitary dump stations, two beaches, launching ramp, courtesy dock, playground, two restroom facilities with showers, washers and dryers; two restrooms facilities with showers and two flush toilets. The total mileage for an inspection tour is approximately 5 miles. Approximate round-trip mileage to the Post Office from this park is 16 miles. Attendants will work a rotational three day on/three day off schedule which includes holidays and weekends.
5. OLD HIGHWAY 41 #1 RAMP & DAY USE AREA
Contract Dates: 09 Apr – 03 Sep 19 Pre-Work Conference: 09-10 Apr 19 Total Number of Performance Days: 56
Old Highway 41 #1 Ramp and Day Use Area is located approximately two miles from Acworth, Georgia. It has 65 boat trailer parking spaces, 47 single parking spaces, two launching ramps, beach, and two restrooms. Total mileage for one inspection tour is approximately 1 mile.
Approximate roundtrip mileage to bank from this park is 30 miles. Attendants are not allowed to have pets in this area.
6. OLD HIGHWAY 41 #3 CAMPGROUND
Contract Dates: 09 May – 04 Sep 19 Contract Dates: 09 May – 04 Sep 19 Pre-Work Conference: 09-15 May 19 Pre-Work Conference: 09-15 May 19 Total Number of Performance Days: 62 Total Number of Performance Days: 60
Old Highway 41 #3 Campground has 50 campsites and is located approximately two miles from Acworth, Georgia. The campground is adjacent to an I-75 overpass. All sites have water and 50 amp electricity. Other amenities include: sanitary dump station, launching ramp, playground, restroom with showers, washer and dryer. The total mileage for one inspection tour is approximately 2 miles. Approximate roundtrip mileage to the Post Office from this park is 4 miles. Attendants will work a rotational four day on/four day off schedule which includes
7. PAYNE CAMPGROUND & BOAT RAMP
Contract Dates: 18 Mar – 04 Sep 19 Contract Dates: 18 Mar – 04 Sep 19
Total Number of Performance Days: 89 Total Number of Performance Days: 87
Payne Campground & Boat Ramp has 60 campsites and a boat ramp with 88 boat trailer parking spaces and 38 car parking spaces. It is located approximately seven miles from Acworth, Georgia. All sites, except eleven, have water and 50 amp electricity. While the boat ramp serves the campground, it is also open to the public. Other amenities include: sanitary dump station, beach, restroom with showers, washer and dryer. The total mileage for one inspection tour is approximately 1.5 miles. Approximate roundtrip mileage to the Post Office from this park is 16 miles. Attendants will work a rotational four day on/four day off schedule which includes holidays and weekends.
8. SWEETWATER CREEK CAMPGROUND
Contract Dates: 07 Mar – 04 Sep 19 Contract Dates: 07 Mar – 04 Sep 19 Pre-Work Conference: 07-13 Mar 19 Pre-Work Conference: 07-13 Mar 19 Total Number of Performance Days: 84 Total Number of Performance Days: 87
Sweetwater Campground located approximately 10 miles from Canton, Georgia has 159 campsites and a group area with 9 campsites and a shelter. Approximately 2/3 of the campsites have water and 50 amp electricity. Other amenities include: sanitary dump station, beach, launching ramp, courtesy dock, playground, two restrooms with showers, washers and dryers.
The total mileage for one inspection tour is approximately 5 miles. Approximate round-trip mileage to the Post Office from this park is 20 miles. Attendants will work a three day on/three day off rotational schedule. In August, attendants will rotate weekends as the campground will only be open weekends and the week prior to Labor Day. Attendants will also open the gates to Sweetwater Day Use from time to time in the absence of attendants/volunteers.
9. SWEETWATER CREEK DAY USE AREA
Contract Dates: 09 Apr – 03 Sep 19 Pre-Work Conference: 09-10 Apr 19 Total Number of Performance Days: 56
Sweetwater Day Use Area is located approximately 10 miles from Canton, Georgia. It has 133 single parking spaces, beach, restroom, and group shelter. Total mileage for one inspection tour is approximately 0.5 miles. Approximate round-trip mileage to bank from this park is 26 miles. Attendants are not allowed to have pets in this area.
10. VICTORIA CAMPGROUND
Contract Dates: 18 Mar – 28 Oct 19 Contract Dates: 18 Mar – 28 Oct 19
Total Number of Performance Days: 117 Total Number of Performance Days: 113
Victoria Campground has 72 campsites and is located approximately 10 miles from
Woodstock, Georgia. All sites have water and 50 amp electricity. Other amenities include: two sanitary dump stations, beach, playground, two restroom facilities with showers, washers, and dryers. The total mileage for one inspection tour is approximately 1.2 miles. Approximate roundtrip mileage to the Post Office from this park is 20 miles. Attendants will work a rotational four day on/four day off schedule which includes holidays and weekends.
11. VICTORIA RAMP & DAY USE AREA
Contract Dates: 09 Apr – 03 Sep 19 Contract Dates: 09 Apr – 05 Aug 19 Pre-Work Conference: 09-10 Apr 19 Pre-Work Conference: 09-10 Apr 19 Total Number of Performance Days: 55 Total Number of Performance Days: 52
Victoria Day Use Area is located approximately 10 miles from Woodstock, GA. It has 95 boat trailer parking spaces, 94 car parking spaces, four launching ramps, beach, and restroom.
Total mileage for one inspection tour is approximately 1 mile. Approximate roundtrip mileage to bank from this park is 14 miles. Attendants are not allowed to have pets in this day use area.
However, attendants may have two pets at their campsite (campsite #6) in Victoria Campground which is adjacent to the Victoria Day Use Area (about 150 yards away from the gatehouse).
C. BLACK WARRIOR & TOMBIGBEE
1. BURCHFIELD BRANCH PARK
Contract Dates: 27 Feb – 25 Nov 19 Pre-Work Conference: 27-28 Feb 19 Total Number of Performance Days: 159
Burchfield Branch Park has a total of 36 Class A electric and water sites. The campground has a bathhouse with coin operated washer and dryer. Also located in the park are:
one dump station, one swimming beach area, one large group shelter, two fishing piers, a day use picnic area and a boat ramp. The park is located approximately 25 miles from Hueytown, AL and 41 miles from Tuscaloosa, AL. Attendants will work every weekend Friday, Saturday, Sunday and Monday four days on/three days off schedule which includes holidays and weekends, including Thursday 4 July 19.
2. DEERLICK CREEK CAMPGROUND
Contract Dates: 27 Feb – 25 Nov 19 Pre-Work Conference: 27- 28 Feb 19 Total Number of Performance Days: 159
Deerlick Creek Park has a total of 46 campsites; 40 Class A electric and water sites, 6 tent only electric and water sites. The campground has a bathhouse with coin operated washer and dryer. Also located in the park are: one dump station, one swimming beach area, one large group shelter for use by registered campers only, four fishing piers, a day use picnic area and a boat ramp is also located near the beach area and will require routine patrol. The park is located approximately 20 miles from Tuscaloosa, AL. Attendants will work every weekend Friday, Saturday, Sunday and Monday four days on/three days off schedule which includes holidays and weekends, including Thursday 4July19.
3. ROCKY BRANCH PARK
Contract Dates: 23 May – 02 Sep 19 Pre-Work Conference: 23 May 19 Total Number of Performance Days: 62
Rocky Branch Park is a day use area with one swimming beach area and a day use picnic area, two large group shelters, and a boat ramp is also located near the beach area and will require routine patrol. The park is located approximately 10 miles from Tuscaloosa, Alabama.
Attendants will work every weekend Friday, Saturday, Sunday and Monday four days on/three days off schedule which includes holidays and weekends, including 4July19.
D. BUFORD DAM/LAKE SIDNEY LANIER
1. BALD RIDGE CAMPGROUND
Contract Dates: 19 Mar - 20 Oct 19 Contract Dates: 19 Mar - 20 Oct 19 Pre-Work Conference: 19-21 Mar 19 Pre-Work Conference: 19-21 Mar 19 Total Number of Performance Days: 107 Total Number of Performance Days: 106
Bald Ridge Campground is located on Lake Sidney Lanier approximately 30 miles north of Atlanta, Georgia. The campground encompasses approximately 43 acres with two miles of park roads to be surveyed. The campground contains 82 developed campsites with water and 50 amp electrical hookup, three washhouses, two washer and dryer facilities, one designated swim beach, one playground, one dump station, and one boat ramp. The closest post office is seven miles away. Attendants will work a rotational four day on/four day off schedule which includes
2. DUCKETT MILL CAMPGROUND
Contract Dates: 19 Mar - 15 Sep 19 Contract Dates: 19 Mar - 15 Sep 19
Total Number of Performance Days: 91 Total Number of Performance Days: 87
Duckett Mill Campground is located on Lake Sidney Lanier approximately 50 miles north of Atlanta, Georgia. The campground encompasses approximately 97 acres with four miles of park roads to be surveyed. The campground contains 111 developed campsites, two washhouses, one washer and dryer facility, one comfort station (no shower), one designated swim beach, one playground, one dump station, and one boat ramp. The closest post office is nine miles away.
Attendants will work a rotational four day on/four day off schedule which includes holidays and weekends.
3. OLD FEDERAL CAMPGROUND
Old Federal Campground is located on Lake Sidney Lanier approximately 40 miles north of Atlanta, Georgia. The campground encompasses approximately 63 acres with two miles of park roads to be surveyed. The campground contains 84 developed campsites, three washhouses, two washer and dryer facilities, one designated swim beach, one playground, one dump station, one boat ramp, and two picnic shelters. The closest post office is four miles away. Attendants will work a rotational four day on/four day off schedule which includes holidays and weekends.
4. SAWNEE CAMPGROUND
Sawnee Campground is located on Lake Sidney Lanier approximately 30 miles north of Atlanta, Georgia. The campground encompasses approximately 33 acres with two miles of park roads to be surveyed. The campground contains 59 developed campsites, two washhouses, two washer and dryer facilities, one designated swim beach, one playground, one dump station, and one boat ramp. The closest post office is seven miles away. Attendants will work a rotational four day on/four day off schedule which includes holidays and weekends.
5. VAN PUGH SOUTH CAMPGROUND
Contract Dates: 19 Mar - 15 Sep 19 Contract Dates: 19 Mar - 15 Sep 19
Total Number of Performance Days: 91 Total Number of Performance Days: 87
Van Pugh South Campground is located on Lake Sidney Lanier approximately 40 miles north of Atlanta, Georgia. The campground encompasses approximately 49 acres with two miles of park roads to be surveyed. The campground contains 55 developed campsites, two washhouses, two washer and dryer facilities¸ one playground, one dump station, and one boat ramp. The closest post office is four miles away. Attendants will work a rotational four day on/four day off schedule which includes holidays and weekends.
E. CARTERS LAKE
1. DAMSITE PARK - CARTERS LAKE
Contract Dates: 04 April - 03 Sep 19 Pre-Work Conference: 04 Apr 19 Total Number of Performance Days: 92
The recreational facility at Damsite Park includes a three lane boat ramp, two comfort stations, dispersed picnicking areas, one large group picnic shelters, playground and two small picnic shelters. The park experiences heavy use during summer weekends and holidays.
Attendant will be responsible for completing two weekly fee vault pick-ups. Round trip mileage for making two weekly fee vault collections at Carters Lake is approximately 25 miles. The approximate total round trip mileage to acquire a money order at the nearest current source is 38 miles. Approximate mileage for each round trip inspection tour of Damsite Park is 1 mile.
2. DOLL MOUNTAIN CAMPGROUND - CARTERS LAKE
Contract Dates: 01 April - 25 Oct 19 Contract Dates: 01 April – 27 Oct 19 Pre-Work Conference: 01–04 Apr 19 Pre-Work Conference: 01–04 Apr 19 Total Number of Performance Days: 108 Total Number of Performance Days: 106
Doll Mountain is comprised of separate camping and day use recreation areas. Doll
Mountain Campground has 66 sites, two waterborne comfort stations, one waterless restroom, playground and boat ramp. Doll Mountain Day Use area has a boat ramp, waterborne restroom, picnicking area and large group picnic shelter. The approximate total round trip mileage to acquire a money order at the nearest current source is 24 miles. Inspection tour driving distance of Doll Mountain campground and day use area is approximately 6 miles.
3. HARRIS BRANCH PARK - CARTERS LAKE
Contract Dates: 02 May – 02 Sep 19 Contract Dates: 02 May – 30 Aug 19 Pre-Work Conference: 02 May 19 Pre-Work Conference: 02 May 19 Total Number of Performance Days: 64 Total Number of Performance Days: 61
Harris Branch Park is a public use recreation area comprised of a day use beach and ten site campground. The beach area experiences heavy traffic flow, especially on weekends. The approximate total round trip mileage to acquire a money order at the nearest current source is 24 miles. Approximate mileage for each round trip park inspection tour is 1.5 miles.
4. WOODRING BRANCH CAMPGROUND - CARTERS LAKE
Contract Dates: 01 April – 25 Oct 19 Contract Dates: 01 April - 27 Oct 19 Pre-Work Conference: 01 – 04 Apr 19 Pre-Work Conference: 01 – 04 Apr 19
Woodring Branch is comprised of a developed campground, primitive campground and a day use area. Facilities in Woodring Branch developed campground include 43 sites, a boat ramp, water borne comfort station, and swimming area. The primitive camping area has 12 sites and a waterless restroom. The day use area has a boat ramp, picnic area and waterborne restroom. The developed campground in Woodring experiences heavy use on weekends the entire season. The approximate total round trip mileage to acquire a money order at the nearest source is 34 miles.
Inspection tour distance of the Woodring Branch Campground is approximately 3 miles. Driving distance for the campground and day use area is approximately 6 miles.
F. LAKE SEMINOLE
1. EASTBANK CAMPGROUND
Contract Dates: 01 Mar 19 - 29 Feb 20 Contract Dates: 01 Mar 19 - 25 Feb 20 Pre-Work Conference: 01-02 Mar 19 Pre-Work Conference: 01-02 Mar 19 Total Number of Performance Days: 186 Total Number of Performance Days: 182
Eastbank Campground consists of approximately 65 acres of grassy and wooded areas.
There are 64 sites in the campground, 62 of which have water and electrical hookups available.
The campground has newly rebuilt boat ramp and fish cleaning station, two bathhouses, laundry facility, group shelter, horseshoes, shuffleboard, volleyball court, and hiking trails. The campground has two miles of paved roads and is located ½ of a mile from the Resource Management Office; ¾ mile north of Chattahoochee, FL; 45 miles west of Tallahassee, Florida;
25 miles east of Marianna, Florida; and 23 miles southeast of Bainbridge, Georgia. Post office is 1 mile away from campground, as well as convenient stores, commercial eateries, and gas stations.
2. HALES LANDING CAMPGROUND
Contract Dates: 01 Mar 19 – 29 Feb 20 Contract Dates: 01 Mar 19 - 25 Feb 20
Total Number of Performance Days: 186 Total Number of Performance Days: 182
Hales Landing Park is located on Lake Seminole, a U.S. Army Corps of Engineers Project.
Hales Landing Park consists of 24 campsites, a boat ramp, picnic area, bathrooms and pavilion.
Day use area is separated from overnight camping area. Hales Landing Park is located approximately 6 miles from Bainbridge, Ga. Approximate round trip mileage to the nearest bank or post office is 14 miles. This park is located in the Eastern Time Zone.
G. OKATIBBEE LAKE
1. TWILTLEY BRANCH CAMPGROUND
Contract Dates: 01 Mar – 30 Sept 19 Contract Dates: 01 Mar – 30 Sept 19 Pre-Work Conference: 01-03 Mar 19 Pre-Work Conference: 05–07 Mar 19
Twiltley Branch Campground is located on Okatibbee Lake, a U.S. Army Corps of
Engineers Flood Control Project. Twiltley Branch Campground consist of 64 campsites, 52 class “A” sites w/electricity/water and 12 class “C” sites w/water only. The campground also has three large group sites. The campground is located approximately ten miles north of Meridian MS. off Hwy 19 in the small community of Collinsville Ms. Collinsville Day Use Area is located next to the Twiltley Branch Campground entrance, (less than 1/8th of a mile from campground gate). The Collinsville Day Use Area consists of a beach, boat ramp, picnic shelter, rest room, and numerous picnic sites. The Gatehouse is located 3.5 miles from the Okatibbee Resource Management Office and 2.4 miles from the nearest bank and post office, located in Collinsville, MS.
H. TENNESSEE-TOMBIGBEE WATERWAY
1. BLUE BLUFF CAMPGROUND
Contract Dates: 13 Feb – 15 Sep 19 Contract Dates: 13 Feb – 11 Sep 19 Pre-Work Conference: 13-15 Feb 19 Pre-Work Conference: 13-15 Feb 19 Total Number of Performance Days: 111 Total Number of Performance Days: 107
Blue Bluff Campground and Picnic Area is located on the West Bank of Aberdeen Lake on the Tennessee-Tombigbee Waterway. The campground is approximately an eight-mile round trip to banking facilities in Aberdeen, MS. Blue Bluff Campground has 92 Class A campsites, 89 with water/electrical hook-ups, and three with sewer hook-ups; two restrooms with showers, one multi-use court, one pavilion and two play areas are scattered throughout the campground. Laundry facilities are available. Several fishing piers and a one-lane boat ramp with car/trailer spaces are located within the campground for camper use only. The adjacent picnic area has three picnic pavilions, as well as individual picnic sites, a play area and two restrooms.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.