B08_Amendment.pdf

PDF 2 MB Posted

Attached to
Canyon Lake Cleaning Capital Region
Solicitation number
W9126G21Q0029
Issued by

About this file

This is a performance work statement for cleaning services at various parks and locations at Canyon Lake, Texas. The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and other items necessary to perform cleaning services as specified, including grounds cleaning, restroom cleaning, picnic/camping area cleaning, and other facility cleaning. The services will be provided at ten recreation areas/parks, the outlet works, and the embankment at Canyon Lake. The contract term is for a base year from April 1, 2021 through March 31, 2022, with four one-year option periods and one six-month option period. The solicitation was issued by the Department of the Army Corps of Engineers Fort Worth District for cleaning services at various locations in the Capital Region around Canyon Lake, Texas.

View the file

Other files

File Type Posted
Amendment 5.pdf PDF
Amd 4.pdf PDF
B08_Amendment 3.pdf PDF
B08_Amendment 2.pdf PDF
B08_Solicitation_B.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W9126G21Q0029 09-Feb-2021

b. TELEPHONE NUMBER 8. OFFER DUE DATE/LOCAL TIME

03:00 PM 09 Mar 2021

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W9126G9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

BRIAN EDWARDS

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

US ARMY CORPS OF ENGINEERS FORT WORTH

819 TAYLOR ST, CT OFC RM 2A17

FORT WORTH TX 76102-0300

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 967422 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

CANYON PROJECT OFC ATTN CESWF-OD-CN

JAVIER E PEREZ ORTIZ

601 COE ROAD

CANYON LAKE TX 78133

TEL: 830-964-3341 FAX: 830-964-2215

(817) 886-6403FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$19,500,000

NAICS:

561720

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF121

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W9126G21Q0029

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 12 Months

Prime Facility Cleaning (FRM)

FFP

The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform cleaning services as defined in this Performance Work Statement (PWS) except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

Base Year: 3 April 2021 - 31 March 2022

CS: Brian L. Edwards, brian.edwards@usace.army.mil, 817-886-1053 FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 12 Months

Park Cleaning and Maintenane (REC)

FFP

The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform cleaning services as defined in this Performance Work Statement (PWS) except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

Base Year: 3 April 2021 - 31 March 2022

CS: Brian L. Edwards, brian.edwards@usace.army.mil, 817-886-1053 FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

1001 12 Months OPTION Prime Facility Cleaning (FRM)

FFP

The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform cleaning services as defined in this Performance Work Statement (PWS) except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

Option Year 1: 1 April 2022 - 31 March 2023

CS: Brian L. Edwards, brian.edwards@usace.army.mil, 817-886-1053

1002 12 Months OPTION Park Cleaning and Maintenance (REC)

FFP

The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform cleaning services as defined in this Performance Work Statement (PWS) except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

Option Year 1: 1 April 2022 - 31 March 2023

2001 12 Months OPTION Prime Facility Cleaning (FRM)

FFP

The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform cleaning services as defined in this Performance Work Statement (PWS) except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

Option Year 2: 1 April 2023 - 31 March 2024

2002 12 Months OPTION Park Cleaning and Maintenance (REC)

FFP

The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform cleaning services as defined in this Performance Work Statement (PWS) except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

Option Year 2: 1 April 2023 - 31 March 2024

3001 12 Months OPTION Prime Facility Cleaning (REC)

FFP

The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform cleaning services as defined in this Performance Work Statement (PWS) except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

Option Year 3: 1 April 2024 - 31 March 2025

3002 12 Months OPTION Park Cleaning and Maintenance (REC)

FFP

The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform cleaning services as defined in this Performance Work Statement (PWS) except for those items specified as government furnished

Option Year 3: 1 April 2024 - 31 March 2025

4001 12 Months OPTION Prime Facility Ceaning (FRM)

FFP

The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform cleaning services as defined in this Performance Work Statement (PWS) except for those items specified as government furnished

Option Year 4: 1 April 2025 - 31 March 2026

4002 12 Months OPTION Park Cleaning and Maintenance (REC)

FFP

The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform cleaning services as defined in this Performance Work Statement (PWS) except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

Option Year 4: 1 April 2025 - 31 March 2026

5001 6 Months OPTION Prime Facility Cleaing (FRM)

FFP

The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform cleaning services as defined in this Performance Work Statement (PWS) except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

Option Year 5: 1 April 2026 - 30 September 2026

5002 6 Months OPTION Park Cleaning and Maintenance (REC)

FFP

The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform cleaning services as defined in this Performance Work Statement (PWS) except for those items specified as government furnished

Option Year 5: 1 April 2026 - 30 September 2026

BID SHEET

BID SHEET Facility Cleaning Services Canyon Lake, TX

BASE YEAR - 03 APRIL 2021 THROUGH 31 MARCH 2022

CLIN # DESCRIPTION TOTAL UNIT

UNIT

PRICE

PRICE

PRIME FACILITY

CLEANING(FRM)

12 MO

PARK CLEANING AND

MAINTENANCE(REC)

12 MO

TOTAL AMOUNT FOR CLIN - (0001 - 0002)

OPTION YEAR ONE – 01 APRIL 2022 through 31 March 2023

PRICE

PRICE

PRIME FACILITY

CLEANING(FRM)

12 MO

PARK CLEANING AND

MAINTENANCE(REC)

TOTAL AMOUNT FOR CLIN - (1001 - 1002)

OPTION YEAR TWO – 01 APRIL 2023 through 31 MARCH 2024

PRICE

PRICE

PRIME FACILITY

CLEANING(FRM)

12 MO

PARK CLEANING AND

MAINTENANCE(REC)

TOTAL AMOUNT FOR CLIN - (2001 - 2002)

OPTION YEAR THREE – 01 APRIL 2024 through 31 MARCH 2025

PRICE

PRICE

PRIME FACILITY

CLEANING(FRM)

12 MO

PARK CLEANING AND

MAINTENANCE(REC)

TOTAL AMOUNT FOR CLIN - (3001 - 3002)

OPTION YEAR FOUR – 01 APRIL 2025 through 31 MARCH 2026

PRICE

PRICE

PRIME FACILITY

CLEANING(FRM)

12 MO

PARK CLEANING AND

MAINTENANCE(REC)

TOTAL AMOUNT FOR CLIN - (4001 - 4002)

OPTION YEAR FIVE – 01 APRIL 2026 through 30 SEPTEMBER 2026

PRICE

PRICE

PRIME FACILITY

CLEANING(FRM)

12 MO

PARK CLEANING AND

MAINTENANCE(REC)

TOTAL AMOUNT FOR CLIN - (5001 - 5002)

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 03-APR-2021 TO

31-MAR-2022

N/A CANYON PROJECT OFC ATTN CESWF-

OD-CN

JAVIER E PEREZ ORTIZ

601 COE ROAD

CANYON LAKE TX 78133

830-964-3341

967422

0002 POP 03-APR-2021 TO

31-MAR-2022

N/A (SAME AS PREVIOUS LOCATION)

1001 POP 01-APR-2022 TO

31-MAR-2023

N/A (SAME AS PREVIOUS LOCATION)

1002 POP 01-APR-2022 TO

31-MAR-2023

N/A (SAME AS PREVIOUS LOCATION)

2001 POP 01-APR-2023 TO

31-MAR-2024

N/A (SAME AS PREVIOUS LOCATION)

2002 POP 01-APR-2023 TO

31-MAR-2024

N/A (SAME AS PREVIOUS LOCATION)

3001 POP 01-APR-2024 TO

31-MAR-2025

N/A (SAME AS PREVIOUS LOCATION)

3002 POP 01-APR-2024 TO

31-MAR-2025

N/A (SAME AS PREVIOUS LOCATION)

4001 POP 01-APR-2025 TO

31-MAR-2026

N/A (SAME AS PREVIOUS LOCATION)

4002 POP 01-APR-2025 TO

31-MAR-2026

N/A (SAME AS PREVIOUS LOCATION)

5001 POP 01-APR-2026 TO

30-SEP-2026

N/A (SAME AS PREVIOUS LOCATION)

5002 POP 03-APR-2026 TO

02-OCT-2026

N/A (SAME AS PREVIOUS LOCATION)

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 N/A N/A N/A Government 0002 N/A N/A N/A Government 1001 N/A N/A N/A Government 1002 N/A N/A N/A Government 2001 N/A N/A N/A Government 2002 N/A N/A N/A Government 3001 N/A N/A N/A Government 3002 N/A N/A N/A Government 4001 N/A N/A N/A Government 4002 N/A N/A N/A Government 5001 N/A N/A N/A Government 5002 N/A N/A N/A Government

KO STATEMENT

Only a warranted Contracting Officer either a Procuring Contracting Officer (PCO), or an Administrative Contracting Officer (ACO), acting within their delegated limits, has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract you shall not proceed with the change and shall immediately notify the Contracting Officer.

SITE VISIT

52.237-1 SITE VIST

VIRTUAL SITE VISIT INFORMATION

52.237-1 SITE VISIT

There will be a Virtual Site Visit performed in order to clarify expectations and answer any questions concerning the requirements of the specified work. Prospective offerors are required to contact the Contract Specialist via email to express their interests by 3:00 PM (CST) two business days prior to attending the virtual site visit. At a minimum, the email should reference the Solicitation Number, Project Title, Name(s) of Individual(s) who will attend the virtual site visit, Name of Company Represented, and Phone Number of Company being represented. An e-mail containing the dial-in information will be sent to all prospective attendees who have expressed interest.

Friday, February 19, 2021 @ 9:00 AM CST

U.S. Army Corps of Engineers Canyon Lake Office 601 C.O.E Road Canyon Lake, Texas 78133

Brian Edwards 817-886-1053 Brian.edwards@usace.army.mil hattie.j.henry@usace.army.mil

IN PERSON SITE-VISIT INFORMATION

Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

Prospective offerors/quoters are required to contact the Contract Specialist via email to express their interests by 3:00 PM (CST) two business days prior to attending the site visit. Site visit attendees must provide the following information: Solicitation Number, Project Title, Name(s) of Individual(s) who will attend the site visit, Name of Company Represented, Phone Number of Company being represented. All attendees will be required to sign the attendance sheet. Due to COVID-19 restrictions, space availability will be limited to two (2) participants per company.

All personnel are required to wear masks during site visits, and maintain a distance of six (6) feet between individuals, where able. Contractors must provide their own masks.

Address: U.S. Army Corps of Engineers

Canyon Lake Office 601 C.O.E. Road Canyon Lake, Texas 78133 Brian Edwards 817-886-1053 brian.edwards@usace.army.mil Friday, February 19, 2021 @ 10:00 AM CST

INSTRUCTIONS TO OFFEROR

INSTRUCTIONS TO OFFERORS

INSTRUCTIONS TO OFFERORS

QUOTER DUE DATE/LOCAL TIME: March 9, 2021, 3:00 PM CST POINT OF CONTACT: Brian L. Edwards, brian.edwards@usace.army.mil, 817-886-1053 Quotes shall be accepted via “EMAIL ONLY,” no fax, mail, express mail, or hands carry, “NO EXCEPTIONS.” EMAIL your proposal to: brian.edwards@usace.army.mil and CIV_OPS.Proposals@usace.army.mil

Subject line of email MUST include the solicitation number and your Company Name.

For additional help contact your local Association Procurement Technical Assistance Centers (PTAC). Centers were created by Congress to assist businesses seeking to compete on federal contracts. Services are generally free; however, a small fee may be charged for certain services. Please use website http://www.aptac-us.org/new/ to contact a center to assist you in the preparation for a federal contract, registering in SAM or other required systems.

SYSTEM FOR AWARD MANAGEMENT (SAM) is REQUIRED to receive an award on all federal government contracts. Therefore, contractors are encouraged to begin this process sooner rather than later. If already registered, please ensure your registration is ACTIVE. The website to register with SAM is: http://www.sam.gov.

DATA UNIVERSAL NUMBERING SYSTEM (DUNS) is REQUIRED. Dun & Bradstreet (D&B) provides a DUNS Number, a unique nine digit identification number, for each physical location of your business.

DUNS Number assignment is FREE for all businesses required to register with the US Federal government for contracts or grants in the System for Award Management (SAM see below).

The website to obtain your DUNS number: http://fedgov.dnb.com/webform For technical difficulties, contact govt@dnb.com or phone 866-705-5711.

WAGE RATES: The Service Contract Act applies (see attached wage rates).

VENDOR INFORMATION SHEET

COMPANY NAME

POC

(Last, First Middle)

ADDRESS

(Number & Street) (City, State and Zip)

PHONE NUMBER MOBILE

(Area code and number) (Area code and number)

EMAIL ADDRESS___________________________________________

DUNS NUMBER CAGE CODE NUMBER_______________

Vendor’s Online Representation and Certification Application (ORCA) are updated in SAM Yes No

ATTACHMENT 1

NAVFAC/USACE PAST PERFORMANCE QUESTIONAIRE (Form PPQ-0)

CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information Firm name: CAGE Code:

Address: DUNS Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of Project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract type: Firm Fixed Price Cost Reimbursement Other (please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy) Explain Differences:

Original Contract Price (Award Amount):

Final contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNARIE AND

SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED

QUESTIONNARIE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS

QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATION. CLIENTS ARE HIGHLY

ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER,

QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE

OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT RESERVES THE RIGHT TO

VERIFY ANY AND ALL INFORMATION ON THIS FORM.

AFTER COMPLETION, PLEASE EMAIL TO: brian.edwards@usace.army.mil, CIV- OPS.Proposals@usace.army.mil Ensure the former employer references the solicitation number in the email subject line.

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATIONOF THE CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable No information or did not apply to your contract

Rating will be neither positive or negative.

TO BE COMPLETED BY CLIENT

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. QUALITY

a) Quality of technical data/report preparation efforts E VG S M U N

b) Ability to meet quality standards for technical performance E VG S M U N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance.

E VG S M U N

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

E VG S M U N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

E VG S M U N

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract

E VG S M U N

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project? E VG S M U N

b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)

E VG S M U N

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?

E VG S M U N

d) Overall customer satisfaction E VG S M U N

4. MANAGEMENT/PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and /or labor force?

E VG S M U N

b) Ability to hire, apply, and retain qualified workforce to this effort E VG S M U N

c) Government Property Control E VG S M U N

d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N

e) Utilization of Small Business concerns E VG S M U N

f) Ability to simultaneously manage multiple projects with multiple disciplines

E VG S M U N

g) Ability to assimilate and incorporate changes in requirement and/or priority, including planning, execution and response to Government changes

E VG S M U N

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)

E VG S M U N

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agree price(s)?

E VG S M U N

b) Contractor Proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client

E VG S M U N

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports.

Budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

E VG S M U N

d) In the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.

YES NO

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

YES NO

f) Have there been any indication that the contractor has had any financial problems? If yes, please explain below.

YES NO

6. SAFETY/SECURITY

a) To What extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements, regarding housekeeping, safety, correction of noted deficiencies, etc.)

E VG S M U N

b) Contractor complied with all security requirements for the project and personnel security requirements.

E VG S M U N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues)

E VG S M U N

b) Compliance with contractual terms/provisions (explain if specific issues)

E VG S M U N

c) Would you hire or work with this firm again? (If no, please explain below)

YES NO

d) In Summary, provide an overall rating for the work performed by this contractor.

E VG S M U N

Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (Please attach additional pages in necessary):

INSURANCE REQUIREMENT

Prior to commencement of work, the Contractor shall furnish the original of his Insurance Certificate directly to the Contracting Officer, and one copy directly to the Lake Project Office.

Submit a copy of Insurance Certificate directly to:

U.S. Army Corps of Engineers

ATTN: CESWF-CT

P.O. Box 17300 Fort Worth, TX 76102

And U.S. Army Corps of Engineers Lake Georgetown Office 500 Lake Overlook Drive Georgetown, Texas 78633 And email to: CIV-OPS.Proposals@usace.army.mil The Contractor shall maintain, during the entire period of his performance under this contract, the following minimum insurance requirements:

(a) Comprehensive general liability insurance for bodily injury in the minimum limits of $500,000 per occurrence. No property damage liability is required.

(b) Comprehensive automobile liability insurance covering the operation of all automobiles used in connection with the performance of the contract in the minimum limits of $200,000 per person and $500,000 per accident for bodily injury and $20,000 per accident for property damage.

(c) Workmen's Compensation and Employer's Liability Insurance in the minimum amount of $100,000.00, or in compliance with applicable State statutes.

(d) An endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer.

NOTE:

(1) It is recommended that the contractor furnish a copy of the foregoing requirements to his insurance company in order to assure that an Insurance Certificate is issued meeting the minimum requirements shown. The Insurance Certificate shall also show the contract number to which it applies as well as a brief description and location of the work.

PWS

US ARMY CORPS OF ENGINEERS

FORT WORTH DISTRICT

CAPITAL REGION

FACILTIES CLEANING SERVICE, CANYON LAKE, TEXAS

PERFORMANCE WORK STATEMENT (PWS)

1. GENERAL: This is a non-personal services contract to provide services at various parks and locations at Canyon Lake. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform cleaning services as defined in this Performance Work Statement (PWS) except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

1.1.1 Definitions:

(a) Contractor: Company structure, including all partners, officers and employees with interest in this contract.

(b) Government: Government of the United States of America.

(c) Contracting Officer (KO): Person executing this contract on behalf of the Government.

(d) Contracting Officer’s Representative (COR): If applicable, the (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the contractor concerning technical aspects of the contract: issue written interpretations of technical requirements; including Government drawings, designs, specifications: monitor Contractor’s performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of Government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the contract.

(e) Safety Manual: EM 385-1-1, Corps of Engineers Safety and Health Requirements

Manual, current edition available at pre-work meeting.

(f) Performance Standard: Describes the desired results that are to be achieved.

(g) Quality Control: Action taken by the Contractor and/or their personnel to document, inspect and control performance of services to insure specifications and requirements of this PWS are met.

(h) Quality Assurance: Action taken by the Government to insure the Contractor's quality control system is functioning and effective and that the Contractor is providing services which are in accordance with this PWS.

(i) Quality Assurance Representative (QAR): Person designated by the Lake Manager to perform Quality Assurance Inspections, review invoices, and perform strict contract oversight. The QAR does not have authority to change any terms of the contract.

(j) Quality Assurance Surveillance Plan (QASP): Plan developed by the Government depicting means Quality Assurance will be controlled.

(k) Contract Discrepancy Report (CDR): Written record of unsatisfactory performance by the Contractor as observed by the Quality Assurance Representative, issued to the Contractor when the performance threshold does not meet the minimum requirements.

1.1.2 Basic Requirements: The following requirements for submitting a quote and receiving an award are now mandatory for conducting business with the DOD Government.

1.1.3 All offerors are required to obtain a Data Universal Numbering System (DUNS) number by visiting www.dnb.com.

1.1.4 All prospective contractors must be registered in System for Award Management (SAM) database prior to any award resulting from this solicitation. If at time of award, contractor is not registered, award will be made to the next successful “registered” offer. Registration may be accomplished via the internet at www.sam.gov.

1.1.5 All payments shall be made by Electronic Funds Transfer (EFT) or “direct deposit”.

1.1.6 Permits: The Contractor will, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor will comply with any applicable Federal, State, County, and Municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.

1.1.7 Veterans Employment Emphasis: In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS 222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreachefforts: U.S. Department of Labor Veterans employment, www.vets.gov/ Federal veteran employment information , www.fedshirevets.gov/index.aspx Veterans’ Employment and Training Service (VETS) , http://www.dol.gov/vets/ Veterans Opportunity to Work (VOW) Program , http://benefits.va.gov/vow/ U.S. Army Warrior Transition Command Employment Index , wtc.army.mil/modules/employers/index.html Hiring Our Heroes initiative , www.uschamberfoundation.org/hiring-our-heroes Guide to Hiring Veterans , www.whitehouse.gov/sites/default/files/docs/white_house_business_counc il_-_guide_to_hiring_veterans_0.pdf

1.2. Scope: This contract includes work to be performed in any or all parks or portions of parks at the U.S. Army Corps of Engineers, Fort Worth District, Capital Region Office, Canyon Lake, TX (reference Attachment 3-Tabulaton & Frequency of Areas and Facilities and Attachment 8-Supportive Documentation for Bid Schedule CLINS) as further specified below. The Contractor is responsible for the following service requirements:

1.2.1 The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials (except those specified to be provided by the Government), supervision, and other items and non-personal services necessary to perform facility cleaning services as specified at ten

(10) recreation areas/parks, the outlet works and the embankment at Canyon Lake, Texas. These services include but are not limited to cleaning grounds, restrooms, picnic/camping/screened shelter units, group pavillions/shelters, fishing piers, courtesy docks, RV dump stations, bulk refuse receptacle areas and swim beach areas.

All Park Maps are located in Attachment 5.

1.2.2 Facility Cleaning Requirements:

1.2.2.1 Regulations and Permits: The Contractor without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor will comply with any applicable all current Municipal, County, State, and Federal rules and regulations in connection wit the performance of the work specified under this contract to include but not limited to; governing sanitary standards of drinking water, protection of public water sources and solid waste disposal shall be met and maintained throughout the performance of the work specified under this contract. All trash collected on Government property shall be placed in Bulk Refuse Receptacles (BRR) in the park. If BRR are full in the park, the Contractor shall dispose of trash in nearest BRR in adjacent parks. If trash is hauled off Government property, the Contractor shall make all the necessary arrangements, obtain permits required and make all payments for proper disposal in a facility that is licensed by the Texas Commission on Environmental Quality. If the proposed disposal area is not presently being utilized as a State authorized City or County garbage disposal area, the Contractor must furnish the Government a letter from the Texas Commission on Environmental Quality approving the area for disposal. This approval will be required even if the Contractor owns the land. If fees are charged for use of the disposal area, the Contractor shall furnish to the Government, on a monthly basis, copies of all receipts for fees paid.

1.2.2.2 Traffic Regulations and Safety: The work to be performed under this contract shall be within the boundaries of land administered by the U.S. Army Corps of Engineers. The Contractor and contract employees are subject to all Title 36 regulations while completing work under this contract. No special provisions or entitlements shall be granted to the Contractor or contract employees. The attention of the Contractor and his employees shall be directed to the need for extreme caution and care while driving and operating equipment in these locations. The Contractor and employees shall comply with all state and local traffic laws. The Contractor shall comply with all pertinent provisions of the Corps of Engineers Manual, EM 385-1-1, Safety and Health Requirement Manual. An observed violation of safety requirements shall be grounds for the Government to stop work. Work shall not continue until the violation is corrected.

1.2.2.3 Accident Reporting: The Contractor shall maintain an accurate record of, and shall report to the Contracting Officer (KO) in the manner and time limitations and on the forms prescribed by the KO, all accidents resulting in death, traumatic injury, occupational disease, and damage to property, materials, supplies, and equipment incidental to work performed under this contract. Medical expenses for Contractor personnel are the responsibility of the Contractor.

1.2.2.4 Condition of Equipment: All equipment used to perform work under this contract must be in good operating and mechanical condition and comply with Safety Manual. A regular schedule of preventive maintenance must be followed on all equipment. All maintenance shall be conducted off Government property. Contractor shall insure leaking and unsafe equipment is repaired immediately and shall be responsible for containment and clean-up of leaks. Contractor shall remove and dispose of contaminated soils resulting from leaks or spills in accordance with Federal, State, County and Municipal laws, codes and regulations.

1.2.2.5 Safety Inspections: Prior to work commencement, all equipment shall be inspected by the Government to ensure compliance with Section 18 of Safety Manual. Contractor shall present all equipment to the Government for inspection whenever equipment is mobilized at the Lake. Contractor shall notify the Government at least two (2) days prior to bringing equipment on-site so that the time and place of these inspections may be scheduled. The Government may inspect equipment at any time it is operated on Government Property. Any equipment found deficient shall be taken out of service immediately until faulty conditions have been corrected and passed by the Government. No such removal will reduce the Contractor's obligation to perform all work required within the time scheduled under this contract. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.

1.2.2.6 Maps: Cleaning Maps are specified in Attachment 5 and indicate the approximate areas where services shall be performed. Due to the large scale of service areas, actual boundaries on-site may not be discernible from the maps and delineation on-site by the Government will govern.

1.2.2.7 Typical Unit Drawings: Contract requirements will override all typical drawings.

Typical Unit Drawings provided in Attachment 6 are not to scale, nor are they intended to depict all facilities at all locations. Each unit varies considerably in structure, design and size.

Therefore, Typical Unit Drawings are included for general information purposes only.

1.2.2.8 Reports: The Contractor shall prepare and submit Daily Activity Reports (DARs) and Quality Control Reports (QCRs) as specified. Contractor shall develop and provide their own reports. A Daily Activity Report shall be completed each day work is performed and shall be submitted to the Government as directed no later than the following day. A Quality Control Report shall be submitted to the Government at the end of each work week as directed. The Contractor’s Quality Control Inspectors (QCIs) shall ensure all reports are complete, legible and comprehensible.

1.2.2.9 Tabulation of Park Areas and Facilities: The Tabulation of Park Areas and Facilities is provided in Attachment 3. It shows acreage estimates and quantifies facilities within each park. The tabulation is provided for the convenience of the Contractor to determine the work required and to prepare a bid for the work. Lake personnel will show the Contractor the service limits and requirements during an on-site inspection of the areas where required services shall be performed. If the number of facilities listed on the tabulation sheets and maps differs from the number of facilities actually on the ground, then the tabulation sheets and maps will be used for contract purposes. This tabulation depicts all parks open at 100% with current facilities and does not reflect any future work such as remodeling, re-design upgrades, new construction, demolition or moving facilities within areas which may occur within required services areas during performance of contract. The Government reserves the right to perform any future work at its discretion and to modify any and all Schedules within the contract.

1.2.2.10 Frequency Schedules: The Frequency Schedule is provided in Attachment 3 for facility cleaning services required. Extra Services shall be required on specified days around the holidays of Easter, Memorial Day, 4th of July and Labor Day are also provided in Attachment 3 and included in Attachment 8 Supportive Documentation for Bid Schedule CLINS in Summer Totals).

1.2.2.11 Work Schedule: The Government will provide the Contractor with a preferred work schedule sequence for parks and/or areas at the lake for services to be performed. The Contractor must provide sufficient personnel and equipment to accomplish services at the lake. The Contractor shall submit a work schedule for each service for the lake to include approximate times for beginning work and ending work for each required service listed by parks or areas. Work schedules must be submitted within ten (10) days after the preferred work sequence has been issued to the Contractor, but no later than ten (10) calendar days after the beginning of initial services and prior to frequency changes. This work schedule is extremely important as it controls the time at which the Government’s Quality Assurance (QA) inspections are performed, ensuring that inspections are conducted only after the required services have been completed. Any variation or unforeseen change, such as being ahead or behind the approved work schedule, must be reported immediately by telephone or in person to the QAR. Any proposed change to an approved work schedule must be submitted in writing and approved by the Government in advance of actual work schedule changes.

1.2.2.12 Additional Service Work Requirements:

1.2.2.12.1 Restrictions: Raw lake water shall not be used for cleaning except on fishing piers and courtesy docks.

1.2.2.12.2 Occupied Facilities: If a facility is occupied by the public at the time of the scheduled servicing, the Contractor shall ask their permission to service the facility.

If the public objects to the performance of the service, the Contractor shall immediately record the unit (by park, facility type and number) on their DAR as a “non-serviced” unit. If the public allows partial cleaning, the Contractor shall note on their DAR as unit “occupied/cleaned” and the Contractor shall be paid the full price. If the facility becomes unoccupied while Contractor is still in the park, the Contractor shall service the unit as required and note the unit as “cleaned”. The DAR must be kept current during work performance so that a unit which was not serviced and was later rejected by the Government's QAI can be verified as non-performed because the facility was occupied by the public. A site that is confirmed as being occupied may then be counted as non-performance, rather than as a reject.

1.2.2.12.3 All Quality Control Inspectors and Subcontractors, if used, shall possess as a minimum a copy of that portion of the contract specifications which governs the work in which they are engaged. Failure to comply will result in cessation of work and removal of employees until such time that this requirement can be met.

1.2.2.12.4 Payment: Payment for completed and accepted work will be done on a monthly basis. The Contractor shall only invoice after the end of each month. When the monthly invoicing is submitted, the Contractor shall include all labor hours worked during the month for the submitted invoice.

1.2.2.13 Cleaning Services

1.2.2.13.1 General Grounds Cleanup: General Grounds Cleanup are performed according to the Frequency Schedule provided in Attachment 3 and in conjunction with other scheduled cleaning services, in order to leave the entire park or area with an overall neat and clean appearance by removing large refuse and conspicuous litter and fish/animal remains from the parks or areas, the limits of which are designated as the cleaning boundaries on the Cleaning Maps provided in Attachment 5. On the dam embankment road and in park areas with long entrance roads leading into the park proper, cleaning boundaries shall be one-hundred (100) feet off of each side of the road’s centerline, or to the tree or brush lines, or to the road right-of-way fence, whichever is closest. Hiking trailhead cleaning boundaries shall be twenty (20) feet each side of the trail center line to a distance of seventy five (75) feet from the start of the trailhead into the hiking trail(s). Litter collected shall be disposed of within bulk refuse receptacles and large refuse such as abandoned appliances, mattresses, barrels, furniture, etc., shall be removed from and disposed of off of Government property and not placed in bulk refuse receptacles. The Contractor will not be required to remove tree branches or timber or other natural drift deposited on shoreline during high water or by high winds. During low lake level periods, the water’s edge will be limited as specified in table below.

Low Lake Elevation General Grounds Cleanup Limit

Lake Normal Lake Elevation Limit Elevation

Canyon 909’ MSL 899’ MSL

1.2.2.13.2 Detailed Grounds Cleanup: Detailed Grounds Cleanup shall be performed within twenty (20) feet on all sides of the facilities, as described in each of the typical unit definitions and/or delineated on Typical Unit Drawings specified in Attachment 6 unless specified otherwise, as part of each scheduled facility cleaning day using any acceptable method to remove large refuse, fish/animal remains and all litter, including, but not limited to cigarette butts, glass, broken glass, bottle caps, paper, food scraps and can tabs within these areas surrounding facilities. All litter shall be properly disposed of in bulk refuse receptacles. Large refuse such as abandoned appliances, mattresses, barrels, furniture, etc., shall be removed from and disposed of off of Government property and not placed in bulk refuse receptacles. Detailed Grounds Cleanup, Para. 1.2.2.13.2 is considered part of the cleaning service for each facility and shall be included in the Contractor’s bid price for the facility cleaning.

1.2.2.13.3 Hazardous/Special Waste, Public-Generated: Public use areas will very infrequently contain hazardous/special wastes as defined by the Texas Commission on Environmental Quality. Examples of such wastes include but are not limited to used oil filters, tires, lead acid batteries, paint cans and/or dead animals. Contractor shall dispose of such waste found in accordance with Federal, State, County and Municipal laws, codes and regulations.

1.2.2.13.4 Performance Standards: General Grounds Cleanup, Para. 1.2.2.13.1 shall result in grounds with a neat and clean appearance, with all large refuse and conspicuous litter and fish/animal remains removed and properly disposed. Detailed Grounds Cleanup, Para.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .