W9126G21R0051 0001.pdf
PDF 1 MB Posted
- Solicitation number
- W9126G21R0051
About this file
This solicitation is for the design and construction of a new Aquatic Tank at Lackland Air Force Base in San Antonio, Texas. The project involves building two Olympic-sized indoor swimming pools with overhead catwalks, shower facilities for men and women, and some administrative spaces. The estimated value is between $25-100 million. The contract will be a firm-fixed-price design-bid-build awarded using best value tradeoff procedures. Evaluation factors are past performance, schedule, small business participation, and price. The primary point of contact is Natasha Kennedy. The solicitation number is W9126G21R0051 and it will be posted on beta.sam.gov where interested parties can register and monitor for amendments. The prevailing Davis-Bacon wages apply and registration on sam.gov is required to receive an award. Anticipated award is in June 2021.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04 EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The Solicitation for Lackland Aquatics Tanks; Lackland AFB, Texas is amended as follows.
See SF30 Continuation Sheet(s)
NOTE: Proposal Receipt date is 22 April 2021; at 2:00 p.m., CT, as previously announced.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer) (Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.
W912621R0051
X 9B. DATED (SEE ITEM 11)
23-MAR-2021
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26 -MAR-2021
CODE
US ARMY ENGINEER DISTRICT, FORT WORTH
ATTN: CESWF-CT
819 TAYLOR ST, ROOM 2A19
P.O. BOX 17300
FORT WORTH TX 76102-0300
W9126G 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODE CODE
EMAIL: TEL:
W9126G21R0051
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
CHANGES TO SOLICITATION W9126G21R0051
CHANGES TO THE SPECIFICATIONS
1. Revised Section.- Replace the section noted listed below with the attached revised section of the same number, W9126G21R0051, AMENDMENT 0001
00 21 30 SITE VISITS
2. Replacement Section.- Replace the section noted listed below in its entirety with the attached new section of the same number, W9126G21R0051, AMENDMENT 0001
00 73 46 WAGE DETERMINATION SCHEDULE
End of Summary of Changes
Lackland Aquatics Tanks LK20AT
SECTION 00 21 30
SITE VISITS
PART 1 GENERAL
1.1 SITE VISITS
a. Pursuant to Contract Clause "FAR 52.236-3, Site Investigation and Conditions Affecting the Work," and the Site Visit Clause in Section 00 21 00 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS, prospective offerors will be permitted to inspect the site where services are to be performed and to satisfy themselves as to all general and local conditions that may affect the cost of performance of the Contract to the extent such information is reasonably obtainable. Offerors or quoters are urged and expected to inspect the site where the work will be performed.
b. Site visit information: The site visit will be:
Date: <AM01> 06 02 APR 2021 <AM01>
Time: 9:00 AM CT
Location: Bldg 147 Parking Lot
950 Voyager Drive JBSA Lackland Chapman Training Annex, TX 78236-5155
POC: David Dickson EMAIL: David.J.Dickson@usace.army.mil Phone: Office: (210) 671-0177 / Mobile: (360) 970-2261
See Section 01 35 17.00 44 SPECIAL PROJECT PROCEDURES FOR LACKLAND AFB for Installation Entrance Requirements.
Offerors and subcontractors wishing to participate must submit a complete listing of all personnel to attend the preproposal site visit, via email the attached JBSA request form (with Section II, Blocks 8 - 12 and Section V completed), to the referenced Base Access POC, a minimum of seven (7) calendar days prior to the preproposal site site visit. Include the following information for all attendees and subcontractors. The first name on the list will indicate: TEAM CHIEF, and this individual will be responsible for all other personnel:
Offeror's and offeror's subcontractor personnel full names Date of Birth Home Address Driver's License, including the State Issued Vehicle Registration Proof of Insurance SSN (last 4 digits) Firm
The U.S. Government will conduct a check of every individual submitted; this will include checking all law enforcement databases.
Persons with questionable criminal records or outstanding warrants will be denied access to the installation.
DOCUMENT 00 21 30 Page 1
W9126G21R0051, AMENDMENT 0001
M2ECAJMC
Cross-Out
Lackland Aquatics Tanks LK20AT
In addition to passing a background check, visitors will have to bring their Drivers License and proof of Insurance and Registration to the Luke East Visitors Center the day of the visit.
c. Personnel are required to wear masks during site visits if a distance of six (6) feet cannot be maintained between individuals. Contractors must provide their own masks.
d. In no event will a failure to inspect the site constitute grounds for withdrawal of a proposal after receipt of proposal or for a claim after award of the contract.
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
-- End of Section --
DOCUMENT 00 21 30 Page 2
W9126G21R0051, AMENDMENT 0001
UNESCORTED ACCESS REQUEST
(Per JBSANANTONIOI 31-1131)
JBSANANTONIO 7 20190821
"FOUO, This document contains information exempt from mandatory disclosure under the FOIA. Title 5 U.S.C. 552 (b) (6) applies.
This document also contains personal information that is protected by the Privacy Act of 1974 and must be safeguarded from unauthorized disclosure."
SPECIAL SECURITY REQUIREMENTS: IAW AFMAN 31-113, paragraph 3.7.1.3.3, "It is the sponsoring organization's responsibility to ensure the visit is properly recorded and documented...and the local AFOSI unit is notified when foreign visitors arrive and depart the installation.
On the day of visit and when the foreign visitors have departed the installation, email AFOSI, at AFOSI.Det403@us.af.mil indicating time of arrival and departure from the installation.
The following information has been provided to aid in the completion of the Unescorted Access Request.
Section I: Sponsor Information.
Block 1. Title The sponsors title (ie; Mr., Ms., Mrs., or associated rank of Military/GS employee).
Block 2. Last Name, First Name MI (Full name of sponsor, use format assigned).
Block 3. Duty Phone (Office number you can be reached at during business hours).
Block 4. Cell/Home Phone (Phone number you may be reached at during requested access times for your guests).
Block 5. DoD ID Number (Assigned number on your DoD ID Card-This is required to fully identify you in DBIDS).
Block 6. Organization/Home Address (If you are sponsoring for a government purpose use your organization. If it is for personal reasons use your home address).
Block 7. Email Address (email submissions will be sent encrypted utilizing a .mil email address).
Section II: Access Details.
Block 8. Category for Access (Check the category of your guest).
Block 9 Location (Check which location(s) in the JBSA area you are requesting your guests to have access to – Must be a valid need for entry to these locations. Contractor/Vendors must provide contract number stating access locations are required).
Block 10. Time Frame
From Date (Start date of visit/contract, etc…) To Date (End date of visit/contract, etc…)
From Time (Start time of visit or if continual access, start time each day) To Time (End time of visit or if continual access, end time each day)
Days of Week (Days of week entry is required - If visiting select day(s) visit will take place, if continual access is required – actual days of work required to be present)
Block 11. Reason for Access. Provide specific reason for access (ie; Meeting, Tow Truck, Pop-A-Lock, Taxi, Wedding, Family visit, etc…).
Block 12. Identify the Visiting Organization, Name of Event or if Contractor: Company Name (Prime and Sub Contractor), Contract Number and
Contract Period.
Block 13a, b, c: Sponsor completes each block. Must be legible when completed manually.
Section III: Visitor Center Use Only.
Section IV: Foreign Disclosure Office Use Only.
Section V: Guest Information.
Foreign visitors must be processed through the Foreign Disclosure Office. Email completed form to 502SRG.MAS.JBSA_ForeignRequest@us.af.mil For more than 20 visitors [Special Event] use continuation sheets).
Block 16. Fill in the blocks [alphabetical order] for all visitors 18 years of age or older.
Last Name, First Name MI (Full name of visitor, use format assigned).
DOB: Date of Birth (Use format assigned).
Country (Country of birth for foreign visitors).
ID Type: Must be a valid form of photo ID. Below are acceptable forms. Use the corresponding number when making your selection.
1 = Driver's License 2 = State Identification Card 3 = Veteran's Identification Card 4 = Passport/Visa 5 = Permanent Residence Card 6 = US Citizenship & Immigration Services
ID Number (The associated number assigned to the ID Type) Country of Issue (Country where identification was issued) State of Issue (State where identification was issued) If a tracking number is assigned, the sponsor will relay the number to their guest(s) for announcement at a visitor center. This will allow the Visitor Center Personnel to track completed paperwork for issuance of an access credential.
AUTHORITY: Title 10, United States Code 8012. PRINCIPAL PURPOSE: To assist security personnel in establishing a fitness determination through the identity proofing and vetting process. ROUTINE USES: To be utilized by personnel requesting to obtain guest installation access pass for unescorted access to Joint Base San Antonio (JBSA) installations for 1 -30 days or for special one-time events. DISCLOSURE: Disclosure of the requested information is voluntary;
however, failure to provide information may result in denial of request or the refusal by the 802 Security Forces Squadron, Installation Access Control Section to permit access to the installation.
JBSANANTONIO 7 20190821
IV. FOREIGN DISCLOSURE OFFICE (FDO) USE ONLY
III. VISITOR CENTER USE ONLY
I. SPONSOR INFORMATION
1. TITLE 2. LAST NAME, FIRST NAME, MI 3. DUTY PHONE 4. ALTERNATE CONTACT NUMBER 5. DOD ID NUMBER
6. ORGANIZATION/HOME ADDRESS 7. EMAIL ADDRESS
II. ACCESS DETAILS
8. CATEGORY OF ACCESS 9. LOCATION 10. TIME FRAME
Contractor/Vendor
Personal Services
Delivery/Pick-Up
Visitor/Volunteer
Special Event
Foreign National
(Ex: Pizza Delivery/.Non Driver Status)
JBSA-RND
JBSA-LAK
JBSA-FSH
JBSA-SAMMC
JBSA-CB
From Date:
To Date:
From Time:
To Time:
Thursday
Wednesday
Sunday
Monday
Tuesday
Saturday
Friday
11. REASON FOR ACCESS (Be Specific)
14a. TRACKING NUMBER
14b. RECEIVED DATE
14c. VETTED DATE 14d. POSTED DATE (For EAL Use)
14e. ECP POSTED LOCATION (For EAL Use)
TSDB
NCIC III
SFMIS
ALERTS
15a. CASE NAME 15b. VETTED DATE
Approved Denied
15d. NAME, GRADE/RANK, OFFICE SYMBOL, AND TITLE OF VERIFIER
12. CONTRACTED COMPANY SPONSORED OR SPECIAL EVENT NAME
15e. SIGNATURE
13b. NAME, GRADE/RANK, OFFICE SYMBOL, AND TITLE OF SPONSOR 13d. SIGNATURE
14g. NAME, GRADE/RANK, OFFICE SYMBOL, AND TITLE OF VERIFIER 14h. SIGNATURE
13a. DATE OF SIGNATURE
14f. DATE OF SIGNATURE
15c. DATE OF SIGNATURE
JBSANANTONIO 7 20190821
V. GUEST INFORMATION
16. Enter information for all persons 18 years of age or older (in alphabetical order). Refer to page 1 for instructions.
TRACKING NUMBER
Last Name, First Name, MI
DOB
(DD/MMM/YY)
Country of Birth
ID
Type
ID
Number
Country of Issue
State of
Issue VCC Use Only
Select
Select
SECTION 00 73 46 - WAGE DETERMINATION SCHEDULE
APPLICATION OF WAGE DECISIONS
Solicitation Number: W9126G21R0051
Project: Aquatic Tank
Location: Joint Base San Antonio-Lackland (JBSA-LAK), Texas
Counties: Bexar County, TX
1. Davis-Bacon Construction Wage Rate Requirements TX20210231 (03/12/21) Building Construction Projects, is applicable to the construction, alteration, painting, or repair of buildings, installations within buildings, appurtenances to buildings, foundations for buildings, excavation and fill for buildings, and utilities within five feet of buildings in Bexar County, Texas.
NOTE:
(1) Payroll records are required, under the Davis-Bacon Act, to be submitted to the U.S.
Army Corps of Engineers for all construction work performed.
(2) The Wage Decision Number applicable to the work performed is to be shown on all certified payroll records submitted. If multiple wage decisions are utilized within a pay period, so annotate clearly those work hours and rates-of-pay per the applicable wage decision under which the work was performed.
W9126G21R0051
SECTION 00 73 46
WAGE DETERMINATION SCHEDULE
"General Decision Number: TX20210231 03/12/2021
Superseded General Decision Number: TX20210231
State: Texas
Construction Type: Building
County: Bexar County in Texas.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate.)
The EO minimum wage rate will be adjusted annually.
Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis- Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts
Modification Number Publication Date 0 01/01/2021 1 03/12/2021
ASBE0087-014 03/02/2020
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR (Duct, Pipe and Mechanical System Insulation)....$ 23.97 10.79
BOIL0074-003 01/01/2017
Rates Fringes
BOILERMAKER......................$ 28.00 22.35
ELEC0060-003 07/27/2020
Rates Fringes
ELECTRICIAN (Communication Technician Only).................$ 29.60 15%+5.45
ELEC0060-004 07/27/2020
Rates Fringes
ELECTRICIAN (Excludes Low Voltage Wiring)..................$ 29.60 18%+5.45
* ELEV0081-001 01/01/2021
Rates Fringes
ELEVATOR MECHANIC................$ 43.31 36.365
FOOTNOTES:
A. 6% under 5 years based on regular hourly rate for all hours worked. 8% over 5 years based on regular hourly rate for all hours worked.
B. Holidays: New Year's Day; Memorial Day; Independence daDay; Labor Day; Thanksgiving Day; Friday after thThanksgiving Day; Christmas Day; and Veterans Day.
ENGI0450-002 04/01/2014
Rates Fringes
POWER EQUIPMENT OPERATOR
Cranes......................$ 34.85 9.85
IRON0066-013 06/01/2020
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 23.45 6.83
IRON0084-011 06/01/2020
Rates Fringes
IRONWORKER, ORNAMENTAL...........$ 25.26 7.13
PLUM0142-009 07/01/2020
Rates Fringes
HVAC MECHANIC (HVAC
Electrical Temperature Control Installation Only).......$ 30.25 13.36 HVAC MECHANIC (HVAC Unit Installation Only)...............$ 30.25 13.36 PIPEFITTER (Including HVAC Pipe Installation)...............$ 31.90 13.76
Including HVAC Pipe Installation PLUMBER (Excludes HVAC Pipe Installation)....................$ 31.90 13.76 Excludes HVAC Pipe Installation
* SFTX0669-002 01/01/2021
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 30.64 22.20
SHEE0067-004 07/01/2020
Rates Fringes
Sheet metal worker Excludes HVAC Duct Installation................$ 27.31 15.51 HVAC Duct Installation Only.$ 27.31 15.51
SUTX2014-006 07/21/2014
Rates Fringes
BRICKLAYER.......................$ 22.15 0.00
CARPENTER (Acoustical Ceiling
Installation Only)...............$ 17.83 0.00 CARPENTER (Form Work Only).......$ 13.63 0.00 CARPENTER, Excludes Acoustical Ceiling Installation, Drywall Hanging, Form Work, and Metal Stud Installation................$ 16.86 4.17
CAULKER..........................$ 15.00 0.00
CEMENT MASON/CONCRETE FINISHER...$ 22.27 5.30
DRYWALL FINISHER/TAPER...........$ 13.81 0.00
DRYWALL HANGER AND METAL STUD
INSTALLER........................$ 15.18 0.00
ELECTRICIAN (Low Voltage Wiring Only).....................$ 20.39 3.04
IRONWORKER, REINFORCING..........$ 12.27 0.00
LABORER: Common or General......$ 10.75 0.00 LABORER: Mason Tender - Brick...$ 11.88 0.00 LABORER: Mason Tender -
Cement/Concrete..................$ 12.00 0.00 LABORER: Pipelayer..............$ 11.00 0.00 LABORER: Roof Tearoff...........$ 11.28 0.00 LABORER: Landscape and Irrigation.......................$ 8.00 0.00
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 15.98 0.00 OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 14.00 0.00 OPERATOR: Bulldozer.............$ 14.00 0.00 OPERATOR: Drill.................$ 14.50 0.00 OPERATOR: Forklift..............$ 12.50 0.00 OPERATOR: Grader/Blade..........$ 23.00 5.07 OPERATOR: Loader................$ 12.79 0.00 OPERATOR: Mechanic..............$ 18.75 5.12 OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 16.03 0.00 OPERATOR: Roller................$ 12.00 0.00 PAINTER (Brush, Roller and Spray), Excludes Drywall Finishing/Taping.................$ 13.07 0.00
ROOFER...........................$ 12.00 0.00
TILE FINISHER....................$ 11.32 0.00
TILE SETTER......................$ 14.94 0.00
TRUCK DRIVER: Dump Truck........$ 12.39 1.18 TRUCK DRIVER: Flatbed Truck.....$ 19.65 8.57 TRUCK DRIVER: Semi-Trailer Truck............................$ 12.50 0.00 TRUCK DRIVER: Water Truck.......$ 12.00 4.11 WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/ govcontracts
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates.
Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
----- WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) rulruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
Changes to the SPECIFICATIONS
File details come from the government source that posted it. Updated .