am_1.pdf

PDF 750 KB Posted

Attached to
WSMR Construct Earthen Covered Magazine
Solicitation number
W9126G21B0002
Issued by

View the file

Other files

File Type Posted
Bid Abstract_21B0002.pdf PDF
am_5.pdf PDF
am_4.pdf PDF
am_4.pdf PDF
SF1442.pdf PDF
am_3.pdf PDF
am_2.pdf PDF
WSMR ECM Site Visit Rosters.pdf PDF
g21b0002.pdf PDF
g21b0002_Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04 EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See SF30 Continuation Sheet(s)

NOTE: Proposal Receipt date is 09 August 2021; at 10:00 a.m.,CT, as previously announced.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer) (Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.

W9126G21B0002

X 9B. DATED (SEE ITEM 11)

09-Jul-2021

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

14-Jul-2021

CODE

US ARMY ENGINEER DISTRICT, FORT WORTH

ATTN: CESWF-CT

819 TAYLOR ST, ROOM 2A19

P.O. BOX 17300

FORT WORTH TX 76102-0300

W9126G 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODE CODE

EMAIL: TEL:

The Solicitation for the Construction of the Earthen Covered Magazine; White Sands Missile Range, New Mexico is amended as follows.

W9126G21B0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

CHANGES TO SOLICITATION W9126G21B0002

CHANGES TO DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

1. Section 00 21 30 SITE VISITS has been replaced in its entirety, each page bearing the notation W9126G21B0002-0001.

End of Summary of Changes

Construct Earthen Covered Magazine WS20ECM

SECTION 00 21 30

SITE VISITS

AMENDMENT 0001

PART 1 GENERAL

1.1 SITE VISITS

(a) Pursuant to Contract Clause "FAR 52.236-3, Site Investigation and Conditions Affecting the Work," and the Site Visit Clause in Section 00 21 00 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS prospective offerors will be permitted to inspect the site where services are to be performed and to satisfy themselves as to all general and local conditions that may affect the cost of performance of the Contract to the extent such information is reasonably obtainable. Offerors are urged and expected to inspect the site where the work will be performed. Site Visits will be by appointment only and may involve other bidders.

(b) Site visit information: The site visit will be:

Date: 20 July 2021 Time: 8:30 am to 4:00 pm MT <AM#0001> 9:00 am to 10:30 am MT, and 1:00 pm to 2:30 pm MT </AM#0001> Location: Building 102, located at the southwest corner of the intersection of Springfield Street and Headquarters Avenue, in the main cantonment area of White Sands Missile Range, NM. Participants will proceed to the project site together after signing in and receiving a site visit briefing at Building 102. Parking is available on site in theparking lot north of Building 102 located at the intersection of Springfield Street and Headquarters Avenue.

POC: Gage Blair EMAIL: gage.s.blair@usace.army.mil Phone: 575-678-2516 Mobile: 575-693-1608

POC: Roy Bonhorst EMAIL: roy.n.bonhorst@usace.army.mil Phone: 575-678-5644 Mobile: 575-892-2706

See Section 01 35 20.00 44 SPECIAL PROJECT PROCEDURES FOR WHITE SANDS MISSILE RANGE for Installation Entrance Requirements.

Offerors and subcontractors wishing to participate must submit a complete listing of all personnel to attend the preproposal site visit, via email, to the referenced Base Access POC, a minimum of three (3) calendar days prior to the preproposal site visit. Site visit appointments are limited to 90 minutes each. Include the following information for all attendees and subcontractors:

Offeror's and offeror's subcontractor personnel full names State Issued Driver's License,Firm

DOCUMENT 00 21 30 Page 1

W9126G21B0002-0001

Construct Earthen Covered Magazine WS20ECM

Personnel are required to wear masks during site visits, and maintain a distance of six (6) feet between individuals, where able. Contractors must provide their own masks.

NOTE: The U.S. Government will conduct a check of every individual submitted; this will include checking all law enforcement databases.

Persons with questionable criminal records or outstanding warrants will be denied access to the installation.

(c) In no event will a failure to inspect the site constitute grounds for withdrawal of a bid after bid opening or for a claim after award of the contract.

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

-- End of Section --

DOCUMENT 00 21 30 Page 2

W9126G21B0002-0001

AMENDMENT 0001
SUMMARY OF WORK
00 21 30 - SITE VISITS
PART 1 GENERAL
1.1 SITE VISITS
PART 2 PRODUCTS NOT USED
PART 3 EXECUTION NOT USED

File details come from the government source that posted it. Updated .