AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE 4. REQUISITION/PURCHASE 5. PROJECT NO. (If applicable)
W91278-15-R-0054-0001 20 JUN 2017
6. ISSUED BY CODE 7. ADMINISTERED BY(If other than item 6)
CODE
Corps of Engineers 109 St. Joseph St.
Mobile, AL 36602
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP code) 9A. AMENDMENT OF SOLICITATION
NO.
W91278-15-R-0054
9B. DATED (SEE ITEM 11)
25 MAY 2017
10A. MODIFICATION OF
CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority)
THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b)
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)
The subject solicitation for: IDIQ MATOC FOR MEDICAL FACILITY REPAIR & MINOR CONSTRUCTION IN SUPPORT
OF MEDCOM SRM PROGRAM FOR NRMC
Is modified in the following: REFER TO THE ENCLOSED REVISED SPECIFICATIONS FOR AMENDMENT NO. 0001
Except as provided herein, all terms and conditions of the document reference in item 9A or 10A, as Heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICE (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of contracting officer)
16C. DATE SIGNED
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
X 1 k5ct9ss9 Highlight k5ct9ss9 Highlight k5ct9ss9 Highlight
IDIQ MATOC for Medical Facility Repair & Minor W91278-15-R-0054 Construction in Support of MEDCOM SRM Program for NRMC
SF 30 Page 2 W91278-15-R-0054-0001
PART I - REVISIONS MADE BY ADDED AND/OR REPLACEMENT PARAGRAPHS/PAGES/SECTIONS
The items listed below are to be replaced by the corresponding added and/or revised paragraphs/pages or sections. Added and/or revised paragraphs/pages or sections are indicated by a note in bottom right hand corner of each paragraph or page. Added sections are hereby made a part of the contract and are to be inserted in the specification in the proper numerical/alphabetical sequence.
Within the specifications, deletions from the specifications are indicated by strikethrough, e.g.: deletions are marked with strikethrough and additions to the specifications including revisions/substitutions are indicated in bold, italic and underlined, e.g.: additions are indicated thus.
Corresponding Added or Revised Paragraph SECTION Page, and/or Section
00700 Revised clause 52.228-1
Sample Project - Scope of Work Added paragraph 1.2
Revised paragraphs 2.1 and 2.3.2
Encl as stated Revised pages of the specifications as indicated in Part I.
00700
AMENDMENT NO. W91278-15-R-0054-0001
00700
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c) The amount of the bid guarantee shall be determined at task order award 20% percent of the bid price (Bid Schedule No.2 – Sample Project) or $ determined at task order award 3,000,000.00, whichever is less.-
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of provision)
(NOTE: The remainder of the section is unchanged by the amendment.)
This page was intentionally left blank for duplex printing.
SAMPLE PROJECT – SCOPE OF WORK
1.2 Magnitude: $500,000.00 - $1,000,000.00
2.1 Project Description:
The objective of this Task Order is for the Contractor to provide all labor, materials and equipment necessary to replace four (4) Rooftop Units (RTU’s, 2 Trane, 2 Carrier Units, RTU 04,05,06,07) in IMD Server Rooms 313 and 314 and Laboratory area with (2) HVAC units (RTU 1, RTU 2) equipped with single zone VAV RTUs with hot gas bypass (HGBP) capability and provide duct mounted hydronic reheat coil connected into the building’s existing boiler plant. Hot gas bypass capability will allow the unit compressors to continue operating under part load, providing humidity control. All heating shall be performed by use of hydronic reheat coils and the building’s existing boiler plant. The existing working hydronic fluid consist of a glycol type mix. Each RTU shall handle 100% of the cooling and heating requirements of the spaces listed below (a-d). RTU’s shall be mounted on existing roof curbs via new roof curb adaptors. The Contractor shall provide new electrical circuits for the new RTUs. Work in all areas shall include reworking the duct work to accommodate the required zoning and coordination with MEDDAC’s existing Trane system to ensure all new work is connected into the existing head end system.
The Contractor shall base his price on the design provided (see Attachment 1). Contractor shall be responsible for temporary Heating and or Cooling as required for the Information Computer Rooms 313, 314 and Laboratory areas.
a. The common area of the Laboratory shall be zoned with single zone VAV box with hydronic reheat.
b. Micro Biology shall be zoned with a single zone VAV box with hydronic reheat. NOTE: The space is already equipped with an existing dedicated exhaust fan that will remain.
c. The three (3) rooms just off the Laboratory common area) shall be zoned with a single zone VAV Box with hydronic reheat.
d. Replace the existing 2- 10-Ton Carrier RTUs & 2- 10-Ton Trane RTUs with RTUs with dual circuits that utilize HGBP to lower relative humidity in server rooms 313 and 314. Units shall be single zone VAV and will be provided with duct mounted hydronic reheat coil connected into the buildings existing boiler plant.
2.3.2 Electrical: Contractor shall determine the power requirements and availability of existing service to tie into. If existing electrical is not sufficient the contractor is responsible for providing step down transformer, panels, and required power necessary power for the new equipment, digital controls, VAV, etc.
The information (voltage/amperage/length) available for existing breakers are as follows:
Room 313:
UACO5A - 480 Volt/70 AMP/70 ft.
Room 314:
UACO4A - 480 volt/40 AMP/70 ft.
UACO4B - 208/80 AMP/90 ft.
UACO4C - 208/80 AMP/90 ft.
(NOTE: The remainder of the section is unchanged by the amendment.)