Sources Sought response final.docx

DOCX document 24 KB Posted

Attached to
Source Sought for Industry Capabilities to Design and Construct New World Screwworm Facility
Solicitation number
W9126G26R1AS7
Issued by

About this file

This is a Sources Sought response template for a New World Screwworm (NWS) Facility design-build project by the U.S. Army Corps of Engineers (USACE). The document seeks industry input on capabilities to construct a specialized facility at Moore Air Base in Edinburg, Texas, with a target production of 300 million sterile flies per week. The facility requires complex design specifications including BSL biosecurity protocols (Levels 2 and 3), Arthropod Containment Level (ACL) protocols, and laboratory spaces with stringent containment requirements.

The template requests detailed information from potential contractors, covering company background, design-build capabilities, technical expertise, and market factors. Key areas of focus include experience with specialized containment facilities, design-build methodologies, technological capabilities (such as BIM and project management software), and potential challenges in constructing a high-security biological research facility. The government is specifically looking for prime firms that can mobilize quickly, provide innovative solutions, and potentially complete the project within a 12-month timeframe after Notice to Proceed (NTP).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOURCES SOUGHT RESPONSE NEW WORLD SCREWWORM (NWS) FACILITY

Firms may use this template to submit information related to the sources sought posting. Firms may submit capability statements or brochures in response. The Government highly encourages the use of already provided information to respond to this sources sought. Links to company websites are permitted.

SECTION 1. COMPANY INFORMATION

· Company Name: _________________________________________________

· Address: _______________________________________________________

· Point of Contact (POC):

· Name: _________________________________________________

· Title:___________________________________________________

· Phone Number:__________________________________________

· Email Address:___________________________________________

· Cage Code: ___________________________________________________

· SAM UEI Number: ______________________________________________

· Company Website: ______________________________________________

· Bonding Capability (single/aggregate): _____________/__________________

· Relevant NAICS Codes: (List all that apply) List the NAICs under which your firm is registered and that your firm thinks applies to this action:

· Annual Revenue (Approximate): (Select One)

· ☐ Less than $1 Million

· ☐ $1 Million - $5 Million

· ☐ $5 Million - $10 Million

· ☐ $10 Million - $25 Million

· ☐ $25 Million - $50 Million

· ☐ Over $50 Million

· Years in Business: __________________________________________

SECTION 2. DESIGN-BUILD CAPABILITIES & EXPERIENCE

· Design-Build Experience: Do you have direct experience as a prime contractor on design-build projects? ☐ Yes ☐ No

· Design-Build Team:

· Do you have in-house design capabilities, or do you typically partner with external design firms?

☐ Yes ☐ No

· If you partner with external design firms, do you have established relationships with firms specializing in:

· ☐ Containment facilities/laboratories

· ☐ Animal rearing facilities

· ☐ Mechanical, Electrical, and Plumbing (MEP) engineering

· ☐ Other (please specify):

· Experience with Specialized Facilities:

· Have you designed and/or constructed facilities with specialized requirements, such as:

· ☐ Containment facilities (e.g., BSL-2, BSL-3)

· ☐ Animal rearing facilities

· ☐ Laboratories

· ☐ Cleanrooms

· ☐ Other (please specify):

· If yes, please provide examples and describe any specific challenges encountered and how they were addressed.

· Design-Build to Budget/Target Value Design Build:

· Do you have experience with Design-Build to Budget type contracts?

☐ Yes ☐ No

· Do you have internal cost controls to ensure the contract remains in budget?

☐ Yes ☐ No

· Rough outline of a schedule for completing this week. (you may provide rough milestone schedule, primavera software, or projects summary schedule)

· Could construction be completed within a year (12 month) after Notice to Proceed (NTP)?

SECTION 3. TECHNICAL CAPABILITIES

· Relevant Technical Expertise: Please mark if your firm has experience or expertise relevant to the construction of an NWS facility, such as:

· HVAC systems for controlled environments

· Air filtration and ventilation systems

· Waste management and sterilization protocols

· Biosecurity measures

· Construction materials suitable for containment

· Experience with Government Contracts: Have you provided design-build services to Government agencies via contract or agreement? ☐ Yes ☐ No

· Experience with Non-Government Entities: Have you provided design-build services to Non-Government, State, local agencies, or private entities via contract or agreement? ☐ Yes ☐ No

· Use of Technology:

· Do you utilize Building Information Modeling (BIM) for design and construction? ☐ Yes ☐ No

· Do you use project management software for cost control, scheduling, and communication? ☐ Yes ☐ No

· Please describe any other relevant technologies your firm employs.

SECTION 4. MARKET FACTORS & POTENTIAL CONCERNS (Responses to these questions may be addressed separately via email or another document)

· Market Factors: Are there any market factors (e.g., availability of qualified labor, supply chain issues, subcontractor market) that may impact your pricing or ability to propose on a project of this nature?

· Significant Concerns/Risks: What significant concerns or risks do you foresee with the requirements of designing and constructing an NWS facility (e.g., unclear specifications, stringent containment requirements, specialized equipment)?

· Pricing Impact: Does the specialized nature of an NWS facility (e.g., containment requirements, specialized equipment) affect your pricing or ability to propose? Would outside consultants be required to price a requirement which included these features?

· Industry Successes/Challenges: What industry successes or challenges have you experienced in designing and constructing similar specialized facilities?

SECTION 5. RECOMMENDATIONS FOR THE GOVERNMENT (Responses to these questions may be addressed separately via email or another document)

· What information should USACE consider before incorporating the specialized requirements of an NWS facility in acquisitions, specifications, or statements of work?

· Are there specific design standards, guidelines, or best practices that you recommend USACE consider?

· Do you have any recommendations for mitigating potential risks associated with the construction of this type of facility?

· Any standard USACE requirements that should be considered in waiving, removing or reducing to improve rate of completion for this project?

File details come from the government source that posted it. Updated .