RFIs_W9126G21B0027_MurrellParkEntrance_15Sep2021.pdf

PDF 466 KB Posted

Attached to
Murrell Park Front Entrance (Consturction) Road Repair and Repaving
Solicitation number
W9126G21B0027
Issued by

About this file

This solicitation is for road repair and repaving work at Murrell Park Front Entrance. The selected contractor will remove approximately two to four inches of existing asphalt on over 1,000 linear feet of park road averaging 15 to 25 feet wide, remove and replace the existing base course with eight inches of new flexible base, and install four inches of hot mix asphalt. An additional 750 linear feet of turnaround area will undergo similar removal and replacement of asphalt and base course, with four inches of asphalt applied. Around 90 linear feet of the turnaround will be repaved with eight inches of reinforced concrete. The contractor must also construct 1,500 linear feet of six by 18 inch concrete curbs. The solicitation was issued by the Department of the Army Corps of Engineers Fort Worth Engineering District.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI’s Murrell Park Front Entrance (Construction) Road Repair and Repaving

W9126G21B0027 15 Sep 2021

Q. Will this area of the park be closed during construction – OR – will Traffic Control be required?

Government Response: Traffic control will be required as per section 1.6 under the summary of work.

Q. The attachments did not address the culvert or ditch work. Is this work expected to be completed?

Government Response: Yes, it is mentioned in section 1.4.1.1